Loading...
HomeMy WebLinkAboutLocal 81 PB Packet 2026-09-01 To: Planning Board Members From: Nick Quilty-Koval, Planner Date: August 25, 2026 RE: Plumbers and Steamfitters (Local 81 Union) Sketch Plan Review Please find attached materials related to sketch plan review for the proposed Plumbers and Steamfitters (Local 81 Union) new Joint Apprentice Training Center building project, located on Elmira Road, between Enfield Falls Road and Park Lane, in the Low Density Residential Zone and the Inlet Valley Overlay District (IVOD). The project involves constructing a +/- 23,700 square foot building on +/- 9 acres of land, along with parking facilities, outdoor training areas, a public walking trail, and other site elements. There is no official Planning Board action for this project on September 1st, as it is a sketch plan review per Town Code § 270- 185 (B), which states that "the sole purpose of sketch plan review is to informally and generally review the proposed project, advise the applicant as to whether it is reasonable to anticipate a positive response to a formal application, and to highlight any concerns that may be readily apparent to the Planning Board." Based on an initial review of the application and a site visit, staff offers the following discussion items for consideration: Physical Characteristics The proposed Local 81 Union project will be located on vacant property that currently consists of two individual parcels, which will be combined into one property as part of this project. Portions of one parcel formerly associated with the Eddydale Farm Stand are characterized by gently sloping terrain with low-growing vegetation. The second parcel, not used by the farm stand, consists of early successional vegetation, including some larger deciduous and evergreen trees, overgrown shrubs, and tall grasses. Adjacent properties include New York State parklands and lands designated as a Tompkins County Unique Natural Area. According to application materials, the project is primarily proposed along Route 13 frontage, with limited disturbance anticipated in the rear portions of the property. Comprehensive Plan/Environmental Review The 2014 Comprehensive Plan and Future Land Use Map has characterized this property as “Semi Rural Neighborhood.” According to the Comprehensive Plan, development in this area should remain “sensitive to the established character of its setting.” TOWN OF ITHACA NEW YORK The Town Board adopted the IVOD provisions on February 13, 2023, to meet the goals of the Comprehensive Plan (2014) and the Inlet Valley Ithaca Plan (2018); more information on that initiative here: https://townithacany.gov/inlet-valley. The proposed Local 81 Union project will require a special permit and site plan approval from the Town of Ithaca Planning Board and may require area variances from the Zoning Board of Appeals, pending further review by the Town Code Enforcement Department. The proposed project is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. As such, the project requires the completion of a Full Environmental Assessment Form and a coordinated review amongst the agencies that have discretionary decision authority to approve certain aspects of the project. IVOD Design Standard Requirements The applicant is proposing to construct a +/- 23,700 square foot facility, along with outdoor training areas, a public walking trail, solar panels, and other site plan elements. This project will be required to comply with the building and design standards, lighting standards, parking standards, and other design standards associated with the IVOD provisions. Additionally, the project will be required to comply with other Town Code sections related to solar energy systems. The preliminary site plan submission must contain significant architectural, building, and site details, drawings, and plans. This site is located prominently on NYS Route 13/Elmira Road, so this project’s architectural design should promote the character and design characteristics of the IVOD while complementing the existing community. The submission should include a narrative statement from the applicant (along with the associated drawings), listing the specific details on how the project complies with the IVOD standards. With respect to vegetation, the project should prioritize preservation of existing vegetation and native trees where feasible, especially along property boundaries, areas located adjacent to Tompkins County Unique Natural Areas, and areas located adjacent to New York State parkland. The preliminary site plan application submission will require a landscaping plan that complies with the IVOD requirements; and the plan should contain native, non-invasive tree and plant species. This is a highly disturbed site, and is a highly visible site located at the gateway of the southeastern portion of the Town, so the proposed landscaping plan should include abundant plantings. Lastly, the project will require a