1. Ithaca Fire Department Quarterly Report—Chief Moody
2. Tompkins County Wayfinding presentation—Whitham Planning & Design on behalf of
Tompkins County Chamber of Commerce
3. Green New Deal annual report—Town Sustainability Planner Hilary Swartwood
4. Committee Reports
a) Budget
b) Codes & Ordinances
c) Personnel and Organization/ERC
d) Planning
e) Public Works
f) Others
o CWIO
o Parks, Trails, Preserves &Recreation
o TCCOG
5. Consent Agenda
a. Approval of Town Board Minutes
b. Approval of the Town of Ithaca Abstract
c. Appointment of Court Attendants
d. Appointment of Planning Board Member
6. Review of Correspondence
TOWN OF ITHACA
„ NEW YORK
Green New Deal Action Plan
Overview
In March 2020,the Town of Ithaca adopted a resolution in support of a Green New Deal(GND).The resolution included the
development of a GND Action Plan,which describes how to achieve the Town of Ithaca goals for government operations and the
broader community. The Action Plan should be thought of as a road map that provides a path for implementation by detailing specific
actions and deliverables.
Key Goals
1. Meet the electricity needs of Town government operations with 100%regionally sourced renewable electricity by 2025
2. Reduce emissions,or create offsets,from the Town fleet of vehicles by 50%from the 2010 levels by 2025
o Reduce emissions by at least 10%
o Offset remaining emissions
3. Achieve an equitable transition to carbon-neutrality town-wide by 2030
o Reduce net emissions by at least 85%through efficiency,conservation,and renewable energy
o Sequester carbon in the Town
o Offset remaining GHG emissions through regional initiatives
The Process: Goal Setting&Review
Specific goals will be identified for 2-year periods and will be re-evaluated annually by the Planning Committee and Town Board.
During the year,updates will be given periodically to the Planning Committee as a way to continually assess progress.The goals in
the accompanying table are for 2025-2026.
In order for the Town to achieve its goals it will include a range of topics,as determined by the Town's Comprehensive Plan. These
include Institutionalization of Sustainability(EC-1);Buildings and Infrastructure(EC-2);Municipal Water and Wastewater(EC-3);
Transportation(EC-4);Renewable Energy Production(EC-5);Waste Generation and Sustainable Purchasing(EC-6);and Community
Resilience and Adaption(EC-7).Not every topic will be included in each new version of the Action Plan: only those actions which the
sustainability planner has direct or partial involvement with will be listed.
When identifying and evaluating goals for the Action Plan,the Town will:
• incorporate the energy and climate protection goals and recommendations from the Town's Comprehensive Plan
• incorporate policy,cost and staffing implications
• seek community input and collaborative approaches,when appropriate
• develop metrics to adhere to equity principles outlined in the Town's Green New Deal resolution
• support exploration of grant opportunities,including federal and state,to aid implementation of GND initiatives
• integrate across all components of the Town's organization and work
• tap into knowledge,research,and creativity
• coordinate to the fullest extent possible with City of Ithaca,Tompkins County,and other municipalities
• utilize a decision-making process that factors in: Town's goals,meeting residents'needs,prosperity and vibrancy,and the
environmental health of the community
• track and report on progress towards achieving goals
• consider the costs of environmental externalities
Roles and Responsibilities
• Role of Town Board:to provide policy leadership for the Town's Green New Deal initiatives
• Role of Management:to provide management direction for policies and initiatives
• Role of Planning Committee:annually evaluate priorities and initiatives of the Green New Deal
• Role of Departments:to implement policies and initiatives
• Role of Town Residents:to educate each other and collaborate with the Town,as appropriate
• Partnerships/Collaborations:to collaborate with municipalities,community institutions,and organizations to achieve mutual
sustainability goals
1
Green New Deal Action Plan 2025- 2026
Howwe measure progress
GND-1 EC-1-B Complete government operations greenhouse gas inventory in 2025. High Sustainability Government Operations Greenhouse Gas Inventory completed and
approved by Town Board in 2025.
Explore incorporating internal(TOI)cost of carbon into project Sustainability,Finance,Planning, Create an analysis of possiblewaysto incorporate cost of planning
GND-1 EC-1 A selection and planning(e.g.,through CIP and/or budget process). Medium Engineering,Public Works into project selection and presentto management
Institutionalization of
Sustainabitity GND-3 EC-1-A
Develop a plan on how to best incorporate equity principles into High Sustainability,Planning Provide a draft analysis and scope of work to Town Supervisor and
decision-making processes Directorof Planning
Use Town newsletter and website to encourage/enable Town Revise website to be more accessible.Update website quarterly.
