Loading...
HomeMy WebLinkAboutTB 2023-190 Sewer Exemption 213 King Road WMEETING OF THE ITHACA TOWN BOARD December 11th, 2023 TB Resolution 2023 -190: Authorization for the Town Engineer to issue a Sewer Exemption for 213 King Road West Whereas the Town Engineer received a request for a Sewer Exemption from the future owner(s) of 213 King Road Westindicatingthere is no access to town sewer and identifying the difficulties associated with connecting to municipal sewer due to the nearest sewer main(s) being approximately 1500+/- feet away, which would requirea main extension at an estimated cost of $450,000, and Whereas the future owners are constructing a single-family home on the property and the Tompkins County Health Department has designed and approved a septic system for the proposed home, now therefore be it Resolved, pursuant to Town Code Section 214-6, the Town Board finds the applicant has shown unusual and extreme practical difficulties in connecting to municipal sewer for the reasons conveyed by town staff and the reasons detailed in the request for a sewer exemption submitted to the Town Engineer, dated November20, 2023, and be it further Resolved, that the Town Board authorizes the Town Engineer to issue an exemption from Town Code Section 214-5 Connection required, for 213 King Road West, for the installation of a new, onsite wastewater treatment system associated with aproposed new single-family residence, subject to the consent of the Tompkins County Health Department. Moved: Rob RosenSeconded: Pamela Bleiwas Vote: ayes- Howe, DePaolo, Bleiwas, Levine, Johnson, Rosen & Goodman