Loading...
HomeMy WebLinkAbout2024 Sanitary Sewer Rehab Project Re-Bid Tab 9-27-2024Item #Item Description Unit Amount Unit Cost Total Cost Unit Cost Total Cost 1 MOBILIZATION LS 1 $500.00 $500.00 $10,000.00 $10,000.00 2 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1 $500.00 $500.00 $10,000.00 $10,000.00 3 PRE-CCTV INSPECTION LF 12211 $2.55 $31,138.05 $6.75 $82,424.25 4 POST-CCTV INSPECTION LF 12211 $2.25 $27,474.75 $1.00 $12,211.00 5 INSTALLATION OF INITIAL 3-FOOT LONG 8-INCH CURED IN PLACE PIPE (CIPP) SPOT REPAIR LF 14 $1,500.00 $21,000.00 $2,300.00 $32,200.00 6 ADDITIONAL 8-INCH CURED IN PLACE PIPE (CIPP) SPOT REPAIR LF 7 $150.00 $1,050.00 $100.00 $700.00 7 PRESSURE TESTING AND MECHANICAL GROUTING OF MAINLINE JOINTS Ea 940 $34.00 $31,960.00 $36.00 $33,840.00 8 PRESSURE TESTING AND MECHANICAL GROUTING OF SERVICE CONNECTIONS Ea 174 $650.00 $113,100.00 $500.00 $87,000.00 9 CHEMICAL GROUT MATERIAL Gal 279 $10.00 $2,790.00 $10.00 $2,790.00 10 8-INCH X 4-INCH 360º LATERAL T-LINER Ea 3 $3,400.00 $10,200.00 $5,000.00 $15,000.00 11 8-INCH X 6-INCH 360º LATERAL T-LINER Ea 2 $3,400.00 $6,800.00 $4,000.00 $8,000.00 12 LATERAL CUTS AS ORDERED BY ENGINEER (A.O.B.E.)Ea 3 $100.00 $300.00 $200.00 $600.00 TOTAL $246,812.80 $294,765.25 BID TAB 9-27-2024 Sanitary Sewer Rehabilitation Project NE 2024 Sewer Specialty Services Co., Inc National Water Main Cleaning Co.