Loading...
HomeMy WebLinkAboutPWC Agenda 2025-09-16 and PacketAGENDA PUBLIC WORKS COMMITTEE September 16, 2025, 9:00a.m. ZOOM Link: https://us06web.zoom.us/j/81695207215 1. Approval of Minutes a. July 15, 2025 2. Member Comments/Concerns a. Consider Modifications to Agenda 3. Glenside Streetlight Removal Request 4. Yield Signs Forest Home Drive 5. Waldorf Sanitary Sewer Pump Station NYSDOT Surplus Property Request 6. CIP Final 7. Project Updates a. PWF MEP b. TH Court Clerks/Mezzanine c. Town Hall Weatherization d. Site Design Manual e. Enterprise f. Coddington Community Center DEPARTMENT OF ENGINEERING Stormwater, Sanitary Sewer, Potable Water, Roads, Parks, and Trails 114 Seven Mile Drive, Ithaca, N.Y. 14850 ENGINEERING@TOWN.ITHACA.NY.US PHONE: 607.273.1656 FAX: 607.272.6076 www.townithacany.gov TO: Town of Ithaca Public Works Committee FROM: Justin McNeal – Senior Civil Engineer Joseph Slater – Director of Public Works RE: Streetlight Removal Request at 204 Glenside Rd The Town of Ithaca Public Works Department received a request from Emily Zetkulic to remove the streetlight at 204 Glenside Rd. In accordance with the Streetlight Policy the applicant was required to submit a Streetlight Request through the Town’s permitting portal. As part of the request the applicant was required to submit a petition to the Town showing support for the removal of the existing streetlight. The Engineering Department produced a map titled “204 Glenside Rd Street Light Petition Area” (see attached) in accordance with the Streetlight Policy showing the Affected Area that the applicant must petition. The second attachment in this report is the petition that was signed by 6 of the 8 properties in the Affected Area. We used the NYSDOT Clear Crash Data Viewer to verify if there were any vehicle accidents within the Affected Area. A map of the crashes in the vicinity of Glenside Rd titled “Glenside Crash Data” has been attached in this report. According to the database there have been no recorded crashes in the vicinity of the streetlight that would be removed. Glenside Rd is a low volume residential street and there are currently no pedestrian facilities or crosswalks in the Affected Area. Sincerely, Justin McNeal Joseph Slater Senior Civil Engineer Director of Public Works Town of Ithaca Town of Ithaca Prop Damage Possible Injury Serious Injury FEE 1937 P13 M11 FEE 1937 P15 M11 FEE 1937 P8 M7 FEE 1937 P18 M13 FEE 1937 P14 M11 FEE 1994 P54 M41 11" X 17" PAPER (ANSI B) 60 FEETSCALE 1 INCH = TOWN OF ITHACA - TOMPKINS COUNTY TOWN OF ITHACA PUMP STATION SURPLUS REQUEST 2025-008 GRID NORTH SH 454 PSC 5356 PSC 5356 PSC 5356 PSC 5356 PSC 5356 FLORAL AVENUE EXTENSION - S.H. NO. 9281 ROUTE 13A FEE 1931 P6 M5 PSC 5356 FEE 1931 P6 M5 PSC 5356 PE 1937 P17 M12 PSC 5356 ITHACA ROAD - S.H. NO. 454 PERMANENT EASEMENT FOR DRAINAGE 136' +/- 115' +/- 116' +/- 98' +/- 61' +/- 15' +/- 14345+/- SQ. FT. 0.33+/- ACRE PROPOSED SURPLUS APPROXIMATE HIGHWAY BOUNDARY APPROXIMATE HIGHWAY BOUNDARY APPROXIMATE HIGHWAY BOUNDARY 33' (MIN.) Babcock Ridge Trail at Culver Road Preserve 9/11/2025 Trail and Site Enhancements, Grant 5/15/2024 $70,425.00 Total:$281,700.00 Design:$66,675.00 Contract:$66,675.00 Resolution:2024-46 Change Order:0 End Date:7/31/2025 Total:$66,675.00 Contract:Resolution: Change Order:End Date: Total: Contract:Resolution: Change Order:End Date: Total: Summary: S.Harris 9/11/2025 Project Progress Summary 217 Montgomery Street, Suite 1100, Syracuse, New York 13202 Environmental Design & Research, D.P.C. (EDR) 2022-118, 2023-052, 2024-46, 2025-050 Project: Contractor/Design Professional: Account Number(s): Resolutions: Bid Date: Type: CIP Budget: Date: Received seven bids on 9/10/2025. In the process of reviewing bids to award the project. Amendment Value: Amendment Value: Contract Authorized Value: Completed to Date:$63,341.25 Completed to Date: Completed to Date: East Shore Drive Bicycle and Pedestrian Safety Corridor Design 9/11/2025 Pedestrian and Bike Improvements/TAP Grant 5/19/2025 $286,600.00 Total:$1,146,400.00 Design:$165,000.00 Contract:$165,000.00 Resolution:2025-021 Change Order:0 End Date:12/31/2026 Total:$165,000.00 Contract:Resolution: Change Order:End Date: Total: Contract:Resolution: Change Order:End Date: Total: Summary: S.Harris 9/11/2025 Project Progress Summary Project: Date: Type: Bid Date: 17,669.74$ Contractor/Design Professional: Barton & Loguidice, DPC 443 Electronic Parkway, Syracuse NY 13088 Account Number(s): CIP Budget: Resolutions:2023-106, 2024-007, 2024-120, 2025-021 Contract Authorized Value: Completed to Date: Preliminary Design, revised PSP sent to DOT, in the process of reviewing the DAD. We briefly met with ICSD Deputy Superintendent to discuss the detectable warning strips that will need to be installed as part of the project. They were open to the idea, but wanted to discuss internally. Amendment Value: Completed to Date: Amendment Value: Completed to Date: 2024 Inlet Valley Sewer Improvement Project 9/9/2025 Pump station and conveyance route imrpovements 10/25/2024 Total:1,278,685$ Design:$45,496.00 Contract:$42,096.00 Resolution:2024-118 Change Order:0 End Date:1/1/2026 Total:$42,096.00 Contract:$0.00 Resolution: Change Order:0 End Date: Total:$0.00 Contract:Resolution: Change Order:End Date: Total: Summary: E.Rodgers 9/9/2025 Type: CIP Budget: Date: Subdivision shall go to planning board for approval on 9/16/2025. Permits from USACE and DEC have been received. Once property acquisition is complete final highway work permits will be submitted to DOT. The materials bid package is complete and will go out to bid on 9/12/2025. B&L is coordinating with NYSEG for approval of site chnages. Amendment Value: Amendment Value: Contract Authorized Value: Part A Completed to Date:$31,892.45 Completed to Date:$0.00 Completed to Date: Project Progress Summary TB 2024-095;TB 2024-100; TB 2024-101; TB 2024-118 Project: Contractor/Design Professional: Account Number(s): Resolutions: RFP Bid Date: Barton and Loguidice King Road West Box Culvert Replacement 9/10/2025 Stormwater Structure Rehabilitation N/A DB5112.501 Total:$350,000.00 Design:$41,600.00 Contract:$14,600.00 Part A Resolution:2024-034 Change Order:$2,900.00 Available End Date:9/27/2024 Total:$17,500.00 Contract:$41,600.00 Part B Resolution:2024-097 Change Order:$4,500.00 Available End Date:7/1/2025 Total:$46,100.00 Contract:$17,500.00 Part C Resolution:2025-093 Change Order:$0.00 End Date: Total:$17,500.00 Contract:$509,000.00 Construction Contract Resolution:2025-100 Change Order:$50,000.00 End Date: Total:$559,000.00 Summary: J McNeal 8/22/2025 Project Progress Summary Project: Date: Type: Bid Date: $14,600.00 Contractor/Design Professional: Barton & Loguidice, DPC 443 Electronic Parkway, Syracuse NY 13088 Account Number(s): CIP Budget: Resolutions:2024-034, 2024-097, 2025-093, 2025-100 Contract Authorized Value: Completed to Date: Bids were opened on 8/29, the low bid came in at $509k from R. DeVincentis. The resolution to award went before the board on 9/8/2025 and was approved via TB Reso 2025-100. The board also approved contracting with B&L for part C of the Design Contract for C&A as part of TB Reso 2025- 093. We are currently working on the contract ammendment. Amendment Value: Completed to Date: Amendment Value: Completed to Date:$37,550.00 Amendment Value: Completed to Date: MEP and Structural Improvements Porject PWF 9/9/2025 Total:$1,141,894.93 Design:$178,022.08 Contract:$116,170.33 Resolution:Multiple Change Order:$61,851.75 End Date:10/31/2025 Total:$178,022.08 Contract:$947,533.00 Resolution:2024-113 Change Order:$94,753.30 Approved Amount End Date:9/15/2025 Total:$1,042,286.30 Contract:Resolution: Change Order:End Date: Total:$0.00 Summary: E.Rodgers 9/9/2025 Waiting on Mechanical and Electrical Contract to complete controls and fire alarm work. Substanial completion has been issued to the General Contractor. Once Fire alarm is switched over to new control panel C&S will be on site to conduct a final walk through. Amendment Value: Authorized Value: Contracts Authorized Value: C&S Completed to Date:158,483.33$ Completed to Date:575,581.10$ Completed to Date: Multiple Prime Project Progress Summary 499 Col. Eileen Collins Blvd. Syracuse NY 13212 C&S Engineering 2024-015, 2024-034, 2024-117, 2024-133 Project: Design Professional: Account Number(s): Resolutions: Bid Date: Type: CIP Budget: Date: Townline Rd Bridge Replacement Design 9/11/2025 Bridge Replacement/BridgeNY for County 1/1/2024 Total:$2,342,000.00 Design:$323,000.00 Contract:$323,000.00 Resolution:2023-173 Change Order:0 End Date:12/1/2025 Total:$323,000.00 $92,891.82 Contract:Resolution: Change Order:End Date: Total: Contract:Resolution: Change Order:End Date: Total: Summary: S.Harris 9/11/2025 Date: Completed to Date: Draft Design Approval Document (DDAD) has been submitted to NYSDOT for comment and approval. Project Progress Summary 443 Electronic Parkway, Syracuse NY 13088 Barton & Loguidice, DPC 2023-173 Project: Contractor/Design Professional: Account Number(s): Amendment Value: Resolutions: Amendment Value: Contract Authorized Value: Completed to Date: Completed to Date: Type: CIP Budget: Bid Date: