Loading...
HomeMy WebLinkAboutTB 2024-010 Approve Highway Expenditures Agreement 2024MEETING OF THE ITHACA TOWN BOARD January 11, 2022 TB Resolution 2024 – 010: Approval of 2024 Agreement for Expenditure of HighwayMoniesResolved that the Town Board of the Town of Ithaca approves the following Agreement with the Highway Superintendent of the Town of Ithaca for 2024:AGREEMENT between the Town Highway Superintendent of the Town of Ithaca, Tompkins County, New York, and the undersigned members of the Town Board.Pursuant to the provisions of Section 284 of the Highway Law, we agree that moneys levied and collected in the Town for the repair and improvement of highways, and received from the State for State Aid for the repair and improvement of highways, shall be expended as follows:HIGHWAY: GENERAL REPAIRS. The sum of $265,000 shall be set aside to be expended for primary work and general repairs of town highways, including sluices, culverts, pavement markings, guiderails, surface treating and bridges having a span of less than five feet and walks or the renewals thereof.PERMANENT IMPROVEMENTS. The sum of $250,000 shall be set aside to be expended for the permanent improvement of town highways, including paving, guide rails, etc. The sum of $115,000 shall be set aside to be expended for the permanent improvement of Ridgecrest Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.57 miles of road The sum of $553,000 shall be set aside to be expended for the permanent improvement of theElm Street Extension to re-establish shoulders, mill asphalt, and install an asphalt overly on1.57 miles of road The sum of $447,000 shall be set aside to be expended for the permanent improvement of King Road West (from approximately #333 King Road W. to Sandbank Rd.) to re- establish shoulders, mill asphalt, and install an asphalt overly on 0.98 miles of road The sum of $30,000 shall be set aside to be expended for the permanent improvement of Holly Creek Lane to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.18 miles of road The sum of $87,000 shall be set aside to be expended for the permanent improvement of Larissa Lane & Schickel Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.55 miles of road The sum of $52,000 shall be set aside to be expended for the permanent improvement of Glenside Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.20 miles of road The sum of $116,000 shall be set aside to be expended for the permanent improvement of Coy Glen Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.72 miles of road (Signatures on file on separate Agreement) Moved: Susie GutenbergerSeconded: Rod Howe Vote: ayes – Howe, DePaolo, Levine, Bleiwas, and Gutenberger