GND-3 EC-1-A residents,employees,and other stakeholders to help create a vibrant Medium Sustainability Provide sustainability updatestothe Town newsletter.
and healthy community.
GND-1 EC-2-B Implementand amend the Ithaca Energy Code Supplement(Chapter High Sustainability,Codes&Zoning Amended code approved by Town Board and NYS
135 of Town Law)
GND-3 EC-2-C Manage the lECS Implementation Assistance Program Medium Sustainability,Codes&Zoning Numberof projectsthat utilize thefree assistance program
GND-1 EC-2-B Participate inthe NYSERDA Stretch to Zero(STZ)pilot program High Sustainability,Codes&Zoning Participation in each quarterly meetingand receive$200kin grantfunds
Continue planning and implementation towards goal of net-zero Sustainability,Engineering, Town Hall weatherization study completed in 2025 and successfully
Infrastructure GND-1 EC-2-D High
government facilities(Town Hall and Public Works). Planning,Finance applyforgrants
GND-3 EC-2-A StayinformedofCROWDand related policies(local and statelevel) Medium Sustainability Update Town Supervisor and other interested partieson
for deconstruction/construction waste recycling deconstruction policies and develop a potential scope of work
GND-1 EC-2-D Explore grant and funding opportunities to support Green New Deal Medium Sustainability,Finance Updated listofpotentialgrant,rebate,and incentive programs
initiatives
GND-2 EC-4-B Investigate implementation of EVcharging stations town-wide High Sustainability,PublicWorks Collaborate with internal departmentsto determine feasibility of EV
charging stations throughout the Town
Transportation GND-2 EC-4-B Analyze and monitor Town fleet with the annual Green Fleet Inventory High Sustainability,Public Works Complete Inventory and present analysis to Town Public Works
Committee annually(summer)
GND-2 EC-4-B Reviewand revisethe Town's Green Fleet Policy in 2025 High Sustainability,Public Works,Town Revised policyapproved by Town Board by December2025
Supervisor
Continue partnership with City of Ithaca and Local Power to advance
GND-3 EC-S-D the creation of a Community Choice Aggregation(CCA)program High Sustainability Launch CCA program when local administrators are approved by NYS.
Renewable Energy (Chapter 144 of Town Law)
Production
GND-3 EC-5-B In partnership with the City of Ithaca and Local Power develop a High Sustainability Final DER Plan approved by Town Board.
Distributed Energy Resource(DER)Plan
Waste Generation& GND-3 EC-6-D Reviewand,if needed,revise the Gren Procurement policy. High Sustainability,Human Resources Revised policy approved by Town Board by December2025
Purchasing
GND-3 EC-7-B
Stay informed of NYS CLCPA implementation and related NYS Medium Sustainability Continually update TownSupervisorand other interested parties on
policies. NYS climate and energy policy.Use this to inform Town policy.
2
In
010,
�.
4 \ 'S• � a' _14-.� �, i3: «. �; Sy�f. j� '1. r; .� �r S/��� '��• Fig
t�P# 1 / +-� -J� r .f i. `�. t•
id
ft,
.yam � �_ �� •'
OCR
40
Vv
y ", r
LZ
Green New Deal Plam
I
Action
Progress Report
Swartwood, 00'r
Hilary Sustainabitity Planner tv 'YO
Town of • : • . • 0000
April 27, 2026
Agenda
Sustainability Planner: What does she do?
Green New Deal (GND) Action Plan Process
GND + Comprehensive Plan Overview -
GND Action Plan 2025- 2026
Status of Government Operations: Transitioning to 100% Regionally
Sourced Renewable Energylop
Status of Town Vehicle Fleet: Emission Trends
Status of Town Vehicle Fleet: Challenges & Focus Areas
Major Accomplishments since the Adoption of the 2020 Green New
Deal
Resources
04/27/2026 ®TOWN OF ITHACA
NEW YORK
Sustainability Planner: What does she do?
This is a general overview,these percetages fluctuate depending on the programs/projects. Percentages are based on work done in one week(5 days, 35
hours).
Sustainability Programs: Tompkins Green Energy
Network (CCA + Own Your Power), Green Fleet Capital Projects: Town Hall Weatherization,
o Inventory, Clean Energy Communities (CEC), Incorporating/ institutionalizing Sustainability
23/o Green New Deal Action Plan, Energy and Climate 17o� and equity in Town processes (like Capital
Protection Chapter of the Comprehensive Plan, Improvement Project (CIP))
Town Building Electrification, Ithaca Energy Code
Supplement (IECS).
