Loading...
HomeMy WebLinkAboutPB 2024-025 Maplewood Phase II Recom PDZ to TB PB Resolution 2024-025: Recommendation to the Town Board Proposed Planned Development Zone – Maplewood Phase II Project Maple Avenue, Town of Ithaca Tax Parcel No.’s 63.-2-5, 63.-2-6, 63.-2-7.1, and 63.-2-7.3 Town of Ithaca Planning Board December 17, 2024 Whereas: 1. This is consideration of a Recommendation to the Town Board Regarding the Proposed Rezoning for the Maplewood Phase II Project on Maple Avenue, located between the Maplewood Graduate Student Apartment complex and the East Lawn Cemetery. The project, which requires a rezoning from Multiple Residence and High Density Residential Zones to a Planned Development Zone (PDZ), involves consolidating four parcels and constructing six (6) five-story apartment buildings, containing 615 units/800 beds in studio, one bedroom, and two-bedroom unit configurations. The project will also include integrated amenity/service spaces, parking areas, trails and pedestrian facilities, open spaces, stormwater facilities, and other site improvements. The project is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. Cornell University, Owner/Applicant; Michele Palmer, Whitham Planning, Design, Landscape Architecture, PLLC, Agent, 2. The Maplewood Phase II development project has been determined to be consistent with the Town Comprehensive Plan, which included the project site in the “TND High Density” category, intending the area for a mix of higher density housing types “built to create an intentional neighborhood with linkages and proximity to services, employment, public transit, and recreational areas,” 3. The consultant team drafted language for a Maplewood II Planned Development Zone (PDZ) that utilizes a form-based code approach to guide and regulate the form of the development, following the formatting and language used in the Maplewood Graduate and Professional Student Housing Redevelopment Project PDZ (PDZ No. 16), 4. The Town of Ithaca Planning Committee reviewed the draft Maplewood Phase II PDZ language at their meetings on June 20, 2024, July 18, 2024, August 15, 2024, and September 16, 2024, and referred the draft language to the Town Board for referral to the Planning Board, 5. The consultant team, along with Greystar, a developer/owner/manager of collegiate housing, presented the development proposal and draft PDZ to the Town Board on October 7, 2024, where the Town Board, via resolution, then referred the draft PDZ to the Planning Board for review and a recommendation, and 6. The Planning Board, at a public hearing on December 17, 2024, has reviewed, discussed, and considered the draft Maplewood Phase II PDZ language; Now, therefore be it resolved: That, per Town Code §270-181 (F), the Planning Board hereby recommends that the Ithaca Town Board adopt a local law creating a Planned Development Zone for the Maplewood Phase II Project, with the recommended changes outlined in the draft document titled “Draft Maplewood II PDZ- for 12-17-24 Planning Board meeting.” Moved: Fred Wilcox Seconded: Sara Reynolds Vote: Ayes: Fred Wilcox, Caitlin Cameron, Cindy Kaufman, Bill Arms, Gary Stewart, Liz Bageant, and Sara Reynolds