Loading...
HomeMy WebLinkAboutFire Stations Renovations 1987-88Chronology of Fire Station Ccnroittee Activities Fire Station Committee formed on 3/2/87 First meeting held on 3/5/87 - Focus on timetable, sites Meetings 3/12, 3/19, 3/26 and 4/28/87 - Focus on schedule, sites Meeting 5/7/87 - Discussion and approve request for proposal material to go to architects 5/6/87 - Town ZBA approved sites 6/9/87 - FSC agreed to interview three architects 6/11/87 - Project scope at 600k/station, 600 renovation confirmed by City Engineer 6/15/87 - Egner Associates selected 9/16/87 - FSC approved building at 9,700 sq. ft. 10/22/87 - FSC - City Engineer suggest 300k in savings possible 11/19/87 - FSC - Egner presents 7,500 sq. ft. building 11/24/87 - FSC reviewed renovation 12/3/87 - FSC reviewed Town project scope proposed 12/11/87 - Architect authorized to proceed on design development - renovations at 900k - unacceptable 1/12/88 - FS Committee agreed on 900k level/station 1/19/88 - FSC agreed on 900k level renovations 2/8/88 - City/Town agreed on budgets at 900k 2/9/88 - Gray letter to Salm - no apparent $ problem 3/12/88 - FSC update on Egner - no apparent $ problem 4/25/88 - Gray letter on maintenance 4/28/88 - Deputy Controller reports on financing RESOLUTION WHEREAS, the Joint Town/City Fire Station Design Ccnnittee has successfully developed a program and project scope for the two new fire stations and the renovation of existing Stations V, #9 and Central acceptable to the Ccamittee, the Fire Ccamission, the Fire Department staff and fire fighters, and WHEREAS, the Fire Station Committee reccnmends approval of a project cost for each station at $900,000/station and a renovation project budget of $900,000, and WHEREAS, the City of Ithaca has established a capital project for these improvements and will arrange for financing at the appropriate tiim when bids are received, NOW THEREFORE BE IT RESOLVED, that the Tcwn Board hereby accepts the project budgets as described above and authorize the Fire Station Comdttee to ccuplete design work in the frost timely manner possible to enable construction to begin during the early summer of 1988, subject to the receipt of acceptable bids within budget, AND FUP. M RESOLVED, that the Town Supervisor is authorized to make the balance of the Town share of the 5% down payment required by the 1986 Tax Reform Act prior to adoption by the City of the necessary bond resolution (approximately April 1988) in the following amounts: E New Stations 1,800,000 x .05 x already paid 1987 balance due Renovations 900,000 x .05 x already paid 1987 balance due 70 27 Total amount due $47,180 + $63,000 $15,820 $47,180 _ $12,150 4,239 $ 7,911 $7,911 = $55,091 BE TT FURTHER RESOLVED, that authorization be give for such amount to be borrowed from the Sewer Fund until 1989 Fire Protection tax - revenues are available. l/ ()°"j (ju0 u ,o; -7 CITY OF ITHACA 10B EAST GREEN STREET ITHACA, NEW YORK 14850 OFFICE OF CITY ENGINEER M E M O R A N D U M To: Dominick Cafferillo, Deputy Comptroller From: William J. Gray, P.E. Lw(J Re: Fire Station Construction Satellite Stations and Renovations File: Govt. (Fire Station Construction -Satellite) .0 Cross File: (Fire Station Renovations) .0 Date: September 22, 1987 This memo is a follow-up to our discussion of September 18, 1987, The following is my current budget breakdown for the initial work on the fire station construction and renovation work. Fire Stations Budget - Initial Dedign New Stations: South & West Hill Renovate Stations: Central, #9, #7 New Renovate Total Architect Schematic Design & Budget 15,000 14,000 #7 Measured Drawings 1,500 15,000 15,500 30,500 Survey Site Topo - two sites 2,400 Property Survey for Agreement 900 Additional Topo & Utilities 1,000 4,300 4,300 Soils Borings - two sites 2,500 2,500 2,500 Engineering In -House Expense 400 100 Contingency 400 100 800 200 1,000 22,600 15,700- 38,300 TELEPHONE: 272-1713 CODE 607 "An Equal Opportunity Employer with an Affirmative Action Program" Memo: Dominick Cafferillo Deputy Comptroller -2- September 22, 1987 . I expect $38,000 to be expended by the end of November 1987. At that point, we will be in the process of negotiating the follow on contract with the architect for final design and construction services. If you need any additional information, please contact me at your convenience. ATTACHMENT #2 RE: REFURBISHMENT OF LADDER TRUCK #939 Total authorized: February 4, 1987 Common Council Meeting $43,000.00 from Capital Reserve # 15 April 1, 1987 Common Council Meeting $4,579.00 from Capital Reserve # 15 Total available for refurbishment $47,579.00 Expenditures: Travel costs $ 19782.33 Seagrave Fire Apparatus 449071.00 Total $455,853.33 Unexpended to date $ 19725.67 OFFICE OF CITY ENGINEER Mr. Anton J. Egner Egner Associates 310 W. State St. Ithaca, NY 14850 Dear Mr. Egner: CITY OF ITHACA TOS EAST GREEN STREET ITHACA, NEW YORK 14850 December 11, 1987 TELEPHONE: 272.1713 CODE 607 Re: Authorization for Design Development Renovations to Existing Fire Stations File: Gov. (Fire Station Renovations) .10 This letter is being written as a follow --up to Fire Station Committee meetings of November 24, 1987 and December 3, 1987. You are authorized to proceed with the design development phase for renovations to the existing fire stations outlined in our agreement for architectural services dated July 7, 1987. The renovations to these stations shall be as outlined in Sections 2, 3 and 4 of the Schematic Design Report dated October 1, 1987. Following the review of your Schematic Design Report, it is our intention to proceed with the program renovations as summarized on pages 24, 27 and 35. We would like the design for the additional work options, outlined for the Central Fire Station and Fire Station No. 9, to proceed through the initial design to the economic feasibility study. The City is pursuing technical assistant grants through New York State Energy Research and Development Agency (NYSERDA). If possible, it will be our intent to use the work developed for submission under the Technical Assistance Grant and receive construction grant funds for energy conservation improvements. Your Consulting Engineers are probably already familiar with the NYSERDA program based on previous experience. I believe that some improvements with a payback period of less than 4 years were considered eligible for grant funds. As more information on this program becomes available, it will be forwarded. Once your feasibility study becomes available on the additional work options you have outlined, it will be possible for the committee to complete its review and finalize the scope of the additional work options to be included. At this point, we would be able to complete the design development phase and proceed into the construction documents phase. Mr. Anton J. Egner -Z- December 11, 1987 While it was our intent to develop the fee for professional services for the final three phases of the project, it appears that it will be necessary to further segment this because of the variable scope relating to additional services. At this time, I anticipate the basic services to consist of design development for the programmed work. Additional services are needed to cover the development of the economic analysis for the outlined options, assistance in review of those options, and finally, designed development for the selected options. Once you have had an opportunity to review this authorization and request for additional services, please contact me so that we may develop the necessary addendum to the agreement for professional services. If you have any questions or comments, please do not hesitate, to contact me. Very truly o s, William J. Gray, r.E. City Engineer WJG:m cc: Sean Killeen, Chairman Noel Desch, Town of Ithaca, Representative Edward. Olmstead, Fire Chief fIII aMe) V,.AM1111V TO: Ithaca Town Board FROM: Noel Desch RE: Fire Station Renovation Project DATE: January 20, 1988 The Fire Station Planning Committee, at its meeting yesterday, unanimously agreed to recommend that the Town Board and Common Council approve a project budget of $900,000 for the renovation of Stations #7, #9 and Central Fire Station following a report from Architect Tony Egner and City Engineer Bill Gray (see attached). Although we should formally vote on this on February 8 I would like, if possible, your verbal approval by February 1. I have preliminarily indicated to the City that even though the Town's share is 27% of this capital project we want the financing to be over 20 years since we are replacing boilers and similar quality improvements. our annual debt service payment to the City would be approximately $28,000, all of which will cane back if we do not renew the contract in 1992. If financed over 10 years, our annual cost will be about $45,000. I will leave a copy of the full schematic design report with Jean Swartwood so those who have not seen the full scope can do so. ND/js enc. t OFFICE OF CITY ENGINEER CITY OF ITHACA, NEW YORK 108 East Green Street ITHACA, NEW YORK 14850 jOS SHEET NO OF Iyy� y�[}/.r�� CALCULATED BY � CATS 1 / 1� (,.•5 CHECKED BY DATA SCAT r Iff 0 --o 00 co M cn Z m rn Z 2 co 0 z O om m CcG°J,�1� s� 0o T ZN �o Z T �C,0ra Om ,� Zm �Imz oypz m ;� n I > Z > m r m O O m n s c m � i m � O < 10 �N 0 0 0 1 ti n m I x CENTRAL FIRE STATION - ESTIMATED MAGNITUDE OF COSTS Estimated magnitude of costs for Central Fire Station are based on 1987 square foot costs and assume separate trade construction contracts. The costs are presented by major trades of work with contingency included. Recommended additional mechanical work estimates are shown provided separately for review and consideration. Proarammed Scone General eQutiomcti.on HVAC Plumbing Fire Protection Electric Total Additional Work Options Exterior Wall Insulation and Finishes $ 9,800 Radiant Heat - Apparatus Room 5_0, 000 Replace Emergency Generator - 65k-w 30,000 Boiler Replacement 20,000 Replace Chiller/Condenser 25,000 New Unit Ventilators - First Floor E5j 17,200 Asbestos Removal 3.0.500 Total Additional Work, Options $122r 500 a ,�Jabaa 9 105t000 17 57PQGo 45 660 $393,900 49, 5)bb upY 76 ' ( r ' ^ 77 _.__2-__._,.4 21, &;t 1 ll %' � 9te=� � FIRE STATION NO. 7 - ESTIMATED MAGNITUDE OF CONSTRUCTION COSTS, The following summary of the estimated magnitude of construction costs reflect construction work associated with the stair replacement and sprinkler systems only and include contingency. General. Construction Fire Protection Allow for NechanicaljElectrical Alterations Total $20,000 23,000 6 500 $49,500 27 FIRE STATION NO. 9 - ESTIMATED MAGNITUDE OF COSTS SUMMARY The magnitude of cost estimate is based on separate trade contracts. The first breakdown reflects work included. in the original program scope of work. Estimated costs for additional work options are included for review and consideration. Proarammed Scone General Construction HVAC Plumbing Fire Protection Electric Total Additional Work Outiors Insulate Exterior Walls Basement, First, Second Floors Not including Apparatus. Room Replace Windows/Skylights Not including Apparatus Room Replace Boiler Replace Air Handling Unit & Condenser_ New Radiant Heat in Apparatus Room Total Additional Work Optio,-us $ 90,000 3?,000 '7, 200 2. . 000 $184,200 (/ $ 9,500"1 �; YrokrTZn� � 22,500 20,000 9,50E 3-0,000 $75 , 500 1 35 CITY OF ITHACA 10B EAST GREEN STREET ITHACA, NEW YORK 14950 OFFICE OF MAYOR April 1, 1988 James A. Mason, Chairman Board of Representatives R.D. #1, Box 453 Trumansburg, New York 14886 Dear Mr. M:� TELEPHONE: 272-1713 CODE 607 The City and Town of Ithaca are currently embarked on major improvements to the fire fighting and emergency medical capabilities within Tompkins County. Two new fire stations will be built, one on West Hill near the hospital and the other on South Hill next to Ithaca College, for a combined estimated construction cost of 1.8 million dollars. In addition, complete renovations will be made to the remaining fire stations within the City at an estimated cost of 900,000 dollars. This total of 2.7 million dollars (estimated) is well over original "ball park" estimates and all attempts have been made to reduce costs without sacrificing needed services. Many cuts have had to be made to get the figure "down" to 2.7 million dollars and Ithaca College and Cornell have aided our community greatly by agreeing to donate the lands necessary for the new fire stations. Included in the 2.7 million dollars is a significant expenditure for the much needed renovation and upgrading of the Tompkins County Fire and Emergency Medical Dispatch Room located in Central Fire Station. As you are aware, this function serves the entire county and the space is provided free of charge by the City of Ithaca. Not included in the 2.7 million dollars is an estimated 20-25 thousand dollars for moving and reinstallation of county owned computer, alarm, communication and dispatching equipment. In order to provide the best possible service to area residents we are respectfully requesting Tompkins County to provide the needed funds for the moving and reinstallation of the Tompkins County Fire and Emergency Medical Dispatch Room equipment in the space we are renovating at Central Fire Station. It is our hope that you will join with the City of Ithaca, Town of Ithaca, Cornell University and Ithaca College in this project. Please do not hesitate to ask for additional information. Sincerel John C. Gutenberger Noel Desch City of lthacaq=NTown of Ithaca '„ a s* 9 o Celebrating .,aa s 1888 - 1988 "An Equal Oo, orwmi9 Employer ann an AlonnatHo ACaon % rn 0 TO: Ithaca Town Board FROM: Noel Desch ;� RE: Fire Service Needs DATE: May 2, 1988 At its meeting last Thursday, the Common Council B&A Committee recommended approval of the Fire Station Committee proposal to move forward with the bidding of two new fire stations at a capital project cost of $2,300,000 and the renovations of Stations 7, 9 and Central at the capital project cost of $1,000,000. This proposal represents another $600,000 increase above the $900,000 increase authorized last Fall and it probably won't be the last increase since there are still the unknowns of bidding, the cost of traffic lights, sanitary sewer serving West Hill which at least in part will probably drive the cost up again. The Fire Station Committee reversed its field again at the meeting last Tuesday. Last Fall it had the option of building with quality, but smaller, or building with lower quality but more space. After having wasted 6 months and 30-40 thousand in architects fees it cam to the conclusion with great surprise (?) that it was a poor investment to build a lower quality building and further you couldn't retire the debt over more than 15 years for this residential construction type building. It is interesting that that question was not pursued last Fall. I believe we have a responsibility to live within our current and definable future needs and not just go along with the peripheral view the City has taken on the matter. Don't forget we are paying for 70% of the new station cost and these are supposed to be satellite stations. I have prepared for your comparison, some statistics and a cost analysis of what I proposed to the Committee last Fall. A fire resistive building within a $900,000 budget to be paid for over 20 years. Also attached are the implications on the tax rate of each scenario including the equipment replacement and manpower proposal and a table prepared by the Chief on bunking space needs, sometime ago. ND/js encs. Conclusions (A) My recormendation remains as it was last Fall and this is to stick within the construction of two Class B Fire Stations at $900,000 per station. This is justified in the following basis: (1) The current design goes beyond established program requirements by building 2 - four bay stations instead of 2 - two bay stations. (2) Building bunker space for bunkers over 3 times the current use of such space. (3) The upward pressures on the Town budget dictate that we hold the line and live within our needs even when the amount to be saved is in the .10 - .20/1000 per assessed value range. Before permitting the project to go out to bid we need to know what we are getting for our $900,000 (or whatever). . For example, these questions are among many that need to be answered: (1) What will the traffic lightscost and who pays? (2) Does the City agree to the Cornell proposal to pay for the West Hill sewer? If so, we should see it in writing. (3) Why do we need to spend 5% of the project cost on administrative services? B. As you can see by the trends, we need to look ahead to the period beyond the current contract. Service by the City is rapidly becaming unaffordable. As a start, to give us saw of the flexibility we need I propose that we adopt a sprinkler ordinance requiring all new attached housing, commercial, institutional and business structures to be fully equipped with an automatic sprinkler system. This will drastically reduce the fire risk as our camnunity grows. Secondly, we need to develop an incentive program to encourage the installation of sprinkler systems in single family dwellings, both new and old, so that our future generations are protected to the maximum degree possible. With the number of multiple dwellings on the horizon we need to act swiftly. TTATl0 OPpjC—D a�EDkGT(a� . 66) 01) k: C'town1 lU C1) la Caj r� Gz) jOj1L �� _. 66' sp c(7) -._--- �L7'k�u6N _/�7�XJMtcrr) G�' l3 -E,%1PCUi�E.T C?�EtE�` /Y7A�U�vlijl/ LEUEL) AAE_ GN i��r(.� IY�liC i��MAc� Ce,MI51NAT(a1vr AJ�o p�oU�, Size use LAP MOR'L of