HomeMy WebLinkAboutTB 2025-049 IAWWTF -Amendment EngineeringMEETING OF THE ITHACA TOWN BOARD
May12, 2025
TB Resolution 2025 - 049: Approval and Authorization to sign an Engineering Agreement Amendment for the preparation of the IAWWTF Capital Improvement Plan Project
Whereas, the Town of Ithaca approved its share of the preparation of the IAWWTF Capital Improvement Plan (the Project) and authorized the Town Supervisor to execute the agreement for
the Project with Barton & Loguidice, D.P.C. (B&L) for a fee of One Hundred Twenty-Two Thousand Six Hundred and Forty Dollars ($122,640) by TB Resolution 2024-035; and
Whereas, B&L has proposed a contract amendment to modify the scope of the project to include the preparation of a SEQR, and to provide engineering and technical assistance to compile
funding application materials and bonding materials (Funding Assistance); and
Whereas, B&L has proposed a lump sum fee of Five Thousand Dollars and Zero Cents ($5,000.00)for the SEQR, a fee not to exceed of Fourteen Thousand Five Hundred Dollars and Zero Cents
($14,500.00) for the Funding assistance, and a fee not to exceed of Five Hundred Dollars and Zero Cents ($500.00) reimbursable expenses, of which the Town of Ithaca’s share would be
Seven Thousand Nine Hundred Twenty Dollars and Zero Cents ($7,920.00); and
Whereas, the 50% cost match was received by the plant; and now therefore be it
Resolved, that the initial authorization of funds is sufficient for this amendment and is authorized to fund the amendment; and be it further
Resolved, that the Town Supervisor is authorized to execute said Contract Agreement on behalf of the Town of Ithaca.
Moved: Rob RosenSeconded:Eric Levine
Vote: ayes- Howe, Levine, Johnson, Gutenberger and Rosen