Loading...
HomeMy WebLinkAboutTB 2024-133 Award PWF MEP and Structural Construction Project Contracts and ProfessionalMEETING OF THE ITHACA TOWN BOARD December 9, 2024 TB Resolution 2024- 133: Authorization to Award and Execute Construction Contractsand Construction Phase Engineering Services for the Town of Ithaca Public Works Facility Mechanical, Electrical, and Plumbing (MEP) and Structural Improvements Project Whereas, on November 15, 2024, the Town of Ithaca Director of Engineering (Director) and Deputy Clerkreceived bids for the Town of IthacaPublic Works Facility Mechanical, Electrical, and Plumbing (MEP) and Structural Improvements Project Construction Contracts (the Project), for thereplacement and/or improvement of various MEP components and repair of a damaged concrete garage floor slab at the Town of Ithaca Public Works Facility,and Whereas, the Directorhas reviewed the bids, qualifications of the bidders,and has determined that the lowest responsive bids bythe lowest responsible bidders are as shown below in Table 1, and Table 1 Construction Contract Bidder Bidder Adress Bid Amount General Edger Enterprises of Elmira, Inc. 330 East 14th Street, Elmira Heights, NY 14903 $120,800.00 Mechanical DFM Mechanical Services, Inc. 390 Peruville Rd, Freeville, NY 13068 $487,458.00 Plumbing DFM Mechanical Services, Inc. 390 Peruville Rd, Freeville, NY 13068 $199,375.00 Electrical Upstate Companies I, LLC 1690 State Highway 8, Mount Upton, NY 13809 $139,900.00 Construction Contract Total= $947,533.00 Construction Contingency, Special Inspections and Testing, Utility Fees (10%) = $ 94,753.30 CA Services = $ 34,538.75 Project Total = $ 1,076,825.05 Whereas, C & S Engineers, Inc. (C&S) has provided a fixed fee proposal of $34,538.75 for bidding and construction administration professional services (CA Services), and Whereas,on November 4,2024, the Town Board authorized and approved the Project, at a total costnot to exceed $1,193,100.00 subject to a permissive referendum pursuant to the provisions of Town Law §220, and Whereas, the referendum period has expired, with no petitions against the Project being received, now, therefore, be it Resolved, that the Town Board authorizes the award of the construction contracts forthe Town of IthacaPublic Works Facility Mechanical, Electrical, and Plumbing (MEP) and Structural Improvements Project to the contractors listed in Table 1 and authorizes the Town Supervisor to execute the contracts, subject to final approval by the Director and review by the Attorney for the Town, and be it further Resolved,that the Director is authorized to approve change orders to saidconstruction contracts, order construction special inspections and testing, and pay utility modification fees with a total costnot to exceed $94,753.30in aggregate,upon receipt of appropriate justification, and be it further Resolved, that the Town Board approves and authorizes the Town Supervisor toexecute a contract amendment with C&S for bidding and construction administration professional services for an additional fixed fee of $34,538.75,subject to review bythe Attorney for the Town. Moved: Rob Rosen Seconded: Susie Gutenberger Vote: Ayes – Levine, Rosen, DePaolo, Howe, Bleiwas, Johnson and Gutenberger