Loading...
HomeMy WebLinkAboutPB Packet 2026-09-01 TOWN OF ITHACA PLANNING BOARD Shirley A. Raffensperger Board Room, Town Hall 215 North Tioga Street Ithaca, New York 14850 Tuesday, September 1, 2026 6:30 P.M. AGENDA 1. Persons to be heard. 2. SEQR Determination: Bomber Heights Solar - Troy Road, between Coddington Road and King Road East 3. PUBLIC HEARING: Consideration of Preliminary Site Plan Approval for the proposed Bomber Heights Solar large-scale community solar photovoltaic system project, located on Troy Road, between Coddington Road and King Road East, in the Low-Density Residential Zone and Large-Scale Photovoltaic Solar Energy System Overlay District. The project involves installing a 5MWac single-axis sun tracking solar array system on approximately 31+/- acres of land, along with two inverter/transformer equipment pads, battery energy storage, new utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. This is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. The Planning Board declared their intent to be Lead Agency in the environmental review of the project on March 3, 2026. Troy Heights, LLC, Owner; Nexamp Solar, Applicant; Ryan McCune, Agent. 4. Sketch Plan for the proposed Plumbers and Steamfitters (Local 81 Union) new Joint Apprentice Training Center building project, located on Elmira Road, between Enfield Falls Road and Park Lane, in the Low Density Residential Zone and the Inlet Valley Overlay District (IV-T zone). The project involves constructing a +/- 23,700 square foot building on +/- 9 acres of land, along with parking facilities, outdoor training areas, a public use walking trail, and other site plan elements. This is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. There are no decisions or approvals at this meeting, other than the Planning Board declaring their intent to be Lead Agency in the environmental review of the project. Plumbers and Steamfitters Local 81, Owner; Tommy Hayward, Applicant; Ed Keplinger, Agent. 5. Continue to consider a recommendation to the Town Board regarding proposed amendments to Town Code, Chapter 234, Subdivision of Land. 6. Approval of Minutes. 7. Other Business. 8. Adjournment. C.J. Randall Director of Planning 607-273-1747 Meeting materials are available at https://townithacany.gov/meeting-calendar-agendas/. Board Member(s) may attend via the videoconferencing platform ZOOM when necessary. The public can access ZOOM by the links provided or by going to https://us06web.zoom.us/j/83643764382 or calling (929) 436-2866 and entering the Meeting ID# 83643764382. Public comments where applicable can be made in person at the meeting, by USPS to the address above, via the videoconferencin g platform ZOOM, or via email to Planning@townithacany.gov until 3pm the day of the meeting. All comments become a public record and are distributed to Board Members and the Applicant(s) prior to the meeting. The meeting is also broadcast and saved as a courtesy on Youtube.com/@townofithacavideo Town of Ithaca Notice of Public Hearing Planning Board Tuesday, September 1, 2026 @ 6:30 P.M. 215 N. Tioga St. Consideration of Preliminary Site Plan Approval for the proposed Bomber Heights Solar large-scale community solar photovoltaic system project, located on Troy Road, between Coddington Road and King Road East, in the Low-Density Residential Zone and Large-Scale Photovoltaic Solar Energy System Overlay District. The project involves installing a 5MWac single-axis sun tracking solar array system on approximately 31+/- acres of land, along with two inverter/transformer equipment pads, battery energy storage, new utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. This is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. The Planning Board declared their intent to be Lead Agency in the environmental review of the project on March 3, 2026. Troy Heights, LLC, Owner; Nexamp Solar, Applicant; Ryan McCune, Agent. Meeting materials are available at https://townithacany.gov/meeting-calendar-agendas/. Board Member(s) may attend via the videoconferencing platform ZOOM when necessary. The public can access ZOOM by the links provided or by going to https://us06web.zoom.us or calling (929) 436- 2866 and entering the Meeting ID# 8364 376 4382. Public comments can be made in person at the meeting or via the videoconferencing platform ZOOM above, or by mail, or email to Planning@townithacany.gov until 3pm the day of the meeting. All comments become a public record and are distributed to Board Members and the Applicant(s) prior to the meeting. The meeting is also broadcast and saved as a courtesy on Youtube.com/@townofithacavideo CJ Randall Director of Planning 1 To: Planning Board Members From: Christine Balestra, Senior Planner Date: August 24, 2026 RE: Proposed Bomber Heights Solar Project – SEQR Determination, Preliminary Site Plan Review Please find attached materials related to the proposed Bomber Heights large-scale ground- mounted community photovoltaic solar energy system project, located on Troy Road in the Low Density Residential Zone/Large-Scale Photovoltaic Solar Energy System Overlay District. The project is scheduled for the September 1, 2026, Planning Board meeting for SEQR determination and consideration of preliminary site plan review. The project involves installing a 5MWac single-axis sun tracking solar energy system on a total footprint of approximately 31+/- acres of the 62+/- acre property, along with two inverter/transformer equipment pads, battery energy storage, new overhead utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. The project is a Type I Action under the State Environmental Quality Review Act (6 NYCRR Part 617). The Planning Board declared their intent to be the lead agency in the environmental review of the project at the sketch plan review meeting on March 3, 2026. The Board provided feedback, comments, and concerns for the applicant team to consider. Here is a link to the sketch plan review materials: https://lfweb.townithacany.gov/WebLink/DocView.aspx?id=202529&dbid=0&repo=TownOfIthaca Property characteristics and history: The existing 62+/- acre parcel on Troy Road is currently maintained as a mix of open fields, meadow, brush, and wooded areas scattered around the property. The majority of the property is gently sloping, with two streams located in the southeast and northeast corners, respectively. There are two overhead NYSEG power lines that bisect the property and run towards the existing NYSEG substation on East King Road to the south. The parcel is bound on the north by vacant land and residences near the intersection of Troy and Coddington Roads, on the east by vacant land and residences along Coddington Road, on the south by the utility’s substation and residences along East King Road, and on the west by Troy Road. Large-Scale Overlay Zone, Town Code §270-219.1 Solar energy systems: In 2023, the Town Board, following a recommendation by the Planning Board, adopted amendments to the Town Code to increase the maximum area for a solar facility footprint from 10 acres to 35 acres, to coincide with the typical footprint for a distributed community solar project (5 MW). The adopted amendments also limited large-scale solar energy systems to precise areas via a Large-Scale Solar Overlay Zone. The Overlay District was based on an evaluation of the factors of town-wide concern such as 2 proximity to electric infrastructure, topography, encumbered or preserved parcels, etc. The parcel containing the proposed Bomber Heights solar project is within one of those precise areas on the Large-Scale Solar Overlay Zone Map (copy attached). Application materials: As board members may recall, the sketch plan submission included more material than necessary for a sketch plan review. The applicant has provided additional materials as requested by the board and staff since the sketch plan meeting. The materials comply with the submission requirements outlined in Town Code §270-219.1 (Solar energy systems). The Planning Board Preliminary Site Plan Review packet of materials includes: 1. This staff memo 2. Town of Ithaca Engineering comment letter, SWPPP excerpt & applicant comments 3. Town of Ithaca Code Enforcement comment letter & applicant memo from May 2026 4. Project Overview/Applicant narrative 5. SEQR Lead Agency letter to agencies & agency responses 6. Draft SEQR resolution for the board to consider 7. Draft resolution of approval for the board to consider, with draft conditions of approval 8. SEQR Full EAF Parts 1-3, plus maps, attachments, etc. 9. NYS DEC Wetland Determination letter, dated 06/04/2025 (previously received, along with wetland delineation report- report begins on page 52 of sketch plan link above) 10. USDA Soil Survey sheets 11. US Fish and Wildlife Determinations on Northern Long-Eared Bat and other plant and wildlife species (LaBella cover memo, July 17, 2026, USFWS 07/16/2026 & 05/29/2026) 12. Letter from New York State Parks, Recreation, and Historic Preservation Office, dated May 04, 2026, regarding Historic/Cultural Resources 13. Visual Simulation* Memo, dated June 2026 & Viewshed Analysis with photo log 14. Glint/Glare Study 15. “What is Energy Storage?” Document 16. Bomber Heights Solar PV & Battery Energy Storage System Emergency Response Plan 17. Bomber Heights Solar Panel Specification Sheet 18. Decommissioning Plan, dated January 2025 19. Operations and Maintenance Plan, dated July 2026 20. Civil Drawing Set, dated December 2025, revised 07/10/2026 21. Line of Sight Profile sheets, dated December 2025 22. *Photo Simulations in 11” x 17” size (related to visual sim memo above) Here is a link to the materials listed above: https://lfweb.townithacany.gov/WebLink/Browse.aspx?id=222114&dbid=0&repo=TownOfIthaca Please call me at (607) 273-1721 ext. 121 or email me at cbalestra@townithacany.gov if you have any questions. Att. 443 Electronics Parkway, Liverpool, NY 13088 ·Office: 315-457-5200 ·Fax: 315-451-0052 ·BartonandLoguidice.com August 19, 2026 Mr. Justin McNeal, Director of Engineering Town Ithaca Engineering Department 114 Seven Mile Drive Ithaca, New York 14850 Re: Bomber Heights Solar PV Subj: Follow-up Engineering Review of SWPPP File: 2071.015.001 Dear Mr. McNeal: Barton & Loguidice, D.P.C. (B&L) has reviewed the Stormwater Pollution Prevention Plan (SWPPP) prepared by LaBella Associates which was prepared on behalf of Nexamp, Inc. (“Applicant”) for the above referenced project. The SWPPP document reviewed was last dated July 2026. Based on our follow-up engineering review of the SWPPP, we offer the following: Based on the comment responses provided by the applicant to our engineering review letter dated April 29, 2026, comments numbered 1-3, 5-6, 8-22, and 24-32 have been addressed. Comments numbered 4, 7, and 23 remain as they were not fully resolved by the applicants response. These comments are shown below with additional information in bold. Our follow-up engineering review did identify additional comments what are shown below and begin with number 33. Suggestions and comments for the Town’s consideration: Initial Review SWPPP Comments 4.Please provide correspondence with NYSDEC regarding the on-site Class A regulated streams.It is anticipated that correspondence/permitting with NYSDEC for disturbance of the streams will be needed, as the plans show the streams being disturbed by the stormwater discharge locations and panels that extend over the streams. Mr. Justin McNeal, Director of Engineering Town Ithaca Engineering Department August 19, 2026 Page 2 2071.015.001 Bomber Solar SWPPP Review 08192026 (ID 3664368).docx 7.Based on the topography of the site and the mapped DEC streams on and adjacent to the site, it is anticipated that there may be 1-2 additional locations where channelized water exits the site. Review and revise to ensure the design points are representative of the discharge points from the site.Though all runoff from the site eventually enters the Sixmile Creek downstream, the area between the property boundary of the site and Sixmile Creek contains sensitive infrastructure that could be negatively impacted by increased flows from the specific locations where runoff leaves the site. At a minimum, the locations where mapped streams that convey runoff from the site should be modeled as separate design points. 23.Please include a landscaping plan that details all proposed plantings.A specific landscaping plan should be provided for the bioretention basin, with specific plantings and on-center spacings to be utilized, rather than a seed mix. Refer to Chapter 11 of the 2024 Stormwater Management Design Manual. Additional Review SWPPP Comments 33.The post-development drainage map has not been updated with changes to the site layout, review and revise. 34.Question 26 of the eNOI should be revised to specify the Sixmile Creek as the nearest waterbody; questions 27 and 28 should be revised accordingly. 35.The SWPPP specifies that 1.40 acres of new impervious are being created, but only 1.18 acres are accounted for in the WQv calculation of the GI Worksheet. The plans specify 1.30 acres of new impervious. The HydroCAD model only includes 0.794 acres of impervious area. Review and revise accordingly for consistency. 36.The GI Worksheet specifies that grass filter strips are being used to reduce runoff from the access road and turnaround. Please provide these calculations in the GI Worksheets, and call out the typical locations of the grass filter strips on the plans. 37.Some woods on site are modeled as “fair” and some as “poor” in the existing condition, please confirm how these areas were differentiated. Additionally, the woods are modeled as “good” in the proposed condition model. As the woods are not anticipated to change as part of the project, they should remain the same as in the existing condition. 38.The HydroCAD time of concentration path should be changed from shallow concentrated flow to channelized flow when it intersects with an on-site stream. Mr. Justin McNeal, Director of Engineering Town Ithaca Engineering Department August 19, 2026 Page 3 2071.015.001 Bomber Solar SWPPP Review 08192026 (ID 3664368).docx 39.The existing condition sheet flow uses “Woods: Light Underbrush”, and the proposed condition uses “Woods: Dense Underbrush”. As the woods are not anticipated to change as part of the project, this should remain the same as in the existing condition. 40.The post-development HydroCAD model only includes the 100-year storm event, this should be revised to include the 1-year and 10-year storm events. 41.The filter area in the GI Worksheets for the filtration bioretention basin (2,100 SF) does not match the HydroCAD model (2,602 SF). 42.The silt socks should be placed parallel to contours, many of the silt socks shown are shown crossing several contours. 43.The orange construction fencing to protect the wetlands and other sensitive environmental features should be shown on the erosion and sediment control plan. 44.The elevations of the detention basin on the plans do not match that shown in the HydroCAD model. Review and revise for consistency. 45.Please confirm if the proposed detention basin will be used as a sediment basin during construction, and if so, please provide details and grading for the sediment basin if it will differ from the detention basin. 46.Identify the Maintenance Access route for the bioretention area and stormwater pond. 47.Include Town inspection requirements from Chapter 228. Specifically, the rain inspection requirement which is not already included in the SWPPP. 48.Please confirm where disposal of spoil materials hauled off site will occur. If disposal will be at a site within the Town of Ithaca, a SWPPP and erosion control plan may need to be prepared for the disposal site. If the disposal site will be outside of the Town of Ithaca, we still will need to know the disposal location. This item should be coordinated further with the Town Engineering Department. 49.Please confirm whether any Town roads will be utilized to haul materials to and from the project site. If yes, and depending on the volume of vehicles, a roadway use agreement with the Town Department of Public Works may be necessary. This item should be coordinated further with the Town Engineering Department. Mr. Justin McNeal, Director of Engineering Town Ithaca Engineering Department August 19, 2026 Page 4 2071.015.001 Bomber Solar SWPPP Review 08192026 (ID 3664368).docx At this time, we recommend that the Applicant address the engineering review comments presented herein, and submit revised documents/additional information to the Town for further review. Please contact me if you have any questions or comments regarding our engineering review of Bomber Heights Solar PV SWPPP. Sincerely, BARTON & LOGUIDICE, D.P.C. Charles A. White, P.E., LEED AP Vice President CAW/jjb cc: C.J. Randall, Director of Planning, Town of Ithaca Stormwater Pollution Prevention Plan Prepared for: Nexamp, Inc. 101 Summer Street, 2nd. Floor Boston, MA 02110 Submitted by: LaBella Associates 300 State Street, Suite 201 Rochester, NY 14614 (585) 454-6110 Bomber Heights Solar PV Town of Ithaca, Tompkins County, New York Date: November 2025 Last revised: July 2026 Project No. 2240665-134393 PREPARER OF THE SWPPP “I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) for this project has been prepared in accordance with the terms and conditions of the GP-0-25-001. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of this permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings.” Name and Title1: Mufuta Tshimanga Date: Issued in June 2026 1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying Professionals Letter. TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY .................................................................................................................... 1 1.1 Project Description ................................................................................................................... 1 1.2 Stormwater Pollution Controls ................................................................................................. 2 2.0 SITE CHARACTERISTICS .................................................................................................................. 2 2.1 Land Use and Topography ....................................................................................................... 2 2.2 Soils and Groundwater............................................................................................................. 3 2.3 Watershed Designation ........................................................................................................... 4 2.4 Receiving Water Bodies ........................................................................................................... 4 2.5 Aquifer Designation .................................................................................................................. 4 2.6 Wetlands ................................................................................................................................... 4 2.7 Flood Plains .............................................................................................................................. 4 2.8 Listed, Endangered, or Threatened Species .......................................................................... 5 2.9 Historic Places .......................................................................................................................... 5 2.10 Rainfall Data ........................................................................................................................... 5 2.11 Pre-development Watershed Conditions .............................................................................. 5 2.12 Post-development Watershed Conditions ............................................................................ 6 2.13 Description of Design Points ................................................................................................. 6 3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6 3.1 STEP 1 – Site Planning ............................................................................................................ 7 3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7 3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total WQv ......................................................................................................................................... 8 3.4 STEP 4 – Calculate the Minimum RRv Required..................... Error! Bookmark not defined. 3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume .................... 9 3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 10 3.7 Deviations from NYSDEC Requirements............................................................................... 11 4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 12 5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 13 5.1 Temporary Erosion and Sediment Control Measures .......................................................... 13 5.2 Permanent Erosion and Sediment Control Measures ......................................................... 14 5.3 Other Pollutant Controls......................................................................................................... 15 5.4 Construction Housekeeping Practices .................................................................................. 17 6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 18 6.1 Inspection and Maintenance Requirements ........................................................................ 18 6.2 Reporting Requirements ........................................................................................................ 20 7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 22 7.1 Owner’s/Operator's Responsibilities ..................................................................................... 22 7.2 Owner’s/Operator’s Engineer’s Responsibilities .................................................................. 25 7.3 Contractor's Responsibilities ................................................................................................. 26 7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 27 7.5 SWPPP Participants ............................................................................................................... 29 LIST OF TABLES Table 1: USDA Soil Data .............................................................................................................................. 3 Table 2: Project Site HSG Data ................................................................................................................... 3 Table 3: Rainfall Data .................................................................................................................................. 5 Table 4: Required WQv Summary ............................................................................................................... 7 Table 5: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 8 Table 6: RRv Summary ................................................................................................................................ 9 Table 7: Minimum RRv Summary ............................................................................................................... 9 Table 8: Summary of WQv Provided ......................................................................................................... 10 Table 9: Design Events .............................................................................................................................. 11 Table 10: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 12 Table 11: Common Construction Pollutants ............................................................................................ 16 APPENDICES Appendix A: Figures • A-1: Site Location Map • A-2: Soils Map • A-3: Historic Places Screening Map • A-4: Environmental Resource Map • A-5: FEMA Firm Map • A-6: Pre-Development Watershed Delineation Map • A-7: Post-Development Watershed Delineation Map Appendix B: Forms • Notice of Intent (NOI) • SWPPP Preparer Certification Form • Owner/Operator Certification Form • Contractor and Subcontractor Certification Forms • Notice of Termination (NOT) Appendix C: Project Evaluation and Design Calculations Appendix D: Pre-Development Stormwater Modeling Appendix E: Post-Development Stormwater Modeling Appendix F: SWPPP Inspection Report (Sample Form) Appendix G: Post-Construction Inspections and Maintenance Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008 Appendix I: LaBella Certifying Professionals Letter Appendix J: NYSDEC SPDES General Permit GP-0-25-001 Appendix K: Geotechnical Documentation Stormwater Pollution Prevention Plan 2240665-134393 Page 1 1.0 EXECUTIVE SUMMARY This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated with construction of 5-MW solar array in the Town of Ithaca. This SWPPP includes the elements necessary to comply with the national baseline general permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the National Pollutant Discharge Elimination System (NPDES) program and all local governing agency requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the commencement of construction activity. This SWPPP has been developed in accordance with the “New York State Department of Environmental Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29, 2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater management, pollution prevention, and erosion and sediment control measures necessary during and following completion of construction. This SWPPP and the accompanying plans entitled “Bomber Heights Solar” have been submitted as a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this SWPPP is not considered complete without them. References made herein to “the plans” or to a specific “sheet” refer to these drawings. This report considers the impacts associated with the intended development with the purpose of: 1. Maintaining existing drainage patterns as much as possible while continuing the conveyance of upland watershed runoff; 2. Controlling increases in the rate of stormwater runoff resulting from the proposed development so as not to adversely alter downstream conditions; and 3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation resulting from stormwater runoff generated both during and after construction. The analysis and design completed and documented in this report is intended to be part of the application made for a solar development project completed on behalf of the Owner/Operator. 1.1 Project Description Nexamp, Inc. is proposing development project, to include 5.0-MW solar array to be installed on one parcel totaling approximately 62 acres located at an unaddressed property along Troy Road, town of Ithaca, Tompkins County, New York 147750 (tax parcel ID: 49.00-1-26.2). Activities include the installation of a ground-mounted solar energy system of freestanding modules/panels, new electrical equipment, and accessories including fencing, under and aboveground electrical lines, access roads, and inverter/transformer equipment pads. The total project area of disturbance proposed is approximately ±40.8 acres. The project will disturb one (1) or more acres and as such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been provided in Appendix A, as Figure A-1. This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes post-construction stormwater management practices, as well as erosion and sediment controls. Stormwater Pollution Prevention Plan 2240665-134393 Page 2 This project is located within the town of Ithaca, regulated, traditional land use control Municipal Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required to accompany NOIs submitted to the NYSDEC. Runoff from the project site will discharge to Sixmile Creek, which is not included in the list of Section 303(d) water bodies included in Appendix D of GP-0-25-001. Project construction activities will consist primarily of the installation of solar facility and the necessary infrastructure. Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels and lubricants, chemicals associated with building construction, and building materials. Without adequate control there is the potential for each type of pollutant to be transported by stormwater. 1.2 Stormwater Pollution Controls The stormwater pollution controls outlined herein have been designed and evaluated in accordance with the following standards and guidelines: • New York State Stormwater Management Design Manual, dated July 31, 2024 (Design Manual). • New York State Standards and Specifications for Erosion and Sediment Control, dated November 2016 (SSESC). Stormwater quality will be enhanced through the implementation of temporary and permanent erosion and sediment control measures, the proposed stormwater management practice(s), and other construction-phase pollution controls outlined herein. The proposed stormwater management approach consisting of on-site stormwater management practices will adequately collect, treat, and convey the stormwater runoff. Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24- hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that the peak rate of runoff from the project site will not be increased. The post-construction stormwater management practice(s) will be owned by Bomber Heights Solar PV. Policy and procedures will be in place, which ensure operation and maintenance of the practice(s) in accordance with the operation and maintenance plan. 2.0 SITE CHARACTERISTICS 2.1 State Environmental Quality Review The construction activity is subject to State Environmental Quality Review (SEQR). The project is considered a Type I action. As such, SEQR coordination has been initiated A copy of the SEQR documentation, in accordance with Part I.A.5. of GP-0-25-001. 2.2 Land Use and Topography The project site is located within the low Density Residential (LDR) zoning district. The proposed solar project is permitted use within this district. Stormwater Pollution Prevention Plan 2240665-134393 Page 3 The overall site is slightly sloping, with slopes ranging from 3 to 15 percent. Site elevations range from approximately 1,000 feet above mean sea level (MSL) to 1166 feet MSL. The site is gradually sloping to the northeast. 2.3 Soils and Groundwater The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/) was used to obtain surficial soil conditions for the study area, as follows: Table 1: USDA Soil Data Map Symbol & Description Hydrologic Soil Group Permeability (inches/hour) Erosion Factor K Depth to Water Table (feet) Depth to Bedrock (feet) BgC- Bath and Valois, 5 to 15 percent slopes C 0.01- 0.14 0.32 2.0- 3.0 >5.0 BgD- Bath and Valois soils, 15 to 25 percent slopes, eroded C 0.01-0.14 0.37 2.0- 3.0 >5.0 EbB- Erie channery silt loam, 3 to 8 percent slopes D 0.01-0.14 0.37 0.6-1.2 >5.0 EbC- Erie channery silt loam, 8 to 15 percent slopes D 0.01-0.14 0.37 0.6-1.2 >5.0 EbC3- Erie channery silt loam, 8 to 15 percent slopes, eroded D 0.01-0.14 0.43 0.6-1.2 >5.0 EcA - Chippewa and Alden soils, 0 to 8 percent slopes D 0.06-0.57 0.32 0.0-0.5 >5.0 LnD - Lordstown channery silt loam, 15 to 25 percent slopes C 0.14-1.42 0.32 <6.6 >5.0 Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain soils with a soil slope phase of E or F. The project site is composed of HSG A soils, HSG B soils, HSG C soils, and HSG D soils, as shown in the table below. Table 2: Project Site HSG Data HSG A HSG B HSG C HSG D 0% 0% 23% 77% • Type C Soils: Soils having a low infiltration rate when thoroughly wet and consisting chiefly of soils with a layer that impedes downward movement of water and soils with moderately fine-to- fine texture. These soils have a low rate of water transmission. • Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a permanent high water table, soils that have a clay pan or clay layer at or near the surface, and Stormwater Pollution Prevention Plan 2240665-134393 Page 4 soils that are shallow over nearly impervious material. These soils have a very low rate of water transmission. An on-site geotechnical investigation was performed by Terraconon 06/12/2026 an 06/16/2026. 11 test pits were performed on the project site to obtain representative subsurface information within the limits of the proposed disturbance. For detailed geotechnical information, refer to the Geotechnical Interpretive Report in Appendix K, entitled, “Bomber Heights Solar”. The geotechnical evaluation found that the soils on-site classify as variations of sandy, silty, clay, lean classifications in the Unified Soil Classification System, with varied rock fragments across the site. The depth to bedrock was observed at minimum 3.6 feet below current grade of the site. It was reported that the weathered bedrock will affect the project where pre-drilling is required. The testing determined that groundwater was not observed at the test pit locations. The soils map for the study area is presented in Appendix A, as Figure A-2. 2.4 Watershed Designation The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001. 2.5 Receiving Water Bodies The nearest natural classified water body into which runoff from the project site will discharge is Sixmile Creek. The Sixmile Creek is classified by NYSDEC as a Class A water body, and is not included in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001. 2.6 Aquifer Designation The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS) 2.1.3 (1980). 