Loading...
HomeMy WebLinkAboutSignature Copy of Highway Expenditures Agreement 2024MEETING OF THE ITHACA TOWN BOARD January 11, 2024 AGREEMENT FOR EXPENDITURE OF HIGHWAYMONIESThe Ithaca Town Board adopted TB Resolution 2024-010 approving the: AGREEMENT between the Town Highway Superintendent of the Town of Ithaca, Tompkins County, New York, and the undersigned members of the Town Board.Pursuant to the provisions of Section 284 of the Highway Law, we agree that moneys levied and collected in the Town for the repair and improvement of highways, and received from the State for State Aid for the repair and improvement of highways, shall be expended as follows:HIGHWAY: GENERAL REPAIRS. The sum of $265,000 shall be set aside to be expended for primary work and general repairs of town highways, including sluices, culverts, pavement markings, guiderails, surface treating and bridges having a span of less than five feet and walks or the renewals thereof.PERMANENT IMPROVEMENTS. The sum of $250,000 shall be set aside to be expended for the permanent improvement of town highways, including paving, guide rails, etc. The sum of $115,000 shall be set aside to be expended for the permanent improvement of Ridgecrest Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.57 miles of road The sum of $553,000 shall be set aside to be expended for the permanent improvement of theElm Street Extension to re-establish shoulders, mill asphalt, and install an asphalt overly on1.57 miles of road The sum of $447,000 shall be set aside to be expended for the permanent improvement of King Road West (from approximately #333 King Road W. to Sandbank Rd.) to re- establish shoulders, mill asphalt, and install an asphalt overly on 0.98 miles of road The sum of $30,000 shall be set aside to be expended for the permanent improvement of Holly Creek Lane to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.18 miles of road The sum of $87,000 shall be set aside to be expended for the permanent improvement of Larissa Lane & Schickel Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.55 miles of road The sum of $52,000 shall be set aside to be expended for the permanent improvement of Glenside Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.20 miles of road The sum of $116,000 shall be set aside to be expended for the permanent improvement of Coy Glen Road to re-establish shoulders, mill asphalt, and install an asphalt overly on 0.72 miles of road Signatures ______________________________________________________________________ Joeseph Slater, Highway Superintendent Jeffrey Smith, Tompkins County Highway ______________________________________________________________________ Rod Howe, Town Supervisor Rich DePaolo, Deputy Town Supervisor ______________________________________________________________________ Pamela Bleiwas, Town Board MemberEric Levine, Town Board Member ______________________________________________________________________ Margaret Johnson, Town Board Member Rob Rosen, Town Board Member __________________________________ Susie Gutenberger, Town Board Member