Loading...
HomeMy WebLinkAbout04. Bomber Heights-Project Narrative-0.0z Table of Content Project Overview & Narrative Bomber Heights Solar Troy Road| Town of Ithaca, NY Primary Contact: Ryan McCune Nexamp Solar 101 Summer Street, 2nd Fl Boston, MA 02110 607-592-5648 Bomber Heights Solar – Project Narrative – Town of Ithaca 2 Table of Contents Table of Contents .......................................................................................................................... 2 Project Team ................................................................................................................................. 3 Project Summary .......................................................................................................................... 4 Project Details ............................................................................................................................... 5 Existing Site Conditions ................................................................................................................ 6 Proposed Array Layout ................................................................................................................. 7 Existing Conditions ....................................................................................................................... 8 Permitting and Project Design ...................................................................................................... 9 Draft Construction Schedule ....................................................................................................... 14 Company Overview ..................................................................................................................... 15 Bomber Heights Solar – Project Narrative – Town of Ithaca 3 Project Team Company Role Name Email Nexamp Solar, LLC Lead Developer Ryan M McCune com LaBella PC Project Manager Kelly Sullivan Lead Site Plan Designer Andrew Graham Lead Civil Designer Mufuta Tshimanga Bomber Heights Solar – Project Narrative – Town of Ithaca 4 Project Summary Members of the Town Planning Board, Nexamp is excited to present the Town of Ithaca with its plan for a solar system located on Troy Rd in Ithaca. This Community Solar system will be constructed on a collection of open fields owned by Troy Heights, LLC . As we embark on the application process, Nexamp hopes to learn more about the Town’s desires for ongoing solar development, and ultimately, we are seeking feedback that will help our team adjust our final design as we head into environmental and site plan approval processes. The proposed solar array is a single-axis sun-tracking system, which optimizes system performance by tracking the sun from east to west throughout the day. The Utility-approved system is 4.5MWac and should occupy 25-30 acres of fenced area each. The proposed project will also include construction of a new gravel access road leading to the proposed solar array area, Single-Axis Tracker solar racking, no more than two inverter/transformer equipment pads, Solar Energy Storage, new overhead utility poles, and and code compliant deer fence around the perimeter of each solar array. There will be a moderate amount of site grading, largely as a result of tree clearing and the installation of robust stormwater management systems to limit erosion and runoff. At the conclusion of construction, the soil will be seeded with a locally appropriate seed mix to prevent soil damage and promote deep root growth. Vegetation management within the solar array would be accomplished by mowing and/or sheep grazing within the fenced area. At the end of their lives, the solar arrays will be decommissioned, and the site restored back to the current existing condition, per Town Code requirements. Included in this packet is an overview of the project, including system design, environmental conditions, the estimated permitting process, and a sample construction schedule. Additionally, should the board members or Town employees want to better familiarize themselves with Nexamp and its history, we have provided a brief overview of our company as well. We sincerely thank all members of the board for their consideration, and we hope that this pre- application process sets the groundwork for a productive partnership in the future. Best, Ryan M McCune Bomber Heights Solar – Project Narrative – Town of Ithaca 5 Project Details * Address Troy Rd, Ithaca, NY Panels Silfab 650W Bifacial Panels Tax Parcels 49.-1-26.2 Inverters Solectria String Inverters Zoning District LDR - Solar Overlay Energy Storage 5MW - 20MWh 8 – Tesla MegaPack System Size 5MWac Racking Nevados Total Fenced Acreage 25-30 acres Property Setbacks: Front ~400’ Side ~ 75’ Back ~ 84’’ **Racking, battery and panel providers subject to change due to supply chain constraints Bomber Heights Solar – Project Narrative – Town of Ithaca 6 Existing Site Conditions Summary As part of its initial due diligence related to the site, Nexamp has worked with civil and environmental contractors to conduct extensive physical, environmental, and permitting diligence on the site. Pre- Permitting meetings with the Town have informed our current design, and as designed the site in question will not require any environmental permits other than those associated with its SWPPP and eventual SPDES permit application. Phase one environmental studies have found no evidence of Recognized Environmental Conditions (RECs), Historical Recognized Environmental Conditions (HRECs) or Controlled Recognized Environmental Conditions (CRECs) within the fenced area of the site. Our project is subject to full SEQR review by the Town of Ithaca Planning Board. Phase I Environmental reports can be shared with the Town upon request. The Phase I study was conducted by our civil engineering partners at LaBella PLLC, and was completed pursuant to ASTM, E1527-13 standards. Tax Parcel Currently, the project is slated for construction on a single parcel; 49.-1-26.2, located in the Town’s Low Density Residential District. The parcel in question is part of the Town’s Large Solar Overlay District. Wetlands & Drainage While this site does contain several sections of poorly drained soils, there are no DEC recognized wetlands present on the site. A site jurisdictional determination request was filed, and issued in 2025 which confirms this status. Site analysis shows several potentially non-jurisdictional wetlands on the site. These wetlands may be non-jurisdictional due to their lack of continuous surface-level connection to any Navigable Waterway. USACE coordination on the matter is underway. Should USACE assert jurisdiction, a Nationwide permit allowing for disturbance of wetlands over .25 acres would be required, should they not assert jurisdiction no additional permitting is required. Given the time constraints surrounding USACE staffing and priorities, our recommendation is that the Town proceed with its analysis, and add USACE approvals as a condition precedent to the issuance of a building permit. Wildlife Preliminary analysis of the NYS Environmental Resource Mapper and NYS EAF Mapper have shown no species of interest, or endangered species within the project area, or area of impact. USFWS has indicated two endangered species in the area: the Monarch Butterfly and the Northern Long Eared Bat. A determination Key letter for the NLEB was issued in June 2026, stating that the project is Not Likely to Adversely Affect (NLAA).While impacts are unlikely, the project is open to adhering to tree clearing time of year restrictions (Nov-Mar), should that be requested by the Board. Archaeological Resources A SHPO No Impact Letter was issued, stating no expected impacts, in June 2026. Soils The facility does not fall within a recognized agricultural district, and per USDA mapping, no prime soils exist within the proposed project footprint. Bomber Heights Solar – Project Narrative – Town of Ithaca 7 Proposed Array Layout Bomber Heights Solar – Project Narrative – Town of Ithaca 8 Existing Conditions Bomber Heights Solar – Project Narrative – Town of Ithaca 9 Permitting and Project Design Nexamp has progressed through the design process while consulting the new Solar Code, and thus feels confident that its final project design adheres to all the stipulations codified in the Town’s local Solar law. Nexamp’s system is qualified as a Full-Size Solar system, per the guidelines issued in the latest Town of Ithaca Solar Code. As designed, our project meets all the design, signage and safety standards as outlined in the local law and will be eligible for site plan approval consideration by the Town Planning Board. Per the town’s Solar Law, we have, or will furnish the following materials to aid with the consideration of our site plan application. Items highlighted in bold have been amended since the original submission, as of 4/4/2026. 0.0- Project Narrative 0.1 – Battery Energy Storage System (BESS) FAQ 1.0 – Application (completed online) 1.1 – Owners Authorization 1.2 – Memorandum of Lease 1.3 – Deed 2.0 – Site Plan Designs 2.1 – Three Line Electrical Diagrams 3.0 – FEAF Part 1 4.0 – Wetland Delineation and Report 4.1 NYS DEC Parcel Determination 5.0 – NYSHPO Documentation (Pending as of 4/1/2026) 6.0 – FAA No Hazard Determination 7.0 – USDA Soil Map 7.1 USDA Bedrock Mapping 8.0 Habitat Assessment Memoranda 8.1 USFWS Concurrence Letters 9.0 Visual Simulation Memoranda 9.1 – Viewshed Analysis 9.2 - Line of Sight Analysis 9.3 - Glint and Glare Study 9.4 - Visual Renderings 10.0 SWPPP Report 10.1 Infiltration Testing Data 11.0 Emergency Response Plan 11.1- Fire Chief Correspondence (these materials have been provided to the Town, but have not been uploaded to public data rooms) 12.0 Decommissioning Plan 13.0 Operations and Maintenance Plan 14.0 CESIR Study 15.0 Spec Sheets Bomber Heights Solar – Project Narrative – Town of Ithaca 10 We expect the Town to designate this project a Type I action under SEQR and encourage the Town Planning Board to take lead agency of the project to retain greater oversight as to the final design and legal conditions attached to the site plan approval for the project. In addition to town approvals, we expect the project to be subject to the following approvals prior to construction. Jurisdiction Approving Party Approval Status Notes Town of Ithaca Planning Board SEQR Declaration In Process - Applied Town of Ithaca Planning Board Preliminary Site Plan Approval In Process – Applied Town of Ithaca Zoning Board of Appeals Area Variance – Tree Clearing In Process – Applied Town of Ithaca Planning Board Final Site Plan Approval In Process Tompkins Count Planning Board 239-m Approved Conditions: - Inclusion of Tompkins County EMR in the ERP - Suggestion to increase the frequency of plowing to storms under 10” Town of Ithaca Code Enforcement Officer Building Permit To Be Submitted New York State NYS DEC SPDES Water Permit To Be Submitted MS4 Approval must be granted by the Town of Ithaca prior to DEC submission New York State NYSDEC Wetland Jurisdictional Determination Approved – No Impact New York State NYSHPO No Impact Letter Approved – No Impact Federal Government FAA Navigation Impact Designation Approved – No Impact Federal Government USFWS No Impact letter Approved NLEB – Not Likely to Adversely Affect Green Floater – No Impact Federal Government USACE Nationwide Permits 14, 51 In Process Bomber Heights Solar – Project Narrative – Town of Ithaca 11 Permitting and Design Compliance Zoning: The proposed site at Troy Road is located within the LDR district, as well as the solar overlay district provided by the Town of Ithaca. The parcel is not part of a required open space area or park-side area. The facility should be designated as a Large-Scale Ground Mounted PV system. It exists entirely on one parcel, and the solar facility footprint does not exceed 35 acres. All project equipment is setback are a minimum of 75ft, access roads occur within this setback to comply with road placement regulations. Standard Requirement Project Compliance Permitted Use Allowed Complies – parcel is included in the Town’s Overlay District Lot Coverage Up to 35 acres Complies – Project is less than 35 acres Tree Clearing No more than 20% of 10 acres on the lot, no more than 10% of the balance Per code, expected allowed tree clearing is 6.201 acres. Total Tree clearing approximately ±23 acres. An Area Variance application has been filed under permit number ZBAA-26-8 Setbacks 75 ft from property lines and streets Complies – design respects setbacks to all generating equipment Fencing 8 ft wildlife-friendly fence, ≥25 ft setback Complies – wildlife-friendly fencing planned Buffering 50 ft vegetative buffer Complies – landscape buffer provided Height Limit ≤ 20 ft Complies – solar panels < 20 ft Decommissioning Financial assurance for full removal Complies – decommissioning plan will be filed with Site Plan Application Interconnection: This is a 5MWac, 20MWh Energy Storage facility connected via local distribution grid to the South Hill Substation. The facility was approved by NYSEG in April of 2024. The system is planning to Interconnect via utility poles on Troy rd. at a new proposed entrance. Conduit within the system fence, and all conduit heading to the POI will remain underground, buried to NYSDAM and Town of Ithaca standards, to the extent approved by the utility. Transmission crossings will be regulated and permitted by NYSEGs ROW Engineering Team Racking: Racking suppliers are somewhat fluid at this stage, due to the early age of the project and lack of visibility into later-stage availability. Regardless of supplier, the system will be a Single- Portrait single-axis tracker system, mounted to the ground via either steel I beams or ground screws. The overall system height should not be more than 17-18 ft at peak tilt. Panels utilized will be a PV, domestically produced bifacial variety, covered with anti-glare coating to meet the Town of Ithaca’s requirements. Bomber Heights Solar – Project Narrative – Town of Ithaca 12 Roads: Roads for this project have been located and constructed to preserve safety and comply with the Town’s soil protection requirements. The one deviation is that all roads will be constructed to 20’ wide to allow for easy passage by first responders. Construction and maintenance access will be conducted via the main access off Troy Road. The road will continue through the facility past the energy storage facilities to the rear fence for fire access as directed by the IFD. Construction and access roads will be built at grade where possible, but several raised areas will occur to preserve existing drainage patters and ensure adequate stormwater protections. A temporary laydown area will be constructed off the Construction and Maintenance access road for storage of all construction material, equipment, and employee parking throughout the systems construction. This laydown area will be removed, excess stone spread on road surfaces, and soil seeded and remediated prior to final completion. Stormwater: All roads will be impervious surfaces treated to NYSDEC standards. A SWPPP and stormwater narrative have been included in our application materials to better outline these features and their respective functionality. Extensive temporary protections will be installed during construction to prevent runoff and soil damage, including ground-level silt controls around all proposed tree clearing, and areas of disturbance. A 5-acre waiver is being sought, so stormwater inspections will take place bi-weekly throughout active construction. DEC reports will be shared with Town engineers at their request. Screening and Vegetation: The project as designed preserves substantial natural screening to the North, West and East. This natural, native screening is going to be preserved to substantially screen the project. To augment this natural screening, trees have been proposed along Troy Rd and abutting eastern property lines to screen landowners to the North/Northwest and East of the proposed array. During and following construction, Nexamp plans to seed the facility with Ernst Buzz and Fuzz, an ASGA-approved grazing and pollinator friendly seed mix that will promote foraging and pollinator habitat in the project area. Fencing: The project was designed with 8’ farm fence throughout the site, satisfying NEC requirements. Posts will be PT wood, save gate entrances which will be standard metal poles for stability. The fence is small-wildlife friendly, made of galvanized steel 2.5” mesh, and will be installed at 2” above grade. Construction Practices: Nexamp; as the developer and contractor for the project will, manage all subcontractors and steer the project with its own Project Management team. Per Town and State Requirements, the project will be constructed under NYSDAM guidelines, dictating soil management and storage in addition to environmental monitoring requirements. The facility does not impact any prime soils, so environmental monitoring will be handled by on-site, Nexamp Project Managers. NYSDEC stormwater requirements and installations will be handled under the SPDES permit to be issued to the company. Operations and Maintenance: Nexamp Asset Management Services, LLC, a subsidiary of Nexamp Inc, will be the long-term asset manager for the system. Nexamp has never sold one of its NYS assets and has only parted with a few of the 100+ Community Solar Systems it has developed and constructed in NYS. As such, we feel confident in the promises made in our Operations and Maintenance Plan, included in our submission. This O&M Plan covers routine inspections and maintenance, stormwater inspections, vegetative maintenance, invasive species management and snow removal. Bomber Heights Solar – Project Narrative – Town of Ithaca 13 Decommissioning: Decommissioning plan with cost certification was submitted that meets town requirements, additional decommissioning agreements can be supplied for consideration by the Town. Bomber Heights Solar – Project Narrative – Town of Ithaca 14 Draft Construction Schedule The project will proceed through a coordinated local and state permitting process. Locally, approval requires Sketch Plan Review, Zoning Variance Review followed by Site Plan Review consideration before the Town of Ithaca Planning Board. At this time, the Planning Board has taken jurisdiction over SEQRA. In addition to local approvals, the applicant is pursuing required state and federal permits, which may not be complete at the time of initial filing. Anticipated permits include, US Army Corps Section 404- Nationwide Permit, SHPO consultation, FAA hazard determinations, and endangered species reviews by the appropriate State or Federal agencies. At this time, NYSDEC coordination on wetland jurisdiction has been completed, and no jurisdictional wetlands have been claimed within the development area. Once local permits have been received, and conditions have been met, the project expects to follow a 12- 18 month construction window, which may be affected by weather. Sample Construction Schedule Months 0-3 – Tree Clearing – Grading – Stormwater Control Installation Months 3-6 – Road Installation, Trenching and conduit Installation, Equipment Pad Installation Months 6-10 – Racking Installation – Inverter Installation Months 10-14– Panel Installation, BESS placement, Electrical Start Months 12-16 – Electrical Installation – MV Cabling – POI construction Months 16-18 – QA /QC – Remedial Action Month 18 – Operations Deployment for construction is expected within 6-9 months of project acceptance, subject to equipment availability. Bomber Heights Solar – Project Narrative – Town of Ithaca 15 Company Overview In 2007, U.S. Army veterans Will Thompson and Dan Leary realized a vision for making a range of renewable energy options more affordable and accessible to homeowners and businesses throughout the Commonwealth of Massachusetts. The pair launched NexGen Energy Solutions, a turnkey provider of renewable energy and carbon solutions, in their hometown of North Andover, Massachusetts. NexGen became Nexamp later in 2007. During the early years, Nexamp delivered a variety of energy systems for residential, commercial, municipal and agricultural customers. Energy solutions offered included solar PV, solar thermal, micro- wind, geothermal heating and cooling, and a wide array of energy efficiency services. In 2011, Nexamp shifted its focus fully toward commercial and industrial scale solar facilities, working with businesses, municipalities, and property owners that wanted to realize the various benefits of renewable solar generation. 2015 marked Nexamp’s first community solar project and the beginning of a new chapter for the company. Leveraging its integrated approach of developing, building, owning and operating solar plants, Nexamp turned its focus to community solar, and alongside that the mission of making the benefits of solar power available to everyone—homeowners, renters, non-profits, small businesses, farms and more. Nexamp was named NECEC Clean Energy Company of the Year in 2015 and a Solar Power World Top 3 Commercial Solar Developer in 2017. In 2016, Mitsubishi’s Diamond Generating Corporation made a significant investment in Nexamp, and in 2018 the group made an additional investment that gave it a controlling interest. Serving a rapidly expanding network of individuals, property owners, businesses, and communities that benefit from its nationally distributed portfolio of solar assets, Nexamp is a Massachusetts-based, nationally headquartered solar company that is laying the groundwork for a cleaner, more secure and resilient energy future. Throughout 2022, Nexamp permitted and financed more than 250MWs of community solar projects in 12 states, with more than half of that total capacity occurring in New York State. Our team expects to bring another 250MWs through permitting and financing through 2023, adding to our industry-leading community solar portfolio. Even in uncertain times, our team has considered to set the bar for not only developing sustainable projects but managing them and working with our partner communities to build lasting relationships. Bomber Heights Solar – Project Narrative – Town of Ithaca 16 Company Information Year Founded 2007 Years in Business 19 Ownership Status Privately held, Delaware Corporation Year Established 2007 Other Legal Names of Firm Nexamp Capital, LLC Nexamp Solar, LLC Nexamp Asset Management Services, LLC Parent Company Nexamp, Inc. Federal Tax Identification 261541318 Number of Employees, 473 full-time employees