Loading...
HomeMy WebLinkAboutOpenGov record WSD-26-3Town of Ithaca July 13, 2026 Record No: WSD- 26-3 Water and Sewer Availability Determination Status: Active Submitted On: 7/6/2026 Primary Location 0 Elmira Rd Unit Plumbers & Steamfitters Local 8 Ithaca, NY 14850 Owner Plumbers & Steamfitters Local 8/Marcus Willamee, Bus. Mgr 107 Twin Oaks Dr Syracuse, NY 13206 Applicant Edward Keplinger 315-445-7980 ek@keplingerfreeman.com 6320 Fly Road, Suite 109 Ste 109 East Syracuse, NY 13057 Project Information This form is used for determining whether a project location has access to Town water and/or sewer, and whether there is adequate capacity in the area for the project. It does not guarantee or reserve water or sewer capacity, nor does it imply approval of the project. Project Name/Name of Development Local 81 Union Training Facility I am the Owner Agent Existing Use of Property Vacant Description of Proposed Use Training facility for plumbers and steamfitters Do you anticipate changing parcel boundaries? Yes Describe the changes to parcel boundaries, including all subdivisions and/or consolidations. Resubdivision of parcel 35-01-10.2 and parcel 35-01-09.21 Do you anticipate requesting a zoning change? No Utility Information Utilities Needed* Both water and sewer Does the project include a residential component? * No Does the project include a commercial/industrial component?* Yes Total commercial/industrial square feet 23000 Estimated commercial/industrial water use (gallons per day) 1600 Do you anticipate dedicating privately constructed utilities to the Town?* No Any additional information/comments? The usage is based upon 80 students, which would not occur very often. Attachments L201 SITE GRADING DRAINAGE AND UTILITIES PLAN-Layout1.pdf Uploaded by Edward Keplinger on Jul 6, 2026 at 1:06 PM REQUIRED Timeline Label Activated Completed Assignee Due Date Status Review fee 7/6/2026, 1:06:25 PM 7/6/2026, 1:07:39 PM Edward Keplinger -Completed Received by Planning 7/6/2026, 1:07:39 PM -C.J. Randall -Active Received by Engineering 7/6/2026, 1:07:39 PM -Justin McNeal -Active Received by Public Works 7/6/2026, 1:07:39 PM 7/7/2026, 9:57:49 AM Joseph Slater -Completed Received by Code Enforcement 7/6/2026, 1:07:39 PM -Marty Moseley -Active Response ----Inactive Proposed Utility Layout