2.7 Wetlands Wetlands depicted on the accompanying plan set were delineated by GZA Geoenvironmental of New York in October 2023, March and May 2026. The wetland boundary was surveyed by GZA on January 2, 2024 and presented on a map entitled “Figure 3”. At the time of application to the NYSDEC, the revised 2025 regulations were still in effect and a site visit was coordinated to address NYSDEC jurisdictional wetlands and streams on-site. After the conclusion of the site visit in May 2025, a non-jurisdictional notice was issued stating that there were no NYSDEC wetlands or “adjacent regulated areas” on the site. 2.8 Flood Plains According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of Ithaca New York, Community Panel Numbers 36109C0211D & 36109C0213 D. The project site lies within Flood Zone D, areas determined to be outside 500-year floodplain The FEMA Flood Map has been provided in Appendix A, as Figure A-5. Stormwater Pollution Prevention Plan 2240665-134393 Page 5 2.9 Listed, Endangered, or Threatened Species An ecological assessment report dated 02/20/2024, as prepared by Labella Associates, DPC, indicates that the project will not have a significant adverse impact on any listed, endangered, or threatened species, or on any critical habitat. An Environmental Resource Map has been provided in Appendix A, as Figure A-4. 2.10 Historic Places A search on the New York State Cultural Resource Information System (CRIS) database, performed on October 29, 2025, revealed that the construction activity is not within an archaeological buffer area indicated on the sensitivity map, and that the construction activity is not located on or immediately adjacent to a property listed or determined to be eligible for listing on the National or State Registers of Historic Places. The project does propose a new permanent building on the construction site within 20 feet from a building, structure, or object that is more than 50 years, however NYS Office of Parks, Recreation and Historic Preservation (OPRHP) has determined that the building, structure, or object more than 50 years old is not historically/archaeologically significant in accordance with Part I.A.4 of GP-0-25-001. A printout of the historic places screening map is presented in Appendix A, as Figure A-3. . 2.11 Rainfall Data Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and post- development stormwater runoff characteristics. Rainfall data specific to the portion of Tompkins County under consideration, for various 24-hour storm events, is presented in the following Table: Table 3: Rainfall Data Storm Event Return Period 24-Hour Rainfall (inches) 1-year 2.01 10-year 3.43 100-year 5.94 2.12 Pre-development Watershed Conditions The pre-development project site is covered predominantly by woods and agricultural fields. Analysis of pre-development conditions considered existing drainage patterns, soil types, ground cover, and topography. The Pre-Development Watershed Delineation Map has been provided in Appendix A, as Figure A-6. The results of the computer modeling used to analyze the overall watershed under pre-development conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at each Design Point is presented in Table 10. Stormwater Pollution Prevention Plan 2240665-134393 Page 6 Subcatchment ES-1 is a 62.0± acre watershed consisting of agricultural fields and woods Runoff flows in a direction overland via sheet and shallow concentrated toward the northeast. 2.13 Post-development Watershed Conditions The post-development project site is covered predominantly by meadow, woods, and impervious pavement. The analysis of post-development conditions considered existing drainage patterns, soil types, ground cover to remain, planned site development, site grading, and stormwater management facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map has been provided in Appendix A, as Figure A-7. The results of the computer modeling used to analyze the overall watershed under post-development conditions are presented in Appendix D. A summary of the post-development watershed runoff rates at each Design Point is presented in Table 11. Stormwater discharge from the project site is controlled by a single stormwater management practice. It has been designed to provide the above quantity controls by attenuating stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which existed prior to development of the site. The design is detailed on the accompanying plans. A Post-Development Watershed Delineation Map, with the tributary areas to each stormwater management practice proposed, has been provided in Appendix A, as Figure A-7. 2.14 Description of Design Points The study area consists of an overall watershed that encompasses approximately 62.0 acres, including ±41-acre area of disturbance. The overall watershed encompasses the entire project area; therefore, discharge from the project site was evaluated at one design point (DP). A description of the design point is provided below. • Off-site discharge to low area located northeast of the project area. 3.0 STORMWATER MANAGEMENT PLANNING Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of stormwater management practices that must be implemented for both new development and redevelopment projects. This process is intended to develop a design that maintains pre-construction hydrologic conditions through the application of environmentally sound development principles, as well as treatment and control of runoff discharges from the site. The following sections outline the step-by- step process and how it has been applied to this project. The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and post-development conditions, to maintain the pre-development rate of runoff in order to minimize impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff exiting the site. The Design Manual provides both water quality and water quantity objectives to be met by projects requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit peak runoff rates and improve the quality of runoff leaving the developed site. Stormwater Pollution Prevention Plan 2240665-134393 Page 7 3.1 STEP 1 – Site Planning During the Site Planning process, the project site is evaluated for implementation of the green infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve natural resources and reduce impervious cover. Appendix C provides a description of each green infrastructure planning measure, along with a project specific evaluation. 3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff is important since most runoff related water quality contaminants are transported from land, particularly the impervious surfaces, during the initial stages of storm events. 3.2.1 NYSDEC Requirements for Water Quality Volume The Design Manual requires that water quality treatment be provided for the initial flush of runoff from every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume” (WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows: WQv = ()()()[] 12 ARPV Where: P = 90% Rainfall Event Number (per DEC 1.0 inch minimum) Rv = 0.05 + 0.009 (I) I = Impervious Cover (Percent) A = Contributing Area in Acres This definition ensures that, all other things being equal, the Water Quality Volume will increase along with the impervious cover percentage. 3.2.2 Methodology for New Development The Water Quality Volume equation has been applied to the drainage area tributary to each of the stormwater quality practices proposed for this project. The practices have been sized to accommodate the Water Quality Volume, as per the performance criteria presented in Chapter 5 and/or Chapter 6 of the Design Manual. Water quality volume calculations for each of the proposed practices are presented in Appendix C. Table 4: Required WQv Summary Required WQv 4260 cf 0.098 af Stormwater Pollution Prevention Plan 2240665-134393 Page 8 3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total WQv Land use change and development in the watershed increases the volume of runoff. As such, reductions in the amount of runoff from new development, accomplished through the implementation of a stormwater management plan for the site, will play an important role in the success or failure of the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater runoff, but they can decrease the size of the peak runoff rate reduction facilities. 3.3.1 NYSDEC Requirements for New Development The Design Manual states that runoff reduction shall be achieved through infiltration, groundwater recharge, reuse, recycle, and/or evaporation/evapotranspiration of 100-percent of the post- development water quality volume to replicate pre-development hydrology. Runoff control techniques provide treatment in a distributed manner before runoff reaches the collection system, by maintaining pre-construction infiltration, peak runoff flow, discharge volume, as well as minimizing concentrated flow. This can be accomplished by applying a combination of Runoff Reduction Techniques, standard Stormwater Management Practices (SMPs) with RRv capacity, and good operation and maintenance. 3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract drawings for practice dimensions, material specifications, and installation details. Practice specific calculations are presented in Appendix C. Table 5: Summary of Standard SMPs with RRv Capacity being Applied Standard SMP with RRv Capacity Design Variant Pretreatment Volume Required (% of WQv) Pretreatment Volume Provided (CF) RRv Capacity WQv Required (CF) WQv Reduced /RRv Provided (CF) WQv Treated1 (CF) Total WQv Provided2 (CF) Filtration Bioretention F-5 25 690 40% 2,571 2,016 555 2,571 Dry Swale (HSG C & D) O-1 10 170 20% 1,689 338 1,351 1,689 Standard SMP with RRv Capacity Totals 4,260 2,354 1,906 4,260 Footnotes: 1WQv Treated = WQV Required - RRv Provided 2Total WQv Provided = WQV Treated + RRv Provided Stormwater Pollution Prevention Plan 2240665-134393 Page 9 3.3.3 RRv Performance Summary A summary of the RRv provided is presented in the following table: Table 6: RRv Summary WQv Required (CF) (increase in impervious cover) RRv Provided WQv Reduced (CF) % RRv Provided/ WQv Reduced 4,260 2,354 55% As indicated in the above table, the RRv provided/WQv reduced is not greater than or equal to the WQv required for the project site. The remaining WQv will be treated on-site using standard SMPs with RRv capacity as shown below. 3.4 STEP 4 – Calculate the Minimum RRv Required Projects that cannot achieve 100% of the runoff reduction requirement due to site limitations, shall provide a minimum runoff reduction volume as calculated by the following equation: RRvmin = ()()()()[] 12 AicRPV S∗ Where: RRvmin = Runoff Reduction Volume (in acre-feet) P = 90% Rainfall Event Number Aic = Total area of new impervious cover (acres) Rv* = 0.05+0.009(I), where I is 100% impervious S = Hydrologic Soil Group (HSG) Specific Reduction Factor where: HSG A = 0.55 HSG C = 0.30 HSG B = 0.40 HSG D = 0.20 Based upon the soil survey data, the site consists of soils having a hydrologic soil type of D. As such, a specific reduction factor of 0.20 has been applied. Calculation of the required minimum RRv is presented in Appendix C. Table 7: Minimum RRv Summary Minimum RRv Required (CF) RRv Provided/ WQv Reduced (CF) % of Minimum RRv Provided 958 2,354 246% As indicated in the above table, the RRv provided is greater than the minimum RRv required for the project site. Therefore, the runoff reduction volume criteria has been met for the project and the design can proceed to Step 5. 3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume If the entire Water Quality Volume is not treated through implementation of RR techniques and standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the standard SMPs listed in Table 3.3 of the Design Manual. Stormwater Pollution Prevention Plan 2240665-134393 Page 10 Table 8: Summary of WQv Provided Step 2 WQv Required (CF) Step 3 WQv Reduction by RR Techniques & Standard SMPs w/ RRv Capacity (CF)1 Step 5 Reduced WQv to be Treated by Standard SMPs (CF)2 Redevelopment WQv New Development WQv 0 4,260 2,354 1,906 Footnotes: 1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity 2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced Based upon the results listed in the above Table, the entire WQv has been treated by application of RR techniques and standard SMPs with RRv capacity. 3.6 STEP 6 - Apply Volume and Peak Rate Control This report presents the pre-development and post-development features and conditions associated with the rate of surface water runoff within the study area. For both cases, the drainage patterns, drainage structures, soil types, and ground cover types are considered in this study. 3.6.1 NYSDEC Requirements for New Development Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity criteria: 1. The Channel Protection (CPv) requirement is designed to protect stream channels from erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-hour storm event. The Manual defines the CPv detention time as the center of mass detention time through each stormwater management practice. 2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and therefore must spill over into the floodplain. This is accomplished by providing detention storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak discharge rate does not exceed the corresponding pre-development rate. 3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood damage from large storm events, to maintain the boundaries of the pre-development 100-year floodplain, and to protect the physical integrity of stormwater management practices. This is accomplished by providing detention storage to ensure that, at each Design Point, the post- development 100-year 24-hour peak discharge rate does not exceed the corresponding pre- development rate. 3.6.2 Methodology In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and Stormwater Pollution Prevention Plan 2240665-134393 Page 11 Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the hydrologic and hydraulic characteristics of a given watershed and associated stormwater management facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff hydrographs. HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass detention time for various hydraulic features. Documentation for HydroCAD can be found on their website: http://www.hydrocad.net/. For this analysis, the watershed and drainage system was broken down into a network consisting of three types of components as described below: 1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of runoff unique to that area. 2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another. 3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and empties in a manner determined by its geometry and the hydraulic structure located at its outlets. Subcatchments, reaches, and ponds and links are represented by hexagons, squares, and triangles, and broken boxes respectively, on the watershed routing diagrams provided with the computations included in Appendix D and Appendix E. The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities, servicing the study area, was performed by dividing the tributary watershed into relatively homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by watershed conditions, methods of collection, conveyance, and points of discharge. Watershed characteristics for each subcatchment were then assessed from United States Geological Service (USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site investigations, and land use maps. Proposed stormwater management practices were designed and evaluated in accordance with the Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff characteristics for various 24-hour storm events identified in the following Table. Table 9: Design Events Facility 24-hour Storm Event Storm Sewer 10- or 25-year Stormwater Management Practice(s) 1-year 10-year 100-year Flood Conditions 100-year Stormwater Pollution Prevention Plan 2240665-134393 Page 12 3.6.3 Performance Summary Per Section 4.6 of the Design Manual , the CPv requirement does not apply as the reduction of the entire CPv is achieved by application of runoff reduction techniques or infiltration systems. A comparison of the pre- and post-development watershed conditions was performed for all Design Points and storm events evaluated herein. For all Design Points and design storms, this comparison demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a significant adverse impact on the adjacent or downstream properties or receiving water courses. The results of the computer modeling used to analyze the pre- and post-development watersheds are presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of this analysis. Table 10: Summary of Pre- and Post-Development Peak Discharge Rates Pre- vs. Post-Development Discharge Rate (cfs) Design Point (AP) 10-year 24-hour storm event 100-year 24-hour storm event Pre Post Pre Post 1 82.04 52.47 204.80 152.60 Total 82.04 52.47 204.80 152.60 3.7 Climate Change Consideration This report presents the consideration for future physical risks due to climate change, in accordance with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance systems and detention systems were evaluated against the seven (7) physical risks identified by NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR 490, and associated guidance. Appendix C provides a description of each consideration, specific to the project. • NOAA Sea Level Rise Mapper 4.0 CONSTRUCTION SEQUENCE This project has not received written approval from NYSDEC the Town of Ithaca allowing the disturbance of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence requires the disturbance of more than five acres at any one time, written approval must be obtained from written approval from NYSDEC the Town of Ithaca prior to disturbing more than five acres at once. The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to Construction” in the accompanying drawings and waiver request identifies the major construction activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are expected to begin is presented on the accompanying drawings, though each activity will not necessarily be completed before the next begins. In addition, these activities could occur in a different order if necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP. The Contractor will be responsible for implementing the erosion and sediment control measures identified on the plans. The Contractor may designate these tasks to certain subcontractors as they see Stormwater Pollution Prevention Plan 2240665-134393 Page 13 fit, but the ultimate responsibility for implementing these controls and ensuring their proper function remains with the Contractor. In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases have been provided. The plans address clearing and grubbing, excavation and grading, utility and infrastructure installation, final stabilization, and any other construction activity at the site that will result in soil disturbance. Refer to the plans for further information on the project phasing and sequencing. 5.0 CONSTRUCTION-PHASE POLLUTION CONTROL The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment control measures that have been incorporated into the design of this project. These measures will be implemented during construction, to minimize soil erosion and control sediment transport off-site, and after construction, to control the quality and quantity of stormwater runoff from the developed site. Erosion control measures, designed to minimize soil loss, and sediment control measures, intended to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been developed in accordance with the following documents: • NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030) • New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC (November 2016) The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion and sediment control measures. These documents include limitations on the duration of soil exposure, criteria and specifications for placement and installation of the erosion and sediment control measures, a maintenance schedule, and specifications for the implementation of erosion and sediment control practices and procedures. Temporary and permanent erosion and sediment control measures that shall be applied during construction generally include: 1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing sediment from construction site discharges. 2. Preservation of existing vegetation to the greatest extent practical. Following the completion of construction activities in any portion of the site, permanent vegetation shall be established on all exposed soils. 3. Site preparation activities to minimize the area and duration of soil disruption. 4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are avoided. 5.1 Temporary Erosion and Sediment Control Measures The temporary erosion and sediment control measures described in the following sections are included as part of the construction documents. 5.1.1 Stabilized Construction Access Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to reduce the tracking of sediment onto public roadways. Stormwater Pollution Prevention Plan 2240665-134393 Page 14 Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is to trap dust and mud that would otherwise be carried off-site by construction traffic. The access(es) shall be maintained in a condition, which will control tracking of sediment onto public rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance shall be provided after each substantial rainfall event. 5.1.2 Silt Fencing Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be established downgradient of all disturbed areas. These barriers may extend into non-impact areas to provide adequate protection of adjacent lands. Clearing and grubbing will be performed only as necessary for the installation of the sediment control barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be performed as needed. 5.1.3 Temporary Seeding For areas undergoing clearing, grading, and disturbance as part of construction activities, where work has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next business day and completed within fourteen (14) days from the date the soil disturbance activity has temporarily ceased. 5.1.4 Stone and Block Drop Inlet Protection Concrete blocks surrounded by wire mesh and crushed stone will be placed around both existing catch basins, and proposed catch basins once they have been installed, to prevent sediment from entering the catch basins and storm sewer system. During construction, crushed stone shall be replaced as necessary to ensure proper function. depicted on the accompanying plans have been designed to provide 3,600 CF of storage per acre of tributary watershed. 5.2 Permanent Erosion and Sediment Control Measures The permanent erosion and sediment control measures described in the following sections are included as part of the construction documents. 5.2.1 Establishment of Permanent Vegetation Disturbed areas that will be vegetated must be seeded in accordance with the contract documents. The type of seed, mulch, and maintenance measures as described in the contract documents shall also be followed. Permanent soil stabilization measures must be initiated by the end of the next business day and completed within fourteen (14) days from the date the soil disturbance activity has permanently ceased. Final site stabilization is achieved when all soil-disturbing activities at the site have been completed and a uniform, perennial vegetative cover with a density of 80 percent has been established or equivalent Stormwater Pollution Prevention Plan 2240665-134393 Page 15 stabilization measures (such as the use of mulches or geotextiles) have been employed on all unpaved areas and areas not covered by permanent structures. 5.3 Other Pollutant Controls Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants used in vehicle and equipment operation and maintenance, vehicle and equipment washing and toxic or hazardous substances. The following table identifies materials and/or chemicals commonly used and/or stored on construction sites and should be addressed in the site-specific spill prevention and response plan: Stormwater Pollution Prevention Plan 2240665-134393 Page 16 Table 11: Common Construction Pollutants Material/Chemical Physical Description Stormwater Pollutants Location* Pesticides (insecticides, fungicides, herbicides, rodenticides) Various colored to colorless liquid, powder, pellets, or grains Chlorinated hydrocarbons, organophosphates, carbamates, arsenic Herbicides used for noxious weed control Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas Cleaning solvents Colorless, blue, or yellow-green liquid Perchloroethylene, methylene chloride, trichloroethylene, petroleum distillates No equipment cleaning allowed in project limits Asphalt Black solid Oil, petroleum distillates Streets and roofing Concrete White solid/grey liquid Limestone, sand, pH, chromium Curb and gutter, building construction Curing compounds Creamy white liquid Naphtha Curb and gutter Hydraulic oil/fluids Brown oily petroleum hydrocarbon Mineral oil Leaks or broken hoses from equipment Gasoline Colorless, pale brown or pink petroleum hydrocarbon Benzene, ethyl benzene, toluene, xylene, MTBE Secondary containment / staging area Diesel Fuel Clear, blue-green to yellow liquid Petroleum distillate, oil & grease, naphthalene, xylenes Secondary containment / staging area Kerosene Pale yellow liquid petroleum hydrocarbon Coal oil, petroleum distillates Secondary containment / staging area Antifreeze/coolant Clear green/yellow liquid Ethylene glycol, propylene glycol, heavy metals (copper, lead, zinc) Leaks or broken hoses from equipment Sanitary toilets Various colored liquid Bacteria, parasites, and viruses Staging area Construction materials Granular fill Various colored solids Sediment Stockpile / fill areas Subbase course Gray/brown solid Sediment, dust Stockpile Topsoil Brown solid Sediment Stockpile Mulch Various colored solid Sediment, debris Staging area Seed Brown/yellow solid Nutrients, debris Staging area HDPE Storm Pipe Black solid Staging area SDR-35, SDR-21 PVC Pipe Various colored solid Staging area Metals Frames and Grates Gray solid Staging area Joint Sealant Light gray viscous solid Polyurethane Staging area *(Area where material/chemical is used on-site) July 17, 2026 Mr. Justin McNeal, Senior Civil Engineer Town of Ithaca Engineering Department 114 Seven Mile Drive Ithaca, New York 14850 RE: Bomber Heights Solar PV Troy Road, Ithaca, New York Project Number: 2240665 Dear Mr. McNeal: Nexamp Solar, LLC and LaBella Associates, DPC (LaBella) received your copy of the Comment Letter dated 04/29/2026. Please find the comment responses below. Comment Letter General 1, It is noted that the final SWPPP will need to be stamped by a licensed NYS Professional Engineer. Response: Acknowledged 2. Section 1.1 of the SWPPP specifies that the site does not discharge to a 303(d) waterbody, but Section 2.5 specifies that it does discharge to a 303(d). It appears that the on-site streams discharge into the Sixmile Creek. Review and revise for consistency. Response: Upon review of the project site location and the receiving waterbodies, it was confirmed that the site will discharge into Sixmile Creek, which is not a 303(d) waterbody. The SWPPP narrative was updated to reflect that on-site streams will not discharge to a 303(d) waterbody. 3. Please revise the SWPPP to include the negative Jurisdictional Determination in regards to the on-site wetlands, and provide any correspondence with the USACE regarding the on-site wetlands. Response: A statement was added in the SWPPP section 2.7 Wetlands stating there is a negative Jurisdictional Determination from the NYSDEC and the approach taken to obtain it. A USACE submission is scheduled to be submitted in the near future, and all correspondence will be updated when received. 4. Please provide correspondence with NYSDEC regarding the on-site Class A regulated streams. Response: As of this response letter there has been no correspondence with NYSDEC regarding the on-site Class A regulated streams. Correspondence can be provided if and when it is necessary and initiated. 2 5. It is noted that per NYSDEC’s Solar Development Webinar from July 28, 2025, the 2018 NYSDEC Solar Memorandum and the Maryland Department of the Environment’s Solar Design Guidance are outdated design documents, and the aforementioned webinar is the relevant guidance. Response: The SWPPP narrative and appendices have been updated to reflect the removal of outdated solar design guidance. 6. Section 3.4 of the SWPPP specifies that the entire WQv is provided in RRv. Table 7 indicates that only 87.94% of the WQv is reduced, so Steps 4 and 5 should be completed. Review and revise accordingly. Response: The stormwater on-site was reevaluated and only 55% of the WQv is being reduced 7. Based on the topography of the site and the mapped DEC streams on and adjacent to the site, it is anticipated that there may be 1-2 additional locations where channelized water exits the site. Review and revise to ensure the design points are representative of the discharge points from the site. Response: The design points were kept the same as all flow from the site meets at a common point downstream. The analysis point that was chosen on-site is assumed to be the longest path. 8. Question 5 of the eNOI specifies that the project is not subject to SEQR, review and revise accordingly. Response: Question 5 of the eNOI has been updated to state the project is subject to SEQR and when the documentation that the project review has been satisfied is obtained, question 5.a. will be answered. 9. Please provide a phasing plan showing defined limits to be used during construction to maintain a maximum disturbance of 5 acres at any given time. Response: A phasing plan has been added to the project plan set as sheet C407. 10. As a portion of the proposed solar array is located on slopes greater than 8%, the array falls under CGP 0-25-001 Appendix B’s Table 2. The NYSDEC has provided accommodations in their July 28, 2025 Solar Development Webinar for ground mounted solar arrays based on the following two scenarios: a. In areas of slopes greater than 8% slope, if it is determined by the engineer that sheet flow can be maintained (using gravel diaphragms spaced in accordance with the below table) or the relevant or equivalent Blue Book practices, then this meets the WQv and RRv requirements (i.e., gravel diaphragms do not need to be sized to hold WQv), and the panels may be considered “pervious” in modeling for the 1-year, 10-year, and 100-year storm events. b. If it is determined by the engineer that sheet flow cannot be maintained on slopes greater than 8%, gravel diaphragms or equivalent Blue Book practices may still be used to meet the WQv and RRv requirements, but they must be sized to hold the entire WQv. In this 3 case, the panels would be considered “impervious” in modeling for the 1-year, 10-year, and 100-year storm events. The SWPPP appears to show the gravel diaphragms being sized to store the WQv (scenario 2), but the panels are currently modeled as pervious in the HydroCAD model (scenario 1), so it is unclear if the engineer has determined that sheet flow can be maintained on site. The SWPPP should be revised to clearly specify the approach and specify that sheet flow can/cannot be maintained at the site. Response: It is determined by engineer that sheet flow will be maintained across the site but the level spreaders were still sized to hold the WQv and the panels were modeled as pervious. The level spreaders have been reduced to 1’ x 1’, spaced per table 1 above and have been modeled as pervious in the HydroCAD modeling. 11. In reference to comment 12 above, it appears that the gravel diaphragms are sized to store the WQv to meet the WQv/RRv requirements for panels on slopes greater than 8%. If this is the case, this is considered a deviation from the 2024 Stormwater Design Manual. Question 37 of the eNOI should be revised accordingly to account for this. Response: See response number 10. Question 37 of the eNOI was not updated. 12. Per the 2024 Stormwater Manual, local rainfall distribution curves should be utilized rather than the generalized “Type II” rainfall distribution curves. Review and revise as necessary. Response: The SWPPP narrative and HydroCAD models were updated to reflect the relevant local IDF rainfall data for the project site. 13. The proposed dry swales should be modeled in HydroCAD to confirm the required design standards such as flow depth and velocity. Response: The proposed dry swales were modeled in HydroCAD to confirm the required design standards such as flow depth and velocity are adequate to handle the flows on-site. 14. If no infiltration is anticipated within the dry detention basin, it is recommended that the lowest orifice be at the bottom of the basin to completely drain the basin between rain events. Response: The lowest orifice was lowered to be at the bottom of the basin to completely drain the basin between rain events. 4 15. BIO-1 has a peak elevations above the storage in the 100-year event. It is recommended to add additional storage to accommodate this peak elevation or revise the outlet structure to pass additional flow. Response: The stormwater was reevaluated and Bio-1 has been removed from the design and replaced with dry swales. 16. Please provide calculations for pre-treatment requirements for the practices where pre- treatment volume is not included in HydroCAD. Response: The pretreatment for the bioretention basin is accounted for in the HydroCAD model. According to the NYS Stormwater Design Manual, the bioretention basin must have 25% of the WQv as pretreatment. The HydroCAD model takes this into account by adding the forebay into the storage section and showing that 25% of the required WQv is being met. According to the NYS Stormwater Design Manual Section 6.5.3, a 2’ x 1’ pea gravel diaphragm at the downgradient edge of the impervious surface with a maximum contributing slope of 5% is sufficient as pretreatment for a Dry Swale. The pea gravel diaphragm is shown in detail 3 on sheet C501. 17. Please provide calculations for the proposed culverts beneath the access road. Response: Calculations for the proposed culverts beneath the access road have been included in the HydroCAD modeling. Appendix C of SWPPP. 18. Revise the construction sequence on sheet C001 of the plans to include the installation of stormwater management practices (dry swales and bioretention basins) after grading is complete and the site is stabilized. Response: The construction sequence reflected on C001 has been updated to reflect the installation of stormwater management practices after finalization of grading and approval of stabilization by the qualified inspector. 19. Portions of the proposed solar panels overhang the dry swales and conveyance swales. Please confirm that the panels in these locations will not impede access and maintenance of the stormwater management practices. Response: The layout has been revised and solar panels are not proposed to overhang the dry swales and conveyance swales. 20. Please provide a slopes analysis plan for the areas where solar panels are proposed showing slopes greater than 8%, 20%, and 35%. Response: Additional sheets labeled C405 and C406 were added to the project plan set to depict the site slope heat map. The ranges shown on the plan sheet demonstrate slopes 8- 10%, 10-20%, 20-35%, and slopes >35%, which correlate with the gravel diaphragm design requirements. 21. Please provide a detail showing the spacing between rows of solar panels. 5 Response: Detail 5 on sheet C502 has been amplified, detailing the row spacing for the proposed solar panel installation. 22. The eNOI indicates 34.0 acres of disturbance but the SWPPP narrative indicates 31.8 acres of disturbance. This discrepancy should be corrected. Response: The eNOI, SWPPP narrative and plan set were updated to display the accurate limit of disturbance for the project. 23. Please include a landscaping plan that details all proposed plantings. Response: A landscaping plan has been included in the plan set starting with sheets L100. 24. Provide soil borings in accordance with the NYSDEC Stormwater Design Manual. Water table elevation should be confirmed for bioretention areas and dry swale area to determine if an impermeable liner will be required. Response: Soils borings were performed in the areas of the bioretention and dry swales. Due to the shallow bedrock, impermeable liners have been proposed in the design. Please see detail 5 sheet C503 and detail 3 sheet C501 respectively. 25. For bioretention areas, filter media layer thickness should be 30-inches minimum. Response: Detail 5 on sheet C503 has been updated to reflect the 30-inch minimum for bioretention filter media layer thickness. 26. The model for BIO-2 shows 24-inches of storage during the 100-year event whereas the maximum allowable in 18-inches. Response: BIO-2 was adjusted so only 18-inches of storage is being utilized in the 100-year event. 27. Provide a check dam detail in accordance with NYSDEC Blue Book standards. Response: A stone check dam detail was added to the project plan set on sheet C501 as Detail 8. Sizing was done in compliance with this detail shown in detail 8 on sheet C501. 28. The dry swale underdrain shall be a minimum of 6-inch diameter. Response: Detail 3 on sheet C501 has been updated to reflect the 6-inch minimum diameter for the dry swale underdrain. 29. It is recommended that stone outlet protection be provided at the bioretention and detention pond outfalls to prevent the potential for erosion. Response: Stone outlet protection was added to the downstream end sections for the bioretention and detention ponds. A detail has been added to sheet C503 as Detail 10 in accordance with the NYSDEC stone outlet protection requirements. 30. Prior to issuance of a building permit, a Stormwater Operation and Maintenance Agreement will be required in accordance with Chapter 228 of the Town of Ithaca Town Law. 6 Response: Acknowledged. 31. Please include in the SWPPP that weekly inspections shall be submitted to the Town of Ithaca Engineering Department. Response: Submission of weekly inspection reports has been added to the SWPPP in sections 6.2.1 and 7.4 of the narrative. 32. Once the SWPPP has been deemed acceptable by the Town Engineer, the Applicant will need to apply for a SWPPP Permit through OpenGov. Final approval will not be issued until the application has been submitted and the Fee has been paid. Response: Acknowledged. If you have any questions or require any additional information, please do not hesitate to contact me via email at agraham@labellapc.com. Respectfully submitted, LaBella Associates Andrew Graham, PE Civil Engineer DEPARTMENT OF CODE ENFORCEMENT 215 N. Tioga St 14850 607.273.1783 codes@town.ithaca.ny.us 7/24/26 Bomber Heights Project Plan Review Response to Comments uploaded on 7/20/26 2025 NYS Uniform Code and Town of Ithaca Code Bold lettering are responses from the Town of Ithaca Code Department based on materials uploaded to the file on 7/20/26. The underlined wording is responses from the applicant from the document titled “ 16.2 Bomber Heights-Codes Response Letter-v1 5.7.26pdf”. 1. Emergency Response Plan The emergency response plan will be reviewed for compliance with Section 1207.17 of the 2025 New York State Fire Code (NYSFC) at the time of building permit application. Additional information may be required at that stage to demonstrate full compliance. Response: The applicant looks forward to receiving these comments, and will make adjustments to the ERP in accordance with the Fire Code and recommendations from the Fire Department. 2. Stream Setback The submitted plans identify one stream setback on the subject property. Based on the information provided, no construction activity appears to be proposed within the designated setback area. This shall remain in compliance throughout the project. Response: Acknowledged. 3. Clear-Cutting Limitations (Town of Ithaca Code §270-5) The subject parcel has a total area of 62.01 acres. Clear-cutting limitations are evaluated as follows: • For the first 10 acres: 20% allowable clear-cutting = 87,120 square feet (2.0 acres) • Remaining acreage (52.01 acres): 10% allowable clear-cutting = 182,995.56 square feet (4.201 acres) • The Town of Ithaca defines clear-cutting as the removal of 50% or more of trees measuring 6 inches or greater in diameter at breast height (DBH) over any area exceeding one acre. • Sheet C100 identifies a “tree clearing and grubbing” area totaling approximately 23.16 acres. At this time, it is unclear whether this area meets the definition of clear-cutting under Town Code. Response: At this time, rather than conducting additional surveys to identify if the project is or is not in compliance with this provision of the code, the applicant has instead decided to file for an area variance, which assumes that 100% of the proposed tree clearing area meets the definition of “clear cutting”. At this time, this area variance appears to be a request for an exceedance of up to 16.959 acres additional acres of tree clearing over and above the 6.201 acres allowed by the code. TOI Response: Thank you for this information, we have received your area variance application and will schedule you after the Planning Board provides you with a preliminary site plan approval and makes a determination with respect to SEQRA. 4. A detailed tree survey shall be provided identifying all trees measuring 6 inches or greater DBH and the extent of canopy removal. This information is necessary to determine the total area of clear-cutting and whether the proposed work exceeds allowable limits, potentially requiring an area variance. Response: In lieu of the generating this tree survey; with the explicit purpose of seeking to prove the project’s compliance with the underlying code, the applicant has instead sought an area variance for up to 16.959 acres of additional tree clearing. TOI Response: Thank you for this information, we have received your area variance application and will schedule you after the Planning Board provides you with a preliminary site plan approval and makes a determination with respect to SEQRA . 5. Fire Apparatus Access and Snow Removal The Operation and Maintenance document (Page 11) indicates that snow removal will occur only after accumulation of 10 inch snow event or upon request by the Ithaca Fire Department under extenuating circumstances. • This provision does not meet the intent of the following code sections: • NYS Fire Code §503.2.3: Fire apparatus access roads shall be designed and maintained to support imposed loads and provide all- weather driving capabilities. DEPARTMENT OF CODE ENFORCEMENT 215 N. Tioga St 14850 607.273.1783 codes@town.ithaca.ny.us • NYS Property Maintenance Code §302.3: Driveways and similar areas shall be maintained in a safe condition and free of hazards. • If there was a snow event that accumulated 9” of snow and a week later there was a snow event that accumulated 7” of snow, that would essentially be 16” of snow on the fire apparatus access road, which would not be passable for emergency vehicles. • Allowing 10 inches of snow accumulation prior to removal is not acceptable for maintaining required emergency access. Based on consultation with the Ithaca Fire Department, this threshold is considered inadequate. • The snow removal plan should be revised to ensure continuous and reliable access for emergency vehicles under all weather conditions. Response: The operations and maintenance plan has been revised to read that “snow removal shall occur any time accumulation at the site exceeds 6 inches of snow. However, it should be noted, that the language proposed in the operations and maintenance plan directly mirrors that proposed, and accepted, by the Town for Carrowmoor Solar. We appreciate the Code’s office issuing a new interpretation but would like the record to show this is a deviation from previously accepted language. TOI Response: Thank you for your response. As you are aware, there have been some retirements at the Ithaca Fire Department. This is not an interpretation, but rather a judgement call with respect to safety traversing the site in the event of an emergency. Please note that we may need to review the Carrowmore agreement to ensure that the Fire Department can respond adequately and the lack of maintenance does not constitute a life safety issue for those that are on site in the event that they need medical attention or emergency responders need to be deployed to the site. 5. Wildlife-Friendly Fencing (Town of Ithaca Code §270-219.1G[a]) The project proposes perimeter fencing for a solar installation exceeding three acres, which requires the use of wildlife-friendly fencing. 1. It is unclear from the submitted materials whether the proposed fencing includes openings sufficient to allow passage of small mammals and reptiles, or whether it minimizes the risk of entanglement or injury. 2. Please provide fencing specifications, including opening dimensions and design details, to demonstrate compliance with the Town of Ithaca Code requirements. Response: The fence detail provided has been accepted as a wildlife friendly design on recently evaluated projects, namely Carrowmoor Solar, LLC. The 8’ farm fences being deployed on both projects include wildlife friendly features, including; 2” gaps from the ground throughout for passage of small mammals, usage of fixed-knot wire mesh which poses minimal entanglement risk. If the Town has a specific standard which has been determined following the acceptance of this design during previous projects, please make us aware and we will happily review that standards and apply it where appropriate. TOI Response: Thank you for your response. It appears that plan set C502 detail 8 identifies the fencing that is proposed for this project. The detail and notes appear require several items, such as, but not limited to: fixed knot wire mesh to be Bekaert solidrock pro, 12.5 gauge, class 3 galvanized, 6” vertical spacing or approved equal, and all fence wire to be 2” above ground. Please note that one design is not always approved on all projects, as each project is reviewed and considered on its own merit due to different situations that may be present for each project. To: Town of Ithaca Code Enforcement 215 N Tioga St Ithaca, NY 14850 From: Nexamp Solar, LLC. d/b/a Bomber Heights Solar, LLC 101 Summer St, Flr 2 Boston, MA 02110 RE: Bomber Heights Project – Plan Review Comments – 05/07/2026 1. Emergency Response Plan The emergency response plan will be reviewed for compliance with Section 1207.17 of the 2025 New York State Fire Code (NYSFC) at the time of building permit application. Additional information may be required at that stage to demonstrate full compliance. Response: The applicant looks forward to receiving these comments, and will make adjustments to the ERP in accordance with the Fire Code and recommendations from the Fire Department. 2. Stream Setback The submitted plans identify one stream setback on the subject property. Based on the information provided, no construction activity appears to be proposed within the designated setback area. This shall remain in compliance throughout the project. Response: Acknowledged. 3. Clear-Cutting Limitations (Town of Ithaca Code §270-5) The subject parcel has a total area of 62.01 acres. Clear-cutting limitations are evaluated as follows: • For the first 10 acres: 20% allowable clear-cutting = 87,120 square feet (2.0 acres) Remaining acreage (52.01 acres): 10% allowable clear-cutting = 182,995.56 square feet (4.201 acres) The Town of Ithaca defines clear-cutting as the removal of 50% or more of trees measuring 6 inches or greater in diameter at breast height (DBH) over any area exceeding one acre. • Sheet C100 identifies a “tree clearing and grubbing” area totaling approximately 23.16 acres. At this time, it is unclear whether this area meets the definition of clear-cutting under Town Code. Response: At this time, rather than conducting additional surveys to identify if the project is or is not in compliance with this provision of the code, the applicant has instead decided to file for an area variance, which assumes that 100% of the proposed tree clearing area meets the definition of “clear cutting”. At this time, this area variance appears to be a request for an exceedance of up to 16.959 acres additional acres of tree clearing over and above the 6.201 acres allowed by the code. 4. A detailed tree survey shall be provided identifying all trees measuring 6 inches or greater DBH and the extent of canopy removal. This information is necessary to determine the total area of clear-cutting and whether the proposed work exceeds allowable limits, potentially requiring an area variance. Response: In lieu of the generating this tree survey; with the explicit purpose of seeking to prove the project’s compliance with the underlying code, the applicant has instead sought an area variance for up to 16.959 acres of additional tree clearing. 5. Fire Apparatus Access and Snow Removal The Operation and Maintenance document (Page 11) indicates that snow removal will occur only after accumulation of 10 inch snow event or upon request by the Ithaca Fire Department under extenuating circumstances. This provision does not meet the intent of the following code sections: • NYS Fire Code §503.2.3: Fire apparatus access roads shall be designed and maintained to support imposed loads and provide all-weather driving capabilities. • NYS Property Maintenance Code §302.3: Driveways and similar areas shall be maintained in a safe condition and free of hazards. • If there was a snow event that accumulated 9” of snow and a week later there was a snow event that accumulated 7” of snow, that would essentially be 16” of snow on the fire apparatus access road, which would not be passable for emergency vehicles. • Allowing 10 inches of snow accumulation prior to removal is not acceptable for maintaining required emergency access. Based on consultation with the Ithaca Fire Department, this threshold is considered inadequate. • The snow removal plan should be revised to ensure continuous and reliable access for emergency vehicles under all weather conditions. Response: The operations and maintenance plan has been revised to read that “snow removal shall occur any time accumulation at the site exceeds 6 inches of snow. However, it should be noted, that the language proposed in the operations and maintenance plan directly mirrors that proposed, and accepted, by the Town for Carrowmoor Solar. We appreciate the Code’s ofice issuing a new interpretation, but would like the record to show this is a deviation from previously accepted language. 6. Wildlife-Friendly Fencing (Town of Ithaca Code §270-219.1G[a]) The project proposes perimeter fencing for a solar installation exceeding three acres, which requires the use of wildlife-friendly fencing. • It is unclear from the submitted materials whether the proposed fencing includes openings suficient to allow passage of small mammals and reptiles, or whether it minimizes the risk of entanglement or injury. • Please provide fencing specifications, including opening dimensions and design details, to demonstrate compliance with the Town of Ithaca Code requirements. Response: The fence detail provided has been accepted as a wildlife friendly design on recently evaluated projects, namely Carrowmoor Solar, LLC. The 8’ farm fences being deployed on both projects include wildlife friendly features, including; 2” gaps from the ground throughout for passage of small mammals, usage of fixed-knot wire mesh which poses minimal entanglement risk. If the Town has a specific standard which has been determined following the acceptance of this design during previous projects, please make us aware and we will happily review that standards and apply it where appropriate. z Table of Content Project Overview & Narrative Bomber Heights Solar Troy Road| Town of Ithaca, NY Primary Contact: Ryan McCune Nexamp Solar 101 Summer Street, 2nd Fl Boston, MA 02110 607-592-5648 Bomber Heights Solar – Project Narrative – Town of Ithaca 2 Table of Contents Table of Contents .......................................................................................................................... 2 Project Team ................................................................................................................................. 3 Project Summary .......................................................................................................................... 4 Project Details ............................................................................................................................... 5 Existing Site Conditions ................................................................................................................ 6 Proposed Array Layout ................................................................................................................. 7 Existing Conditions ....................................................................................................................... 8 Permitting and Project Design ...................................................................................................... 9 Draft Construction Schedule ....................................................................................................... 14 Company Overview ..................................................................................................................... 15 Bomber Heights Solar – Project Narrative – Town of Ithaca 3 Project Team Company Role Name Email Nexamp Solar, LLC Lead Developer Ryan M McCune com LaBella PC Project Manager Kelly Sullivan Lead Site Plan Designer Andrew Graham Lead Civil Designer Mufuta Tshimanga Bomber Heights Solar – Project Narrative – Town of Ithaca 4 Project Summary Members of the Town Planning Board, Nexamp is excited to present the Town of Ithaca with its plan for a solar system located on Troy Rd in Ithaca. This Community Solar system will be constructed on a collection of open fields owned by Troy Heights, LLC . As we embark on the application process, Nexamp hopes to learn more about the Town’s desires for ongoing solar development, and ultimately, we are seeking feedback that will help our team adjust our final design as we head into environmental and site plan approval processes. The proposed solar array is a single-axis sun-tracking system, which optimizes system performance by tracking the sun from east to west throughout the day. The Utility-approved system is 4.5MWac and should occupy 25-30 acres of fenced area each. The proposed project will also include construction of a new gravel access road leading to the proposed solar array area, Single-Axis Tracker solar racking, no more than two inverter/transformer equipment pads, Solar Energy Storage, new overhead utility poles, and and code compliant deer fence around the perimeter of each solar array. There will be a moderate amount of site grading, largely as a result of tree clearing and the installation of robust stormwater management systems to limit erosion and runoff. At the conclusion of construction, the soil will be seeded with a locally appropriate seed mix to prevent soil damage and promote deep root growth. Vegetation management within the solar array would be accomplished by mowing and/or sheep grazing within the fenced area. At the end of their lives, the solar arrays will be decommissioned, and the site restored back to the current existing condition, per Town Code requirements. Included in this packet is an overview of the project, including system design, environmental conditions, the estimated permitting process, and a sample construction schedule. Additionally, should the board members or Town employees want to better familiarize themselves with Nexamp and its history, we have provided a brief overview of our company as well. We sincerely thank all members of the board for their consideration, and we hope that this pre- application process sets the groundwork for a productive partnership in the future. Best, Ryan M McCune Bomber Heights Solar – Project Narrative – Town of Ithaca 5 Project Details * Address Troy Rd, Ithaca, NY Panels Silfab 650W Bifacial Panels Tax Parcels 49.-1-26.2 Inverters Solectria String Inverters Zoning District LDR - Solar Overlay Energy Storage 5MW - 20MWh 8 – Tesla MegaPack System Size 5MWac Racking Nevados Total Fenced Acreage 25-30 acres Property Setbacks: Front ~400’ Side ~ 75’ Back ~ 84’’ **Racking, battery and panel providers subject to change due to supply chain constraints Bomber Heights Solar – Project Narrative – Town of Ithaca 6 Existing Site Conditions Summary As part of its initial due diligence related to the site, Nexamp has worked with civil and environmental contractors to conduct extensive physical, environmental, and permitting diligence on the site. Pre- Permitting meetings with the Town have informed our current design, and as designed the site in question will not require any environmental permits other than those associated with its SWPPP and eventual SPDES permit application. Phase one environmental studies have found no evidence of Recognized Environmental Conditions (RECs), Historical Recognized Environmental Conditions (HRECs) or Controlled Recognized Environmental Conditions (CRECs) within the fenced area of the site. Our project is subject to full SEQR review by the Town of Ithaca Planning Board. Phase I Environmental reports can be shared with the Town upon request. The Phase I study was conducted by our civil engineering partners at LaBella PLLC, and was completed pursuant to ASTM, E1527-13 standards. Tax Parcel Currently, the project is slated for construction on a single parcel; 49.-1-26.2, located in the Town’s Low Density Residential District. The parcel in question is part of the Town’s Large Solar Overlay District. Wetlands & Drainage While this site does contain several sections of poorly drained soils, there are no DEC recognized wetlands present on the site. A site jurisdictional determination request was filed, and issued in 2025 which confirms this status. Site analysis shows several potentially non-jurisdictional wetlands on the site. These wetlands may be non-jurisdictional due to their lack of continuous surface-level connection to any Navigable Waterway. USACE coordination on the matter is underway. Should USACE assert jurisdiction, a Nationwide permit allowing for disturbance of wetlands over .25 acres would be required, should they not assert jurisdiction no additional permitting is required. Given the time constraints surrounding USACE staffing and priorities, our recommendation is that the Town proceed with its analysis, and add USACE approvals as a condition precedent to the issuance of a building permit. Wildlife Preliminary analysis of the NYS Environmental Resource Mapper and NYS EAF Mapper have shown no species of interest, or endangered species within the project area, or area of impact. USFWS has indicated two endangered species in the area: the Monarch Butterfly and the Northern Long Eared Bat. A determination Key letter for the NLEB was issued in June 2026, stating that the project is Not Likely to Adversely Affect (NLAA).While impacts are unlikely, the project is open to adhering to tree clearing time of year restrictions (Nov-Mar), should that be requested by the Board. Archaeological Resources A SHPO No Impact Letter was issued, stating no expected impacts, in June 2026. Soils The facility does not fall within a recognized agricultural district, and per USDA mapping, no prime soils exist within the proposed project footprint. Bomber Heights Solar – Project Narrative – Town of Ithaca 7 Proposed Array Layout Bomber Heights Solar – Project Narrative – Town of Ithaca 8 Existing Conditions Bomber Heights Solar – Project Narrative – Town of Ithaca 9 Permitting and Project Design Nexamp has progressed through the design process while consulting the new Solar Code, and thus feels confident that its final project design adheres to all the stipulations codified in the Town’s local Solar law. Nexamp’s system is qualified as a Full-Size Solar system, per the guidelines issued in the latest Town of Ithaca Solar Code. As designed, our project meets all the design, signage and safety standards as outlined in the local law and will be eligible for site plan approval consideration by the Town Planning Board. Per the town’s Solar Law, we have, or will furnish the following materials to aid with the consideration of our site plan application. Items highlighted in bold have been amended since the original submission, as of 4/4/2026. 0.0- Project Narrative 0.1 – Battery Energy Storage System (BESS) FAQ 1.0 – Application (completed online) 1.1 – Owners Authorization 1.2 – Memorandum of Lease 1.3 – Deed 2.0 – Site Plan Designs 2.1 – Three Line Electrical Diagrams 3.0 – FEAF Part 1 4.0 – Wetland Delineation and Report 4.1 NYS DEC Parcel Determination 5.0 – NYSHPO Documentation (Pending as of 4/1/2026) 6.0 – FAA No Hazard Determination 7.0 – USDA Soil Map 7.1 USDA Bedrock Mapping 8.0 Habitat Assessment Memoranda 8.1 USFWS Concurrence Letters 9.0 Visual Simulation Memoranda 9.1 – Viewshed Analysis 9.2 - Line of Sight Analysis 9.3 - Glint and Glare Study 9.4 - Visual Renderings 10.0 SWPPP Report 10.1 Infiltration Testing Data 11.0 Emergency Response Plan 11.1- Fire Chief Correspondence (these materials have been provided to the Town, but have not been uploaded to public data rooms) 12.0 Decommissioning Plan 13.0 Operations and Maintenance Plan 14.0 CESIR Study 15.0 Spec Sheets Bomber Heights Solar – Project Narrative – Town of Ithaca 10 We expect the Town to designate this project a Type I action under SEQR and encourage the Town Planning Board to take lead agency of the project to retain greater oversight as to the final design and legal conditions attached to the site plan approval for the project. In addition to town approvals, we expect the project to be subject to the following approvals prior to construction. Jurisdiction Approving Party Approval Status Notes Town of Ithaca Planning Board SEQR Declaration In Process - Applied Town of Ithaca Planning Board Preliminary Site Plan Approval In Process – Applied Town of Ithaca Zoning Board of Appeals Area Variance – Tree Clearing In Process – Applied Town of Ithaca Planning Board Final Site Plan Approval In Process Tompkins Count Planning Board 239-m Approved Conditions: - Inclusion of Tompkins County EMR in the ERP - Suggestion to increase the frequency of plowing to storms under 10” Town of Ithaca Code Enforcement Officer Building Permit To Be Submitted New York State NYS DEC SPDES Water Permit To Be Submitted MS4 Approval must be granted by the Town of Ithaca prior to DEC submission New York State NYSDEC Wetland Jurisdictional Determination Approved – No Impact New York State NYSHPO No Impact Letter Approved – No Impact Federal Government FAA Navigation Impact Designation Approved – No Impact Federal Government USFWS No Impact letter Approved NLEB – Not Likely to Adversely Affect Green Floater – No Impact Federal Government USACE Nationwide Permits 14, 51 In Process Bomber Heights Solar – Project Narrative – Town of Ithaca 11 Permitting and Design Compliance Zoning: The proposed site at Troy Road is located within the LDR district, as well as the solar overlay district provided by the Town of Ithaca. The parcel is not part of a required open space area or park-side area. The facility should be designated as a Large-Scale Ground Mounted PV system. It exists entirely on one parcel, and the solar facility footprint does not exceed 35 acres. All project equipment is setback are a minimum of 75ft, access roads occur within this setback to comply with road placement regulations. Standard Requirement Project Compliance Permitted Use Allowed Complies – parcel is included in the Town’s Overlay District Lot Coverage Up to 35 acres Complies – Project is less than 35 acres Tree Clearing No more than 20% of 10 acres on the lot, no more than 10% of the balance Per code, expected allowed tree clearing is 6.201 acres. Total Tree clearing approximately ±23 acres. An Area Variance application has been filed under permit number ZBAA-26-8 Setbacks 75 ft from property lines and streets Complies – design respects setbacks to all generating equipment Fencing 8 ft wildlife-friendly fence, ≥25 ft setback Complies – wildlife-friendly fencing planned Buffering 50 ft vegetative buffer Complies – landscape buffer provided Height Limit ≤ 20 ft Complies – solar panels < 20 ft Decommissioning Financial assurance for full removal Complies – decommissioning plan will be filed with Site Plan Application Interconnection: This is a 5MWac, 20MWh Energy Storage facility connected via local distribution grid to the South Hill Substation. The facility was approved by NYSEG in April of 2024. The system is planning to Interconnect via utility poles on Troy rd. at a new proposed entrance. Conduit within the system fence, and all conduit heading to the POI will remain underground, buried to NYSDAM and Town of Ithaca standards, to the extent approved by the utility. Transmission crossings will be regulated and permitted by NYSEGs ROW Engineering Team Racking: Racking suppliers are somewhat fluid at this stage, due to the early age of the project and lack of visibility into later-stage availability. Regardless of supplier, the system will be a Single- Portrait single-axis tracker system, mounted to the ground via either steel I beams or ground screws. The overall system height should not be more than 17-18 ft at peak tilt. Panels utilized will be a PV, domestically produced bifacial variety, covered with anti-glare coating to meet the Town of Ithaca’s requirements. Bomber Heights Solar – Project Narrative – Town of Ithaca 12 Roads: Roads for this project have been located and constructed to preserve safety and comply with the Town’s soil protection requirements. The one deviation is that all roads will be constructed to 20’ wide to allow for easy passage by first responders. Construction and maintenance access will be conducted via the main access off Troy Road. The road will continue through the facility past the energy storage facilities to the rear fence for fire access as directed by the IFD. Construction and access roads will be built at grade where possible, but several raised areas will occur to preserve existing drainage patters and ensure adequate stormwater protections. A temporary laydown area will be constructed off the Construction and Maintenance access road for storage of all construction material, equipment, and employee parking throughout the systems construction. This laydown area will be removed, excess stone spread on road surfaces, and soil seeded and remediated prior to final completion. Stormwater: All roads will be impervious surfaces treated to NYSDEC standards. A SWPPP and stormwater narrative have been included in our application materials to better outline these features and their respective functionality. Extensive temporary protections will be installed during construction to prevent runoff and soil damage, including ground-level silt controls around all proposed tree clearing, and areas of disturbance. A 5-acre waiver is being sought, so stormwater inspections will take place bi-weekly throughout active construction. DEC reports will be shared with Town engineers at their request. Screening and Vegetation: The project as designed preserves substantial natural screening to the North, West and East. This natural, native screening is going to be preserved to substantially screen the project. To augment this natural screening, trees have been proposed along Troy Rd and abutting eastern property lines to screen landowners to the North/Northwest and East of the proposed array. During and following construction, Nexamp plans to seed the facility with Ernst Buzz and Fuzz, an ASGA-approved grazing and pollinator friendly seed mix that will promote foraging and pollinator habitat in the project area. Fencing: The project was designed with 8’ farm fence throughout the site, satisfying NEC requirements. Posts will be PT wood, save gate entrances which will be standard metal poles for stability. The fence is small-wildlife friendly, made of galvanized steel 2.5” mesh, and will be installed at 2” above grade. Construction Practices: Nexamp; as the developer and contractor for the project will, manage all subcontractors and steer the project with its own Project Management team. Per Town and State Requirements, the project will be constructed under NYSDAM guidelines, dictating soil management and storage in addition to environmental monitoring requirements. The facility does not impact any prime soils, so environmental monitoring will be handled by on-site, Nexamp Project Managers. NYSDEC stormwater requirements and installations will be handled under the SPDES permit to be issued to the company. Operations and Maintenance: Nexamp Asset Management Services, LLC, a subsidiary of Nexamp Inc, will be the long-term asset manager for the system. Nexamp has never sold one of its NYS assets and has only parted with a few of the 100+ Community Solar Systems it has developed and constructed in NYS. As such, we feel confident in the promises made in our Operations and Maintenance Plan, included in our submission. This O&M Plan covers routine inspections and maintenance, stormwater inspections, vegetative maintenance, invasive species management and snow removal. Bomber Heights Solar – Project Narrative – Town of Ithaca 13 Decommissioning: Decommissioning plan with cost certification was submitted that meets town requirements, additional decommissioning agreements can be supplied for consideration by the Town. Bomber Heights Solar – Project Narrative – Town of Ithaca 14 Draft Construction Schedule The project will proceed through a coordinated local and state permitting process. Locally, approval requires Sketch Plan Review, Zoning Variance Review followed by Site Plan Review consideration before the Town of Ithaca Planning Board. At this time, the Planning Board has taken jurisdiction over SEQRA. In addition to local approvals, the applicant is pursuing required state and federal permits, which may not be complete at the time of initial filing. Anticipated permits include, US Army Corps Section 404- Nationwide Permit, SHPO consultation, FAA hazard determinations, and endangered species reviews by the appropriate State or Federal agencies. At this time, NYSDEC coordination on wetland jurisdiction has been completed, and no jurisdictional wetlands have been claimed within the development area. Once local permits have been received, and conditions have been met, the project expects to follow a 12- 18 month construction window, which may be affected by weather. Sample Construction Schedule Months 0-3 – Tree Clearing – Grading – Stormwater Control Installation Months 3-6 – Road Installation, Trenching and conduit Installation, Equipment Pad Installation Months 6-10 – Racking Installation – Inverter Installation Months 10-14– Panel Installation, BESS placement, Electrical Start Months 12-16 – Electrical Installation – MV Cabling – POI construction Months 16-18 – QA /QC – Remedial Action Month 18 – Operations Deployment for construction is expected within 6-9 months of project acceptance, subject to equipment availability. Bomber Heights Solar – Project Narrative – Town of Ithaca 15 Company Overview In 2007, U.S. Army veterans Will Thompson and Dan Leary realized a vision for making a range of renewable energy options more affordable and accessible to homeowners and businesses throughout the Commonwealth of Massachusetts. The pair launched NexGen Energy Solutions, a turnkey provider of renewable energy and carbon solutions, in their hometown of North Andover, Massachusetts. NexGen became Nexamp later in 2007. During the early years, Nexamp delivered a variety of energy systems for residential, commercial, municipal and agricultural customers. Energy solutions offered included solar PV, solar thermal, micro- wind, geothermal heating and cooling, and a wide array of energy efficiency services. In 2011, Nexamp shifted its focus fully toward commercial and industrial scale solar facilities, working with businesses, municipalities, and property owners that wanted to realize the various benefits of renewable solar generation. 2015 marked Nexamp’s first community solar project and the beginning of a new chapter for the company. Leveraging its integrated approach of developing, building, owning and operating solar plants, Nexamp turned its focus to community solar, and alongside that the mission of making the benefits of solar power available to everyone—homeowners, renters, non-profits, small businesses, farms and more. Nexamp was named NECEC Clean Energy Company of the Year in 2015 and a Solar Power World Top 3 Commercial Solar Developer in 2017. In 2016, Mitsubishi’s Diamond Generating Corporation made a significant investment in Nexamp, and in 2018 the group made an additional investment that gave it a controlling interest. Serving a rapidly expanding network of individuals, property owners, businesses, and communities that benefit from its nationally distributed portfolio of solar assets, Nexamp is a Massachusetts-based, nationally headquartered solar company that is laying the groundwork for a cleaner, more secure and resilient energy future. Throughout 2022, Nexamp permitted and financed more than 250MWs of community solar projects in 12 states, with more than half of that total capacity occurring in New York State. Our team expects to bring another 250MWs through permitting and financing through 2023, adding to our industry-leading community solar portfolio. Even in uncertain times, our team has considered to set the bar for not only developing sustainable projects but managing them and working with our partner communities to build lasting relationships. Bomber Heights Solar – Project Narrative – Town of Ithaca 16 Company Information Year Founded 2007 Years in Business 19 Ownership Status Privately held, Delaware Corporation Year Established 2007 Other Legal Names of Firm Nexamp Capital, LLC Nexamp Solar, LLC Nexamp Asset Management Services, LLC Parent Company Nexamp, Inc. Federal Tax Identification 261541318 Number of Employees, 473 full-time employees DEPARTMENT OF PLANNING 215 N. Tioga St 14850 607.273.1747 www.town.ithaca.ny.us To: Involved/Interested Agencies: Kellea Bauda, Administrative Director, Tompkins County IDA Katherine Borgella, Commissioner of Planning & Sustainability, Tompkins County Planning Dept. Nick Ensign, Director, Tompkins County Highway Department Dereth Glance, Regional Director, Region 7, N.Y.S. Dept. of Environmental Conservation David Maddox, Federal Aviation Administration Steven Metivier, Chief, Regulatory Branch, US Army Corps of Engineers Tim Sullivan, Biologist, US Fish & Wildlife Service From: Christine Balestra, Senior Planner Date: March 4, 2026 RE: Request for Concurrence in Lead Agency Designation – Bomber Heights Solar Project The Town of Ithaca Planning Board has received an application requesting site plan approval for the Bomber Heights Solar Project, as further described below. Description: The project involves consideration of site plan approval for the proposed Bomber Heights Solar large-scale community photovoltaic system project, located on Troy Road, between Coddington Road and King Road East, in the Low Density Residential Zone and Large-Scale Photovoltaic Solar Energy System Overlay District. The project involves installing a 5MWac single-axis sun tracking solar array system on approximately 31+/- acres of land, along with two inverter/transformer equipment pads, battery energy storage, new utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. This is a Type I Action under the State Environmental Quality Review Act (6 NYCRR Part 617) because the project involves: (1) an action that involves the physical alteration of 10 acres (617.4 (b)(6)(i). This is also a Type I Action under the Town of Ithaca Town Code Chapter 148, Environmental Quality Review because the project involves the authorization of industrial or commercial uses within a residential or agricultural district applying to a parcel of land of 10 or more acres (148.5.A (1). Tentative Date for Planning Board Meeting- Preliminary Site Plan Review and Environmental Determination: April 7, 2026 The Town of Ithaca Planning Board reviewed a sketch plan for this project and adopted a resolution indicating its intent to be the Lead Agency to conduct a coordinated environmental review pursuant to SEQRA and Chapter 148 of the Town of Ithaca Code on March 3, 2026. To coordinate review under 2 SEQRA, your Board or Agency has been identified as having “approval” authority over some aspects of this project. Concurrence with the designation of the Town of Ithaca Planning Board as Lead Agency and comments or concerns related to potential environmental impacts associated with the proposed actions are requested and should be sent prior to April 7, 2026. The materials for this project are a very large file, so they can be downloaded from the following link: PB packet- Bomber Heights Solar Sketch Plan.pdf If you have any questions regarding the above matter, please contact me at (607) 273-1721, extension 121, or by email at cbalestra@townithacany.gov. Att. cc: Lori Brewer, Chair, Town of Ithaca Conservation Board Ryan McCune, Vice President, Business Development, Nexamp Michael Moody, Fire Chief, Ithaca Fire Department Jennifer, Negus, Integrated Field Design, Ithaca, NYSEG Division of Environmental Permits 625 Broadway Albany, NY 12233-1750 | dec.ny.gov | DEPEnergy@dec.ny.gov | (518) 402-9167 KATHY HOCHUL AMANDA LEFTON April 2, 2026 Christine Balestra, Senior Planner Town of Ithaca Planning Board 215 North Tioga Street Ithaca, New York 14850 Emailed to: cbalestra@townithacany.gov Re: Lead Agency Coordination Response Bomber Heights Solar, LLC Solar Project Nexamp, Inc., d/b/a/ Bomber Heights Solar, LLC Tax ID # 49.-1-26.2 117 Troy Rd Ithaca, NY 14850 Dear Christine Balestra: This letter responds to your correspondence dated March 4, 2026, regarding lead agency coordination for the project referenced herein, under Article 8 (State Environmental Quality Review – SEQR) of the Environmental Conservation Law and 6 NYCRR Part 617. The New York State Department of Environmental Conservation (NYSDEC) has the following interest in this project: Name of Action: Bomber Heights Solar, LLC Solar Project NYSDEC Contact Person: Matthew Dahlen, Environmental Analyst Trainee II SEQR Classification: Type I Unlisted Type II NYSDEC Position: Based on the information provided: NYSDEC has no objection to your agency assuming lead agency status for this action. NYSDEC wishes to assume lead agency status for this action. NYSDEC needs additional information in order to respond (see comments). NYSDEC cannot be lead agency because it has no jurisdiction in this action. Please notify NYSDEC immediately if the project/proposed action scope changes, or the EAF is revised. Possible NYSDEC Permitting Requirements A review of NYS protected resources near or within the project site was performed using existing GIS data (see enclosed NYS Resource Map). Please note that jurisdictional Bomber Heights Solar, LLC Solar Project April 2, 2026 Page 2 maps are meant to provide approximate sizes and locations of resources. Actual field conditions may vary from those depicted on the maps. The following provides a summary of potential State permitting requirements for the project based on the results of a protected resources review and project information submitted with your correspondence. Freshwater Wetlands Portions of New York State regulated freshwater wetlands, and their adjacent areas, may be located within the project area. It is recommended that the Applicant submit a request for a freshwater wetlands jurisdictional determination in order to determine whether the proposed work is located within state regulated freshwater wetlands or regulated adjacent area. A Freshwater Wetlands Permit pursuant to Article 24 of the New York State Environmental Conservation Law (ECL) would be required if the project were to impact state regulated freshwater wetlands or their 100-foot adjacent area. Information on wetlands, applying for jurisdictional determination, and the Article 24 permitting process can be located on our Freshwater Wetlands Program website at http://www.dec.ny.gov/permits/6058.html. Water Quality Certification It appears that federally regulated wetlands and/or waterbodies may be located on the project site. Work within certain wetlands and other waters of the U.S. may require a permit from the US Army Corps of Engineers (USACE). A Water Quality Certification, pursuant to Section 401 of the Federal Clean Water Act, may also be required from the NYSDEC if a USACE permit is issued. NYSDEC recommends that the Applicant contact the appropriate USACE District Office directly to discuss federal wetlands and waters of the U.S. regulatory jurisdictions and the potential permitting requirements for this project. Please refer to this NYSDEC website link www.dec.ny.gov/permits/6042.html#Water_Quality_Certification for more information on Water Quality Certifications, including procedures instituted in response to new USEPA rules. Protection of Waters Program Based on current GIS data, it appears that two class A streams are located on or along the subject parcel’s boundary. A stream with a water quality classification of AA, A or B, or with a classification of C with a standard of (T) or (TS), meaning trout or trout-spawning waters, is a protected stream under 6 NYCRR Part 608 – Use and Protection of Waters. If disturbance to the bed and/or banks of a protected stream will result from the proposed project, a Stream Disturbance Permit must first be obtained from the NYSDEC. If the proposed project involves excavation or fill below the mean high water (MHW) level in a Class C stream that is considered navigable according to 6 NYCRR Part 608.1(u), an Excavation and Fill Permit is required from the NYSDEC prior to commencing any work. SPDES General Permit for Stormwater Discharges from Construction Activities Any project which results in a disturbance of one acre or more of land, must be in compliance with the State Pollutant Discharge Elimination System (SPDES) Phase II Bomber Heights Solar, LLC Solar Project April 2, 2026 Page 3 regulations for Stormwater Discharges Associated with Construction Activities and obtain coverage under the SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-25-001). Information regarding the SPDES General Permit for Stormwater Discharges can be found on the NYSDEC’s website at http://www.dec.ny.gov/chemical/8468.html. Please feel free to contact me by e-mail at matthew.dahlen@dec.ny.gov or by telephone at (518) 408-2441 if you have any questions. Sincerely, Matthew Dahlen Environmental Analyst Trainee II Encl.: Project Location & NYS Resources Map ecc: NYSDEC Region 7 Ç o o o o o o o o o o o o o o o o o o o o o o Northern Harrier Tompkins C755012 Former Axiohm Facility C755012A OFF-SITE Former Axiohm Facility State Superfund Program Sixmile Creek Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Unnamed Water Buttermilk Falls NYS ITS GIS Program Office, NYS ITS Geospatial ServicesDivision of Environmental Permits Projection: NAD_1983_ UTM_ Zone _18 N Date: 4 /2/20 26 Disclaimer: This map w as prepared by the NYSD EC Division of Environm ental Permits using the most current data available. It is deemed accurate but is not guaranteed. NYSDEC is not responsible for any inaccuracies in the data and does not necessarily endorse any interpretations or products derived from the data. PROJECT LOCATION MAP Nexamp, In c., d/b /a Bomber Heigh ts So lar, LLC Bomber Heigh ts So lar, LLC Solar ProjectTax Map ID: 49.-1-26.2Town o f Ith acaTompkins CountyRegion 7³Leg end o Regulated F acility Point Remediation Sites Remediation Site Borders Environmental Easements Ç Unconsolidated Mine Unprotected Stream Protected Stream NWI Wetlands Informational Wetlands BBA_Grassland_Birds_ET Agricultural Districts Archeological Sites of Sensitivity State Parks Catego ry State Park Potential EJ Area 0 2,000 4,000 6,000 8,0001,000 Feet 1 inch = 2,000 feet Project Site 1 Chris Balestra From:Maddox, David (FAA) Sent:Thursday, March 5, 2026 7:07 AM To:Chris Balestra Subject:RE: Lead Agency Notification- Bomber Heights Large-Scale Solar- Troy Road-Ithaca Follow Up Flag:Follow up Flag Status:Flagged Good morning, Thank you for the information regarding the proposed solar array. The FAA does not engage in environmental review; however, we will perform aeronautical study on the array when the project is filed in accordance with 14 CFR Part 77. Thanks David Maddox Obstruction Evaluation Group (AJV-A5) AJV-A510 Team Manager From: Chris Balestra <CBalestra@townithacany.gov> Sent: Wednesday, March 4, 2026 3:10 PM Subject: Lead Agency Notification- Bomber Heights Large-Scale Solar- Troy Road-Ithaca CAUTION: This email originated from outside of the Federal Aviation Administration (FAA). Do not click on links or open attachments unless you recognize the sender and know the content is safe. Hi, Please see leer aached and link below for materials related to a large-scale solar project in the Town of Ithaca. The Town of Ithaca Planning Board has declared their intent to be the lead agency in the environmental review of the project and is requesng your concurrence, along with comments or concerns, by April 7, 2026. PB packet- Bomber Heights Solar Sketch Plan.pdf You don't often get email from cbalestra@townithacany.gov. Learn why this is important COMMISSIONER Katherine Borgella DEPUTY COMMISSIONER M. Megan McDonald 121 E. Court St, Ithaca, N.Y. 14850 | Phone: (607) 274-5560 | tompkinscountyny.gov/planning Creating and implementing plans that position Tompkins County communities to thrive. April 3, 2026 Chris Balestra, Senior Planner Town of Ithaca Planning Department 215 North Tioga Street Ithaca, NY 14850 Re: Lead Agency Concurrence for Bomber Heights Solar Project Dear Chris Balestra: As an interested agency, the Tompkins County Department of Planning and Sustainability concurs with the designation of the Town of Ithaca Planning Board to act as Lead Agency for the environmental review for the above-mentioned project under the provisions of the State Environmental Quality Review Act. Thank you for the opportunity to participate in this review. Sincerely, Megan McDonald, AICP Deputy Commissioner of Planning and Sustainability PROPOSED RESOLUTION: SEQR Preliminary Site Plan Approval Bomber Heights Large-Scale Solar Energy System Tax Parcel No. 49.-1-26.2 Troy Road, between Coddington and King Road E Town of Ithaca Planning Board, September 1, 2026 WHEREAS: 1. This action involves consideration of Preliminary Site Plan Approval for the proposed Bomber Heights Solar large-scale community solar photovoltaic system project, located on Troy Road, between Coddington Road and King Road East, in the Low Density Residential Zone and Large-Scale Photovoltaic Solar Energy System Overlay District. The project involves installing a 5MWac single- axis sun tracking solar array system on approximately 31+/- acres of land, along with two inverter/transformer equipment pads, battery energy storage, new utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. Troy Heights, LLC, Owner; Nexamp Solar, Applicant; Ryan McCune, Agent; 2. This is a Type I Action pursuant to State Environmental Quality Review Act, 6 NYCRR Part 617 (617.4(b)(6)(i)), because the project involves the physical alteration of more than 10 acres; 3. At its meeting on March 3, 2026, the Planning Board proposed to establish itself as Lead Agency to coordinate the environmental review of the above-referenced proposal, and on March 4, 2026, notified potential Involved and Interested Agencies of its intent to serve as Lead Agency; 4. The Planning Board, on September 1, 2026, has reviewed and accepted as adequate a Full Environmental Assessment Form Part 1, submitted by the applicant, Parts 2 and 3, prepared by Town Planning staff; an application narrative titled “Project Overview and Narrative, Bomber Heights Solar, Troy Road, Town of Ithaca, NY,” a set of drawings titled “Bomber Heights Solar, Troy Road, Ithaca, NY,14850” prepared by LaBella, dated December 2025, and most recently updated 07/10/2026, including sheets C001, C100-C101, C200-C203, C401-C407, C501-504, L101-103; Line of Sight Profile Plans, prepared by LaBella, dated December 2025; Photo Simulations, prepared by Saratoga Associates, dated 3/10/2026 and 4/08/2026; a Wetlands Delineation Report, Decommissioning Plan, Glint and Glare Study, Operations and Maintenance Plan, Battery Energy Storage System Emergency Response Plan, and other application materials; and 5. The Town Planning staff has recommended a negative determination of environmental significance with respect to the proposal; NOW THEREFORE BE IT RESOLVED: That the Town of Ithaca Planning Board, having received no objections from other Involved Agencies, establishes itself as Lead Agency to coordinate the environmental review of the above-described proposal; AND BE IT FURTHER RESOLVED: That the Town of Ithaca Planning Board hereby makes a negative determination of environmental significance in accordance with Article 8 of the Environmental Conservation Law and 6 NYCRR Part 617 New York State Environmental Quality Review for the above referenced proposal, based on the information in the EAF Part 1 and for the reasons set forth in the EAF Parts 2 and 3, and, therefore, a Draft Environmental Impact Statement will not be required. PROPOSED RESOLUTION: Preliminary Site Plan Approval Bomber Heights Large-Scale Solar Energy System Tax Parcel No. 49.-1-26.2 Troy Road, between Coddington and King Road E Town of Ithaca Planning Board, September 1, 2026 WHEREAS: 1. This action involves consideration of Preliminary Site Plan Approval for the proposed Bomber Heights Solar large-scale community solar photovoltaic system project, located on Troy Road, between Coddington Road and King Road East, in the Low Density Residential Zone and Large- Scale Photovoltaic Solar Energy System Overlay District. The project involves installing a 5MWac single-axis sun tracking solar array system on approximately 31+/- acres of land, along with two inverter/transformer equipment pads, battery energy storage, new utility (NYSEG) poles, eight-foot-tall fencing, stormwater management facilities, access drive, and other site elements. Troy Heights, LLC, Owner; Nexamp Solar, Applicant; Ryan McCune, Agent; 2. This is a Type I Action for which the Town of Ithaca Planning Board, acting as Lead Agency the environmental review with respect to this project on September 1, 2026, made a negative determination of environmental significance, after having reviewed and accepted as adequate a Full Environmental Assessment Form Part 1, submitted by the applicant, Parts 2 and 3, prepared by Town Planning staff, and other application materials; and 3. The Planning Board, at a public hearing held on September 1, 2026, has reviewed and accepted as adequate an application narrative titled “Project Overview and Narrative, Bomber Heights Solar, Troy Road, Town of Ithaca, NY,” a set of drawings titled “Bomber Heights Solar, Troy Road, Ithaca, NY,14850” prepared by LaBella, dated December 2025, and most recently updated 07/10/2026, including sheets C001, C100-C101, C200-C203, C401-C407, C501-504, L101-103; Line of Sight Profile Plans, prepared by LaBella, dated December 2025; Photo Simulations, prepared by Saratoga Associates, dated 3/10/2026 and 4/08/2026; a Wetlands Delineation Report, Decommissioning Plan, Glint and Glare Study, Operations and Maintenance Plan, Battery Energy Storage System Emergency Response Plan, and other application materials; NOW THEREFORE BE IT RESOLVED: That the Town of Ithaca Planning Board hereby grants Preliminary Site Plan Approval for the proposed Bomber Heights Solar project, located on Troy Road, between Coddington Road and King Road East, as described in the materials listed in Whereas #3 above, subject to the following conditions: Before final site plan approval: 1. [Planning Board should discuss] Submission of a Vegetation management plan in accordance with Town Code § 270-219.1G(2)(c)[5][b][i], including a tree survey that shows: (a) Specific trees proposed for removal that are larger than 3 inches DBH (b) Specific labels for any trees that could be suitable roosting sites for the endangered Northern Long-eared Bat (NLEB) or tri-colored bats, and Pg. 2 (c) Any other areas proposed for clear-cutting, 2. Receipt of any necessary variances from the Zoning Board of Appeals, 3. Submission to, and approval by, the Town of Ithaca Engineering Department, of all items listed in the memo dated August 19, 2026, from Charles A. White, P.E., Barton & Loguidice, D.P.C, to Justin McNeal, Director of Engineering, 4. Submission of lighting specification and cut sheets for all proposed outdoor lighting associated with the project – all proposed lighting shall conform to Town Code Chapter 173, Outdoor Lighting, Prior to any site disturbance: 5. To mitigate potential impacts on any roosting habitats for the NLEB and tri-colored bats, the applicant shall:  Minimize clearing- leave as many potential roosts as possible, including snag and cavity trees,  [Planning Board should discuss/consider one or the other condition] Either all site disturbance should take place between Nov. 1 and March 31, or an acoustic bat survey should be conducted between May 15 and August 15 to determine presence or possible absence of bats, and  If any roosts are discovered after March 31, then there shall be no site disturbance during pup season (July 1- Aug 15), 6. Confirm during the growing season (between May and July) that the project site does not contain glaucous or reflexed sedges, which are threatened plant species per the NYS DEC, Before issuance of a building permit: 7. Submission to the Planning Department of any required stream or wetland permit documentation issued by the New York State Department of Environmental Conservation and/or the Army Corps of Engineers, 8. Approval of the Decommissioning Plan and Bond by the Attorney for the Town and the Town Engineer, 9. All pollinator seed mixes applied after construction shall contain plant species preferred by the monarch butterfly; and proposed herbicide application shall not be harmful to pollinators, 10. Submission to the Planning Department of a copy of Tompkins County Highway Construction Permit(s), and 11. Scheduling of a coordination meeting with the Applicant’s Environmental Monitor, and the Town Engineering, Planning, and Codes Departments. Full Environmental Assessment Form Part 1 -Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor.Responses becomepart of the application for approval or funding, are subject to public review,and may be subjectto further verification. Complete Part |based on information currently available.If additional research or investigation would be needed to fully respond toanyitem,please answer as thoroughly aspossible based on current information;indicate whether missing information does not exist,or is not reasonablyavailable to the sponsor;and,when possible,generally describe work or studies that would be necessary toupdateorfullydevelopthatinformation. Applicants/sponsors must complete all items in Sections A &B.In Sections C,D &E,most items contain an initial question thatmustbeansweredeither“Yes”or “No.”If the answerto the initial question is “Yes,”complete the following sub-questions.If theanswertotheinitialquestionis“No,”proceed to the next question.Section F allows the project sponsorto identify and attachadditionalinformation.Section G requires the nameandsignature of the applicant or project sponsor to verify the information in Part|is accurate and complete. A.Project and Applicant/Sponsor Information. Nameof Action or Project:Bomber Heights Solar,LLC Project Location (describe and attach a general location map): Ro ‘*Troy Road,Town ofIthaca,Tompkins County,New York,14850:Tax Parcel ID 49.-1-26.2=ys Brief Description of Proposed Action (include purpose or need):(CR Nexamp has developedplans for the installation of an +/-4.5-MW ACsolar array located within a grassy and forested area at TroyRoad(parcel #49.-1-26.2)in the Town of Ithaca.The total project area will be located on an +/-30-acre area which exists on a larger+/-62-acre parcel of undevelopedforest and fields.The system will also include new electrical wiring,an +/-23,500-sf laydown area,anequipmentpad,and newgravel access drives.The maximum depth of excavation will not exceed four feet,but the helix screws (orH-piles)of the solar tables will be installed at a depth of +/-8-10 feet.The Project is proposing +/-23 acres of tree clearing and grubbing.The project includes one bioretention pond,forebay,and a detention pond.The project would create +/-1.4 acres of new impervioussurface.The purposeof this project is to create clean,renewable energy for local residences and businesses.Thetotal amount ofproposedgrounddisturbanceis+/-41 acres.Future development may include a service staging area,additional energy storage system,and transformer.The disturbance contemplated forthis additional development has beenincludedin the aforementioned area ofdisturbance.For additional details,see attached USGS location map and site drawings. Nameof Applicant/Sponsor:Telephone:697-592-5648 Nexamp Solar,LLC ,d/b/a Bomber Heights,LLC E-Mail PHOS:101 Summer Street City/PO:5 ston State:14,Zip Code:05449 Project Contact (if not same as sponsor;give nameandtitle/role):Telephone:697-599-5648 Ryan M McCune,VP,Business Development E-Mail Address:101 Summer Street City/PO:State:Zip Code:Boston MA 02110 Property Owner (if not same as sponsor):Telephone: Troy Heights,LLC 1E-Mail:ail.com Add"SS:5 willow Point Rd. City/PO:ithaca State:NY Zip Code:44850 Page |of 15 FEAF 2026 B.Government Approvals B.Government Approvals,Funding,or Sponsorship.(“Funding”includes grants,loans,tax relief,and any other forms of financial assistance.) Government Entity If Yes:Identify Agency and Approval(s)Application Date Required (Actual or projected) a.City Council,Town Board,[¥]Yes[_JNo Town of Ithaca Town Board -PILOT PendingorVillageBoardofTrustees b.City,Town orVillage [¥]Yes[_JNo | Town of Ithaca Planning Board -Site Plan —{January-2025.why 3032 (Cag)Planning Board or Commission c.City,Town or ]Yes[7No Village Zoning Board of Appeals d.Other local agencies []Yes[¥No e.County agencies [V]Yesl_No [Tompkins County IDA -PILOT Pending f.Regional agencies [_]Yes[V]JNo g.State agencies [V]Yesl_INo |NYSOPRHP -CRIS Consult;NYSDEC -SPDES_|Species Consult;NYSERDA-funding; GP,Letter of No JD received 6/4/25:NYNHP ->Pending h.Federal agencies [V]Yes__INo _—_JusAcE -uD (TBD);USFWS -No Impact Various Stages Concurrence:AdverseDetermination 1.Coastal Resources. i.Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? ii.Is the project site located in a community with an approved Local Waterfront Revitalization Program? iii.Is the project site within a Coastal Erosion Hazard Area? []Yes[¥]No C.Planning and Zoning C.1.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule,or regulation be the ]Yes[/]No only approval(s)that must be granted to enable the proposed action to proceed? e If Yes,complete sections C,F and G. e If No,proceed to question C.2 and complete all remaining sections and questions in Part | C.2.Adopted land use plans. a.Do any municipally adopted (city,town,village,or county)comprehensive land use plan(s)include the site where the proposed action would be located? If Yes,does the comprehensiveplan include specific recommendations for the site where the proposedaction would be located? [V]Yes[_]No [_]Yes[V]No b.Is the site of the proposed action within any local or regional special planning district (for example:Greenway; Brownfield Opportunity Area (BOA);designated State or Federal heritage area;watershed managementplan; or other?) If Yes,identify the plan(s): [V]Yes [_]No Cayuga Lake Watershed Management Plan c.Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan or an adopted municipal farmland protection plan? If Yes,identify the plan(s): ]Yes[¥]No Page 2 of 15 FEAF 2026 d.Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate [v[v]Yes[_]Nochange? If yes ,identify the elements of the plan that are relevantto the action: ic OOVVT)©Licil lc Vz omprehensive Plan in e[=)qt |lei 11 iC)imate Prote ion arcielic att DLTOmMole SIE WA Dieenergydevelopment,reduction of greenhouse gas emissions,energy efficiency,and climate resilience.Relevant goalsincludeincorporatingsustainabilityintolong-term planning and supporting renewable energy and resilient infrastructurewhereappropriate. C.3.Zoning a.Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.es[_]NoIfYes,what is the zoningclassification(s)including any applicable overlay district? The Project Site is within the Townof Ithaca's Low Density Residential (LDR)Zone and Large Scale Solar Overlay District 4b.Is the use permitted or allowed bya special or conditional use permit?Site Pla =pprod only f3en |ec.Is a zoning change requested as part of the proposed action?S [V]NoIfYes,What is the proposed new zoning for the site? C.4.Existing community services. a.In what school district is the project site located?Ithaca City SchoolDistrict b.Whatpolice or other public protection forces serve the project site? Ithaca Police Department and Tompkins County Sheriff c.Which fire protection and emergency medical services serve the project site? Ithaca Fire Department d.What parks serve the project site? West Hill Park,McDaniels Park,Cass Park,Allan H.Treman State Marine Park D.Project Details D.1.Proposed and Potential Development a.What is the general nature of the proposed action (e.g.,residential,industrial,commercial,recreational;if mixed,includeallcomponents)? Commercial Community Solar Development b.a.Total acreage of the site of the proposed action?+/-40.78 acres Aidb.Total acreage to be physically disturbed?+/-40.78 actes—%>(3s 3 Sauls pec.Total acreage (project site and any contiguous properties)owned des ~A.Sy Posts ,jahehiject9+/-62 esaorcontrolledbytheapplicantorprojectsponsor‘acres asf Lb SMe.ey c.Is the proposed action an expansionof an existing project or use?pyés[v[v]Noi.If Yes,what is the approximate percentage of the proposed expansion and identify the units (e.g.,acres,miles,housingunits,square feet)?%Units: d.Is the proposed action a subdivision,or does it include a subdivision?[_]Yes [v]JNoIfYes, i.Purposeortype of subdivision?(e.g.,residential,industrial,commercial;if mixed,specify types) ii.Is a cluster/conservation layout proposed?[_]Yes [Noiii.Number of lots proposed? iv.Minimum and maximumproposedlot sizes?Minimum Maximum Page 3 of 15 FEAF 2026 e.Will the proposed action be constructed in multiple phases?]Yes[v]No i.If No,anticipated period of construction:12-18 months ii,If Yes: e Total number of phases anticipated e Anticipated commencementdate of phase |(including demolition)month year e Anticipated completion date of final phase month year 9 Generally describe connections or relationships among phases,including any contingencies where progress of one phase maydetermine timing or duration of future phases: f.Does the project include new residential uses?]Yes[v]No If Yes,show numbersof units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase At completion of all phases AD g.\Does the proposed action include new non-residential construction (including expansions)?[v]Yes[_]No If Yes,AQ.roicks 6 Aesth,Sma shre i.Total number of structures | ii,Dimensions (in feet)of largest proposed structure:height;width;and length iii.Approximate extent of building space to be heated or cooled:O square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage?If Yes,KK |esi.Purpose of impoundment)Nest CN Lappecdimond RO DCe_doaching - ii.If a water impoundment,the principal source of the water:(Ground water [-]Surface water s Other specify: Stormwater iii.If other than water,identify the type of impounded/contained liquids and their source.een" N/A ; iv.Approximate size of the proposed impoundment.Volume:million gallons;surface area:_acres v.Dimensions of the proposed dam or impounding structure:.height;1 __length vi.Construction method/materials for the proposed dam or impoundingstructure (e.g.,earth fill,rock,wood,concrete):!_nee. “Oat D.2.Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both?[_]Yes [v]JNo (Not including general site preparation,gradingorinstallation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .Whatis the purpose of the excavation or dredging? ii.How much material (including rock,earth,sediments,etc.)is proposed to be removed from the site? e Volume(specify tons or cubic yards): e Over what duration of time? iii.Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv.Will there be onsite dewatering or processing of excavated materials?LE]Yes[_]No If yes,describe. v.Whatis the total area to be dredged or excavated?acres vi.What is the maximumarea to be workedat any one time?acres vii.What would be the maximum depth of excavation or dredging?feet viii.Will the excavation require blasting?[_lves [No ix.Summarize site reclamation goals and plan: =) Page g of 15 FEAF 2026 b.Would the proposed action causeor result in alteration of,increase or decrease in size of,or encroachment [v]Yes [_]No into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i.Identify the wetland or waterbody which would be affected (by name,water index number,wetland map number or geographicdescription):GZA conductedthe wetland and waterbody delineation on October 2023 &March and May 2026 within the Site.GZA identifiedanddelineatedfourwetlandsandfourstreamswithinthesiteboundary.A 6/4/2025 DEC Letter of No Jurisdictional DeterminationconfirmedthatnoneofthesewetlandsareDECjurisdictional.Final JD status and review by USACE is pending.Any impacts will occur from the installation=of the solar panel racking;fence posts will be installed outside of the bed and banks of streams and ditches to the extent practicable. ti.Describe how the proposed action would affect that waterbody or wetland,e.g.,excavation,fill,placement of structures,or alteration of channels,banks,and shorelines.Indicate extent of activities,alterations and additions in square feet or acres: :.:....ie '6 Oi tie if ciiet HOll ©Glreimerciale oA IO PNCe DO ~t816 a Pei liil NMaACAMIG and [ence po \Je Die or screw driven in USACE regulated wetlands to avoid impacts.Solar panel racking and fence posts will be installed outside of the bed and banks of stream and ditches to the extent practicable. iii.Will the proposed action cause orresult in disturbance to bottom sediments?[]Yes [V]INo If Yes,describe: iv.Will the proposed action cause orresult in the destruction or removal of aquatic vegetation?[_]Yes[v]NoIfYes: e acres of aquatic vegetation proposed to be removed:_ expected acreage of aquatic vegetation remaining after project completion: e purpose of proposed removal (e.g.beach clearing,invasive species control,boat access): e proposed method of plant removal: e if chemical/herbicide treatment will be used,specify product(s): v.Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demandfor water?[Yes 1 |NoIfYes::i.Total anticipated water usage/demandper day:|gallons/day (see below)ii.Will the proposed action obtain water from an existing public water supply?[_]Yes [NoIfYes: e Name of district or service area:| e Does the existing public water supply have capacity to serve the proposal?[_]Yes No e Is the project site in the existing district?[_]Yes No e Is expansion of the district needed?Yes}|No e Do existing lines serve the project site?Hy No iti,Will line extension within an existing district be necessary to supply the project?lves [|No If Yes: e Describe extensions or capacity expansions proposedto serve this project: e Source(s)of supply for the district: iv.ls anew water supply district or service area proposed to be formedto serve the project site?[les [No If Yes: e Applicant/sponsorfor new district: e Date application submitted or anticipated: e Proposed source(s)of supply for new district: v.Ifa public water supply will not be used,describe plans to provide water supply for the project: vi.If water supply will be from wells (public or private),what is the maximum pumpingcapacity:gallons/minute. Page 5 of 15 FEAF 2026 d.Will the proposed action generate liquid wastes?]Yes [V]JNo If Yes: i.Total anticipated liquid waste generation per day:_gallons/day ii,Nature of liquid wastes to be generated (e.g.,sanitary wastewater,industrial;if combination,describe all components and approximate volumesor proportions of each): iii.Will the proposed action use any existing public wastewater treatment facilities?[_]Yes [No If Yes: e Name of wastewater treatmentplant to be used: e Name of district: e Does the existing wastewater treatment plant have capacity to serve the project?es [No e Is the projectsite in the existing district?es[[No e Is expansionof the district needed?es [_JNo e Do existing sewerlines serve the project site?]ves [_JNo e Willa line extension within an existing district be necessary to serve the project?[_]Yes [_JNo If Yes: e Describe extensions or capacity expansions proposed to serve this project: iv.Will a new wastewater (sewage)treatment district be formed to serve the project site?ly es [__JNo If Yes: e Applicant/sponsor for new district: e Date application submitted or anticipated: 2 Whatis the receiving water for the wastewater discharge? v.If public facilities will not be used,describe plans to provide wastewater treatment for the project,including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi.Describe any plans or designs to capture,recycle or reuse liquid waste: -None. e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point [v]Yes [_JNo sources (i.e.ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source (1.e.,sheet flow)during construction or post construction? If Yes: i.How much impervious surface will the project create in relation to total size of project parcel? Square feet or +1.41 acres (impervious surface) Square feet or +/-62 acres (parcel size) ii.Describe types of new point sources.Access road,laydown area,and equipmentpads. iii.Where will the stormwater runoffbe directed (i.e.on-site stormwater managementfacility/structures,adjacent properties, groundwater,on-site surface water,or off-site surface waters)? Biorentention,detention ponds,conveyance and dry swales. e Ifto surface waters,identify receiving water bodies or wetlands:N/A e Will stormwater runoff flow to adjacent properties?es [_JNo iv.Does the proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater?es [No Page 6 of 15 FEAF 2026 f.Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel [_ ]ves [VNocombustion,waste incineration,or other processes or operations?If Yes,identify: i.Mobile sources during project operations (e.g.,heavy equipment,fleet or delivery vehicles) ii,Stationary sources during construction (e.g.,power generation,structural heating,batch plant,crushers) iii,Stationary sources during operations(e.g.,process emissions,boilers,electric generation,surface coating) g.Will any air emission sources namedin D.2.f (above),require an Air Facility Registration,Air State Facility | lv es|/|NoPermit,Title IV Permit or Title V Permit? If Yes: i.Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration requirementsdiscussedin6NYCRRPart231?[_]Yes[]Noii.As calculated in the air permit application,the proposed action has the potential to emit:®Tons/year(short tons)of carbon monoxide (CO) Tons/year (short tons)of oxides of nitrogen (NOx) Tons/year (short tons)of particulate matter (PM-10,PM-2.5) Tons/year(short tons)of volatile organic compounds (VOC)®Tons/year (short tons)of sulfur dioxide (SO>)iii,Will emissions of air contaminants from the proposed action described above exceed the corresponding major [ lv es[_]Nosourcethresholds? iv.Does the proposedaction have the potential to emit 10 tons/year or more of any one designated hazardous air [_lves[_Nopollutantor25tons/year or more of any combination of such hazardous air pollutants (6 NYCRR 200.1(ag))?If Yes,provide the total potential to emit hazardous air pollutants in short tons/year: h.Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions,such as carbon dioxide,methane,nitrous oxide,sulfur hexafluoride,hydrofluorocarbons,or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxideequivalentsperyearatanypointinthelifetimeoftheproposedaction(estimated using the carbon dioxide equivalent definition andglobalwarmingpotentialsprovidedin6NYCRRPart496)?[_]¥es [v]NoIfYes: i.Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):ii.Describe any greenhouse gas capture,control,or elimination measures included in project design: i.Will the proposedaction result in the release of air pollutants from Open-air operations or processes,such as [_]¥Yes [v]|Noquarryorlandfilloperations? If Yes:Describe operations and nature of emissions (e.g.,diesel exhaust,rock particulates/dust): J.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial [ Vv es [v|Nonewdemandfortransportationfacilitiesorservices? If Yes: i.When is the peak traffic expected (Check all that apply): ]Morning [_]Evening [|]WeekendRandomlybetweenhoursofto ii.For commercial activities only,projected number of truck trips/day and type (e.g.,semi trailers and dumptrucks): iii,Parking spaces: _ Existing Proposed Net increase/decrease iv.Does the proposedaction include any shared use parking?[_]¥es [ Nov.If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: vi.Are public/private transportation service(s)or facilities available within 4 mile of the proposed site?es OovitWilltheproposedactionincludeaccesstopublictransportationoraccommodationsforuseofhybrid,electric Yes Oorotheralternativefueledvehicles? viii.Will the proposedaction include plans for pedestrian or bicycle accommodationsfor connections to existing L_lves[~Nopedestrianorbicycleroutes? Page @ of 15 FEAF 2026 k.Will the proposed action (for commercial or industrial projects only)generate new or additional energy demand?|_|Yes 1“|No If Yes: i.Estimate annual electricity demand during operation of the proposed action: ii.Anticipated sources/suppliers of electricity for the project (e.g.,on-site combustion,on-site renewable,via grid/local utility,or other): iii.Will the proposed action require a new,or an upgrade,to an existing substation?[_]Yes [No |.Hours of operation.Answer all items which apply. i.During Construction:ii.During Operations: ®Monday -Friday:Potentially 7am -7pm e Monday <Friday:24 hours per day e Saturday:Minimally e Saturday:24 hours per day e Sunday:Minimally e Sunday:24 hours per day e Holidays:Minimally e Holidays:24 hours per day m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction,[v]Yes [_]No operation,or both? If yes: i.Provide details including sources,time of day and duration: Intermittent construction noise could exceed ambient noise levels for short periods of time during construction activities.Once operational,noise levels exceeding the existing ambient noise levels are not anticipated. ii.Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?[_lves [VINo Describe: of n.Will the proposed action have outdoor lighting?esf {No If yes: ctures*i.Describe source(s),location(s),height of fixture(s),direction/aim,and proximity to nearest occupied stru Enbehu Us >_gsbentiot Usk pale pec PyIEe.yO 7 C4 t t ii.Will proposed action remove existing natural barriers that could act as a light barrier or screen?[Wes iW INo Describe: o.Does the proposed action have the potential to produce odors for more than one hour per day?|_|Yes 1 [No If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)[_]Yes [VNo or chemical products 185 gallons in above ground storage or any amountin underground storage? If Yes: i.Product(s)to be stored ii.Volume(s)gal per unit time (e.g.,month,year) iii.Generally,describe the proposed storage facilities: q.Will the proposed action (commercial,industrial and recreational projects only)use pesticides (i.e.,herbicides,|_|Yes 1 |No insecticides)during construction or operation? If Yes: i.Describe proposed treatment(s): ii.Will the proposed action use Integrated Pest ManagementPractices?[_]yYes[]No Page got 15 FEAF 2026 r.Will the proposed action (commercial or industrial projects only)involve or require the management or disposal es[_|Noofsolidwaste(excluding hazardous materials)? If Yes: i.Describe anysolid waste(s)to be generated during construction or operation of the facility:e Construction:_1-2 tons per month (unit of time)e Operation:N/A tons per (unit of time) ii.Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste:e Construction;Construction debris of disposable wrapping and containers will be recycled when appropriate. e Operation:N/A iii.Proposed disposal methods/facilities for solid waste generated on-site: e Construction:The exact disposal method will be determined by the contractor and will follow all applicable NYSDEC quidelines ancstandards. e Operation:N/A s.Does the proposed action include construction or modification of a solid waste management facility?[_]Yes [v]NoIfYes: i.Type of management or handling of waste proposed for the site (e.g.,recycling or transferstation,composting,landfill,orotherdisposalactivities): ii.Anticipated rate of disposal/processing: 9 Tons/month,if transfer or other non-combustion/thermal treatment,or a Tons/hour,if combustion or thermal treatment iii.If landfill,anticipated sitelife:years t.Will the proposed action at the site involve the commercial generation,treatment,storage,or disposal of hazardous |_|Yes Iv INowaste? If Yes: i.Name(s)of all hazardous wastes or constituents to be generated,handled,or managed at facility: ii.Generally describe processes or activities involving hazardous wastes or constituents: iii.Specify amountto be handled or generated tons/month iv.Describe any proposals for on-site minimization,recycling,or reuse of hazardous constituents: v.Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? L Wes [_INoIfYes:provide name andlocation of facility: If No:describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: Page 9 of 15 FEAF 2026 E.Site and Setting of Proposed Action E.1.Land uses on and surrounding the project site a.Existing land uses. i.Check all uses that occur on,adjoining and nearthe project site. (J Urban (J Industrial []Commercial {J Residential (suburban)[J Rural (non-farm) [@ Forest (Agriculture [BJ Aquatic (@]Other (specify):Grassy Fields ii.If mix of uses,generally describe: The surrounding area consists mainly of undeveloped forests and grassy (non-agricultural fields) b.Land uses and cover types on the project site. Land use or Current Acreage After Change Cover type Acreage Project Completion (Acres +/-) e Roads,buildings,and other paved or impervious 0 +/-1.4 +144 surfaces (total) ¢Industrial or manufacturing 0 0 0) °Commercial 0 +/-1.4 +1.41 ¢Residential 0 0 0 e Forested +/-34.6 +/-11.4 -23.16 e Meadows,grasslands or brushlands (non-+/-20.4 +/-42.33 +21.93 agricultural,including abandoned agricultural) e Agricultural 0 0 0 (includes active orchards,field,greenhouse,etc.) e Surface water features +/-0.01 +/-0.01 0 (lakes,ponds,streams,rivers,etc.) e Wetlands (freshwateror tidal)+/-6.9 +/-6.72 -0.18 e Non-vegetated (bare rock,earth,or fill)0 0 0 e Other,Describe:0 +/-27.1 +27.1 Page 10 of 15 FEAF 2026 c.Is the project site presently used by membersof the community for public recreation?|_|Yes |v|Noi.If Yes:explain: d.Are there any facilities serving children,the elderly,people with disabilities (e.g.,schools,hospitals,licensed |_}Yes [v]Nodaycarecenters,or group homes)within 1500 feet of the project site? If Yes, i.Identify facilities: e.Does the project site contain an existing dam?[_]Yes|~|NoIfYes: i.Dimensions of the dam and impoundment: e Dam height:feet e Dam length:feet e Surface area:acres e Volume impounded:gallons OR acre-feet ii,Dam’s existing hazardclassification: iti.Provide date and summarizeresults of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste managementfacility,L_]Yes[v]|Noordoestheprojectsiteadjoinpropertythatisnow,or was at one time,used as a solid waste management facility?If Yes: i.Has the facility been formally closed?[]yes[]No e If Yes,cite sources/documentation: ii.Describe the location of the project site relative to the boundaries of the solid waste management facility: iii.Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin [_]Yes [vINopropertywhichisnoworwasatonetimeusedtocommerciallytreat,store and/or dispose of hazardous waste?If Yes: i.Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h.Potential contamination history.Has there been a reported spill at the proposed project site,or have any ]Yes Noremedialactionsbeenconductedatoradjacenttotheproposedsite? If Yes: i.Is any portion of the site listed on the NYSDECSpills Incidents database or Environmental Site [_]yes [|NoRemediationdatabase?Check all that apply: L]Yes Spills Incidents database Provide DEC ID number(s):L]Yes —Environmental Site Remediation database Provide DEC ID number(s): [-]Neither database li.If site has been subject of RCRA corrective activities,describe control measures: iii.Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?L_}Yes lV|NoIfYes,provide DEC ID number(s): iv.If Yes to (i),(ii)or (iii)above,describe currentstatus of site(s): Page |1 of 15 FEAF 2026 v.Is the project site subject to an institutional control limiting property uses?[_lyves[No If Yes,DEC site ID number: Describe the type of institutional control (e.g.,deed restriction or easement): Describe any use limitations: Describe any engineering controls: Will the project affect the institutional or engineering controls in place?L_ly es|__No Explain: E.2.Natural Resources On or Near Project Site a.Whatis the average depth to bedrock on the project site?+/-0.66 to 3.33 feet b.Are there bedrock outcroppings on the project site?|_|Yes|¥No If Yes,what proportion of the site is comprised of bedrock outcroppings?% c.Predominant soil type(s)present on project site:Erie Channery Sil loam,3-8%64.7 % Lordstown Channery Silt Loam,1 13.5 % Erie Channery Silt Loam,8-15%9.4 % d.Whatis the average depth to the water table on the project site?Average:0 to 6.67 feet e.Drainage status of project site soils:[v]Well Drained:22%of site [_]Moderately Well Drained:%of site Poorly Drained 78 %of site f.Approximate proportion of proposed action site with slopes:0-10%:+/-76 %of site 10-15%:+/-10 %ofsite 15%or greater:+/-14 %of site g.Are there any unique geologic features on the project site?|lYes|VN O If Yes,describe: h.Surface water features. i.Does any portion of the project site contain wetlands or other waterbodies (including streams,rivers,[V]Yes[_No ponds,or lakes)? ii.Do any wetlands or other waterbodies adjoin the project site?[V]lyed_No If Yes to either i or ii,continue.If No,skip to E.2.1. iii,Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,Vlyeq_]No state or local agency? iv.For each identified regulated wetland and waterbody on the project site,provide the following information: e Streams:Name 898-323 Classification A ®Lakes or Ponds:Name Classification ®Wetlands:Name Federal Waters Approximate Size °Wetland No.(if regulated by DEC) v.Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired [Jes No waterbodies? If Yes,name of impaired water body/bodies andbasis for listing as impaired: i.Is the project site in a designated Floodway’?]Yes[~No j.Is the project site in the 100-year Floodplain?L_lYes[vJNo k.Is the project site in the 500-year Floodplain?[_]Yes[v]No |.Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer?]Yes[¥No If Yes: i.Name of aquifer: Page 12 of 15 FEAF 2026 m.Identify the predominant wildlife species that occupyor use the project site: Wildlife native to Tompkins County n.Does the project site contain a designated significant natural community?[_]Yes 1 INoIfYes: i.Describe the habitat/community (composition,function,and basis for designation): ii.Source(s)of description or evaluation: iii.Extent of community/habitat: e Currently:acres e Following completion of project as proposed:acres e Gain orloss (indicate +or -):acres 0.Does project site contain any species of plant or animal thatis listed by the federal government or NYS as Yes [Noendangeredorthreatened,or does it contain any areas identified as habitat for an endangeredor threatened species? If Yes: i.Species and listing (endangered or threatened): NYSDEC:Glaucous Sedge (threatened),Reflexed Sedge (threatened):USFWS Northern Long-eared Bat (endangered),Green floater (proposedthreatened),and Monarch Butterfly (proposed threatened).USFWSconsistencyletters dated 7/16/2025,determined that the projectis notlikely to p.Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of L_|Yes[v}Nospecialconcern? If Yes: i.Species and listing: q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing?|_lYes iW INoIfYes,give a brief description of how the proposed action mayaffect that use: E.3.Designated Public Resources On or Near Project Site a.Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to [_]Yes [V]No Agriculture and Markets Law,Article 25-AA,Section 303 and 304? If Yes,provide county plus district name/number: b.Are agricultural lands consisting of highly productive soils present?L_]Yes[¥Noi.If Yes:acreage(s)on project site? ii.Source(s)of soil rating(s): c.Does the project site contain all or part of,or is it substantially contiguous to,a registered National [_]Yes NoNaturalLandmark? If Yes: i.Nature of the natural landmark:[_]Biological Community [_]Geological Feature ii.Provide brief description of landmark,including values behind designation and approximate size/extent: d.Is the project site located in or doesit adjoin a state listed Critical Environmental Area?[_]Yes[v]NoIfYes: i.CEA name: ii.Basis for designation: iii.Designating agency and date: Page 13 of 15 FEAF 2026 e.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district ]Yes [VNo listed on the National or State Register of Historic Places,or that has been determined by the Commissioner of the NYSOffice of Parks,Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i.Nature of historic/archaeological resource:[_]ArchaeologicalSite (_]Historic Building or District ii.Name: iii.Brief description of attributes on which listing is based: f.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for [les [V|No archaeological sites on the New York State Historic Preservation Office (SHPO)archaeological site inventory? g.Have additional archaeologicalor historic site(s)or resources been identified on the project site?|_|Yes [VNo If Yes: i.Describe possible resource(s): ii.Basis for identification: h.Is the project site within five miles of any officially designated and publicly accessible federal,state,or local _|Yes [VINo scenic,or aesthetic resource? If Yes: i.Identify resource: ii.Nature of,or basis for,designation (e.g.,established highway overlook,state or local park,state historic trail,or scenic byway, etc.): iii.Distance between project and resource:miles. i.Is the project site located within a designated river corridor under the Wild,Scenic and Recreational Rivers |Yes |\~|No Program 6 NYCRR 666? If Yes: i.Identify the name ofthe river and its designation: ii.Is the activity consistent with developmentrestrictions contained in 6NYCRRPart 666?[_]Yes [No E.4.Disadvantaged Communities Designated Pursuant to ECL Article 75 a.Is the project located within,or within '4-mile of,a disadvantaged community?[_]Yes iW INo If No,could impacts (see examples below in E.4.b)from the project affect a disadvantaged community?[_lves [V]JNo If Yes to either question in E.4.a,answer the remaining questionsin this section. b.Will there be direct or indirect impacts that may affect a disadvantaged community,such as those listed below?[_]ves [V|No i.new noise sources or expansions/modification of existing noise sources; -noise from operational sources -noise from constructionactivities 11.emissions of air pollutants,including mobile emissions; ili.Wastewater discharges; iv.generation of odors; v.light pollution; vi.new or modified radiation sources; vii.new or modified sources of solid waste generation,management,or disposal. If Yes,describe the impacts: c.Do any ofthe state agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES)Yes [_]No Solid Waste Management Facility Yes [v]No Hazardous Waste ManagementFacility Yes N° Air Pollution Control (Title V or Air State Facility)Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter [|Yes No Page 14 of 15 FEAF 2026 E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions:a.Is the proposed action vulnerable to damage from a projected 100-year flood?]Yes Nob.Is the proposed action vulnerable to damage from a projected 500-year flood?[_]Yes Noc.Is the proposed action in an area potentially affected by sea level rise?[_]Yes Nod.Will the proposed action increase the vulnerability of human or ecological communities to the following:i.drought?Yes [¥]No ll.temperature extremes (hot or cold)?i Yes [v]No iil.extreme storms,including high winds?_JYes |[“|No iv.landslides?_]Yes [v]No v.coastal erosion?[|]Yes [v]No vi.stormwater flooding?1 Yes No vil.other climate or weather hazards?|Yes [v]No.If Yes,describe: F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal,please describe those impacts plus anymeasureswhichyouproposetoavoidorminimizethem. G.Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Nexamp Solar,LLC d/b/a Bomber Heights,LLC Pate 8/17/26 Vad i Title”:Business DevelopmentSignature PRINT FORM Page 15 of 15 FEAF 2026 EAF Mapper Summary Report Friday,August 14,2026 4:27 AM B.i.i [Coastal or Waterfront Area] B.i.ii [Local Waterfront Revitalization Area] C.2.b.[Special PlanningDistrict] E.1.h [DEC Spills or Remediation Site -Potential Contamination History] E.1.h.i [DEC Spills or Remediation Site -Listed] E.1.h.i [DEC Spills or Remediation Site -Environmental Site Remediation Database] E.1.h.iii [Within 2,000'of DEC RemediationSite] E.2.g [Unique Geologic Features] E.2.h.i [Surface Water Features] E.2.h.ii [Surface Water Features] E.2.h.iii [Surface Water Features] E.2.h.iv [Surface Water Features-StreamName] E.2.h.iv [Surface Water Features -StreamClassification] E.2.h.iv [Surface Water Features -WetlandsName] E.2.h.v [Impaired Water Bodies] Disclaimer:The EAF Mapperis a screening tool intendedto assistprojectsponsorsandreviewingagenciesinpreparinganenvironmentalassessmentform(EAF).Notall questions asked in the EAF areansweredbytheEAFMapper.Additional information on any EAFAquestioncanbeobtainedbyconsultingtheEAFWorkbooks.AlthoughtheEAFMapperprovidesthemostup-to-date digital data available toDEC,you mayalso need to contact local or other data sourcestoconfirmdataprovidedbytheMapperortoobtaindatanotprovided by the Mapper. Sound ;Bs ks ie ue Kingston Montpe Wkowts |re #amiiton Rischastal on \Buttato :HO Fork.’Aibany B 4 Sources:Esr,HERE Garmin,USGS Intermag It REMER.hi iRCar,Esr Japan METI China feong g).Eerr Korea EsqhataneywGClferOperivlapcorinGetorsarctrecisserCOMMmarith.Es HERE Gera n fee ye SES NPSPitthurah- No No Digital mapping data are not available or are incomplete.Refer to EAFWorkbook. Digital mapping data are not available or are incomplete.Refer to EAFWorkbook. Digital mapping data are not available or are incomplete.Refer to EAFWorkbook. Digital mapping data are not available or are incomplete.Refer to EAFWorkbook. No No Yes -Digital mapping information on local,New York State,and federalwetlandsandwaterbodiesisknowntobeincomplete.Refer to the EAFWorkbook. Yes -Digital mapping information on local,New York State,and federalwetlandsandwaterbodiesisknowntobeincomplete.Refer to the EAFWorkbook. Yes-Digital mapping information on local,New York State,and federalwetlandsandwaterbodiesisknowntobeincomplete.Refer to the EAFWorkbook. 898-323 A Federal Waters No 1 Full Environmental Assessment Form -EAF Mapper Summary Report E.2.i.[Floodway]Digital mapping data are not available or are incomplete.Refer to EAF Workbook. E.2.j.[100 Year Floodplain]Digital mapping data are not available or are incomplete.Refer to EAF Workbook. E.2.k.[500 Year Floodplain]Digital mapping data are not available or are incomplete.Refer to EAF Workbook. E.2.1.[Aquifers]No E.2.n.[Natural Communities]No E.2.0.[Endangered or Threatened Species]Yes E.2.0.[Endangered or Threatened Species-Glaucous Sedge,Reflexed Sedge Name] E.2.p.[Rare Plants or Animals]No E.3.a.[Agricultural District]No E.3.c.[National Natural Landmark]No E.3.d [Critical Environmental Area]No E.3.e.[National or State Register of Historic Digital mapping data are not available or are incomplete.Refer to EAF Places or State Eligible Sites]Workbook. E.3.f.[Archeological Sites]No E.3.i.[Designated River Corridor]No E.4.a [Disadvantaged Community]No Full Environmental Assessment Form -EAF Mapper Summary Report SCENIC RESOURCE INVENTORY & ANALYSIS Town of Ithaca 78 21. Coddington Road    Location: On the Ithaca/Danby town line.  Direction: North, between 330° and 40°.  Magnitude: Medium; approximately 2,000 cars on average per day, according to the  2007 Transportation Plan.   Seasonal: Year round. More of Cornell and even Cayuga Lake may be visible in  winter.   Near View: The near view is composed of an older, period architecture home,  behind which a hayfield is bordered by woods that descend to Six Mile Creek.  Mid View: The mid view consists of the wooded southern side of East Hill. Little  development appears until further north when the Cornell skyline abruptly appears.  Development that is visible is of muted color and does not stand out. A  communication tower is on the hilltop but is not prominent.  Far View: A view of Cornell, including the clock tower, as well as farm fields on West  Hill beyond.   Aesthetic Significance: This view was a candidate view in the Tompkins County  Scenic Resources report, one of the 110 candidates out of 593 views.  Aesthetic Discord: Utility lines crisscross the near view.    Figure 65: A Welcome to Ithaca sign stands approximately just after the viewpoint.   Figure 64: Cornell University’s skyline is in the distance of this gateway view. SCENIC RESOURCE INVENTORY & ANALYSIS Town of Ithaca 79 22. East Ithaca Recreation Way   Location: At the main entrance to the Hannah Pew trail on Joanne Drive in the Eastern  Heights neighborhood.  Direction: Southwest, approximately between 270° and 300°.  Magnitude: Low. Eastern Heights is a small, suburban style neighborhood with no  through traffic. The Recreation Way is open to foot and bicycle use only.  Seasonal: Year round. It may be enhanced in the winter.  Near View: The near view consists of the gazebo and walkway surrounded by shrubs  and trees. The topography begins to drop quickly just in front of the gazebo.  Mid View: The mid view is comprised of South Hill, which appears predominantly  wooded in the summer, with little visible development except for Ithaca College.  Ithaca College’s towers serve as a dramatic focal point. Also visible is the Ithaca  College Athletic and Events Center as well as a tall telecommunications tower further  up on South Hill.  Far View: The far view is composed of West Hill, including the Bostwick Road farms.  Beyond are the hills of Enfield and Newfield.  Aesthetic Significance: This view is remarkable for the vivid view of Ithaca College and South Hill. The composition with the park and gazebo in  the foreground and the Bostwick Road area and distant hills in the background creates a refreshing view.   Aesthetic Discord: The tower on the Ithaca College Athletic and Events Center is distracting and incongruous.  The telecommunications tower is  also somewhat distracting but is relatively thin and solitary and thus does not overwhelm the landscape.   Figure 66: The unique land form of South Hill is particularly noticeable from this lookout.   9 9 9 9 9 9 9 9 9 9 9 9 99 9 9 Agency Use Only [If applicable] Full Environmental Assessment Form Project : Part 2 - Identification of Potential Project Impacts Date : Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity. If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding with this assessment. Tips for completing Part 2:  Review all of the information provided in Part 1.  Review any application, maps, supporting materials and the Full EAF Workbook.  Answer each of the 18 questions in Part 2.  If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.  If you answer “No” to a numbered question, move on to the next numbered question.  Check appropriate column to indicate the anticipated size of the impact.  Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency checking the box “Moderate to large impact may occur.”  The reviewer is not expected to be an expert in environmental analysis.  If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general question and consult the workbook.  When answering a question consider all components of the proposed activity, that is, the whole action.  Consider the possibility for long-term and cumulative impacts as well as direct impacts.  Answer the question in a reasonable manner considering the scale and context of the project.   1. Impact on Land Proposed action may involve construction on, or physical alteration of, the land surface of the proposed site. (See Part 1. D.1) If “Yes”, answer questions a - j. If “No”, move on to Section 2. NO YES Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may involve construction on land where depth to water table is less than 3 feet. E2d b. The proposed action may involve construction on slopes of 15% or greater. E2f c. The proposed action may involve construction on land where bedrock is exposed, or generally within 5 feet of existing ground surface. E2a d. The proposed action may involve the excavation and removal of more than 1,000 tons of natural material. D2a e. The proposed action may involve construction that continues for more than one year or in multiple phases. D1e f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). D2e, D2q g. The proposed action is, or may be, located within a Coastal Erosion hazard area. B1i h. Other impacts: Page 1 of 13 FEAF 2026 Bomber Heights Solar September 1, 2026  9 9 99 99  9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 2. Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes,  NO  YES minerals, fossils, caves). (See Part 1. E.2.g) If “Yes”, answer questions a - c. If “No”, move on to Section 3. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Identify the specific land form(s) attached: E2g b. The proposed action may affect or is adjacent to a geological feature listed as a registered National Natural Landmark. Specific feature: E3c c. Other impacts: 3. Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water  NO  YES bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h) If “Yes”, answer questions a - l. If “No”, move on to Section 4. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may create a new water body. D2b, D1h b. The proposed action may result in an increase or decrease of over 10% or more than a 10 acre increase or decrease in the surface area of any body of water. D2b c. The proposed action may involve dredging more than 100 cubic yards of material from a wetland or water body. D2a d. The proposed action may involve construction within or adjoining a freshwater or tidal wetland, or in the bed or banks of any other water body. E2h e. The proposed action may create turbidity in a waterbody, either from upland erosion, runoff or by disturbing bottom sediments. D2a, D2h f. The proposed action may include construction of one or more intake(s) for withdrawal of water from surface water. D2c g. The proposed action may include construction of one or more outfall(s) for discharge of wastewater to surface water(s). D2d h. The proposed action may cause soil erosion, or otherwise create a source of stormwater discharge that may lead to siltation or other degradation of receiving water bodies. D2e i. The proposed action may affect the water quality of any water bodies within or downstream of the site of the proposed action. E2h j. The proposed action may involve the application of pesticides or herbicides in or around any water body. D2q, E2h k. The proposed action may require the construction of new, or expansion of existing, wastewater treatment facilities. D1a, D2d Page 2 of 13 9 9  9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9  l. Other impacts: 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or  NO may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If “Yes”, answer questions a - h. If “No”, move on to Section 5.  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may require new water supply wells, or create additional demand on supplies from existing water supply wells. D2c b. Water supply demand from the proposed action may exceed safe and sustainable withdrawal capacity rate of the local supply or aquifer. Cite Source: D2c c. The proposed action may allow or result in residential uses in areas without water and sewer services. D1a, D2c d. The proposed action may include or require wastewater discharged to groundwater. D2d, E2l e. The proposed action may result in the construction of water supply wells in locations where groundwater is, or is suspected to be, contaminated. D2c, E1f, E1g, E1h f. The proposed action may require the bulk storage of petroleum or chemical products over ground water or an aquifer. D2p, E2l g. The proposed action may involve the commercial application of pesticides within 100 feet of potable drinking water or irrigation sources. E2h, D2q, E2l, D2c h. Other impacts: 5. Impact on Flooding The proposed action may result in development on lands subject to flooding.  NO (See Part 1. E.2) If “Yes”, answer questions a -g. If “No”, move on to Section 6.  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in development in a designated floodway. E2i b. The proposed action may result in development within a 100-year or a 500-year floodplain. E2j, E5a, E5b c. The proposed action may result in development in an area potentially affected by sea level rise. E2k, E5c d. The proposed action may result in, or require, modification of existing drainage patterns. D2b, D2e e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, E2j, E2k f. If there is a dam located on the site of the proposed action, is the dam in need of repair, or upgrade? E1e Page 3 of 13 9 9   g. Other impacts: 6. Impacts on Air and Climate The proposed action may include a state regulated air emission source. (See Part 1. D.2.f., D.2.h, D.2.g) or generate greenhouse gas emissions over 10,000 metric tons of carbon dioxide equivalents (See Part 1. D.2.h) If “Yes”, answer questions a -i. If “No”, move on to Section 7.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. If the proposed action requires federal or state air emission permits, the action mayalso have the potential to emit one or more regulated air contaminants at or above the following levels: i. More than 100 short tons/year of carbon monoxide (CO) ii. More than 100 short tons/year of oxides of nitrogen (NOx) outside the NYC Metropolitan Area (6 NYCRR 200.1(au) or Long Island OR 25 short tons/year within the NYC Metropolitan Area or Long Island iii. More than 100 short tons/year of particulate matter (PM-10, PM-2.5) iv. More than 50 short tons/year of volatile organic compounds (VOC) outside the NYC Metropolitan Area or Long Island OR 25 short tons/year within the NYC Metropolitan Area or Long Island v. More than 100 short tons/year of sulfur dioxide (SO2) D2g D2g D2g D2g D2g b. The proposed action has the potential to emit 10 short tons/year or more of any one designated hazardous air pollutant, or 25 short tons/year or more of any combination of such hazardous air pollutants. D2g c. The proposed action may include a heat source capable of producing more than 20 million BTUs per hour. D2f, D2g d. The proposed action may exceed 50% of any of the thresholds in “a” or “b”, above. D2g e. The proposed action may result in the combustion or thermal treatment of solid, hazardous, or hospital/medical/infectious waste. D2f, D2s   f. The proposed action is subject to the Nonattainment New Source Review or Prevention of Significant Deterioration requirements discussed in 6 NYCRR Part 231. D2g g. The proposed action will emit more than 10,000 metric tons of CO2 equivalents per year. D2h h. A municipality adopted comprehensive or individual plan addressing climate change applies to the proposed action and the proposed action would materially conflict with the achievement of one or more goals of the plan related to climate change. C2d i. Other impacts: Page 4 of 13 7. Impact on Plants and Animals The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.) If “Yes”, answer questions a - j. If “No”, move on to Section 8. NO YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may cause reduction in population or loss of individuals of any threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2o b. The proposed action may result in a reduction or degradation of any habitat used by any rare, threatened or endangered species, as listed by New York State or the federal government. E2o c. The proposed action may cause reduction in population, or loss of individuals, of any species of special concern or conservation need, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2p d. The proposed action may result in a reduction or degradation of any habitat used by any species of special concern and conservation need, as listed by New York State or the Federal government. E2p Page 5 of 13 9 9 9 9 9 9 9 9 9 9 9 9  9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 e. The proposed action may diminish the capacity of a registered National Natural Landmark to support the biological community it was established to protect. E3c f. The proposed action may result in the removal of, or ground disturbance in, any portion of a designated significant natural community. Source: E2n g. The proposed action may substantially interfere with nesting/breeding, foraging, or over-wintering habitat for the predominant species that occupy or use the project site. E2m h. The proposed action requires the conversion of more than 10 acres of forest, grassland or any other regionally or locally important habitat. Habitat type & information source: E1b i. Proposed action (commercial, industrial or recreational projects, only) involves use of herbicides or pesticides. D2q j. Other impacts: 8. Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.) If “Yes”, answer questions a - h. If “No”, move on to Section 9.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may impact soil classified within soil group 1 through 4 of the NYS Land Classification System. E2c, E3b b. The proposed action may sever, cross or otherwise limit access to agricultural land (includes cropland, hayfields, pasture, vineyard, orchard, etc). E1a, Elb c. The proposed action may result in the excavation or compaction of the soil profile of active agricultural land. E3b d. The proposed action may irreversibly convert agricultural land to non-agricultural uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. E1b, E3a e. The proposed action may disrupt or prevent installation of an agricultural land management system. El a, E1b f. The proposed action may result, directly or indirectly, in increased development potential or pressure on farmland. C2c, C3, D2c, D2d g. The proposed project is not consistent with the adopted municipal Farmland Protection Plan. C2c h. Other impacts: Page 6 of 13  9 9 9 9 9 999 9 999 99 9 9 9 9   9 9 9 9 9 9 9. Impact on Aesthetic Resources The land use of the proposed action is obviously different from, or are in sharp contrast to, current land use patterns between the proposed project and a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.) If “Yes”, answer questions a - g. If “No”, go to Section 10.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Proposed action may be visible from any officially designated federal, state, or local scenic or aesthetic resource. E3h b. The proposed action may result in the obstruction, elimination or significant screening of one or more officially designated scenic views. E3h, C2b c. The proposed action may be visible from publicly accessible vantage points: i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) ii. Year round E3h d. The situation or activity in which viewers are engaged while viewing the proposed action is: i. Routine travel by residents, including travel to and from work ii. Recreational or tourism-based activities E3h E2q, E1c e. The proposed action may cause a diminishment of the public enjoyment and appreciation of the designated aesthetic resource. E3h f. There are similar projects visible within the following distance of the proposed project: 0-1/2 mile ½ -3 mile 3-5 mile 5+ mile D1a, E1a, D1f, D1g g. Other impacts: 10. Impact on Historic and Archeological Resources The proposed action may occur in or adjacent to a historic or archaeological resource. (Part 1. E.3.e, f. and g.) If “Yes”, answer questions a - e. If “No”, go to Section 11.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may occur wholly or partially within, or substantially contiguous to, any buildings, archaeological site or district which is listed on the National or State Register of Historical Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places. E3e b. The proposed action may occur wholly or partially within, or substantially contiguous to, an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory. E3f c. The proposed action may occur wholly or partially within, or substantially contiguous to, an archaeological site not included on the NY SHPO inventory. Source: E3g Page 7 of 13 9 9 9 9 9 9 9   9 9 9 9 9 9 9 9 9 9  9 9 9 9 9 9 d. Other impacts: If any of the above (a-d) are answered “Moderate to large impact may e. occur”, continue with the following questions to help support conclusions in Part 3: i. The proposed action may result in the destruction or alteration of all or part of the site or property. ii. The proposed action may result in the alteration of the property’s setting or integrity. iii. The proposed action may result in the introduction of visual elements which are out of character with the site or property, or that may alter its setting. E3e, E3g, E3f E3e, E3f, E3g, E1a, E1b E3e, E3f, E3g, E3h, C2, C3 9 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a reduction of an open space resource as designated in any adopted municipal open space plan. (See Part 1. C.2.c, E.1.c., E.2.q.) If “Yes”, answer questions a - e. If “No”, go to Section 12.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in an impairment of natural functions, or “ecosystem services”, provided by an undeveloped area, including but not limited to stormwater storage, nutrient cycling, wildlife habitat. D2e, E1b E2h, E2m, E2o, E2n, E2p b. The proposed action may result in the loss of a current or future recreational resource. C2a, E1c, C2c, E2q c. The proposed action may eliminate open space or recreational resource in an area with few such resources. C2a, C2c E1c, E2q d. The proposed action may result in loss of an area now used informally by the community as an open space resource. C2c, E1c e. Other impacts: 12. Impact on Critical Environmental Areas The proposed action may be located within or adjacent to a critical environmental area (CEA). (See Part 1. E.3.d) If “Yes”, answer questions a - c. If “No”, go to Section 13.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in a reduction in the quantity of the resource or characteristic which was the basis for designation of the CEA. E3d b. The proposed action may result in a reduction in the quality of the resource or characteristic which was the basis for designation of the CEA. E3d c. Other impacts: Page 8 of 13  9 9 99 99 9 9 99 99  99 9 9 9 9 9 9  9 9 9 9 9 9 13. Impact on Transportation The proposed action may result in a change to existing transportation systems.  NO (See Part 1. D.2.j) If “Yes”, answer questions a - f. If “No”, go to Section 14.  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Projected traffic increase may exceed capacity of existing road network. D2j b. The proposed action may result in the construction of paved parking area for 500 or more vehicles. D2j c. The proposed action will degrade existing transit access. D2j d. The proposed action will degrade existing pedestrian or bicycle accommodations. D2j e. The proposed action may alter the present pattern of movement of people or goods. D2j f. Other impacts: 14. Impact on Energy The proposed action may cause an increase in the use of any form of energy.  NO (See Part 1. D.2.k) If “Yes”, answer questions a - e. If “No”, go to Section 15.  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action will require a new, or an upgrade to an existing, substation. D2k b. The proposed action will require the creation or extension of an energy transmission or supply system to serve more than 50 single or two-family residences or to serve a commercial or industrial use. D1f, D1q, D2k c. The proposed action may utilize more than 2,500 MWhrs per year of electricity. D2k d. The proposed action may involve heating and/or cooling of more than 100,000 square feet of building area when completed. D1g e. Other Impacts: 15. Impact on Noise, Odor, and Light The proposed action may result in an increase in noise, odors, or outdoor lighting.  NO (See Part 1. D.2.m., n., and o.) If “Yes”, answer questions a - f. If “No”, go to Section 16.  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may produce sound above noise levels established by local regulation. D2m b. The proposed action may result in blasting within 1,500 feet of any residence, hospital, school, licensed day care center, or nursing home. D2m, E1d c. The proposed action may result in routine odors for more than one hour per day. D2o Page 9 of 13 9 9 9 9 9 9   9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 d. The proposed action may result in light shining onto adjoining properties. D2n e. The proposed action may result in lighting creating sky-glow brighter than existing area conditions. D2n, E1a f. Other impacts: 16. Impact on Human Health The proposed action may have an impact on human health from exposure  NO to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.) If “Yes”, answer questions a - m. If “No”, go to Section 17.  YES Relevant Part I Question(s) No,or small impact may occur Moderate to large impact may occur a. The proposed action is located within 1500 feet of a school, hospital, licensed day care center, group home, nursing home or retirement community. E1d b. The site of the proposed action is currently undergoing remediation. E1g, E1h c. There is a completed emergency spill remediation, or a completed environmental site remediation on, or adjacent to, the site of the proposed action. E1g, E1h d. The site of the action is subject to an institutional control limiting the use of the property (e.g., easement or deed restriction). E1g, E1h e. The proposed action may affect institutional control measures that were put in place to ensure that the site remains protective of the environment and human health. E1g, E1h f. The proposed action has adequate control measures in place to ensure that future generation, treatment and/or disposal of hazardous wastes will be protective of the environment and human health. D2t g. The proposed action involves construction or modification of a solid waste management facility. D2q, E1f h. The proposed action may result in the unearthing of solid or hazardous waste. D2q, E1f i. The proposed action may result in an increase in the rate of disposal, or processing, of solid waste. D2r, D2s j. The proposed action may result in excavation or other disturbance within 2000 feet of a site used for the disposal of solid or hazardous waste. E1f, E1g E1h k. The proposed action may result in the migration of explosive gases from a landfill site to adjacent off-site structures. E1f, E1g l. The proposed action may result in the release of contaminated leachate from the project site. D2s, E1f, D2r m. Other impacts: Page 10 of 13   9 9 9 9 9 9 9 9 9 9 17. Consistency with Community Plans The proposed action is not consistent with adopted land use plans. (See Part 1. C.1, C.2. and C.3.) If “Yes”, answer questions a - h. If “No”, go to Section 18.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action’s land use components may be different from, or in sharp contrast to, current surrounding land use pattern(s). C2, C3, D1a E1a, E1b b. The proposed action will cause the permanent population of the city, town or village in which the project is located to grow by more than 5%. C2 c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 d. The proposed action is inconsistent with any County plans, or other regional land use plans. C2, C2 e. The proposed action may cause a change in the density of development that is not supported by existing infrastructure or is distant from existing infrastructure. C3, D1c, D1d, D1f, D1d, Elb f. The proposed action is located in an area characterized by low density development that will require new or expanded public infrastructure. C4, D2c, D2d D2j g. The proposed action may induce secondary development impacts (e.g., residential or commercial development not included in the proposed action) C2a h. Other: 18. Consistency with Community Character The proposed project is inconsistent with the existing community character. (See Part 1. C.2, C.3, D.2, E.3) If “Yes”, answer questions a - g. If “No”, proceed to Part 3.  NO  YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may replace or eliminate existing facilities, structures, or areas of historic importance to the community. E3e, E3f, E3g b. The proposed action may create a demand for additional community services (e.g. schools, police and fire) C4 c. The proposed action may displace affordable or low-income housing in an area where there is a shortage of such housing. C2, C3, D1f D1g, E1a d. The proposed action may interfere with the use or enjoyment of officially recognized or designated public resources. C2, E3 e. The proposed action is inconsistent with the predominant architectural scale and character. C2, C3 f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 E1a, E1b E2g, E2h g. Other impacts: Page 11 of 13 19. Impact on Disadvantaged Communities The proposed project may impact a disadvantaged community. NO YES (See Part 1. E.4) If “Yes”, answer questions a -g . If “No”, proceed to Part 3. Relevant No, or Moderate Part I small to large Question(s) impact may occur impact may occur a. Is the potentially affected disadvantaged community identified as having comparatively higher burdens or vulnerabilities by the Disadvantaged Community Assessment Tool? E.4.c b. The proposed action may create new air emissions or increase existing air emissions within a disadvantaged community. D.2.f-i, E.4 c. The proposed action may create new wastewater treatment or discharges, or expand existing wastewater treatment or discharges, within a disadvantaged community. D.2.d d. The proposed action creates or expands a solid or hazardous waste management facility, or involves the generation of solid or hazardous waste, within or near a disadvantaged community. D.2.r, D.2.s, D.2.t, E.1.f, E.1.g e. The proposed action may increase traffic within a disadvantaged community. D.2.j f. The proposed action affects or involves one or more of the following facility C.3.c, D.1.a, types: D.1.g, D.2.a, i. landfill; D.2.d, D.2.f, E.1.a, E.1.b. ii. other industrial, manufacturing, or mining land uses; E.1.h, E.1.v, iii. major oil or chemical bulk storage facility; iv. municipal waste combustor; v. power generation facility; vi. risk management plan site; vii. remediation site; or viii. scrap metal processor. E.4 g. Other impacts: Page 12 of 13 20. Future Physical Climate Risks The proposed project may be vulnerable to future physical climate risks or increase the vulnerability of human or ecological communities to future physical climate risks. NO (See Part 1. E.5) If “Yes”, answer questions a -e. If “No”, proceed to Part 3. YES Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action is vulnerable to damage from a projected 100-year flood. E2j, E5a b. The proposed action is vulnerable to damage from a projected 500-year flood. E2k, E5b c. The proposed action is in an area potentially affected by sea level rise. E5c d. The proposed action may increase the vulnerability of human or ecological communities to the following: i. drought ii. temperature extremes (hot or cold) iii. extreme storms, including high winds iv. landslides v. coastal erosion vi. stormwater flooding vii. other climate or weather hazards? If yes, describe: _______________________ E5d e. Other impacts: PRINT FULL FORM Page 13 of 13      Agency Use Only [If Applicable] Project : Date : Full Environmental Assessment Form Part 3 - Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact. Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its determination of significance. Reasons Supporting This Determination: To complete this section:  Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size, or extent of an impact.  Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact occurring, number of people affected by the impact, and any additional environmental consequences if the impact were tooccur.  The assessment should take into consideration any design element or project changes.  Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse environmental impact.  Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact.  For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that no significant adverse environmental impacts will result.  Attach additional sheets, as needed. Determination of Significance - Type 1 and Unlisted Actions SEQR Status:  Type 1   Unlisted Identify portions of EAF completed for this Project: Part 1  Part 2  Part 3 FEAF 2026 Bomber Heights Solar September 1, 2026    Upon review of the information recorded on this EAF, as noted, plus this additional support information and considering both the magnitude and importance of each identified potential impact, it is the conclusion of the as lead agency that:  A. This project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued.  B. Although this project could have a significant adverse impact on the environment, that impact will be avoided or substantially mitigated because of the following conditions that will be required by the lead agency: There will, therefore, be no significant adverse impacts from the project as conditioned, and, therefore, this conditioned negative declaration is issued. A conditioned negative declaration may be used only for UNLISTED actions (see 6 NYCRR 617.7(d)).  C. This Project may result in one or more significant adverse impacts on the environment and an environmental impact statement must be prepared to further assess the impact(s) and possible mitigation and to explore alternatives to avoid or reduce those impacts. Accordingly, this positive declaration is issued. Name of Action: Name of Lead Agency: Name of Responsible Officer in Lead Agency: Title of Responsible Officer: Signature of Responsible Officer in Lead Agency: Date: Signature of Preparer (if different from Responsible Officer) Date: For Further Information: Contact Person: Address: Telephone Number: E-mail: For Type 1 Actions and Conditioned Negative Declarations, a copy of this Notice is sent to: Chief Executive Officer of the political subdivision in which the action will be principally located (e.g., Town / City / Village of) Other involved agencies (if any) Applicant (if any) Environmental Notice Bulletin: http://www.dec.ny.gov/enb/enb.html Page 2 of 2 Application materials submitted by the applicant (15+/- documents), incuding drawings, reports, studies and photo simulations/viewshed analysis, NYS DEC database information, USFWS reports, staff narrative, reports, and proposed resolutions. Town of Ithaca Planning Board Bomber Heights Solar Project Town of Ithaca Planning Board Caitlin Cameron Planning Board Chair Christine Balestra, Senior Planner Town of Ithaca Planning Department, 215 North Tioga Street, Ithaca, NY 14850 607-273-1747, ext. 121 cbalestra@townithacany.gov 1 Part 3 – Evaluation of the Magnitude and Importance of Project Impacts & Determination of Significance Bomber Heights Solar Project- Troy Road State Environmental Quality Review Full Environmental Assessment Form Action: Preliminary Site Plan Approval Location: Troy Road, Tax Parcel No. 49.-1-26.2 Lead Agency: Town of Ithaca Planning Board Involved Agency: Town of Ithaca Zoning Board of Appeals Description: The project involves the construction of the Bomber Heights large-scale community solar photovoltaic system, located on Troy Road, consisting of a 5MWac single-axis sun tracking solar array system on approximately 31 acres of land. The project also includes installing two inverter/transformer equipment pads, solar energy battery storage, new overhead utility (NYSEG) interconnects and poles, eight-foot tall fencing, stormwater management facilities, access drive, and other site elements. The project is located in the Low-Density Residential Zone, in the Large-Scale Photovoltaic Solar Energy System Overlay District, which permits large scale systems with Site Plan Approval by the Planning Board. The Planning Board reviewed a sketch plan for the proposal on March 3, 2026. The proposed action is a Type I Action, pursuant to 6 NYCRR Part 617 (State Environmental Quality Review), because the project includes an action that involves the physical alteration of 10 acres (617.4 (c)(6)(i)). The project is also a Type I Action pursuant to the Town of Ithaca Town Code Chapter 148, Environmental Quality Review, because it involves the authorization of industrial or commercial uses within a residential or agricultural district applying to a parcel of land of 10 or more acres (148.5.A (1)). The Planning Board declared their intent to be the Lead Agency in the environmental review of this project on March 3, 2026. The Zoning Board of Appeals is an Involved Agency in the coordinated review and will be responsible for considering variances for the project relative to the amount of clear-cutting proposed for the project (Town Code, §270-5, and §270-219.1.G(2)(c)[5][b]). This is described in #1 and #7 below. 1. Impact on Land a. The proposed action may involve construction on land where the depth to water table is less than 3 feet. b. The proposed action may involve construction on slopes of 15% or greater. c. The proposed action may involve construction on land where bedrock is exposed, or generally within 5 feet of existing ground surface. f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). Briefly describe the impact on land: The 62+/- acre parcel on Troy Road is maintained as a mix of open fields, meadow, brush, and wooded areas. The majority of the property is gently sloping, with streams located in the southeast and northeast corners, respectively. There are two overhead NYSEG 2 power lines that bisect the property and run towards the existing NYSEG substation on East King Road to the south. The parcel is bound on the north by vacant land and residences near the intersection of Troy and Coddington Roads, on the east by vacant land and residences along Coddington Road, on the south by the utility’s substation and residences along East King Road, and on the west by Troy Road. The overall property contains very few areas with slopes that exceed 15%, as more than 75% of the property contains 0-10% slopes. The entirety of the solar array footprint will reside in areas with slopes 10% or less, with the majority of the array footprint located in areas with slopes 5% or less. According to the EAF Part 1, this property contains a somewhat shallow depth to bedrock and depth to water table in some areas. The soils are also poorly drained. While this would make for less than ideal conditions for construction of structures (e.g. residences, buildings, etc.), it will not create significant environmental impacts for the installation of the proposed solar array. In terms of erosion and physical disturbance, there will be limited ground disturbance and grading associated with the project. The solar array will be constructed on a post and rack system with pile-driven posts, and panels elevated off the ground, so the array itself will cause minimal ground disturbance. This will significantly limit overall site disturbance and will only result in about 1.41+/- acres of impervious surface over the 31+/- acre portion of the property that will be utilized for the solar project. The area underneath and surrounding the panels will be vegetated and will be managed via mowing. Most of the site disturbance will be associated with the installation of the equipment/battery storage pads, gravel access roads, and stormwater management facilities. The project site will be fenced, and special care will be taken to avoid wetlands that are on the site. Additional details relating to wetland and stream mitigations are discussed in #’s 3 and 5 below. Additional information associated with vegetation loss is discussed in #7 below. Based on the above information, impacts identified in this section can be considered small in magnitude. 3. Impacts on Surface Water (description of impact is grouped with #5 below) d. The proposed action may involve construction within or adjoining a freshwater or tidal wetland, or in the bed or banks of any other water body. h. The proposed action may cause soil erosion or otherwise create a source of stormwater discharge that may lead to siltation or other degradation of receiving water bodies. i. The proposed action may affect the water quality of any water bodies within or downstream of the site of the proposed action. 