highway work permit and approval from the NYS DOT to install a curb cut off NYS-13/Elmira Road. Please call me at (607) 273-1747 ext. 127 or email me at nquiltykoval@townithacany.gov if you have any questions, comments, or concerns. Att. Brian S Manthey Ed Keplinger Tommy Hayward Memorandum To: Town of Ithaca Planning Board From: The Town of Ithaca Conservation Board - Environmental Review Committee Date: 08/17/2026 RE: Office and training center sketch plan review The Environmental Review Committee members review the sketch plan and visit the on the east side of Elmira Rd between Sunny Gables and Eddydale Farm Stand for the new construction of a Local 81 Plumbers and Steamfitters union office and training center. We appreciate the applicants’ plans to leave the space in the back of the parcels and provide public parking to allow access to fishing and trails. We were uncertain how storm water would be directed off the service area behind the building. We would encourage a previous surface in that bottleneck area given the sloping nature of the terrain. Recognizing that the project area has many invasive species growing and even more banked in the soil, steps to reduce invasive plants presence in work areas and minimize their further spread need to be a part of construction preparation and implementation. This includes having all vehicles leaving the site cleaned, especially those running among several job sites. Seeds or other plant parts stuck in soil in tire treads, and other vehicle parts will easily spread invasive plants on site and to other areas. Respectfully submitted Lori Brewer Frank Cantone Eva Hoffmann James Hamilton Pete Loucks Richard Martinez PROPOSED RESOLUTION: SEQR Lead Agency – Declaration of Intent Plumbers and Steamfitters Joint Apprentice Training Center Elmira Road 35.-1-10.2 & 35.-1-9.21 Town of Ithaca Planning Board September 1, 2026 WHEREAS: 1. The Town of Ithaca Planning Board, at its meeting on September 1, 2026, considered a Sketch Plan for the proposed Plumbers and Steamfitters (Local 81 Union) new Joint Apprentice Training Center building project, located on Elmira Road, between Enfield Falls Road and Park Lane, in the Low Density Residential Zone and the Inlet Valley Overlay District (IVOD). The project involves constructing a +/- 23,700 square foot building on +/- 9 acres of land, along with parking facilities, outdoor training areas, a public walking trail, and other site plan elements. 2. The proposed project, which requires Site Plan approval and Special Permit by the Planning Board, is a Type I action pursuant to the State Environmental Quality Review Act, 6 NYCRR Part 617, and Chapter 148 of the Town of Ithaca Code regarding Environmental Quality Review, because the proposal involves “any Unlisted action, that exceeds 25 percent of any threshold in this section, occurring wholly or partially within or substantially contiguous to any publicly owned or operated parkland, recreation area or designated open space, including any site on the Register of National Natural Landmarks pursuant to 36 CFR part 62 (which is incorporated by reference pursuant to section 617.17 of this Part),” as noted in 617.4(b)(10). 3. A Full Environmental Assessment Form, Part 1, has been submitted by the applicant, along with a report containing a narrative and studies titled “Plumbers and Steamfitters Local 81 Joint Apprenticeship Training Center Sketch Plan Review Application Project Summary,” dated July 20, 2026, prepared by Brian Manthey Architect, drawings titled “PLUMBERS & STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center,” dated July 20, 2026, prepared by Keplinger Freeman Associates, and other materials; NOW, THEREFORE, BE IT RESOLVED: That the Town of Ithaca Planning Board hereby proposes to establish itself as Lead Agency to coordinate the environmental review of the proposed actions, as described above, and BE IT FURTHER RESOLVED: That the Town of Ithaca Planning Board hereby requests the concurrence of all involved agencies on this proposed Lead Agency designation, said concurrence to be received by the Town of Ithaca Planning Department by October 1, 2026. Moved: Seconded: Vote: Plumbers &Steamfitters (Local 81),Elmira Road Legend 35.-1-10.2 &35.-1-9.21 ||Town of Ithaca Parcels Elmira Road (Tax Map IDs 35.-1-10.2 &35.-1-9.21), Ithaca,New York This map was createdfor informational purposes. 20 July 2026 Plumbers and Steamfitters Local 81 Joint Apprenticeship Training Center Sketch Plan Review Application Project Summary This project represents new construction of a +/-23,700sf Local 81 Plumbers and Steamfitters union office and training center on what is now two tax parcels totaling just over 9 acres. The site is on the east side of Elmira Rd between Sunny Gables and Eddydale Farm Stand, in the Inlet Valley Overlay District (IVOD) transition zone (IV-T). This project includes a subdivision application to combine the two tax parcels into one. The site is directly adjacent to State land which is part of a planned expansion of the Black Diamond Trail System, connecting Taughannock Falls State Park to Robert H Treman State Park. Use and Occupancy Zoning use as defined by the IVOD guidelines classify this as a mixed-use Place of Assembly and Private Club/ Lounge. As a labor union, this use is specifically allowed with special permit approval under the IVOD-VT zoning code. New York State building code classifies this use as a business occupancy. Site programming for the project includes: • Parking for 82 vehicles • Loading dock, including required maneuvering space • Waste enclosure • Additional parking and walking trail for public use to gain access to the planned expansion of the Black Diamond Trail, which is directly adjacent to this site. Building programming for the project includes: • Union offices • Union meeting room • Six training classrooms and labs • Welding training and support space • Loading dock • Outdoor: o rigging training o underslab plumbing training “sandbox” o freestanding solar panel array Hours of operation: This training center will enable a shift from evening classes to daytime (M-F 7am-5pm) training for approximately 60 students. In addition, approximately six labor union staff will occupy the office space during business hours. There will be minimal transient visitors to the office space for paying labor union dues and conducting other union Professional Corporation 1919Patterson Road Marietta,New York13110 hone:315.636.8436 business. Monthly evening meetings in the large meeting room could surge the need for parking to approximately 100 cars. During these events, the truck maneuvering apron will serve as overflow parking. There will be approximately 6 trucks/month to the loading dock and outdoor cylinder storage area. Outdoor training areas: • Rigging training will occasionally involve setup of a truck mounted crane on the paved area in vicinity of the rigging yard. This activity will generally occur during business hours. • Underslab plumbing systems training will involve hand excavation through compacted gravel in the “sandbox”. The sandbox is covered with a steel frame and small scale (<2,000sf) solar panel array to provide some weather protection. Site Design Intent: The driveway into the site is located at the northernmost corner to enhance sight distance to the Highway 13/34/96 northbound merge lane. A sweeping drive, with single loaded parking, provides access to a larger double loaded parking lot in closer proximity to the building and to the rear loading and public parking areas. Additional paved areas provide access to the rigging and sandbox areas while providing emergency vehicle access to the rear and south sides of the building. The rear of the property (approximately five acres) is set aside for public use paths and Black Diamond Trail access as well as approximately solar array. Stormwater will be managed on site for both quality and quantity as required by DEC SWPPP regulations. Site disturbance will be less than 5 acres. Utilities • Water-The building will be served by an existing 8” water service valve currently on the site. This will feed the domestic water and fire protection needs of the building. • A sanitary manhole is available at the road for tie-in. A water and sewer availability determination application to the Town’s Engineering Department has been made. • Electric- There is existing electric service across the street along Elmira Rd. A new utility pole will be set on this property, with underground electric serving an 800-amp 480-volt, three-phase service main with 1200 amp bus bar to accommodate future solar additional integration. A medium scale ground mounted solar array (2-7,000sf) is included as well as a small-scale roof mounted array over the sandbox. • Heating- a geothermal heating system is planned to serve a heat pump HVAC system. The geothermal field is expected to utilize an array of vertical wells under paved areas. Natural gas fired boilers will supplement the geothermal loop and snowmelt at building entrance sidewalks. • The building will be sprinklered in accordance with building and zoning code. Building Design Intent: The building is arranged with larger mass spaces towards the rear of the property while a smaller scale elevation faces Elmira Road. The angled building plan enables site development to utilize a portion of the site bottlenecked by the lot configuration. The building interior design is conceived of as a living laboratory, where the building systems are exposed to view and serve as exhibits to enhance student training. Because fossil fuel fired equipment is a large part of the world these students are being trained to provide service, a natural gas service and equipment will be part of the building systems. This is in addition to solar and geothermal renewable energy components included to provide compliance with Zero Code 2.0 provisions. This project complies with zoning code setbacks and height restrictions. Next Steps: • Preliminary Review application. o Address board comments. o Provide dark sky and Town lighting law compliant site lighting. o Address findings of water and sewer availability report. o Incorporate input from Bolton Point and the Tompkins County Business Energy Advisory Committee. Regards Brian S Manthey FEAF 2026Page 1 of 15 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Project Location (describe and attach a general location map): Brief Description of Proposed Action (include purpose or need): Name of Applicant/Sponsor: Telephone: E-Ma ress: City/PO: State: Zip Code: Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephon : Address: City/PO: State: Zip Code: FEAF 2026Page 2 of 15 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Required Application Date (Actual or projected) a. City Council, Town Board, Yes No or Village Board of Trustees b. City, Town or Village Yes No Planning Board or Commission c. City, Town or Yes No Village Zoning Board of Appeals d. Other local agencies Yes No e. County agencies Yes No f. Regional agencies Yes No g. State agencies Yes No h. Federal agencies Yes No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? Yes No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? Yes No iii. Is the project site within a Coastal Erosion Hazard Area? Yes No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 Yes No C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action would be located? Yes Yes No No b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other)? If Yes, identify the plan(s): Yes No c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan or an adopted municipal farmland protection plan? If Yes, identify the plan(s): Yes No o FEAF 2026Page 3 of 15 d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate change? If Yes , identify the elements of the plan that are relevant to the action: Yes No C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? If Yes, what is the zoning classification(s) including any applicable overlay district? Yes No b. Is the use permitted or allowed by a special or conditional use permit? Yes No c. Is a zoning change requested as part of the proposed action? If Yes, what is the proposed new zoning for the site? Yes No C.4. Existing community services. a. In what school district is the project site located? b. What police or other public protection forces serve the project site? c. Which fire protection and emergency medical services serve the project site? d. What parks serve the project site? D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? Yes If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: No d. Is the proposed action a subdivision, or does it include a subdivision? Yes If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum No No FEAF 2026Page 4 of 15 e. Will the proposed action be constructed in multiple phases? Yes No i.If No, anticipated period of construction: months ii.If Yes:Total number of phases anticipated Anticipated commencement date of phase 1 (including demolition) month year Anticipated completion date of final phase month year Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: f. Does the project include new residential uses?Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase At completion of all phases g. Does the proposed action include new non-residential construction (including expansions)?Yes No If Yes, i.Total number of structures ii.Dimensions (in feet) of largest proposed structure:height; width; and length iii.Approximate extent of building space to be heated or cooled: square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i.Purpose of the impoundment: ii.If a water impoundment, the principal source of the water:Ground water Surface water streams Other specify: iii.If other than water, identify the type of impounded/contained liquids and their source. iv.Approximate size of the proposed impoundment.Volume: million gallons; surface area: acres v.Dimensions of the proposed dam or impounding structure: height; length vi.Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii.How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? Volume (specify tons or cubic yards): Over what duration of time? iii.Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv.Will there be onsite dewatering or processing of excavated materials?Yes No If yes, describe. v.What is the total area to be dredged or excavated?acres vi.What is the maximum area to be worked at any one time?acres vii.What would be the maximum depth of excavation or dredging?feet viii.Will the excavation require blasting? Yes No ix.Summarize site reclamation goals and plan: FEAF 2026Page 5 of 15 b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. FEAF 2026Page 6 of 15 d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district:  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)?  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No FEAF 2026Page 7 of 15 f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i.Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii.Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii.Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i.Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii.As calculated in the air permit application, the proposed action has the potential to emit: Tons/year (short tons) of carbon monoxide (CO) Tons/year (short tons) of oxides of nitrogen (NOx) Tons/year (short tons) of particulate matter (PM-10, PM-2.5) Tons/year (short tons) of volatile organic compounds (VOC) Tons/year (short tons) of sulfur dioxide (SO2) iii.Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h.Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i.Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i.When is the peak traffic expected (Check all that apply):Morning Evening Weekend Randomly between hours of to . ii.For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii.Parking spaces: Existing Proposed Net increase/decrease iv.Does the proposed action include any shared use parking?Yes No v.If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi.Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? FEAF 2026Page 8 of 15 k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i.Estimate annual electricity demand during operation of the proposed action: ii.Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii.Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i.During Construction:ii.During Operations: Monday - Friday:Monday - Friday: Saturday:Saturday: Sunday:Sunday: Holidays:Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i.Provide details including sources, time of day and duration: ii.Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i.Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii.Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o.Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i.Product(s) to be stored ii.Volume(s) per unit time (e.g., month, year) iii.Generally, describe the proposed storage facilities: q.Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i.Describe proposed treatment(s): ii.Will the proposed action use Integrated Pest Management Practices? Yes No n- cT n- FEAF 2026Page 9 of 15 r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i.Describe any solid waste(s) to be generated during construction or operation of the facility: Construction:tons per (unit of time) Operation : tons per (unit of time) ii.Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: Construction: Operation: iii.Proposed disposal methods/facilities for solid waste generated on-site: Construction: Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i.Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): ii.Anticipated rate of disposal/processing: Tons/month, if transfer or other non-combustion/thermal treatment, or Tons/hour, if combustion or thermal treatment iii.If landfill, anticipated site life: years t.Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: i.Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii.Generally describe processes or activities involving hazardous wastes or constituents: iii.Specify amount to be handled or generated tons/month iv.Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: Page 10 of 15 E.Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i.Check all uses that occur on, adjoining and near the project site. Urban Industrial Commercial Residential (suburban) Rural (non-farm) Forest Agriculture Aquatic Other (specify): ii.If mix of uses, generally describe: b. Land uses and cover types on the project site. Land use or Cover type Current Acreage Acreage After Project Completion Change (Acres +/-) Roads, buildings, and other paved or impervious surfaces (total) • Industrial or manufacturing •Commercial •Residential Forested Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) Agricultural (includes active orchards, field, greenhouse, etc.) Surface water features (lakes, ponds, streams, rivers, etc.) Wetlands (freshwater or tidal) Non-vegetated (bare rock, earth, or fill) Other, Describe: FEAF 2026 — FEAF 2026Page 11 of 15 c. Is the project site presently used by members of the community for public recreation? i.If Yes: explain: Yes No d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed day care centers, or group homes) within 1500 feet of the project site? If Yes, i.Identify facilities: Yes No e. Does the project site contain an existing dam? If Yes: i.Dimensions of the dam and impoundment: Dam height: feet Dam length: feet Surface area: acres Volume impounded: gallons OR acre-feet ii.Dam’s existing hazard classification: iii.Provide date and summarize results of last inspection: Yes No f.Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i.Has the facility been formally closed? If Yes, cite sources/documentation: ii.Describe the location of the project site relative to the boundaries of the solid waste management facility: iii.Describe any development constraints due to the prior solid waste activities: Yes Yes No No g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i.Describe waste(s) handled and waste management activities, including approximate time when activities occurred: Yes No h.Potential contamination history. Has there been a reported spill at the proposed project site, or have any remedial actions been conducted at or adjacent to the proposed site? If Yes: i.Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site Remediation database? Check all that apply: Yes – Spills Incidents database Provide DEC ID number(s): Yes – Environmental Site Remediation database Provide DEC ID number(s): Neither database ii.If site has been subject of RCRA corrective activities, describe control measures: iii.Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? If Yes, provide DEC ID number(s): iv.If Yes to (i), (ii) or (iii) above, describe current status of site(s): Yes Yes Yes No No No FEAF 2026Page 12 of 15 v. Is the project site subject to an institutional control limiting property uses?  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place?  Explain: Yes Yes No No E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? If Yes, what proportion of the site is comprised of bedrock outcroppings? % Yes No c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: Well Drained: % of site Moderately Well Drained: % of site Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 0-10%: % of site 10-15%: % of site 15% or greater: % of site g. Are there any unique geologic features on the project site? If Yes, describe: Yes No h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information: Streams: Name Classification• Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: Yes Yes Yes Yes No No No No i. Is the project site in a designated Floodway? Yes No j. Is the project site in the 100-year Floodplain? Yes No k. Is the project site in the 500-year Floodplain? Yes No l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? If Yes: i. Name of aquifer: Yes No FEAF 2026Page 13 of 15 m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres Yes No o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): Yes No p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of special concern? If Yes: i. Species and listing: Yes No q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? If Yes, give a brief description of how the proposed action may affect that use: Yes No E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: Yes No b. Are agricultural lands consisting of highly productive soils present? i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): Yes No c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National Natural Landmark? If Yes: i. Nature of the natural landmark: Biological Community Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: Yes No d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Yes No FEAF 2026Page 14 of 15 e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i.Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii.Name: iii.Brief description of attributes on which listing is based: f.Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i.Describe possible resource(s): ii.Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i.Identify resource: ii.Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii.Distance between project and resource: miles. i.Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i.Identify the name of the river and its designation: ii.Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a.Is the project located within, or within ½ mile of, a disadvantaged community?Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b.Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below?Yes No i.new noise sources or expansions/modification of existing noise sources; - noise from operational sources -noise from construction activitiesii.emissions of air pollutants including, mobile emissions;iii.wastewater discharges;iv.generation of odors;v.ligh pot llution;vi.new or modified radiation sources;vii.new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c.Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No FEAF 2026Page 15 of 15 E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought?Yes No ii. temperature extremes (hot or cold)?Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G.Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Date Signature Title EAF Mapper Summary Report Monday, July 13, 2026 12:27 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper. B.i.i [Coastal or Waterfront Area]No B.i.ii [Local Waterfront Revitalization Area]No C.2.b. [Special Planning District]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site - Potential Contamination History] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Listed] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Environmental Site Remediation Database] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.iii [Within 2,000' of DEC Remediation Site] No E.2.g [Unique Geologic Features]No E.2.h.i [Surface Water Features]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.h.ii [Surface Water Features]Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.iii [Surface Water Features]Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.v [Impaired Water Bodies]No E.2.i. [Floodway]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.j. [100 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.k. [500 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. 1Full Environmental Assessment Form - EAF Mapper Summary Report Klnonton Toronto Hamillon on Buffalo Albany Roc*l«tBr /MnWYo'rk-- Monlps0WGmtoni SlXiiKl Baiiie f Sources Esr,HERE Garmin,USGS Irtermao.INCRE'.^x.RL3n Es'i Japd1 MET Esti Chiruij-ony Esh Eu ?=ir.-.NGCC r "prrST-vrjip ;.-.'h r.J l -irr.I GIS Lsei i^r^PiV/E;d HERE GjrTir,^PSDLl-Hhiir/ih E.2.l. [Aquifers]No E.2.n. [Natural Communities]Yes E.2.n.i [Natural Communities - Name]Rich Sloping Fen, Hemlock-Northern Hardwood Forest E.2.n.i [Natural Communities - Acres]25.0, 430.0 E.2.o. [Endangered or Threatened Species]No E.2.p. [Rare Plants or Animals]No E.3.a. [Agricultural District]No E.3.c. [National Natural Landmark]No E.3.d [Critical Environmental Area]No E.3.e. [National or State Register of Historic Places or State Eligible Sites] Yes - Digital mapping data for archaeological site boundaries are not available. Refer to EAF Workbook. E.3.e.ii [National or State Register of Historic Places or State Eligible Sites - Name] Eligible property:Sunny Gables E.3.f. [Archeological Sites]Yes E.3.i. [Designated River Corridor]No E.4.a [Disadvantaged Community]Yes 2Full Environmental Assessment Form - EAF Mapper Summary Report NY S R T E S 1 3 , 3 4 , 9 4 EN F I E L D F A L L S R O A D PAR K R O A D NYS R T E S 1 3 NY S R T E S 3 4 NY S R T E S 3 4 NY S R T E S 1 3 EDDYDALE FARM STAND PROJECT SITE ROBERT H. TREMAN STATE PARK 47 3 462.85 462.98 462.19 462.13 461.61 462.53 462.28 465.08 464.04 463.97 464.31 463.77 463.89 463.78 463.70 464.80 464.79 464.80 469.02 466.37 461.09 459.92 459.88 463.33 464.50 461.50 462.63 462.07 453.92 462.90 457.29 457.11 458.14 462.39 462.60 459.79 459.09 462.63 460.41 457.33 457.67 457.63 457.11 456.70 460.60 OH W OH W OH W OH W OH W OH W OH W W W ST ST SS 466 465 464 463 463 464 465 466 467 468 464 465 466 465 464 463 462 463 464 465 466 467 468 469 470 467 466 466 467 468 469 470 471 472 473 474 469 468 467 466 465 464 463 462 461 460 459 458 457 456 455 454 453 452 451 450 450 449 448 465 460 455450 456 457 458 459 460 461 462 463 464 465 466 467 468 469 465 460 455 450 445 440 465 458 459 460 461 462 463 464 465 466 467 469 468 465 462 463 461 462 463 464 465 460 455 448449 450 451 452 453 450 451 449 448 447 446 445 444 443 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463464 465 466 467 468 469 470 465 460 470 468 467 466 459 457 458 465 472 471 471 471 479 475 475 472 473 474 472 471 475 476 477 478 470 475 474 473 472471 470 471 471 470469 465 460 461 462 463 464 466 467 468 460 461 462 463 464 465 464 463 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 479 475 470 480 475 470 478 477 476 475 474 473 472 471 470 469 466 467 451 452 453 454 455 456 457 458 459 460 461 462 463 464 470 469 468 463462 461 460 459 458 457 456 455 455 454 459 459 458 460 465 455 476 475 474 W W W SS SS UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT W W W W W W W W W W G G G G G G G G G G PROPOSED BUILDING FFE - 476.00 SERVICE AREA EL M I R A R O A D NY S R T E S 1 3 - 3 4 - 9 6 G G UE UE T SANDBOX RIGGING AREA FISHING ACCESS PARKING - 8 SPACES SOLAR PANELS 3 ROWS APPROXIMATELY 100 FT. X 20 FT., SPACED 20 FEET APART RECREATION TRAIL TO ACCESS BLACK DIAMOND TRAIL AND ENFIELD PARK EVERGREEN SCREENING EVERGREEN SCREENING STORM WATER FACILITY A STORM WATER FACILITY B EDDYDALE FARM STAND WASTE ENCLOSURE SITE ENTRANCE SAN SAN W PROPOSED BUILDING NYS PARKLAND NYS PARKLAND SUNNY GABLES EV CHARGING STATION MONUMENT SIGN (TBD) 74 PARKING SPACES WALK TO EDDYDALE CO P Y R I G H T 2 0 2 6 20 JULY 2026 LANDSCAPE ARCHITECTURE & LAND PLANNING PHONE: (315) 445-7980 FAX: (315) 445-7981 6320 FLY ROAD, SUITE 109 EAST SYRACUSE, NEW YORK 13057 K E P L I N G E R F R E E M A N ASSOCIATES AS SHOWN JPR SKE T C H P L A N SUB M I S S I O N NOT F O R C O N S T R U C T I O N 7.20 . 2 0 2 6 PLUMBERS & STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center between 827 & 919 Elmira Rd ITHACA, NY 14850 Tax Map No. 035.-1-9.21 & 10.2 80400 150 SCALE IN FEET SF GENERAL NOTES PLAN L100 OVERALL ZONE DATA CHART - TOWN OF ITHACA LOCATION MAP SCALE: 1" = 500' ALL NON-PAVED AREAS ARE 'O BE LAHN UNLESS OTHERWISE NOTED LEGEND EXSTNS ’O’AL LOT S'ZE;363315 SF <9.03 ACRES?<COMBINED PARCELS;CCfCCCK &O’ELEVATICN ’OF.SOTTOM Cf CUiB UkiU /LOW PON’ UTLITY PO-E WATER LINE PRE HYDRANT 5TC»f PIPE SANITARY PIPEMAXIMUMBUILDINGHEIGHT JNOEWiRCUND ELECTRIC 2 SPACES PER CLASSROOM XX SPACES 14 SPACES ASPHALT PAtEI-ENT-OtER-AT CONCRETE PAvtf-BN’ TRAFFC SON LIG“T POLE -SEE ELECTRICAL =LANS FOR WIRING- C-RB FLUSH fl'REVEAL XLE55 OTHERWISE NOTES- VEGETATION REVSIONS: DATE SCALE DRAWN BY TITLE1919PcHe^n Rwd Ikrtetto.New Vert15*3 PROPOSED353315SF VARIES 23.’OO SF CONTRACTOR SHALL BLEND NEW WORK SMOOTHLY AND EVENLY WITH EXISTINGLINESANDGRADES. REQU'RED 30.000 SF 100 FT 39331 SF SITE BOUNDARY,TOPOGRA°H'C AND UTILITY SURVEY PREPARED Bv CT MALE ASSOCIATES.SYRACUSE.NY,DATED 24 APRIL 2026,FILE NUMBER 26.0233. ALL FILL/BACKHLL OF EXCAVATIONS AND VOIDS RESU-TING FROM REMOVALS AND RELATED WR<UNDER °RO°OSED OR REP-ACEMENT PAVING AREASSHALLCN_Y EE COARSE AGGREGATE FILL OR SUBBASE COURSE MATERIAL THOROUGHLY COMPACTED. 30 FT SOFT 40 FT ADJUST RMS OF UTILITY S’RLCTURES TO REMAIN WITHIN AREAS OF GRADE CHANGES ~O MEET PROPOSED LNES AND GRADES. 35 FT 50 FT 40 FT Minimum lot size MINIMUM LOT WIDTH MAXIMUM BUILDING AREA OJNER AND ARCHITECT DO NO’CONFIRM THE COMPLETENESS OR ACCURACY OF SUCH INFORMATION.CONTRACTOR IS RESPONSIBLE FOR ’HOROUGH EXAMINATION AND VERIFICATION OF ALL EXISTING SURFACE AND SUBSURFACECONDITIONSAFFECTNGTHENATURE,SCOPE,COMPLEXITY AND COST OF THE CONTRACT WORK ADDITIONAL INFORMATION ON EXISTING CONDITIONS HAS BEEN ADDED TO THE DRAWINGS BASED ON THE LANDSCAPE ARCHITECTS OBSERVATIONS BUT IS NOT INTENDED TO AND DOES NOT ALTER TLE SURVEY INFORMATION.REFER TO SURVEY NOTES FOR ADDITIONAL IFORMATION. 5AW CUT FOR PAVING REMOVALS.EXTEND REMOVAL LNES TO NCLUDE ANY ADJOINING BROKEN OR DETERIORATING PAVING.CAREFULLY REMOVE. STOCKPILE AND PROTECT ANY ITEMS NOTED FOR SALVAGE.ALL DEMOLITION RUBBLE,DEBRS AND EXCESS SOILS TO BE PROMPTLY REMOVED FROM SITE. STRIP AND STOCKPILE SUFFICIENT EXISTING ORGANIC TOPSOILS FOR RESPREADING AS REQUIRED ON DISTURBED AND REGRADED AREAS TO BE ESTABLISHED AS LAHN AND FOR REPAIR OF DIS’URBED EXISTING LAWNS TO REMAIN.STOCKPILE ALL MATERIALS IN APPROVED LOCATIONS WITHOUT INTERFERING WITH OTHER CONTRACTOR LOR<SCHOOL "RAFF'C OR DRAINAGE. CONIAGLMGlTOMMYHAYWARD 4.PROTECT ALL FACILITIES AND IMPROVEMEN’S ON AND ADJOINING THE PROPERTY WHICH ARE NOT SPECIFICALLY IDENTIFIED FOR REMOVAL.VERIFY LOCATIONS AND DEPTHS O=ALL SUBSURFACE UTILITIES TO REMAN PRIOR TO ANY ADJACENT REMOVAL AND EXCAVATION WORK. MINIMUM YARD SETBACKS** FRONT REAR SIDE YARD (ONE SIDE? ALL EXISTNG FEATURES SHALL REMAN UNLESS OTHERWISE NOTED.IF THE CONTRACTOR DAMAGES ANY OF THE EXISTING ON-SITE FACILITIES TO REMAN !TREES.PAVEMENTS.UNDERGROUND UTILITIES.STRUCTURES,ETC-?WHETHER SHOWN ON THE P-ANS OR NOT,THE CONTRACTOR SHALL REPAIR AND/OR REPLACE SUCH ITEMS AT HIS OWN EXPENSE AND ASSUME ALL RESPONSIBILITY FOR SUCH DAMAGE WITHOUT ANY ADDITIONAL COST TO THE OWNER REPLACEMENT MATERIAL SHALL BE SAME QUALITY AND QUANTITY AS OR'GNAL. NOTES; I.REQUIRES SPECIAL PERMIT =OR 2T0-55,PRINCIPAL USE AS PLACE O= ASSEMB-Y AND PRIVATE CLUB-LOUNGER (LABOR UNION? IT IS *MO.ATXM O'YtfWSTATEEOUCATOH14«FOR ANYFfRSCN.UMfSS ACTRG LHC€R THEPWCTSUP^VTSOY tf A UCtNStOARCHITECT.TO ALTER AH iltM 0*THS DOCIMNT IN ANY Ml.PAST 69.5 (6) CYOE TC'BC 0.CONTRACTOR SHALL BE RESPONS'B-E =0R LAUN MAINTENANCE WITHIN THE CONTRACT LIMIT LINE.EXISTING LAWNS SHALL BE MOWED AS MUCH AS PRACTICAL TO KEEP AREA FROM LOOKNG UNSIGHTLY.ALL TRA5H ANDDEBRISSHALLBEPICKEDUPANDDISPOSEDOFPROPER.Y. ZONNG;LDR -LOW DENSITY RESIDENTIAL WITH IV0D OVERLAY 6.THE CONTRACTOR SHALL CONFIRM EXISTNG GRADES AND LOCATIONS OF ALL EXISTING FEATURES WITHN TK CONTRACT LIMIT LINE.THE CONTRACTORSHALLCONTACTTHELANDSCAPEARCHITECTIMMEDIATELYSHOU-D ANY DISCREPANCIES BE =OLND AT (3152 445--9B0. ARCHITECT1 Professional Corporation Wo DECK FFE LBAGHOUSE IMAGES REPRESENTING SIDING at ROADSIDE ENTRANCE IMAGE REPRESENTING LOADING DOCK WEST ELEVATION Wo DECK FFE FFE IMAGE REPRESENTING METAL PANEL SIDING at OFFICE AREA WEST ELEVATION Wo DECK FFE FFE 94'-9' IMAGE REPRESENTING MASONRY WELD SHOP PORTION of BLDG WEST ELEVATION SANDBOXIMAGEREPRESENTINGSOLARPANELCOVEROVERSANDBOX 5TONE BASE DATE 20 JULY 2026 1919 Pottmon Rood MonettaNew YorkDUO SECTION THRU WELD5H0P ROOF AREA ZONE DIAGRAM A200North WATER TABLE TRIM IN ACCORDANCE mV IVOD Wo DECK CLASSRM SOLAR PANELS Wo DECK at MTG RM ENTRANCE ACCENT WINDOWHEAD NlCHIHA CEMENT BOARD SIDING PANELS SPLIT FACE.INTEGRALLY COLORED CMU at WELD SHOP BEYOND Wo DECK at MTG RM LCANOPY OVER CYLINDER STORAGE CEMENT BOARD CLAPBOARD SIDING CEMENT- BOARD FASCIA CAP TRIM SCALE AS NOTED '-RECESSED ENTRANCE +/-93-2' LVERTICAL METALPANELSIDING WEST ELEVATION ARCHITECT Professional Corporation IT IS A (ICLATOI CP HEW YCRKSTATEEDUCATELAWANYPE»$O*.UXlESS ACUNO UNDER '<OREC’SLPERYSCN 0«*LICENSEDARCHITECT.TO AllER AN ITEM CNTHISDOCUMENTINASTWAY.TTUMl.PART 605 (B) DRAWN BY B5M Wo DECK at CLASSRM5 CONTACT iNEOTOMMYHAYWARD607.227.2444 TITLE PRELIMINARYSECTIONS5 WINDOW'« CORNER TRIM IN ACCORDANCE WITH IVOD SECTION I I . PLUMBERS &STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center between 827 &919 Elmira Rd ITHACA,NY 14850TaxMapNo.035.-1-9.21 &10.2 REVISIONS: