HomeMy WebLinkAboutPWC Agenda 2025-09-16 and PacketAGENDA
PUBLIC WORKS
COMMITTEE
September 16, 2025, 9:00a.m.
ZOOM Link:
https://us06web.zoom.us/j/81695207215
1. Approval of
Minutes
a. July 15, 2025
2. Member Comments/Concerns
a. Consider Modifications to Agenda
3. Glenside Streetlight Removal Request
4. Yield Signs Forest Home Drive
5. Waldorf Sanitary Sewer Pump Station NYSDOT Surplus Property Request
6. CIP Final
7. Project Updates
a. PWF MEP
b. TH Court Clerks/Mezzanine
c. Town Hall Weatherization
d. Site Design Manual
e. Enterprise
f. Coddington Community Center
DEPARTMENT OF ENGINEERING
Stormwater, Sanitary Sewer, Potable Water, Roads, Parks, and Trails
114 Seven Mile Drive, Ithaca, N.Y. 14850
ENGINEERING@TOWN.ITHACA.NY.US
PHONE: 607.273.1656
FAX: 607.272.6076
www.townithacany.gov
TO: Town of Ithaca Public Works Committee
FROM: Justin McNeal – Senior Civil Engineer
Joseph Slater – Director of Public Works
RE: Streetlight Removal Request at 204 Glenside Rd
The Town of Ithaca Public Works Department received a request from Emily Zetkulic to
remove the streetlight at 204 Glenside Rd. In accordance with the Streetlight Policy the
applicant was required to submit a Streetlight Request through the Town’s permitting
portal. As part of the request the applicant was required to submit a petition to the Town
showing support for the removal of the existing streetlight. The Engineering Department
produced a map titled “204 Glenside Rd Street Light Petition Area” (see attached) in
accordance with the Streetlight Policy showing the Affected Area that the applicant must
petition. The second attachment in this report is the petition that was signed by 6 of the
8 properties in the Affected Area.
We used the NYSDOT Clear Crash Data Viewer to verify if there were any vehicle
accidents within the Affected Area. A map of the crashes in the vicinity of Glenside Rd
titled “Glenside Crash Data” has been attached in this report. According to the database
there have been no recorded crashes in the vicinity of the streetlight that would be
removed.
Glenside Rd is a low volume residential street and there are currently no pedestrian
facilities or crosswalks in the Affected Area.
Sincerely,
Justin McNeal Joseph Slater
Senior Civil Engineer Director of Public Works
Town of Ithaca Town of Ithaca
Prop Damage
Possible Injury
Serious Injury
FEE 1937
P13
M11
FEE 1937
P15
M11
FEE 1937
P8
M7
FEE 1937
P18
M13
FEE 1937
P14
M11
FEE 1994
P54
M41
11" X 17" PAPER (ANSI B)
60 FEETSCALE 1 INCH =
TOWN OF ITHACA - TOMPKINS COUNTY
TOWN OF ITHACA PUMP STATION
SURPLUS REQUEST 2025-008
GRID
NORTH
SH 454
PSC 5356
PSC 5356
PSC 5356
PSC 5356
PSC 5356
FLORAL AVENUE EXTENSION - S.H. NO. 9281
ROUTE 13A
FEE 1931
P6
M5
PSC 5356
FEE 1931
P6
M5
PSC 5356
PE 1937
P17
M12
PSC 5356
ITHACA ROAD - S.H. NO. 454
PERMANENT EASEMENT FOR DRAINAGE
136' +/-
115' +/-
116' +/-
98' +/-
61' +/-
15' +/-
14345+/- SQ. FT.
0.33+/- ACRE
PROPOSED SURPLUS
APPROXIMATE HIGHWAY BOUNDARY
APPROXIMATE HIGHWAY BOUNDARY
APPROXIMATE HIGHWAY BOUNDARY
33'
(MIN.)
Babcock Ridge Trail at Culver Road Preserve
9/11/2025
Trail and Site Enhancements, Grant
5/15/2024
$70,425.00 Total:$281,700.00 Design:$66,675.00
Contract:$66,675.00 Resolution:2024-46
Change Order:0 End Date:7/31/2025
Total:$66,675.00
Contract:Resolution:
Change Order:End Date:
Total:
Contract:Resolution:
Change Order:End Date:
Total:
Summary:
S.Harris 9/11/2025
Project Progress Summary
217 Montgomery Street, Suite 1100, Syracuse, New York 13202
Environmental Design & Research, D.P.C. (EDR)
2022-118, 2023-052, 2024-46, 2025-050
Project:
Contractor/Design
Professional:
Account Number(s):
Resolutions:
Bid Date:
Type:
CIP Budget:
Date:
Received seven bids on 9/10/2025.
In the process of reviewing bids to award the project.
Amendment Value:
Amendment Value:
Contract
Authorized Value:
Completed to Date:$63,341.25
Completed to Date:
Completed to Date:
East Shore Drive Bicycle and Pedestrian Safety Corridor Design
9/11/2025
Pedestrian and Bike Improvements/TAP Grant
5/19/2025
$286,600.00 Total:$1,146,400.00 Design:$165,000.00
Contract:$165,000.00 Resolution:2025-021
Change Order:0 End Date:12/31/2026
Total:$165,000.00
Contract:Resolution:
Change Order:End Date:
Total:
Contract:Resolution:
Change Order:End Date:
Total:
Summary:
S.Harris 9/11/2025
Project Progress Summary
Project:
Date:
Type:
Bid Date:
17,669.74$
Contractor/Design
Professional:
Barton & Loguidice, DPC
443 Electronic Parkway, Syracuse NY 13088
Account Number(s):
CIP Budget:
Resolutions:2023-106, 2024-007, 2024-120, 2025-021
Contract
Authorized Value:
Completed to Date:
Preliminary Design, revised PSP sent to DOT, in the process of reviewing the DAD.
We briefly met with ICSD Deputy Superintendent to discuss the detectable warning strips that will need to be
installed as part of the project. They were open to the idea, but wanted to discuss internally.
Amendment Value:
Completed to Date:
Amendment Value:
Completed to Date:
2024 Inlet Valley Sewer Improvement Project
9/9/2025
Pump station and conveyance route imrpovements
10/25/2024
Total:1,278,685$ Design:$45,496.00
Contract:$42,096.00 Resolution:2024-118
Change Order:0 End Date:1/1/2026
Total:$42,096.00
Contract:$0.00 Resolution:
Change Order:0 End Date:
Total:$0.00
Contract:Resolution:
Change Order:End Date:
Total:
Summary:
E.Rodgers 9/9/2025
Type:
CIP Budget:
Date:
Subdivision shall go to planning board for approval on 9/16/2025. Permits from USACE and DEC have been
received. Once property acquisition is complete final highway work permits will be submitted to DOT. The materials
bid package is complete and will go out to bid on 9/12/2025. B&L is coordinating with NYSEG for approval of site
chnages.
Amendment Value:
Amendment Value:
Contract
Authorized Value:
Part A
Completed to Date:$31,892.45
Completed to Date:$0.00
Completed to Date:
Project Progress Summary
TB 2024-095;TB 2024-100; TB 2024-101; TB 2024-118
Project:
Contractor/Design
Professional:
Account Number(s):
Resolutions:
RFP Bid Date:
Barton and Loguidice
King Road West Box Culvert Replacement
9/10/2025
Stormwater Structure Rehabilitation
N/A
DB5112.501
Total:$350,000.00 Design:$41,600.00
Contract:$14,600.00 Part A Resolution:2024-034
Change Order:$2,900.00 Available End Date:9/27/2024
Total:$17,500.00
Contract:$41,600.00 Part B Resolution:2024-097
Change Order:$4,500.00 Available End Date:7/1/2025
Total:$46,100.00
Contract:$17,500.00 Part C Resolution:2025-093
Change Order:$0.00 End Date:
Total:$17,500.00
Contract:$509,000.00 Construction Contract Resolution:2025-100
Change Order:$50,000.00 End Date:
Total:$559,000.00
Summary:
J McNeal 8/22/2025
Project Progress Summary
Project:
Date:
Type:
Bid Date:
$14,600.00
Contractor/Design
Professional:
Barton & Loguidice, DPC
443 Electronic Parkway, Syracuse NY 13088
Account Number(s):
CIP Budget:
Resolutions:2024-034, 2024-097, 2025-093, 2025-100
Contract
Authorized Value:
Completed to Date:
Bids were opened on 8/29, the low bid came in at $509k from R. DeVincentis. The resolution to award went before
the board on 9/8/2025 and was approved via TB Reso 2025-100.
The board also approved contracting with B&L for part C of the Design Contract for C&A as part of TB Reso 2025-
093. We are currently working on the contract ammendment.
Amendment Value:
Completed to Date:
Amendment Value:
Completed to Date:$37,550.00
Amendment Value:
Completed to Date:
MEP and Structural Improvements Porject PWF
9/9/2025
Total:$1,141,894.93 Design:$178,022.08
Contract:$116,170.33 Resolution:Multiple
Change Order:$61,851.75 End Date:10/31/2025
Total:$178,022.08
Contract:$947,533.00 Resolution:2024-113
Change Order:$94,753.30 Approved Amount End Date:9/15/2025
Total:$1,042,286.30
Contract:Resolution:
Change Order:End Date:
Total:$0.00
Summary:
E.Rodgers 9/9/2025
Waiting on Mechanical and Electrical Contract to complete controls and fire alarm work. Substanial completion
has been issued to the General Contractor. Once Fire alarm is switched over to new control panel C&S will be on
site to conduct a final walk through.
Amendment Value:
Authorized Value:
Contracts
Authorized Value:
C&S
Completed to Date:158,483.33$
Completed to Date:575,581.10$
Completed to Date:
Multiple Prime
Project Progress Summary
499 Col. Eileen Collins Blvd. Syracuse NY 13212
C&S Engineering
2024-015, 2024-034, 2024-117, 2024-133
Project:
Design Professional:
Account Number(s):
Resolutions:
Bid Date:
Type:
CIP Budget:
Date:
Townline Rd Bridge Replacement Design
9/11/2025
Bridge Replacement/BridgeNY for County
1/1/2024
Total:$2,342,000.00 Design:$323,000.00
Contract:$323,000.00 Resolution:2023-173
Change Order:0 End Date:12/1/2025
Total:$323,000.00 $92,891.82
Contract:Resolution:
Change Order:End Date:
Total:
Contract:Resolution:
Change Order:End Date:
Total:
Summary:
S.Harris 9/11/2025
Date:
Completed to Date:
Draft Design Approval Document (DDAD) has been submitted to NYSDOT for comment and approval.
Project Progress Summary
443 Electronic Parkway, Syracuse NY 13088
Barton & Loguidice, DPC
2023-173
Project:
Contractor/Design
Professional:
Account Number(s):
Amendment Value:
Resolutions:
Amendment Value:
Contract
Authorized Value:
Completed to Date:
Completed to Date:
Type:
CIP Budget:
Bid Date: