Loading...
HomeMy WebLinkAboutTB 2023-174 Award QA_QC Service Contract Coddington Troy GeneratorMEETING OF THE ITHACA TOWN BOARD October 16, 2023 TB Resolution 2023 -174: Authorization to award and execute contract for QA/QC services for the Town of Ithaca 2023 Coddington/Troy Pump Station Backup Generator Water Improvement Whereas, the Town Engineer has developed preliminary documents for the 2023 Town of Ithaca Coddington/Troy Pump Station Backup Generator Water Improvement (Improvement) construction contract and wishes to have a quality assurance and constructability review completed on the documents; and Whereas, Barton & Loguidice has submitted a proposal to complete the review, dated October 16, 2023, for a fee not to exceed of $6,750; and Whereas, the Town Engineer has reviewed the proposal and recommends it to the Town Board; and Whereas at their meeting on November 14, 2022, The Town Board determined that approval, construction, and implementation of the Improvement are a Type II Action (TB 2022-167); and Whereas at their meeting on November 28, 2022, the Town Board adopted a Public Interest Order (TB 2022-176) establishing the Improvement and authorizing a maximum amount of $250,000.00 to be expended on this Improvement, now therefore be it Resolved, that the Town Board authorizes the award and execution by the Supervisor of a contract for review services to Barton and Loguidice, D.P.C, 443 Electronics Parkway, Liverpool, NY 13088, subject to approval of the contract documents by the Director of Engineering and review by the Attorney for the Town. Moved: Rob Rosen Seconded: Pamela Bleiwas Vote: ayes- Howe, DePaolo, Bleiwas, Levine, Johnson, Rosen & Goodman