Partnerships: Tompkins County Climate
Protection Initiative (TCCPI), Climate and Administration: Website updates, email,
17% Sustainable Energy Advisory (CaSE) Board, 2030 11/ timesheets, HR forms, grant management,
District, Circular Reuse and Zero Waste project management, etc.
Development (CROWD), Town Meetings,
Intermunicipal meetings, community meetings,
etc.
Professional Development: Urban Sustainability
Regulatory Projects: IECS, Gov't Operations GHG Directors Network (USDN) participation, ICLEI
17% Inventory, Green Procurement policy review, 14% participation, certificate programs, continuing
Deconstruction analysis education (conferences, workshops, webinars)
04/27/2026 ®TOWN OF ITHACA
NEW YORK
The Action Plan is a living New goals are developed The Planning Committee
document that provides a based on the Comprehensive assesses progress annually.*
path for implementation by Plan, progress reviews and This helps Town staff
detailing specific actions and input from internal and prioritize actions for the next
deliverables. external partners. two years.
Updates are provided The Sustainability Planner
periodically to the Planning acts as the project / program Changes are incorporated
Committee throughout the manager for the Green New and reported to the Town
Deal Action Plan. Tasks are Board.
Green New Deal Action Plan Process
year.** designated by department.
*This is a change from 2025.Instead of assessing progress every 2 years,as was done
previously,the Planning Committee recommends moving to an annual update.
"This is a change from 2024.Instead of reconvening the GND Action Plan Committee
_ every year,the review process
TOWN 1
14 1 • NEW 1 '
Cq
Green New Dead Comprehensive Plan
O • Incorporate sustainability and climate protection into Long-
Achieve an equitable transition to carbon- term planning [EC-1]
=; neutrality town-wide by2030
Reduce energy consumption and greenhouse gas emissions
in buildings and infrastructure [EC-2]
0000
;�- Meet electricity needs of Town government
�.. � Reduce energy consumption and greenhouse gas emissions
operations with 100% regionally sourced related to treatment and distribution [EC-3]
renewable electricity by 2025
Reduce energy consumption and greenhouse emissions in
0000, ' transportation [EC-4]
Reduce emissions from the Town fleet o
%qo i i 4 vehicles by 50% from 2010 levels by 2025 Encourage and facilitate production and use of renewable
- energy [EC-5]
Reduce greenhouse gas emissions related to waste
generation and purchasing [EC-6]
••• • Build a resilient community by preparing for adapting to
impacts of climate change [EC-7]
04/27/2026 .'n TOWN OF ITHACA
NEW YORK
How we measure progress 2026 Progress
GND-1 EC-1-13 Complete government operations greenhouse gas inventory in 2025. High Sustainability Government Operations Greenhouse Gas Inventory completed Progress delayed:Approval will be in second quarter of 2026.Significant
and approved by Town Board in 2025. late discrepancies have stymied progress.
Sustainability,Finance, No Progress:other projects took precedent over this analysis-"green
GND-1 EC-1-A Explore incorporating internal(TOI)cost d carbon into project selection Medium Planning,Engineering,Public Create an analysis t possible ways to incorporate cost a ;nergy"projects are considered in CIP selection,but cost of carbon is not
and planning(e.g.,through CIP and/or budget process).M� - Works planning into project selection and present to management 3onsidered.
of Sustainability GND-3 EC-1-A Develop a plan on how to best incorporate equity principles into decision- High Sustainability,Planning Provide a draft analysis and scope of workto Town Supervisor No Progress:a good projectfor the summer internship program
making processes and Director of Planning
bsite Completed and Ongoing:The website was revised in summer 2025.
GND-3 E wn Vewsletter updates have gone out periodically(based on relevant
So far in 2025 and 2026, of the 17 total actions: information).
GND-1 E -omplete:the Town adopted net-zero appendices for commercial and
are
construction.
GND-3 E 7 actions are completer] e program Complete:the program was shuttered do to lack of participation.
GND-1 F e$200k in complete:The grant was completed and money was received.
Buildings and 2 actions are completed with ongoir ,b progress
5 and complete and Ongoing:Applied for NYS grant,USDN grant,NYSERDA grant,
Infrastructure GND-1 F and Preservation Fund Grant.Weatherization study is not yet complete byTY
_in.TH Weatherization study is not yet completed.
3 actions a r e ongoing (no definitive deadline/ -omplete:A plan of action was completed in first quarter of 2025.A non-
GND-3 E ties a oinding resolution was passed in March 2026.Next Step:get access to
productattached) cope of work :echnical assistance from CROWD.
GND-1 E ive programs Dngoing:research is done as needed.
■
GND-2 E 3 actions are a e La ye d but progressing ne feasability Dngoing:The Town plans to reach out to EV Charging company and discuss
options in 2026.
Transportation GND-2 E Public Works Progress delayed:there was a significant data discrepancy in the emissions
2 actions are not progressing Jata last year that we are solving.Will be back on track this year(2026).
GND-2 E iber2O25 -omplete:after internal review,it was determined that no changes needed
o be made to the Green Fleet policy.
GND-3 EC-5-D creation of a Community Choice Aggregation(CCA)program(Chapter 144 High Sustainability Launch CCA program when local administrators are approved complete:CCA launched in the first quarter of 2026.
........=_...... ... of Town Law) by NYS.
Production
GND-3 EC-S-B In partnership with the City of Ithaca and Local Power develop a High Sustainability Final DER Plan approved by Town Board. complete:The Town finalized contract docs and DER Plan with Local Power
Distributed Energy Resource(DER)Plan and Town Board.Awaiting MOU between City and Town of Ithaca.
.Progress delayed:Town staff met a few times to discuss new direction
GND-3 EC-6-D Review and,if needed,revise the Gren Procurement policy. High Sustainability,Human Revised policy approved by Town Board by December 2025 combine Green procurement and procurement into one policy).But other
Resources projects took precedence over proceeding further in 2025.Looking at 2026
approval.
Community Continually update Town Supervisor and other interested Ongoing:as relevant topics come up,I provide updates to Town Supervisor
Resiliency& GND-3 EC-7-B Stay informed of NYS CLCPA implementation and related NYS policies. Medium Sustainability parties on NYS climate and energy policy.Use this to inform and Director of Planning.
Adaption Town policy.
04/27/2026 6
Status of Government Operations:
Transitioning to 100% Regionally
Sourced Renewable Energy: Off Upstate Energy (Zones A-E)
Track `"% '�`
Key Focus Areas
Challenges Launched Community 2023 Production Ewa
y lwcleRpdmar 27,522
Choice Aggregation and • Wod 24.8892 20
va Nta
N Solar 60 I
Political Own Your Power w • 61fierRenewablcs 1
O • Ws 4,413A13
Uncertainty programs in 2026 • a 9
�' •Dual and 16:v014 404
Cost Researching and applying TOTAL
Technological for grant opportunities
Development Developing an
Infrastructure and electrification strategy
with internal Town
Space Limitations Image courtesy of NYISO
departments https://www.nViso.com/documentsl2Ol42/2223020/2024-Power-
Trends.pdf
04/27/2026 TOWN OF ITHACA 7
to NEW YORK
Status of Town Vehicle Fleet: Emission Trends
Town of Ithaca Vehicle Fleet Emissions
900,000
The Town of Ithaca is off
800,000
776,686 Current Estimated track to meet the 2025
Emissions
700,000 699,017 [goal for vehicle emissions.
A sub-goal stipulates that
600,000
N 2010Baseline the Town could reduce
= Emissions
.y
_0 500,000 467,974 emissions by 10% a n d
405,336
y 389,752 offset with RECs as an
W 400,000 388,343
_2025 Goal alternative to reducing
N reductionfroons % emissions by 50% of the
300,000 reduction from
V 2010baseline) 2010 baseline. The Town
200°°°° 2025 Goal has opted not to pursue
Emissions(50% RECs currently as the
100,000 reduction from the
2010baseline) regulatory landscape is
° uncertain.
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
YEAR
This graph reflects data from 2021-2023. 2024 and 2025 have not been added yet.
04/27/2026 TOWN OF ITHACA
NEW YORK
Challenges to Zero-
Key Focus Areas to
Emission Vehicle (ZEV) Increase ZEV Adoption
Adoption in New York
Vehicle Light-duty ZEV adoption
Availability Investigate deployment of EV
Increased Costs and Charging Stations at strategic
Uncertainty locations Town-wide
- Operational Updated Town Zoning to
1 � 09
Challenges make deployment of EV - ez
charging stations easier
Lack of Charging
Infrastructure Research and implement -
state programs/ incentives
Political for ZEVs
Uncertainty
04/27/2026 TOWN OF ITHACA 9
NEW YORK
Major Accomplishments since the Adoption of the 2020 Green New Deal
Adopted a Form- based Updated EV Launched
code(New charging to an Completed Adopted a new Tompkins Green
Updated Energy Network(T-
NeighborhoodCode) p accessory use LED streetlight Energy Code that
Produced an which serves as an Won a NYSERDA Zoning for in most Town and lighting requires net-zero GEN), two legally
updated instruction manual for grant for the Stretch Solar Energy zones, making control emissions in new separate
Green greenhouse gas planning and building to Zero Pilot to include charging more replacement. construction for programs:
New Deal
inventory walkable, mix-used,
for Program to help building and convenient for Received - commercial and Community Choice
Resolution government and compact with IECS ground solar residents and $24k in residential Aggregation and
is adopted operations neighborhoods implementation facilities developers rebates. buildings. Own Your Power.
2022 A 0263 2026
40
The Town met its Applied for Passed a non-
previously set goal Energy Code Supplement Fleet Policy to help time Reconvened IECS multiple grants analysis of Sustainability binding
to reduce GHG (IECS), code track emissions Sustainability Working Group to (-5)to fund the deconstruction webpage to Deconstruction
emissions from requirements for new and fuel usage Planner review and amend restoration potential and be more Resolution.
government possible
g o release of a new weatherization construction and across the Town's position code ahead of the and p accessible to
facilities by 30/o by additions that vehicles and implementation users.
2020(2010 Energy substantially reduce equipment
NYS energy code. of Town Hall. steps for the
Action Plan) greenhouse gas Town of Ithaca.
emissions while
04/27/2026 emphasizing affordability TOWN OF ITHACA 10
NEW YORK
Resources � • • • • • • • • • • • • • • • •
hi
77777 Sustainability Homepa�e
777 2020 Green New Deal Resolution
• • • • • � • • 2014 Comprehensive Plan •
Ithaca Energy Code Supplement (Chapter 144
Town Code)
Tompkins Green Energy Network (T-GEN)
71 ,
0 0 0 0 0 0 - 0 0 0 0 0
I ' L L L L-1- L L-11
1, rTOWN OF ITHACA
� � INEW ;ORK
Ink
Thankyou .'
0 A '7 ny q .
1
TOWN OF ITHACA
04/27/2026 NEW YORH 12
MEETING OF THE ITHACA TOWN BOARD
April 27, 2026
TB Resolution 2026— :Adopt Consent Agenda
Resolved, that the Town Board approves and/or adopts the following Consent Agenda items:
a. Approval of Town Board Minutes
b. Approval of the Town of Ithaca Abstract
c. Appointment of Court Attendants
d. Appointment of Planning Board Member- Casper
Moved: Seconded:
Vote: ayes-
TB Resolution 2026—a:Approval of Town Board Minutes
Resolved that the Town Board approves the minutes of April 13, 2026, as final with any non-
substantive changes made.
TB Resolution 2026 -b: Town of Ithaca Abstract No. 8 for FY 2026
Resolved that the Town Board authorizes the payment of the following audited vouchers in total
for the amounts indicated:
VOUCHER NOS. 2026 347—397
General Fund Town Wide 71,770.84
General Fund Part-Town 8,703.30
Highway Fund Town Wide DA 6,197.32
Highway Fund Part Town DB 17,557.49
Water Fund 16,320.09
Sewer Fund 10,294.31
Capital Projects 21,729.71
Risk Retention Fund
Fire Protection Fund
Trust and Agency
Debt Service
TOTAL 152,573.06
TB Resolution 2026 - c:Appointment of Court Attendants
Whereas the Town created two Court Attendant positions to provide security during court for
Justice Bergin's on a part time basis; and
Whereas the Interview Committee interviewed four candidates from an open recruitment for the
position; and
Whereas the Committee has determined that Robert Brotherton and Timothy Rumsey possess the
necessary knowledge and skills to satisfactorily perform the duties of the position; and
Whereas Judith Drake, Human Resources Manager appointed Robert Brotherton and Timothy
Rumsey effective April 28, 2026; now, therefore be it
Resolved the Town Board of the Town of Ithaca does hereby approve the part time appointment of
Robert Brotherton and Timothy Rumsey as Court Attendants, effective April 28, 2026, at $60.00
per hour per diem with a two-hour minimum from AI 110.110, with no benefits.
TB Resolution 2026 - d:Appointment of Planning Board Member
Whereas there is a vacant Planning Board Regular Member position due to a resignation, and the
Selection Committee recommends appointing Gideon Casper, 429 Bostwick Road, to the
position for the remainder of an active term ending December 31, 2029; now, therefore,be it
Resolved that the Town Board appoints Gideon Casper as a Planning Board Member for the term
of April 27, 2026, through December 31, 2029.