Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025 Misc. Water Main Replacement Project
Item #Item Description Unit Amount Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost 1 MOBILIZATION LS 1 $38,000.00 $38,000.00 $29,200.00 $29,200.00 $18,200.00 $18,200.00 $11,867.00 $11,867.00 $7,500.00 $7,500.00 2 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1 $19,000.00 $19,000.00 $3,800.00 $3,800.00 $10,000.00 $10,000.00 $5,390.00 $5,390.00 $5,000.00 $5,000.00 3 8-INCH POLYWRAPPED WATER MAIN IN SHOULDER/ VEGETATION LF 425 $138.50 $58,862.50 $225.00 $95,625.00 $132.00 $56,100.00 $128.00 $54,400.00 $105.00 $44,625.00 4 8-INCH GATE VALVES, VALVE BOXES, AND COVERS EA 3 $4,225.00 $12,675.00 $3,075.00 $9,225.00 $2,500.00 $7,500.00 $3,275.00 $9,825.00 $2,600.00 $7,800.00 5 6-INCH GATE VALVES, VALVE BOXES, AND COVERS EA 1 $2,175.00 $2,175.00 $2,500.00 $2,500.00 $1,800.00 $1,800.00 $2,549.00 $2,549.00 $2,000.00 $2,000.00 6 REMOVE EXISTING HYDRANT ASSEMBLY COMPLETE EA 2 $1,010.00 $2,020.00 $2,000.00 $4,000.00 $3,000.00 $6,000.00 $1,283.00 $2,566.00 $750.00 $1,500.00 7 HYDRANT ASSEMBLY COMPLETE EA 3 $8,025.00 $24,075.00 $11,100.00 $33,300.00 $10,000.00 $30,000.00 $8,866.00 $26,598.00 $8,500.00 $25,500.00 8 DRY CONNECTION #1 TO EXISTING WATER MAIN ON SLATERVILLE LS 1 $4,000.00 $4,000.00 $8,500.00 $8,500.00 $10,000.00 $10,000.00 $4,631.00 $4,631.00 $12,500.00 $12,500.00 9 1-INCH TYPE K COPPER SHORT WATER SERVICE CONNECTION EA 1 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $2,000.00 $2,000.00 $2,618.00 $2,618.00 $2,000.00 $2,000.00 10 1-INCH TRENCHLESS TYPE K COPPER LONG WATER SERVICE CONNECTION EA 5 $4,575.00 $22,875.00 $15,000.00 $75,000.00 $6,500.00 $32,500.00 $4,510.00 $22,550.00 $4,000.00 $20,000.00 11 COMPACT DUCTILE IRON WATER MAIN FITTINGS (A.O.B.E.)LBS.100 $4.00 $400.00 $40.00 $4,000.00 $8.00 $800.00 $11.00 $1,100.00 $7.00 $700.00 12 ADDITIONAL WASHED STONE (A.O.B.E.)TON 25 $40.00 $1,000.00 $100.00 $2,500.00 $40.00 $1,000.00 $66.00 $1,650.00 $65.00 $1,625.00 13 SPECIAL GRAVEL BACKFILL (A.O.B.E.)TON 50 $35.00 $1,750.00 $60.00 $3,000.00 $50.00 $2,500.00 $66.00 $3,300.00 $50.00 $2,500.00 14 ADDITIONAL 1-INCH K-COPPER PIPING LF 60 $50.00 $3,000.00 $235.00 $14,100.00 $60.00 $3,600.00 $70.00 $4,200.00 $15.00 $900.00 15 MISCELLANEOUS IMPROVEMENTS LS 1 $15,880.00 $15,880.00 $31,750.00 $31,750.00 $54,000.00 $54,000.00 $8,657.00 $8,657.00 $21,500.00 $21,500.00 Item #Item Description Unit Amount Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost A1-1 8-INCH POLYWRAPPED WATER MAIN IN PAVEMENT LF 675 $380.00 $256,500.00 $417.00 $281,475.00 $300.00 $202,500.00 $140.00 $94,500.00 $255.00 $172,125.00 A1-2 8-INCH GATE VALVES, VALVE BOXES, AND COVERS EA 3 $4,225.00 $12,675.00 $4,000.00 $12,000.00 $2,500.00 $7,500.00 $3,845.00 $11,535.00 $2,750.00 $8,250.00 A1-3 4-INCH TEMPORARY MAIN LS 1 $48,000.00 $48,000.00 $100,500.00 $100,500.00 $106,000.00 $106,000.00 $20,944.00 $20,944.00 $40,500.00 $40,500.00 A1-4 REMOVE EXISTING HYDRANT ASSEMBLY COMPLETE EA 1 $1,010.00 $1,010.00 $1,500.00 $1,500.00 $3,000.00 $3,000.00 $1,711.00 $1,711.00 $750.00 $750.00 A1-5 HYDRANT ASSEMBLY COMPLETE EA 2 $8,025.00 $16,050.00 $12,500.00 $25,000.00 $11,000.00 $22,000.00 $9,721.00 $19,442.00 $8,500.00 $17,000.00 A1-6 DRY CONNECTION #A-1 TO EXISTING WATER MAIN LS 1 $4,000.00 $4,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $5,184.00 $5,184.00 $7,500.00 $7,500.00 A1-7 DRY CONNECTION #A-2 TO EXISTING WATER MAIN LS 1 $4,000.00 $4,000.00 $5,525.00 $5,525.00 $10,000.00 $10,000.00 $5,184.00 $5,184.00 $5,000.00 $5,000.00 A1-8 1-INCH TYPE K COPPER SHORT WATER SERVICE CONNECTION EA 4 $2,000.00 $8,000.00 $6,000.00 $24,000.00 $3,000.00 $12,000.00 $2,864.00 $11,456.00 $3,000.00 $12,000.00 A1-9 1-INCH SLEEVED TYPE K COPPER LONG WATER SERVICE CONNECTION EA 3 $3,200.00 $9,600.00 $35,000.00 $105,000.00 $7,000.00 $21,000.00 $5,890.00 $17,670.00 $4,500.00 $13,500.00 BID TAB 10-17-2025 Bid Alternate #1 - C101 JP REILLY CONSTRUCTION, L.P.BOLAND'S EXCAVATING & TOPSOIL, INC. Base Bid - C100 BOLAND'S EXCAVATING & TOPSOIL, INC. $320,000.00 JP REILLY CONSTRUCTION, L.P. BID TOTAL = $207,712.50 $187,626.00 CASINELLA EXCAVATING LLC. $276,625.00 2025 Miscellaneous Water Main Replacement Project Phase 1 WENZEL LANDSCAPING, LLC $161,901.00 CASINELLA EXCAVATING LLC. $155,650.00 WENZEL LANDSCAPING, LLC BID TOTAL = $359,835.00 $565,000.00 VACRI CONSTRUCTION CORPORATION $236,000.00 VACRI CONSTRUCTION CORPORATION $394,000.00