Loading...
HomeMy WebLinkAboutPWC Agenda 2025-06-17 and PacketAGENDA PUBLIC WORKS COMMITTEE June 17, 2025, 9:00a.m. ZOOM Link: https://us06web.zoom.us/j/81695207215 1. Approval of Minutes a. March 18, 2025 2. Member Comments/Concerns a. Consider Modifications to Agenda 3. Proposed 2026 Fleet Replacement 4. Proposed 2026 Capital Improvement Projects 5. NYSDOT Shared Services Agreement (1 year contract) 6. Public Works Facility Open House 7. Project Updates a. Streetlights b. PWF MEP c. TH Court Clerks/Mezzanine d. Town Hall Weatherization e. Site Design Manual f. Paving Updates g. Babcock Preserve # Equipment to be Auctioned / Traded & Replaced Useful Life Original Purchase Price Year Purchased Replacement Cost (Budgeted) Age of Equipment Since Purchased New Annual Repair Costs (2025) Lifetime Total Repair Costs (Parts and Labor) Projected Auction Price / Trade Mileage / Hours Green Fleet Options 20 2020 Ford F350 4 x 4 Supercab w/ plow 6 47,287.81$ 2020 70,000.00$ 5 $1,630.99 $13,789.00 110,093 no 67 2015 Ford F350 4x2 Crew Cab 10 31,849.30$ 2017 85,000.00$ 10 1,466.38$ $14,123.00 97,667 no 34 2018 Caterpillar Mini-Excavator 308E2 CR 7 119,712.00$ 2019 142,000.00$ 6 179.90$ $1,682.00 60,000.00$ 834 yes 36 2020 Kubota Tractor w/ attachments 5 40,908.66$ 2020 65,000.00$ 5 645.46$ $3,458.00 410 yes 45 2012 ODB Leaf Vacuum 15 21,970.00$ 2012 180,000.00$ 13 184.17$ $594.00 226 no 25 2014 Ford F-150 XLT Supercab 4x4 (Engineering)10 29,448.50$ 2014 75,000.00$ 11 156.61$ $7,100.00 41,957 yes 5 2014 International Tractor Truck 15 121,457.00$ 2013 200,000.00$ 11 690.38$ $24,195.00 62,955 yes T10 2014 Globe Trailer-LowBoy (Trailer for #5)15 58,820.00$ 2013 75,000.00$ 11 -$ $12,587.00 NA no Total Projected Auction Income 60,000.00$ New Equipment to be Added to the Fleet xx xxxxxxx 892,000.00$ Equipment to be Auctioned / Traded & Not Replaced T4 Trout River Flo Boy Trailer (use w/ Truck #5)15 98,633.00$ 53.38$ $3,368.00 49 2017 Gradall -XL3100 15 318,581.84$ 684.29$ $6,305.67 -$ 60,000.00$ 892,000.00$ 60,000.00$ 832,000.00$ Estimated Projected Auction Income Total Estimated Cost Including Items Sold Total Auction Income Town of Ithaca - Proposed Fleet Replacement Schedule 2026 Total New Equipment Total Projected Auction Income Total New/Replaced Equipment TOWN OF ITHACA Capital Improvements Plan 2026-2030 06/13/2025 Revision___, X/X/2025 PREPARED BY: TOWN OF ITHACA ENGINEERING DRA F T Page 1 of 11 CAPITAL IMPROVEMENT PLAN (CIP) Background The Capital Improvement Plan (CIP) is a planning and budgeting tool that provides information about the Town’s infrastructure needs over a five-year time frame. The plan is reviewed annually for need, cost, and priority. The plan is then incorporated into the annual Town budget. The Engineering Department is responsible for administering and shepherding the CIP through the review and approval process. Generally, capital improvements are defined as physical assets, constructed or purchased, that have a useful life of ten years or longer and a cost of $50,000 or more. Equipment and vehicles that are purchased are reviewed and approved separately under the Fleet Management Program. The accuracy of the proposed project cost estimates in the Capital Improvement Plan (CIP) varies. Estimates for projects scheduled to begin in the upcoming year tend to be more precise, while those planned for later years are generally less accurate. This is often because long-term projects have not yet undergone detailed technical review or analysis. In many cases, the complexity of these projects may require the involvement of professional consultants, especially when the scope exceeds the technical expertise of Town staff. Additionally, some projects depend on the completion of earlier phases, which adds further uncertainty to their cost estimates. Process The CIP process typically begins during the first 6 months of the year when town departments make requests or recommendations for future projects to the Engineering Department. Once a consensus has been reached between staff, the project is then incorporated into the draft CIP. The Engineering Department, in conjunction with the Public Works Department and Planning Department, creates project descriptions, cost estimates, and tentatively places the projects on the CIP. Public utility, facilities, and maintenance related projects are reviewed at the Public Works Committee, while proposed walkways, sidewalks, parks, and other recreational type facilities are generally reviewed by the Planning Committee. Based on the committee's recommendations, the CIP is further amended before it is sent to the Budget Committee where members will review and discuss the impact on the Town budget. The Budget Committee considers different funding scenarios for each project, including the use of fund balance, possible grant opportunities, and long-term financing (bonding). This is done to understand the potential implications on the tax levy and benefit rates. Once a funding mechanism has been determined, the CIP is then included in the Tentative annual budget. DRA F T Page 2 of 10 The Budget Committee may request projects to be reviewed and modified based on implications to the tax levy and benefit rates. If this occurs, the CIP will be reviewed, and revised if possible, to alleviate the implications identified by the Budget Committee. If time allows within the Town budget approval process, the Public Works Committee and Planning Committee will be updated on the Budget Committee comments and concerns and will be presented with a revised CIP if applicable. If time does not allow for these committee meetings to occur prior to budget adoption, the updates and revisions will be addressed at a Town Board meeting. If consensus between the Planning Committee, Public Works Committee, and Budget Committee cannot be met, the matter will be discussed and ultimately decided by the Town Board. Once the budget is presented to the Town Board, additional modifications may be requested. These modifications may require further review by the committees mentioned above to determine the impact before final adoption of the town budget - at which point the CIP is deemed complete for the year. DRA F T Date: Cash Capital Grant Bond Total A 1.6 $1,200,000 A 2.6 $25,000 $1,550,000 $450,000 $0 $2,000,000 A 3.6 $250,000 $0 $0 $250,000 A 4.6 $1,500,000 A 5.6 $200,000 A 6.6 $350,000 A 7.6 $200,000 A 8.6 $1,750,000 $1,800,000 $450,000 $0 $2,250,000 $1,500,000 $550,000 $200,000 $1,750,000 Cash Capital Grant Bond Total DB 1.$2,177,680 DB 2.$200,000 DB 3.7 $1,375,000 $1,375,000 DB 4.7 $680,000 $0 $0 $680,000 $800,000 $800,000 $800,000 $800,000 DB 5.7 $50,000 $800,000 $800,000 $800,000 DB 6.7 TBD $2,055,000 $0 $0 $2,055,000 $850,000 $1,600,000 $1,600,000 $1,600,000 Cash Capital Grant Bond Total A 1.8 In House A 2.8 $125,000 $0 $0 $125,000 A 3.8 $100,000 $75,000 $0 $175,000 A 4.8 $3,850,000 A 5.8 $1,500,000 A 6.8 $225,000 $75,000 $0 $300,000 $3,850,000 $1,500,000 $0 $0 Renwick Brook @ Texas Ln Ped Crossing Replacement 2025 2026 2027 2028 2029 2030FundSidewalks and Walkways Page Number Maple Ave Walkway Improvements 2027 2028 2029 Capital Improvement Program (CIP) 2026-2030 2030 Townline Bridge (Bridge NY for TC) Page Number Rt 96 Grant Submission Forest Home Improvements Study/Design Rt 96 Sidewalk Winthrop Dr Sidewalk 2029 20302025 Town Hall Mezzanine Clerk Project Town Hall Weatherization PWF Light Upgrades to LED Town Facilities Page Number 2026 2027 2028 Revision Date:6/13/2025 TH HVAC Upgrades or Alternative Implementation Fund Asset Type PWF Security Fence (Design and Grant 2027, Install 2028) PWF Electric Upgrade TH HVAC Evaluation and Alternative Feasibility Study TH Masonry Repair Evaluation, Design, Repair FH Bridge(s) Assessment FH Bridge(s) Maintenance 2026 Total: Total: Total: Fund Roads, Bridges, and Storm Conveyance 2025 Lower Stone Quarry Feasibility Study/Acquisitions/Design Lower Stone Quarry Construction Road Asphalt Replacement and Rehabilitation Page 3 of 10 DRA F T Date: Capital Improvement Program (CIP) 2026-2030 Revision Date:6/13/2025 Cash Capital Grant Bond Total A 1.8 A 2.8 $30,000 $0 $0 $30,000 $30,000 $30,000 $30,000 $30,000 A 3.8 $50,000 $30,000 $0 $0 $30,000 $80,000 $30,000 $30,000 $30,000 Cash Capital Grant Bond Total F 1.1,122,400 F 2.9 $500,000 $0 $0 $500,000 F 3.9 $0 $175,000 F 4.9 $1,350,000 F 5.9 $0 $550,000 F 6.9 $0 $600,000 F 7. 9 $0 $350,000 $500,000 $0 $0 $500,000 $1,525,000 $550,000 $600,000 $350,000 Coddington Rd Parking Construction Parks-Trails-Open Space Troy and Coddington Motor Drivers Replacement 2027 2028 2029 Fund Tburg Tank Main Replacement/Rehab and Hospital Redundancy Pine Tree Tank Rehab and Pinetree WM Upgrade; Hungerford PS Upgrade Valleyview Booster PS 2030 Iacovelli Playground and Parking Area Trail Overlay 2030 Stone Quarry Rd; Commonland; Winners Circ Wildflower Replacement Backup Generator Chris Circ Page Number 2025 2026 2027 2028 2029 Page Number 2025 2026 Total: Total: Fund Potable Water Page 4 of 10 DRA F T Date: Capital Improvement Program (CIP) 2026-2030 Revision Date:6/13/2025 Cash Capital Grant Bond Total G 1.Budget 2024 G 2.10 $300,000 $0 $0 $300,000 $300,000 $300,000 $300,000 $300,000 G 3.10 $60,000 $60,000 G 4.10 $0 $1,200,000 $360,000 $0 $0 $360,000 $1,500,000 $300,000 $300,000 $300,000 Cash Capital Grant Bond Total G 1.TBD TBD TBD TBD TBD G 2.TBD 3. 4. $0 $0 $0 $0 $0 $0 $0 $0 2026 2027 2028 2029 2030 A $2,580,000 $5,430,000 $2,080,000 $230,000 $1,780,000 B $0 $0 $0 $0 $0 DA $0 $0 $0 $0 $0 DB $2,055,000 $850,000 $1,600,000 $1,600,000 $1,600,000 F $500,000 $1,525,000 $550,000 $600,000 $350,000 G $360,000 $1,500,000 $300,000 $300,000 $300,000 2027 2028 2029 2030 2026 2027 Page Number 2028 2029 2030 2026 Mitchell St Sewer Upgrades Page Number 2025 IAWWTF CIP Inlet Valley Improvements Fund Sanitary Sewer Jointly Owned 2025 Total: Fund Totals Inclusive of Grant Funding Cherry St PS Total: Fund Town Sanitary Sewer Sewer Lining/MH Rehab Linderman Creek Rt 79 Crossing Repair Page 5 of 10 DRA F T Page 6 of 10 Project Descriptions Town Facilities Town Hall Weatherization Construction (2026) This project is the continuation of a multi-year endeavor. The intent of this project is to Weatherize the Town Hall Facility, excluding the leased Post Office area. This project includes insulating the exterior walls, replacing single pane glass with insulated glass within the historic windows, replacing exterior doors, air sealing, replacement of lighting fixtures with LED fixtures, installation of lighting controls, and other associated items. PWF Light Upgrade to LED & Site Lighting (2026) This project is the replacement and upgrade of the remaining interior lights at the PWF and installation of exterior lights near the parking areas. PWF Security Fence (2027) This project is the installation of a security fence, motorized gate, and access control system for the gate at the facility. PWF Electric Upgrade (2028) This project entails upgrading and/or adding an additional electric service to the building. Work within the building may include modifying existing breaker panels to redistribute circuits to different panels so only some circuits have generator back up and others would not. TH Masonry Repair Evaluation, Design, Repair (2028) This project would review the deterioration of the exterior of the Town Hall Facility, design repairs/remediation, and perform the repairs/remediation. TH HVAC Evaluation and Alternative Feasibility Study (2029) This project would review the condition of the existing HVAC and associated systems at Town Hall, review the loading, and determine if/what alternative heating systems would be feasible. TH HVAC Upgrades or Alternative Implementation (2030) This project would construct the items identified within the prior year study. DRA F T Page 7 of 10 Roads, Bridges, and Storm Conveyance Lower Stone Quarry Construction (2026) This project is the construction of the prior year study. This will be a multi-year project. The objective of this project is to improve drainage, sight lines, crash zones, and potential multimodal integration on the lower portion of Stone Quarry Rd within the Town. Road Asphalt Replacement and Rehabilitation (2026) This project is the removal, rehabilitation, and/or placement of asphalt materials on Town roads. This includes but is not limited to new asphalt layers, mill and fill overlays, new construction, recycling, and other technologies that have a useful life 10 years or greater. The following roads will be improved: • Penny Lane • Winners Circle • Lois Lane • Stone Quarry Road – approximately from house #353 South to the intersection of King Road West FH Bridge(s) Assessment (2027) This project is hiring a bridge engineer to review the condition, identify deficiencies, and create construction documents for the repair and maintenance for the Forest Home Bridge(s). FH Bridge(s) Maintenance (2028) This project is the repair and maintenance of the Forest Home Bridge(s). A bridge engineer will be hired in 2026 to review the condition, identify deficiencies, and create construction documents. DRA F T Page 8 of 10 Sidewalks and Walkways Rt 96 Grant (2026) This project is the submission of a grant application for the design and construction of a sidewalk from near the city/town line to Harris B Dates Dr. Renwick Brook @ Texas Ln Ped Crossing Replacement (2026) This project is the replacement of the trail bridge over Renwick Brook with a precast structure. Forest Home Improvements Study/Design (2026) This project is to retain active transportation planning and engineering services, community outreach support services (including community and stakeholder engagement), and agency strategic guidance for the Forest Home neighborhood. Rt 96 Sidewalk (2027) This project is for the design and construction of a sidewalk from near the town/city line to Harris B Dates Dr. Maple Ave Walkway Improvements This project includes the replacement of the existing walkway from the mid-block crossing to Pine Tree Rd. The walkway will be widened, relocated, and lighting added. Winthrop Dr Sidewalk (TBD) This project is for the construction of a sidewalk along Winthrop Dr. from Brandywine Dr to the mid-block crossing to Dewitt Middle School. Parks-Trails-Open Space Iacovelli Playground and Parking Area (2026) This project involves the design and construction of a replacement playground and playing courts. The proposed playground would be an inclusive playground. The project also will include the addition of ADA complaint parking spaces and a small amount of trail modifications. Trail Overlay (2026) This project is the renewal and/or replacement of existing trail surfaces. Coddington Rd Parking Construction (2027) This project is the construction of a new parking lot on an existing City of Ithaca owned fill area on Coddington Road. The project would also include a trail connection to the existing South Hill Rec Way. This project will need an easement from the City of Ithaca. There is the potential to apply for funding for portions of the project. DRA F T Page 9 of 10 Town Potable Water Projects Wildflower Replacement (2026) The Wildflower neighborhood in the East Hill area of the Town has experienced a high number of water main breaks. This project replaces approximately 1,100 linear feet of 8- inch ductile iron water main, fire hydrants, fittings, and appurtenances. Christopher Circle Emergency Backup Generator (2027) This project involves the installation of an emergency backup generator at the Christopher Circle Pump Station. This pump station provides water to the Sapsucker Woods Tank, which does not currently meet the Town minimum storage requirements. The project would consist of a generator, automatic transfer switch, and a new natural gas service. Pine Tree Tank Rehabilitation and Watermain Upgrade; Hungerford Pump Station Upgrade (2027) This project involves the replacement and upsizing of approximately 1,100 linear feet of water main along Pine Tree Road, along with either rehabilitation, replacement, or demolition of the existing Pine Tree Tank. An additional 600 linear feet of new water main along Park Lane as well as a Pressure Reducing Valve Vault to supplement the Pine Tree/Ellis Hollow tank zone during high flow scenarios may be required. Valleyview Booster Pump Station (2028) This project involves the installation of a water booster pump station for the Valley View neighborhood on West Hill to help supplement water pressure. The current pressure at the top of the system on Valley View Road is below the required minimum of 35 psi. This would also allow additional fluctuation of the West Hill Tank and possibly increase the available dwelling unit capacity within the tank. Trumansburg Tank Main Replacement/Rehabilitation and Hospital Redundancy (2029) This project involves the replacement/rehabilitation of the water main from the Trumansburg Rd Tank down to the water main tee at Trumansburg Rd, which was installed circa 1930s. The project would also include work to reconfigure portions of the system to allow bi-direction flow routes to Cayuga Medical Center. Troy and Coddington Road Pump Station Motor Driver Replacement (2030) This project involves the replacement of the motor drivers and control panels for the Coddington and Troy Road Water Pump Stations. These motor drivers were installed in the late 1970’s with the original pump stations. Parts availability is becoming difficult which jeopardizes operation and reliability. DRA F T Page 10 of 10 Town Sanitary Sewer Projects Sewer Lining/MH Rehab (Annually) This project is part of the Town efforts to combat inflow and infiltration within the Town of Ithaca sanitary sewer system. The work being performed depends on the specific project but generally includes lining and/or grout injection of sewer mains as well as manhole sealing and relining. Linderman Creek Rt 79 Crossing Repair (2026) This project is to correct an ongoing maintenance issue. There is a substantial sag in the pipe that is causing excessive grease buildup in the sewer main and blockages in certain cases. This project will remove the existing sewer main in this location and install a new main using the proper pipe supports to prevent sagging in the future. Mitchell St Sewer Upgrades (2027) There are portions of the Mitchell St sanitary sewer shed that are currently at or over their design capacity. The intent of this project is to increase various pipe diameters within the Mitchell St sewer system to accommodate existing and future sanitary sewer flows. Sanitary Sewer Jointly Owned IAWWTF CIP (2026) This project is an IAWWTF project administered by the City of Ithaca. The project is to create a Capital Improvement Plan (CIP) and to seek funding assistance to perform further design and implementation of the CIP. DRA F T