5. Impact on Flooding d. The proposed action may result in, or require, modification of existing drainage patterns. Briefly describe the impact on surface water and flooding: Waterbodies within or downstream of the site: There are wetlands on the property that have been delineated and are included on all of the plans associated with the solar project. The project will avoid wetlands to the greatest extent possible. The access road, equipment pad, and other structures are largely located around the wetlands. There will be no digging or trenching within any wetlands, which will further mitigate impacts. The application materials include correspondence between the applicant and the NYSDEC, indicating that the wetlands are non-jurisdictional and would not require 3 permits from the NYSDEC (letter to Dustin Bradley, LaBella Associates, dated 6/04/2025). The NYSDEC Lead Agency response letter has also noted that the project site is not within a New York State protected Freshwater Wetland. It is unclear if the Army Corps of Engineers (ACOE) will require a Nationwide Permit for work within or near the wetlands. The applicant has submitted an application to the ACOE but has not yet heard back. Given the limited disturbance to the wetlands, it is not anticipated that the ACOE will require mitigations that will change the site layout or project scale. In addition to the wetlands, there are two DEC-regulated Class A streams on the property. One stream is located along the northeast corner of the property, and one is located along the southeast corner of the property. Neither waterbody will be directly impacted by the proposal (the applicant has moved proposed array away from the northeastern stream). Any potential indirect impacts will be mitigated with the proposed stormwater management practices noted below. The NYSDEC has indicated that a Stream Disturbance Permit could be required for the project. The Planning Board should condition final approvals on the applicant obtaining all necessary NYSDEC and/or ACOE permits for the project. Soil Erosion, Water Quality, Water Quantity, & Flooding: According to application materials, there is minimal ground disturbance associated with this project and only approximately 1.41+/- acre of impervious surface will be created. The solar array is on a rack system that is elevated off the ground, and the proposed equipment/battery pads and access roads will require minimal grading. To mitigate soil migration offsite, the applicant proposes installing silt fencing around the site, creating a stabilized construction entrance, and performing temporary soil stabilization. Permanent stormwater management devices will be installed to maintain sheet flow conditions on the site and to maintain pre-condition drainage patterns and peak discharge rates. After construction, the disturbed areas will be seeded with locally appropriate seed mix to prevent soil damage, promote deep root growth, and provide permanent soil stabilization. The applicant proposes to install grass filter strips along the equipment/battery storage pads and access road to provide water quality treatment of stormwater runoff that is generated by the proposed project. These and other practices are described in the Stormwater Pollution Prevention Plan (SWPPP) that was submitted to the Town’s Engineering Department for their review and approval. The Engineering Department has reviewed the SWPPP for the project and deemed the proposed SWPPP to be conceptually acceptable in terms of mitigating environmental impacts related to stormwater. According to the letter from the Town’s engineering consultant, the project will require a specific landscaping plan for the bioretention basin, updated calculations, clarifications of terms, and other items (see application materials, Barton & Loguidice letter dated August 19, 2026, to Justin McNeal, Director of Engineering). Revised materials and calculations should be submitted prior to final site plan approval to ensure that the project is in conformance with applicable local and state stormwater regulations. Based on the above information, impacts identified in this section can be considered small in magnitude. 4 7. Impact on Plants and Animals a. The proposed action may cause reduction in population of loss of individuals and threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. b. The proposed action may result in the reduction or degradation of any habitat used by any rare, threatened, or endangered species, as listed by New York State or the federal government. Briefly describe the impact on plants and animals: There will be approximately 17+/- acres of tree and vegetation removal associated with this project (evaluated in the SWPPP noted above). The application materials include a “NLEB and Glaucous Sedge Habitat Assessment Memo,” prepared by LaBella, dated July 17, 2026. The report indicates that the property contains red maple, northern red oak, white oak, shagbark hickory, white pine, and white ash trees. The summary of findings from the report indicates that there is suitable habitat and roost trees on the property for the northern long- eared bat (NLEB) and the tri-colored bat. The NLEB is an endangered species listed by both United States Fish & Wildlife Service (USFWS) and the New York State Department of Environmental Conservation (NYS DEC). Both bat species live and roost in dead and live trees with exfoliating bark, tree cavities, crevices, hollows of trees greater than 3 inches DBH, leaf clusters, and Spanish moss. Per the findings “All suitable habitat trees found were dead, dying, or alive with hollows, crevices, or peeling bark. Each tree had a DBH greater than 3 inches with some greater than 50 inches.” The report contains a figure (Figure 1) and photo log that shows the locations on the site where suitable habitat exists. Most of these areas are the same areas proposed for clearcutting to accommodate the solar project. The LaBella study also noted that there is suitable habitat for two threatened plant species listed by the NYS DEC. The glaucous and reflexed sedges are both associated with red maple, white ash, white pine, northern red oak, white oak trees. The report, which was completed in January, did not find the presence of either sedge on the property but mentioned that "the presence of these species may need to be confirmed during the growing season, between May and July.” This has been added as a condition of approval for the Planning Board to consider, should the board approve the solar project. The application materials contain letters issued by the (USFWS), dated 05/29/2026, that determine that the project will “NLAA” (Not Likely To Adversely Affect) the potential NLEB and tri-colored bat habitats. However, both the LaBella study and the USFWS documents recommend taking the following conservative precautions:  Minimize clearing- leave as many potential roosts as possible, including snag and cavity trees  Either all site disturbance should take place between Nov. 1 and March 31, or an acoustic bat survey should be conducted between May 15 and August 15 to determine presence or possible absence of bats  If any roosts are discovered after March 31, then no tree cutting during pup season (July 1- Aug 15) The Planning Board should discuss these mitigations with the applicant at the meeting. The applicant is aware of the potential presence of NLEB habitat and understands that there may be the need for additional precautions. The attached draft resolution contains a condition for the board to consider, should the board approve the solar project. According to the solar provisions in Town Code (§270-219.1.G(2)(c)[5][b][i]), “removal of trees and other existing vegetation shall be limited to what is necessary for the construction, operation and 5 maintenance of the photovoltaic solar energy system” and “clear-cutting shall not occur on more than 20% of 10 acres on the lot, and clear-cutting shall not occur on more than 10% of the balance of the acreage on the lot.” The Director of Code Enforcement issued a letter to the applicant during the sketch plan review stage (dated 5/7/26), requesting clarification on the proposed tree clearing for the project to determine if any variances from Town Code were necessary. In the letter, the clear-cutting evaluations for this project were established as follows (considering the whole 62+/- acre parcel):  For the first 10 acres: 20% allowable clear-cutting = 2.0 acres  Remaining acreage (52.01 acres): 10% allowable clear-cutting = 4.201 acres  Total clearcutting permitted = 6.201 acres  Application materials show “tree clearing and grubbing area” totaling approximately 23.16 acres (Sheet C100). The letter from the Code Enforcement Office required the submittal of “a detailed tree survey, identifying all trees measuring 6 inches or greater DBH and the extent of canopy removal.” The applicant has instead applied for a variance from the Zoning Board of Appeals to clear-cut 23+/- acres, which is around 17+/- acres more than what is permitted by Town Code. As the Zoning Board of Appeals is required to grant the minimum variance necessary for the project, this could be considered a significant variance request. The lack of a tree survey, combined with the presence of potential NLEB habitat and the proposal to clear-cut three times the acreage permitted by zoning might result in potential negative environmental impacts to an endangered species whose habitat could exist on the property. The Planning Board should discuss this with the applicant at the meeting. The project includes a wildlife-friendly, wire mesh fence that will surround the acreage associated with the solar array. The fence is required to be designed to allow the passage of small animals and reptiles. The fence will impact large animals (coyote, deer) by forcing them to go around the fenced area. However, the fence is not expected to impact animal migration patterns or break up any known ecological/wildlife corridors. The project also includes seeding the site with a grazing and pollinator-friendly seed mix that will promote foraging and pollinator habitat in the project area. The project will apply EPA and DEC- compliant herbicide use that is specific to targeting invasive species that may encroach on the property. The pollinator seed mix should contain plants preferred by the monarch butterfly, which is currently a proposed threatened species by USFWS; and the proposed herbicide should not be harmful to pollinators. Based on the above information, impacts identified in this section can be considered moderate in magnitude. The Board should consider requiring the mitigation measures mentioned above to reduce environmental impacts on potential NLEB and tri-colored bat habitats and sedge species. 9. Impact on Aesthetic Resources c. The proposed action may be visible from publicly accessible vantage points (seasonally or year-round) Briefly describe the impact on aesthetic resources: The solar array will be installed at least 300 feet into the property off of Troy Road. The frontage will be screened with a row of conifer trees, planted 6 and maintained by the applicant. Aesthetic and/or visual impacts are limited to those traveling along the road, or from looking in the direction of the array from across the road. Although the project will be viewable from Troy road, the project will be hidden behind trees and vegetation along the Coddington and King Road East road frontages. The Town of Ithaca and Tompkins County have established Scenic Resources Inventories that identify significant views in the South Hill area. Troy Road is not a designated federal or state scenic byway. There are no scenic views in the project area listed in the county inventory, but there are scenic views listed in the town inventory. Views “21” and “22” (attached to the EAF Part 1) are listed in the Town Scenic Resource Inventory but are not considered “gateway” or “significant” views. View 21 is located along Coddington Road. View 22 is located within the Eastern Heights Park on east hill and is the view from the park pavilion. The project will not impact these views, as it will not be visible from these viewpoints. The viewshed analysis provided by the applicant illustrates this, particularly in figures C- 2k, C-2l, C-2q, and C-2r. Therefore, there are no identified scenic resources around the project site that would be impacted by the proposed development. The project will mitigate impacts to immediate views along Troy Road with proposed conifer trees, which will provide year-round screening. Based on the above information, impacts identified in this section would be considered small in magnitude. 14. Impact on Energy a. The proposed action will require a new, or an upgrade to an existing substation. Briefly describe the impact on energy: The proposed project is located along an existing electric distribution line and is in one of the few locations in the Town of Ithaca that have been identified in the Solar Law (Town Code §270-219.1) as being appropriate for large-scale solar facilities. The applicant has obtained approval from NYSEG to connect the new solar facility to the distribution grid to NYSEG’s South Hill Substation. The plans do not show installation of any new utility poles along Troy Road to accommodate the project. The proposed solar project will reduce the amount of fossil- fuel generated electricity that is produced and needs to be moved across transmission and distribution lines, which will result in a reduction in greenhouse gas emissions. Based on the above information, impacts identified in this section would be considered small in magnitude. 15. Impact on Noise and Light a. The proposed action may produce sound above noise levels established by local regulation. f. Other impacts: The project includes lighting that must comply with the Town of Ithaca Code, Chapter 173, Outdoor Lighting. Briefly describe the impact on noise and light: The project will create noise impacts during construction of the solar array and related infrastructure. These impacts will be temporary and will cease once the project is completed. The project materials include a glint and glare study with more than 40 observation points. The study indicated that some travel routes might experience some “green” glare from the proposed facility. According to the study, green glare is defined as “glare with a low potential to cause flash blindness” 7 (as opposed to yellow or red glare, which has potential to cause temporary or permanent flash blindness, respectively). Planning staff conducted a site visit along these travel routes on a sunny day in late July and discovered that the model in the glint and glare study did not consider existing topography, structures, or vegetation (page 6 of the study does state that “vegetation was not fully modeled in the analysis, and existing or future vegetative conditions may further reduce visibility of the array.”) Staff noticed particular discrepancy after traveling along Route 4- King Road East and Ridgecrest Road, which is listed in the study as the route with the “greatest modeled exposure.” Route 4 contains rolling hills, residences/other buildings, and thick vegetative screening. Staff concluded that the proposed solar array would be completely blocked by buildings, trees, and other structures along this routes, and that there are, in fact, no publicly travelled routes that will experience glare from the solar project. The project may include safety lighting associated with the equipment/battery storage units. The plans do not show installation of any new NYSEG utility poles along Troy Road to accommodate the project. However, any proposed outdoor lighting will be required to comply with the provisions of Town of Ithaca Code Chapter 173, Outdoor Lighting. The Code contains provisions related to glare and dark-sky compliancy. Based on the above information, impacts identified in this section would be considered small in magnitude. 18. Consistency with Community Character f. Proposed action is inconsistent with the character of the existing natural landscape. Briefly describe the impact on community character: The project site is a mix of open fields, meadow, brush, and wooded areas, with two overhead NYSEG power lines that bisect the property. The proposed solar array – or any other type of development on the site - would be in contrast with the character of the existing natural landscape. However, the proposed solar array will be located at least 300 feet from Troy Road and will contain a line of conifer trees along the frontage that will screen its view along the road. The property is surrounded by thick vegetation outside of the project area that will be preserved and will screen the array from the rear yards of residences that abut the property on Coddington Road and King Road East. The project also includes a decommissioning plan that will restore the land back to its prior use if there is (1) a lack of solar production for six continuous months, (2) a lack of a current local permit, (3) failure to maintain any required decommissioning bond or other security, and (4) a violation of any site plan conditions or permit conditions that continues more than 90 days after the town provides written notice of such violation. The decommissioning plan will ensure that the character of the property will be re-established if and when the solar use terminates. The array and components will be dismantled and recycled, roads and stormwater facilities will be removed, screening will remain unless the town requires removal, topsoil will be replaced, and any disturbed areas will be re- seeded with native species. The solar law that created the Large-Scale Photovoltaic Solar Energy System Overlay District on this parcel is consistent with the Town’s Comprehensive Plan, which included Goal EC-5-B to “revise Town regulations to facilitate local renewable energy production and use.” The solar law is also consistent with Ithaca Town Board Resolution No. 2020-049 (Resolution in Support of a Green New Deal (GND)), 8 and Ithaca Town Code Chapters 135 (Community Choice Aggregation (Energy) Program) and 144 (Energy Code Supplement). Based on the above information, impacts identified in this section would be considered small in magnitude. Staff Recommendation, Determination of Significance A negative determination of environmental significance is recommended for the action as proposed, based on review of the materials submitted for the proposed action, the information above, and analysis of the magnitude and importance of the project impacts. Lead Agency: Town of Ithaca Planning Board – Preliminary Site Plan Review Reviewer: Christine Balestra, Senior Planner Review Date: August 24, 2026 Division of Fish and Wildlife | Bureau of Ecosystem Health KATHY HOCHUL Governor Acting Commissioner LETTER OF NO JURISDICTION – FRESHWATER WETLANDS 06/04/2025 Dustin Bradley Labella Associates, Attn: Dustin Bradley, 3rd floor, 300 State St #201, Rochester, NY 14614 Sent via email to: dbradley@labellapc.com Re: DEC Freshwater Wetlands Parcel Jurisdictional Determination for Parcel 50308949.-1-26.2, Cayuga County. Dear Dustin Bradley, Based on the parcel(s) identified in your request, the New York State Department of Environmental Conservation (DEC) has determined that there are no DEC regulated freshwater wetlands and/or adjacent areas identified on the parcel(s) referenced above. Therefore, in accordance with Article 24 of the Environmental Conservation Law (ECL) and 6 NYCRR Part 663, no freshwater wetlands permit is required. Pursuant to ECL section 24-0703, this letter shall remain valid for a period of five years from the date it is issued (through 06/02/2030). Please note that this determination pertains only to state-regulated, freshwater wetlands and regulated adjacent areas. DEC also regulates protected streams, tidal wetlands, coastal erosion hazard areas, and other important environmental resources. Work affecting those areas may also require DEC permits. More information on other DEC permit programs is available online at https://dec.ny.gov/regulatory/permits-licenses/environmental-permits. In addition, please note that this letter does not relieve you of the responsibility of obtaining any other necessary permits or approvals from other local, state, or federal agencies. If you have questions regarding this determination, please email FWWjurisdiction@dec.ny.gov. January 2, 2024 File No. 15.0167244.00 Mr. Ryan McCune Nexamp, Inc. 101 Summer Street, 2nd Floor Boston, MA 02110 Re: Wetland Delineation Report Troy Road Ithaca, New York Tax Parcel ID: 49.-1-26.2 Dear Mr. Ryan McCune: Pursuant to our proposal dated October 18, 2023, GZA GeoEnvironmental, Inc. (GZA) reviewed the above-referenced property for the presence of regulated wetland and waterbody resources using current State and Federal methodologies. The purpose of this work was to identify areas that may be subject to the jurisdiction of the United States Army Corps of Engineers (USACE) pursuant to Section 404 of the Clean Water Act (CWA), and/or the New York State Department of Environmental Conservation (NYSDEC) pursuant to Freshwater Wetlands Act [Article 24 and Title 23 of Article 71 of the Environmental Conservation Law (ECL)] and Article 15 ECL-Protection of Waters. This letter summarizes the findings of the desktop review and field delineation completed by GZA and is subject to the Limitations provided as Attachment A. Introduction GZA was retained by Nexamp (Client) to perform a wetland and waterbody delineation on the property located on Troy Road, Ithaca, New York. The tax parcel (49.-1-26.2) consists of approximately 62 acres of undeveloped forest and fields. The Study Area (Site) within the parcel consists of approximately 22.4 acres. See Figure 1 for the Site Location Map. GZA reviewed available background information including the New York State Department of Environmental Conservation (NYSDEC) Freshwater Wetlands Map 1, the U.S. Fish and Wildlife Service (USFWS) National Wetland Inventory Map2, the Natural Resources Conservation Service (NRCS) Web Soil Survey Map3, the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM)4, United States Geological Survey (USGS) National 1 New York State Department of Environmental Conservation, Environmental Resource Mapper, 2023 [Website]. Available at: http://www.dec.ny.gov/gis/erm/ 2 U.S. Fish and Wildlife Service, National Wetlands Inventory, Wetland Mapper, 2023 [Website]. Available at: https://www.fsw.gov/wetaldns/data/mapper.html 3 United States Department of Agriculture, National Resource Conservation Service, Web Soil Survey, 2023 [Website]. Available at: https://websilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx 4 Federal Emergency Management Agency (FEMA) 2023. FEMA Flood Map Service Center. Available at: https://msc.fema.gov/portal/home January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 2 active by Design Mapper5, and commercially available aerial imagery. Following this desktop review, GZA conducted a field visit to delineate wetland and waterbody resources at the Site. Wetland scientists from GZA conducted the wetland and waterbody delineation on November 2 and 3, 2023 within the Site. Wetlands and waterbodies were delineated using the methodology outlined in the Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1, using the Routine Determination Method; in conjunction with the Regional Supplement to the Corps 1987 Wetland Delineation Manual: North Central and Northeast Region, Technical Report ERDC/EL TR-09-19; North American Digital Flora: National Wetland Plant List, Version 2.4.0 US Army Corps of Engineers, Engineer Research and Development Center, Cold Regions Research and Engineering Laboratory, Hanover, NH and BONAP, Chapel Hill, NC (2012); and Field Indicators for Identifying Hydric Soils in New England, Version 4 (2018). GPS data for wetlands, waterbodies and other key site features were obtained in the field using a handheld, sub-meter Global Positioning System (GPS). GZA identified and delineated three wetlands and three streams within the Site boundary. Photographs taken during field work are provided in the Appendix A – Photo Log. Desktop Review Results The Site is located approximately 0.4 miles south of the intersection of Troy Road and Coddington Road in Ithaca, NY. A review of the National Mapper5 shows that the Site is gradually sloped to the northeast, with elevations ranging from 1,166 feet NAVD88 to 1,000 feet NAVD88. A review of the NYSDEC freshwater wetlands mapper1 does not identify any state regulated wetlands within the Site. The nearest mapped NYSDEC wetland (TW-9) is located ±2.45 miles to the west. The NYSDEC freshwater wetlands mapper1 does identify one unnamed classified stream (Class A) flowing through the Site. The USFWS National Wetland Inventory (NWI) mapper2 (Figure 2) does identify one riverine wetland classified as R4SBC, which is located at the northern portion of the Site and flows to the northwest. The following describes the resources located within the Site: • Riverine, Intermittent, Streambed, Seasonally Flooded (R4SBC) The NRCS Jefferson County Soil Survey map provided in Appendix C – Soil Report, available online through the Web Soil Survey https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm, mapped the following soil series within the Site: Table 1. Study Area Soils Based on NRCS Web Soil Survey Mapping Unit Soil Name Drainage Class BgC Bath and Valois soils 5-15 Well drained 0 21.5 EbB Erie channery silt loam 3-8 5 72.1 EbC Erie channery silt loam 8-15 5 0.9 5 U.S. Geological Survey, The National Map, 2023 [Website]. Available at: https://viewer.nationalmap.gov/advanced-viewer/ January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 3 active by Design A review of the FEMA Flood Insurance Map effective June 19, 1985, maps the Site as Zone C, which are areas of minimal flood hazard4. Wetland Delineation Findings GZA’s wetland delineation, completed on November 2nd and 3rd, 2023, identified three wetlands and three streams within the Site as summarized below. Wetland A: Wetland A is located along the proposed access road for the Site and exhibits characteristics of an emergent wetland (PEM). Wetland A is approximately 0.02 acres in area and continues offsite to the north (Figure 3 - Waters & Wetlands Delineation Map). The vegetation present within Wetland A consists of scrub-shrub and emergent wetland vegetation. There is no vegetation in the tree stratum; part of Wetland A is within a transmission right-of-way (ROW). and is subject to vegetation maintenance. Vegetation in the shrub stratum consists of silky dogwood (Swida amomum, FACW) and Tartarian honeysuckle (Lonicera tatarica, FACU). Vegetation in the herb stratum consists of soft rush (Juncus effusus, OBL), sensitive fern (Onoclea sensibilis, FACW), grass-leaved goldenrod (Euthamia graminifolia, FAC), creeping buttercup (Ranunculus repens, FAC), several species of grass, a species of sedge (Carex sp.), and a species of goldenrod (Solidago sp.). Soils exhibited hydric conditions such as a dark matrix with low chroma and distinct redox concentrations, meeting the criteria for hydric soil indicator F6 (Redox Dark Surface). Hydrologic indicators include saturation to surface and FAC-Neutral test. Wetland B: Wetland B is located near the northwestern corner and center of the Site and is approximately 1.94 acres in area and exhibits characteristics of a forested wetland (PFO) (Figure 3 - Waters & Wetlands Delineation Map). Wetland B extends across the existing transmission ROW that runs through the middle of the Site utilizing multiple culverts which allow for flow underneath the access route. The vegetation present within Wetland B consists of forested, scrub-shrub, and emergent wetland vegetation. Vegetation in the tree stratum consists of European buckthorn (Rhamnus cathartica, FAC). Vegetation in the shrub stratum consists of Tartarian honeysuckle (Lonicera tatarica, FACU). Vegetation in the herb stratum consists of creeping buttercup (Ranunculus repens, FAC), reed canary grass (Phalaris arundinacea, FACW), creeping yellow-loosestrife (Lysimachia nummularia, FACW), grass-leaved goldenrod (Euthamia graminifolia, FAC), and several species of grass. Soils exhibited hydric conditions such as a depleted matrix with low chroma, meeting the criteria for hydric soil indicator F3 (Depleted Matrix). Hydrologic indicators include saturation to surface. Wetland C: Wetland C is located in the southeastern corner of the Site and is approximately 4.92 acres in area and exhibits characteristics of an emergent wetland (PEM) (Figure 3 - Waters & Wetlands Delineation Map). Wetland C extends across the existing transmission ROW that runs through the middle of the Site. The vegetation within Wetland C consists of forested, scrub-shrub, and emergent wetland vegetation. Vegetation in the tree stratum consists of green ash (Fraxinus pennsylvanica, FACW). Vegetation in the shrub stratum consists of rambler rose (Rosa multiflora, FACU) and gray dogwood (Swida racemose, FAC). Vegetation in the herb stratum consists of soft rush (Juncus effusus, OBL), sensitive fern (Onoclea sensibilis, FACW), swamp dewberry (Rubus hispidus, FACW), graa- January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 4 active by Design leaved goldenrod (Euthamia graminifolia, FAC), creeping buttercup (Ranunculus repens, FAC), northern bedstraw (Galium boreale, FAC), rambler rose (Rosa multiflora, FACU), and several species of grass. Soils exhibits hydric conditions such as a low chroma and distinct redox concentrations, meeting the criteria for hydric soil indicator S5 (Sandy Redox). Hydrologic indicators include saturation to surface and FAC-Neutral test. Stream 1: Stream 1 is located in the northwestern corner of the Site (Figure 3 - Waters & Wetlands Delineation Map). This unnamed stream is classified as Class A and is made up of multiple channels flowing in a northeasterly direction offsite into Sixmile Creek and then to the northwest where is discharges into Cayuga Lake, both of which are navigable waterways. The stream’s substrate consists of cobbles; stream widths ranged from 2 to 10 feet; and stream depth at the time of the delineation was approximately 2 inches. Stream 2: Stream 2 is located near the center of the Site (Figure 3 - Waters & Wetlands Delineation Map). Stream 2 is unnamed, unmapped, and flows to the northeast offsite. The stream’s substrate consists of silt; stream widths ranged from 1 to 4 feet wide; and stream depth ranged from 2-4 inches. Stream 3: Stream 3 is located in the southeastern corner of the Site (Figure 3 - Waters & Wetlands Delineation Map). Stream 3 is unnamed and unmapped, but it flows to the southeast offsite into a mapped (Class A) tributary to Sixmile Creek. The stream’s substrate consists of cobbles; stream widths range from 1 to 10 feet; and stream depths range from 2 to 4 inches. Other Observations on Site Micro Depressions: GZA observed several small, concaved areas or ‘micro depressions’ located along the western edge of the Site (Figure 3 – Waters & Wetlands Delineation). These depressions tend to temporarily pool water but do not qualify as State or Federal wetlands. Drainage: GZA observed several drainage features in the southwestern corner of the Site (Figure 3 - Waters & Wetlands Delineation Map). Two drainages flow into Wetland B and two drainages flow into Wetland C. These drainages range from 1 to 2 feet wide and 1 to 2 inches deep at the time of observation, with cobbles and silt making up the substrate. Shagbark Hickory Stands: GZA observed multiple stands of Shagbark Hickory (Carya ovata) within the Site. Shagbark Hickory is known to be a potential roosting habitat for the federally endangered Northern Long-eared Bat (Myotis septentrionalis). Before any work associated with the project commences (i.e., site disturbance, tree clearing, etc.), consultation with the U.S. Fish & Wildlife Service is recommended to avoid violating section 7(c) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 5 active by Design Regulatory Authority New York State Department of Environmental Conservation The Freshwater Wetlands Act [Article 24 and Title 23 of Article 71 of the Environmental Conservation Law (ECL)] gives the NYSDEC jurisdiction over state-protected wetlands and an adjacent 100-foot protective upland buffer area. There does not appear to be any connection between Wetlands A, B, or C with mapped NYSDEC wetlands. Therefore, GZA anticipates that NYSDEC will not likely assert jurisdiction over Wetlands A, B, or C. The Use and Protection of Waters Regulation [Article 15 Part 608 of the Environmental Conservation Law (ECL)] gives the NYSDEC jurisdiction over state-protected streams. Stream 1 is classified as a Class A stream and therefore does fall within the definition of a protected stream. NYSDEC will assert jurisdiction over Stream 1. Stream 2 is not mapped and therefore does not fall within the definition of a protected stream. Stream 3 is not mapped but does flow into an unnamed mapped stream classified as Class A immediately southeast of the Site. Therefore, GZA anticipates that NYSDEC may assert jurisdiction over Stream 3. United States Army Corps of Engineers (USACE) In accordance with Section 404 of the Clean Water Act (CWA), the USACE asserts jurisdiction over Waters of the United States (WOTUS). WOTUS are defined as wetlands, streams, and other aquatic resources under the regulatory authority per Title 33 Code of Federal Regulations (CFR) Part 328 and the United States Environmental Protection Agency (EPA) per Title 40 CFR Part 230.3(s). Wetlands are defined as “those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions” (33 CFR 328.3[c]). The U.S. EPA and USACE revised the definition of WOTUS which became effective September 8, 2023. Based on the current rule, GZA understands the USACE will assert jurisdiction over the following categories of “waters of the United States” defined in 33 CFR 328.3 and as described below: (a)(1) Waters which are: (i) Currently used, or were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide; (ii) The territorial seas; or (iii) Interstate waters; (a)(2) Impoundments of waters otherwise defined as waters of the United States under this definition, other than impoundments of waters identified under paragraph (a)(5) of this section; (a)(3) Tributaries of waters identified in paragraph (a)(1) or (2) of this section that are relatively permanent, standing or continuously flowing bodies of water; January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 6 active by Design (a)(4) Wetlands adjacent to the following waters: (i) Waters identified in paragraph (a)(1) of this section; or (ii) Relatively permanent, standing or continuously flowing bodies of water identified in paragraph (a)(2) or (a)(3) of this section and with a continuous surface connection to those waters; (a)(5) Intrastate lakes and ponds, streams, or wetlands not identified in paragraphs (a)(1) through (4) of this section that are relatively permanent, standing or continuously flowing bodies of water with a continuous surface connection to the waters identified in paragraph (a)(1) or (a)(3) of this section. Eight exclusions from the definition of "waters of the United States" are codified at paragraph (b), and key terms are defined at paragraph (c). "Adjacent" is defined at (c)(2) as "having a continuous surface connection." These exclusions are described below: (1) Waste treatment systems, including treatment ponds or lagoons, designed to meet the requirements of the Clean Water Act; (2) Prior converted cropland designated by the Secretary of Agriculture. The exclusion would cease upon a change of use, which means that the area is no longer available for the production of agricultural commodities. Notwithstanding the determination of an area’s status as prior converted cropland by any other Federal agency, for the purposes of the Clean Water Act, the final authority regarding Clean Water Act jurisdiction remains with EPA; (3) Ditches (including roadside ditches) excavated wholly in and draining only dry land and that do not carry a relatively permanent flow of water; (4) Artificially irrigated areas that would revert to dry land if the irrigation ceased; (5) Artificial lakes or ponds created by excavating or diking dry land to collect and retain water and which are used exclusively for such purposes as stock watering, irrigation, settling basins, or rice growing; (6) Artificial reflecting or swimming pools or other small ornamental bodies of water created by excavating or diking dry land to retain water for primarily aesthetic reasons; (7) Waterfilled depressions created in dry land incidental to construction activity and pits excavated in dry land for the purpose of obtaining fill, sand, or gravel unless and until the construction or excavation operation is abandoned and the resulting body of water meets the definition of waters of the United States; and (8) Swales and erosional features (e.g., gullies, small washes) characterized by low volume, infrequent, or short duration flow. Section 404 of the CWA establishes a program to regulate the discharge of dredged or fill material into waters of the United States, including wetlands. Activities in waters of the United States regulated under this program include fill for development, water resource projects (such as dams and levees), infrastructure development (such as highways and airports) and mining projects. Section 404 requires a permit before dredged or fill material may be discharged into waters of the United States, unless the activity is exempt from Section 404 regulation (e.g., certain farming and forestry activities). Wetlands B and C likely meet the definition of (a)(4) and (c)(2) as described above. GZA anticipates that USACE will likely assert jurisdiction over Wetlands B and C. Wetland A does not meet the definition of (a)(4) or (c)(2) as described above. GZA anticipates that USACE will not likely assert jurisdiction over Wetland A. Based on a review of the USGS National Mapper National Hydrography Dataset, Stream 1 is an intermittent stream. It flows in a generally northeast direction offsite and the flows into Sixmile Creek. Sixmile Creek then flows in a northwest direction towards the City of Ithaca and into the Cayuga Inlet, which then flows north into Cayuga Lake, all of which are January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 7 active by Design navigable waterways. Stream 1 meets the definition of (a)(3) as described above, therefore, GZA anticipates that USACE will likely assert jurisdiction over Stream 1. Based on a review of the USGS National Mapper National Hydrography Dataset, Stream 2 does not meet the definition of (a)(3) as described above. GZA anticipates that USACE will not likely assert jurisdiction over Stream 2. Based on a review of the USGS National Mapper National Hydrography Dataset, Stream 3 flows directly into an unnamed intermittent stream immediately southeast of the Site. It flows in a generally southeast direction into the unnamed stream, which then flows in a generally northeast direction into Sixmile Creek. Sixmile Creek then flows in a northwest direction towards the City of Ithaca and into the Cayuga Inlet, which then flows north into Cayuga Lake, all of which are navigable waterways. Stream 3 may meet the definition of (a)(3) as described above, therefore, GZA anticipates that USACE may assert jurisdiction over Stream 3. Final determination of the jurisdictional status of the wetlands and streams identified within the Site will be made by the USACE by an approved jurisdictional determination process. Conclusions GZA completed a desktop review of publicly available databases and a wetland and waterbody delineation within the Site described above. The results of this work are summarized below: • The Desktop review did not identify any state regulated wetlands but did identify one unnamed classified stream (Class A) flowing through the Site. The NWI mapper does identify one riverine wetland classified as R4SBC, which is located at the northern portion of the Site and flows to the northwest. The majority of the Site is considered to have somewhat poorly drained soils according to the NRCS Web Soil Survey mapper. • The field delineation conducted on November 2 and 3, 2023, identified three wetlands and three streams within the Site. • Wetlands A, B, and C are not connected to a state mapped wetland. NYSDEC will not likely assert jurisdiction over Wetlands A, B, or C. • Stream 2 is not a protected stream. NYSDEC will likely not assert jurisdiction over Stream 2. • Streams 1 and 3 are classified as protected streams. NYSDEC will likely assert jurisdiction over Streams 1 and 3. • Wetland A does not have a surface connection to a water of the United States. USACE will not likely assert jurisdiction over Wetland A. • Wetlands B and C appear to have a surface connection to a water of the United States. USACE will likely assert jurisdiction over Wetlands B and C. • Stream 2 is not a tributary to a navigable waterway. USACE will not likely assert jurisdiction over Stream 2. • Streams 1 and 3 are tributaries to a navigable waterway. USACE will likely assert jurisdiction over Streams 1 and 3. • Final determination of the jurisdictional status of the wetlands and streams identified within the Site will be made by both the USACE and the NYSDEC upon completion of detailed reviews by those agencies as part of a formal Jurisdictional Determination process. January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 8 active by Design Should you have any questions or require additional information, please contact Joe Rogers at (413) 218-2959 or by email at Joseph.Rogers@gza.com. Sincerely, GZA GEOENVIRONMENTAL, INC. Joe Rogers, PWS, CESSWI Deborah M. Zarta Gier, CNRP Stephen L. Lecco, AICP, CEP, PWS Senior Project Manager Principal in Charge Consultant/Reviewer Attachments: Attachment A - Limitations Figure 1 Site Location Figure 2 Resource Map Figure 3 Wetland Map Appendix A - Photo Log Appendix B - Data Forms Appendix C - Soil Report January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 9 active by Design ATTACHMENT A – LIMITATIONS NATURAL RESOURCE SURVEY AND ASSESSMENT LIMITATIONS 15.0167244.00 Page | 1 January 2015 active by Design USE OF REPORT 1. GZA GeoEnvironmental, Inc. (GZA) has prepared this report on behalf of, and for the exclusive use of NEXAMP, INC. (“Client”) for the stated purpose(s) and location(s) identified in the report. Use of this report, in whole or in part, at other locations, or for other purposes, may lead to inappropriate conclusions; and we do not accept any responsibility for the consequences of such use(s). Further, reliance by any party not identified in the agreement, for any use, without our prior written permission, shall be at that party’s risk, and without any liability to GZA. STANDARD OF CARE 2. GZA’s findings and conclusions are based on the work conducted as part of the Scope of Services set forth in the Report and/or proposal, and reflect our professional judgment. These findings and conclusions must be considered not as scientific or engineering certainties, but rather as our professional opinions concerning the data gathered and observations made during the course of our work. Conditions other than described in this report may be found at the subject location(s). 3. GZA’s services were performed using the degree of skill and care ordinarily exercised by qualified professionals performing the same type of services, at the same time, under similar conditions, at the same or a similar property. No warranty, expressed or implied, is made. LIMITS TO OBSERVATIONS 4. Natural resource characteristics are inherently variable. Biological community composition and diversity can be affected by seasonal, annual or anthropogenic influences. In addition, soil conditions are reflective of subsurface geologic materials, the composition and distribution of which vary spatially. 5. The observations described in this report were made on the dates referenced and under the conditions stated therein. Conditions observed and reported by GZA reflect the conditions that could be reasonably observed based upon the visual observations of surface conditions and/or a limited observation of subsurface conditions at the specific time of observation. Such conditions are subject to environmental and circumstantial alteration and may not reflect conditions observable at another time. 6. The conclusions and recommendations contained in this report are based upon the data obtained from a limited number of surveys performed during the course of our work on the site, as described in the Report. There may be variations between these surveys and other past or future surveys due to inherent environmental and circumstantial variability. RELIANCE ON INFORMATION FROM OTHERS 7. Preparation of this Report may have relied upon information made available by Federal, state and local authorities; and/or work products prepared by other professionals as specified in the report. Unless specifically stated, GZA did not attempt to independently verify the accuracy or completeness of that information. COMPLIANCE WITH REGULATIONS AND CODES 8. GZA’s services were performed to render an opinion on the presence and/or condition of natural resources as described in the Report. Standards used to identify or assess these resources as well as regulatory jurisdiction, if any, are stated in the Report. Standards for identification of jurisdictional resources and regulatory control over them may vary between governmental agencies at Federal, state and local levels and are subject to change over time which may affect the conclusions and findings of this report. NATURAL RESOURCE SURVEY AND ASSESSMENT LIMITATIONS 15.0167244.00 Page | 2 January 2015 active by Design NEW INFORMATION 9. In the event that the Client or others authorized to use this report obtain information on environmental regulatory compliance issues at the site not contained in this report, such information shall be brought to GZA's attention forthwith. GZA will evaluate such information and, on the basis of this work, may modify the conclusions stated in this report. ADDITIONAL SERVICES 10. GZA recommends that we be retained to provide further investigation, if necessary, which would allow GZA to (1) observe compliance with the concepts and recommendations contained herein; (2) evaluate whether the manner of implementation creates a potential new finding; and (3) evaluate whether the manner of implementation affects or changes the conditions on which our opinions were made. January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 10 active by Design FIGURES Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community, Copyright:© 2013 National Geographic Society, i-cubed Esri, HERE, Garmin, (c) OpenStreetMap contributors, © 2023 GZA GeoEnvironmental, Inc. \\GZASPRINGFIELD\Jobs\0 167200 - 0 167299\15.0167244.00 Nexamp Wetland Delineations 10 Sites\GIS\Nexamp Site 10 Troy Heights Solar - Site Locus.mxd, 12/19/2023, 4:46:50 PM, Megan.Wilckens TROY HEIGHTS SOLAR127 TROY ROAD, ITHACA, NY SITE LOCUS JOB NO. FIGURE NO. Data Supplied by : 1 15.0167244.00 401,000 2,000 3,000500 Feet This map presents land cover imagery for the world and detailed topographic maps for the United States. The map includes the National Park Service (NPS) Natural Earth physical map at 1.24km per pixel for the world at small scales, i-cubed eTOPO 1:250,000-scale maps for the contiguous United States at medium scales, and National Geographic TOPO! 1:100,000 and 1:24,000-scale maps (1:250,000 and 1:63,000 in Alaska) for the United States at large scales. The TOPO! maps are seamless, scanned images of United States Geological Survey (USGS) paper topographic maps. SITE DATE: DECEMBER 2023 MTW JBB JBB MTWDESIGNED BY: PROJ MGR: DRAWN BY: REVIEWED BY: PREPARED BY: GZA GeoEnvironmental, Inc.Engineers and Scientistswww.gza.com Legend Study Area A A A Coddington Road East King Road Troy Road WhitetailDrive TroyHeights, LLC49.-1-26.2 \\GZASPRINGFIELD\Jobs\0 167200 - 0 167299\15.0167244.00 Nexamp Wetland Delineations 10 Sites\GIS\Nexamp NY23 Solar 10 - Resource Map.mxd, December 19, 2023 - 4:53:19 PM, Megan.Wilckens LEGEND Study Area TaxParcel Roads ??DEC Streams DEC Wetlands*NWI WetlandsNWI Wetland Type Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Riverine © 2023 - GZA GeoEnvironmental, Inc. UNLESS SPECIFICALLY STATED BY W RITTEN AGREEMENT, THIS DRAW ING IS THE SOLE PROPERTY OF GZA GEOENVIRONMENTAL, INC. (GZA). THE INFORMATION SHOWN ON THE DRAWING IS SOLELY FOR USE BY GZA'S CLIENT OR THE CLIENT'S DESIGNATED REPRESENTATIVE FOR THE SPECIFIC PROJECT AND LOCATION IDENTIFIED ON THE DRAWING. THE DRAWING SHALL NOT BE TRANSFERRED, REUSED, COPIED, OR ALTERED IN ANY MANNER FOR USE AT ANY OTHER LOCATION OR FOR ANY OTHER PURPOSE W ITHOUT THE PRIOR WRITTEN CONSENT OF GZA. ANY TRANSFER, REUSE, OR MODIFICATION TO THE DRAW ING BY THE CLIENT OR OTHERS, WITHOUT THE PRIOR WRITTEN EXPRESS CONSENT OF GZA, W ILL BE AT THE USER'S SOLE RISK AND W ITHOUT ANY RISK OR LIABILITY TO GZA. PREPARED FOR:PREPARED BY: REVIEWED BY: DRAWN BY: PROJECT NO: DESIGNED BY: PROJ MGR: DATE: SCALE: CHECKED BY: REVISION NO: GZA GeoEnvironmental, Inc.www.gza.com 127 TROY RD, ITHACA, NY COUNTY OF TOMPKINS RESOURCE MAP ITHACA PV SITE NEXAMP 101 SUMMER STREET, 2ND FLOOR BOSTON, MA 02110 2FIGURECR 1 " = 300 FEET 12/19/2023 JBB MTW 15.0167244.00 PIC MTW 0 325 650162.5 SCALE IN FEET. A A A Coddington Road East King Road Troy Road WhitetailDrive Wetland A 0.02 ac Wetland B 1.94 ac Wetland C 4.92 ac Stream 2 Stream 3 Stream 1 TroyHeights, LLC49.-1-26.2 \\GZASPRINGFIELD\Jobs\0 167200 - 0 167299\15.0167244.00 Nexamp Wetland Delineations 10 Sites\GIS\Nexamp Site 10 Troy Heights Solar.mxd, December 21, 2023 - 10:14:45 AM, Megan.Wilckens LEGEND Micro Depression Wetland Flags Wet Area Not Flagged Stream Points Drainage Stream 5 5 Culvert Study Area Buffer Area Not Reviewed Tax Parcel Wetland Continuation Line Delineated Wetland Study AreaMapped Features Roads ??DEC Streams DEC Wetlands*NWI WetlandsNWI Wetland Type Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Riverine © 2023 - GZA GeoEnvironmental, Inc. UNLESS SPECIFICALLY STATED BY W RITTEN AGREEMENT, THIS DRAW ING IS THE SOLE PROPERTY OF GZA GEOENVIRONMENTAL, INC. (GZA). THE INFORMATION SHOWN ON THE DRAWING IS SOLELY FOR USE BY GZA'S CLIENT OR THE CLIENT'S DESIGNATED REPRESENTATIVE FOR THE SPECIFIC PROJECT AND LOCATION IDENTIFIED ON THE DRAWING. THE DRAWING SHALL NOT BE TRANSFERRED, REUSED, COPIED, OR ALTERED IN ANY MANNER FOR USE AT ANY OTHER LOCATION OR FOR ANY OTHER PURPOSE W ITHOUT THE PRIOR WRITTEN CONSENT OF GZA. ANY TRANSFER, REUSE, OR MODIFICATION TO THE DRAW ING BY THE CLIENT OR OTHERS, WITHOUT THE PRIOR WRITTEN EXPRESS CONSENT OF GZA, W ILL BE AT THE USER'S SOLE RISK AND W ITHOUT ANY RISK OR LIABILITY TO GZA. PREPARED FOR:PREPARED BY: REVIEWED BY: DRAWN BY: PROJECT NO: DESIGNED BY: PROJ MGR: DATE: SCALE: CHECKED BY: REVISION NO: GZA GeoEnvironmental, Inc.www.gza.com 127 TROY RD, ITHACA, NY COUNTY OF TOMPKINS WATERS & WETLANDS DELINEATION ITHACA PV SITE NEXAMP 101 SUMMER STREET, 2ND FLOOR BOSTON, MA 02110 3FIGURECR 1 " = 300 FEET 12/21/2023 JBB MTW 15.0167244.00 PIC MTW 0 325 650162.5 SCALE IN FEET. January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 11 active by Design APPENDIX A: PHOTO LOG Photographic Log Page 1 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: North Description: Wetland A located next to Troy Road, along the proposed access route for the Site. Photo No. Date: Direction Photo Taken: N/A Description: Photo set of upland (left) and wetland (right) soil samples for Wetland A. Photographic Log Page 2 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: South Description: Wetland B near the northern end of the Site. Photo No. Date: Direction Photo Taken: East Description: Wetland B along one of the fingers of the gulley within the forested area. Photographic Log Page 3 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: West Description: Wetland B where it crosses the existing transmission ROW. Photo No. Date: Direction Photo Taken: N/A Description: Photo set of upland (left) and wetland (right) soil samples for Wetland B. Photographic Log Page 4 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: South Description: Wetland C near the southeastern end of the Site. Photo No. Date: Direction Photo Taken: N/A Description: Photo set of upland (left) and wetland (right) soil samples for Wetland C. Photographic Log Page 5 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: Southeast Description: Stream 1 located in the northern end of the Site. Stream 1 consisted of multiple channels within gullies that flowed in a N- NE direction. Photo No. Date: Direction Photo Taken: North Description: Stream 2 located near the center of the Site. Stream 2 flows to the NE. Photographic Log Page 6 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: North Description: Stream 3 located in the southeastern corner of the Site. Stream 3 flows to the SE. Photo No. Date: Direction Photo Taken: North Description: Gravel access area off Troy Road. Photographic Log Page 7 of 7 Client Name: Nexamp Site Location: 127 Troy Road, Ithaca, NY Project No. 15.0167244.00 Photo No Date: Direction Photo Taken: North Description: Upland field in the northeastern corner of the Site. Photo No. Date: Direction Photo Taken: Southwest Description: Upland forest in the center of the Site. January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 12 active by Design APPENDIX B: DATA FORMS Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No No X X No X ? X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/2/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):convex Slope %:1 Nexamp NY Sampling Point:TH-A Up GZA - PD, MW Section, Township, Range:N/A WGS 84 EbB N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.410003 Long:-76.477761 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-A upland sample taken near flag I-A3 HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches): US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size:X 1. 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: N/A Number of Dominant Species Total Number of Dominant Species Across All Strata:4 (B) Percent of Dominant Species Lonicera tatarica 30 Yes FACU Prevalence Index worksheet: 20 Yes FAC FAC species 190 570 0 Swida racemosa UPL species 15 75 FACU species 40 =Total Cover 805 Prevalence Index = B/A =3.29 245 (A) FACW species 0 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Galium boreale 3 - Prevalence Index is ≤3.01 Swida racemosa Problematic Hydrophytic Vegetation1 (Explain) Symphyotrichum lateriflorum 1Indicators of hydric soil and wetland hydrology must Pastinaca sativa Ranunculus repens Solidago sp. Taraxacum officinale 10 No FACU Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) silt loam11-13 10YR 5/2 M Loamy/Clayey9510YR 5/8 5 C Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No X No X X No X ? X X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/2/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):concave Slope %:1 Nexamp NY Sampling Point:TH-A Wet GZA - PD, MW Section, Township, Range:N/A WGS 84 EbB N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.41008089 Long:-76.47765467 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-A wetland sample taken along the edge of the exising transmission line HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches):0 US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size:X 1.X 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: N/A Number of Dominant Species Total Number of Dominant Species Across All Strata:4 (B) Percent of Dominant Species Swida amomum 5 Yes FACW Prevalence Index worksheet: 5 Yes FACU FAC species 100 300 150 Lonicera tatarica UPL species 0 0 FACU species 5 =Total Cover 500 Prevalence Index = B/A =2.38 210 (A) FACW species 75 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Juncus effusus 3 - Prevalence Index is ≤3.01 Onoclea sensibilis Problematic Hydrophytic Vegetation1 (Explain) Grass species 1Indicators of hydric soil and wetland hydrology must Euthamia graminifolia Sedge species Solidago sp. Ranunculus repens 5 No FAC Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point ? X X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) silt loam6-13 10YR 3/2 M Loamy/Clayey9510YR 5/8 5 C Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No No X X No X X X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/2/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):convex Slope %:1 Nexamp NY Sampling Point:TH-B Up GZA - PD, MW Section, Township, Range:N/A WGS 84 EbB N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.41007114 Long:-76.47627455 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-B upland sample taken between flags I-B1a+ and I-B2a HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches): US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size:X 1. 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: Rhamnus cathartica Number of Dominant Species Fraxinus pennsylvanica Total Number of Dominant Species Across All Strata:5 (B) Percent of Dominant Species Lonicera tatarica 20 Yes FACU Prevalence Index worksheet: FAC species 150 450 130 660 Prevalence Index = B/A =2.81 235 (A) FACW species 65 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Lysimachia nummularia 3 - Prevalence Index is ≤3.01 Euthamia graminifolia Problematic Hydrophytic Vegetation1 (Explain) Grass species 1Indicators of hydric soil and wetland hydrology must Rhamnus cathartica Galium boreale 5 No FAC Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) silt loam13-20 10YR 5/3 Loamy/Clayey9010YR 5/2 5 Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No X No X X No X X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/2/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):concave Slope %:1 Nexamp NY Sampling Point:TH-B Wet GZA - PD, MW Section, Township, Range:N/A WGS 84 EbB N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.41003798 Long:-76.47632903 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-B wetland sample taken between flags I-B1a+ and I-B2a HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches):0 US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size:X 1.X 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: Rhamnus cathartica Number of Dominant Species Total Number of Dominant Species Across All Strata:4 (B) Percent of Dominant Species Lonicera tatarica 5 Yes FACU Prevalence Index worksheet: FAC species 150 450 140 610 Prevalence Index = B/A =2.71 225 (A) FACW species 70 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Ranunculus repens 3 - Prevalence Index is ≤3.01 Phalaris arundinacea Problematic Hydrophytic Vegetation1 (Explain) Grass species 1Indicators of hydric soil and wetland hydrology must Lysimachia nummularia Euthamia graminifolia 15 No FAC Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point X X X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) silt loam7-13 10YR 4/2 M Loamy/Clayey8010YR 5/8 10 C Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. No X No X X No X ? X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/3/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):convex Slope %:2 Nexamp NY Sampling Point:TH-C Up GZA - PD, MW Section, Township, Range:N/A WGS 84 EcA N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.40732236 Long:-76.47420623 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-C upland sample taken near flag I-C8, on the edge of the forest HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches): US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size: 1. 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: Acer rubrum Number of Dominant Species Prunus serotina Carya ovata 10 No Populus tremuloides 40 Yes FACU Total Number of Dominant Species Across All Strata:FACU 6 (B) Percent of Dominant Species Elaeagnus umbellata 10 Yes UPL Prevalence Index worksheet: FAC species 65 195 0 885 Prevalence Index = B/A =3.77 235 (A) FACW species 0 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Lonicera tatarica 3 - Prevalence Index is ≤3.01 Ligustrum sinense Problematic Hydrophytic Vegetation1 (Explain) 1Indicators of hydric soil and wetland hydrology must Solidago sp. Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) fine sandy loam 4-10 10YR 4/4 Sandy100 Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Project/Site: Applicant/Owner: Investigator(s): Lat: Soil Map Unit Name:NWI classification: X Are Vegetation , Soil , or Hydrology Yes X Are Vegetation , Soil , or Hydrology SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc. X No X No X X No X ? X X X X Yes X WETLAND DETERMINATION DATA FORM – Northcentral and Northeast Region Troy Heights Solar City/County:Ithaca / Tompkins Sampling Date:11/3/23 Landform (hillside, terrace, etc.):terrace Local relief (concave, convex, none):concave Slope %:1 Nexamp NY Sampling Point:TH-C Wet GZA - PD, MW Section, Township, Range:N/A WGS 84 EcA N/A Are climatic / hydrologic conditions on the site typical for this time of year?Yes No (If no, explain in Remarks.) Subregion (LRR or MLRA):LRR R 42.407209 Long:-76.474218 Datum: significantly disturbed?Are “Normal Circumstances” present?No naturally problematic?(If needed, explain any answers in Remarks.) Hydrophytic Vegetation Present?Yes Wetland Hydrology Present?Yes If yes, optional Wetland Site ID: Hydric Soil Present? Yes Remarks: (Explain alternative procedures here or in a separate report.) TH-C wetland sample taken near flag I-C8 HYDROLOGY Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) Surface Soil Cracks (B6) Surface Water (A1) Water Marks (B1)Hydrogen Sulfide Odor (C1)Crayfish Burrows (C8) Sediment Deposits (B2)Oxidized Rhizospheres on Living Roots (C3)Saturation Visible on Aerial Imagery (C9) Water-Stained Leaves (B9)Drainage Patterns (B10) High Water Table (A2)Aquatic Fauna (B13)Moss Trim Lines (B16) Saturation (A3)Marl Deposits (B15)Dry-Season Water Table (C2) Iron Deposits (B5)Thin Muck Surface (C7)Shallow Aquitard (D3) Inundation Visible on Aerial Imagery (B7)Other (Explain in Remarks)Microtopographic Relief (D4) Drift Deposits (B3)Presence of Reduced Iron (C4)Stunted or Stressed Plants (D1) Algal Mat or Crust (B4)Recent Iron Reduction in Tilled Soils (C6)Geomorphic Position (D2) Water Table Present?Yes No Depth (inches): Sparsely Vegetated Concave Surface (B8)FAC-Neutral Test (D5) Surface Water Present?Yes No Depth (inches): Remarks: (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Saturation Present?Yes No Depth (inches):0 US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point: (Plot size: 1. 2. 3. 4. 5. 6.(A/B) 7. Sapling/Shrub Stratum (Plot size:x 1 = 1.x 2 = 2.x 3 = 3.x 4 = 4.x 5 = 5.(B) 6. 7. Herb Stratum (Plot size:X 1.X 2.1 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. (Plot size: 1. 2. 3. 4.X VEGETATION Dominance Test worksheet: Fraxinus pennsylvanica Number of Dominant Species Total Number of Dominant Species Across All Strata:5 (B) Percent of Dominant Species Rosa multiflora 10 Yes FACU Prevalence Index worksheet: 5 Yes FAC FAC species 85 255 90 Swida racemosa UPL species 0 0 FACU species 15 10 =Total Cover 455 Prevalence Index = B/A =2.33 195 (A) FACW species 45 5 ft )2 - Dominance Test is >50% Hydrophytic Vegetation Indicators: Juncus effusus 3 - Prevalence Index is ≤3.01 Onoclea sensibilis Problematic Hydrophytic Vegetation1 (Explain) Ranunculus repens 1Indicators of hydric soil and wetland hydrology must Rubus hispidus Galium boreale Rosa multiflora Euthamia graminifolia 10 No FAC Sapling/shrub – Woody plants less than 3 in. DBH Definitions of Vegetation Strata: Grass species 60 Yes FAC Tree – Woody plants 3 in. (7.6 cm) or more in Woody vines – All woody vines greater than 3.28 ft in N/A Herb – All herbaceous (non-woody) plants, regardless Hydrophytic Vegetation Remarks: (Include photo numbers here or on a separate sheet.) =Total Cover US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 Sampling Point X X SOIL Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) silt loam8-13 10YR 3/1 M Loamy/Clayey9510YR 4/6 5 C Hydric Soil Indicators:Indicators for Problematic Hydric Soils3: LRR R,LRR K, L, MLRA 149B) MLRA 149B)LRR K, L, R) LRR R, MLRA 149B)LRR K, L, R) LRR K, L)LRR K, L) 1 2 MLRA 149B) MLRA 144A, 145, 149B) LRR K, L)LRR K, L) LRR K, L, R) LRR K, L ) Yes No Version 7.0, 2015 Errata. (http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_051293.docx) Restrictive Layer (if observed): Hydric Soil Present? US Army Corps of Engineers Northcentral and Northeast Region – Version 2.0 January 2, 2024 File No. 15.0167244.00 Nexamp – Troy Heights Wetland Delineation Findings Page | 13 active by Design APPENDIX C: SOIL REPORT United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Tompkins County, New York Natural Resources Conservation Service December 7, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................11 Map Unit Descriptions.........................................................................................11 Tompkins County, New York...........................................................................13 BgC—Bath and Valois soils, 5 to 15 percent slopes...................................13 EbB—Erie channery silt loam, 3 to 8 percent slopes..................................15 EbC—Erie channery silt loam, 8 to 15 percent slopes................................17 EcA—Chippewa and Alden soils, 0 to 8 percent slopes.............................18 Soil Information for All Uses...............................................................................21 Suitabilities and Limitations for Use....................................................................21 Land Classifications........................................................................................21 Hydric Rating by Map Unit...........................................................................21 References............................................................................................................26 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6 identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 9 Custom Soil Resource Report Soil Map 46 9 5 7 6 0 46 9 5 8 5 0 46 9 5 9 4 0 46 9 6 0 3 0 46 9 6 1 2 0 46 9 6 2 1 0 46 9 6 3 0 0 46 9 6 3 9 0 46 9 6 4 8 0 46 9 5 7 6 0 46 9 5 8 5 0 46 9 5 9 4 0 46 9 6 0 3 0 46 9 6 1 2 0 46 9 6 2 1 0 46 9 6 3 0 0 46 9 6 3 9 0 46 9 6 4 8 0 378350 378440 378530 378620 378710 378800 378890 378350 378440 378530 378620 378710 378800 378890 42° 24' 40'' N 76 ° 2 8 ' 4 2 ' ' W 42° 24' 40'' N 76 ° 2 8 ' 1 7 ' ' W 42° 24' 16'' N 76 ° 2 8 ' 4 2 ' ' W 42° 24' 16'' N 76 ° 2 8 ' 1 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:3,690 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Tompkins County, New York Survey Area Data: Version 19, Sep 5, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2020—Oct 1, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BgC Bath and Valois soils, 5 to 15 percent slopes 4.8 21.5% EbB Erie channery silt loam, 3 to 8 percent slopes 16.2 72.1% EbC Erie channery silt loam, 8 to 15 percent slopes 0.2 0.9% EcA Chippewa and Alden soils, 0 to 8 percent slopes 1.2 5.5% Totals for Area of Interest 22.4 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. Custom Soil Resource Report 11 The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12 Tompkins County, New York BgC—Bath and Valois soils, 5 to 15 percent slopes Map Unit Setting National map unit symbol: 2v32c Elevation: 330 to 2,460 feet Mean annual precipitation: 31 to 70 inches Mean annual air temperature: 39 to 52 degrees F Frost-free period: 105 to 180 days Farmland classification: Farmland of statewide importance Map Unit Composition Bath and similar soils:40 percent Valois and similar soils:35 percent Minor components:25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bath Setting Landform:Mountains, hills Landform position (two-dimensional):Backslope, summit, shoulder Landform position (three-dimensional):Side slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Parent material:Loamy till derived mainly from gray and brown siltstone, sandstone, and shale Typical profile Ap - 0 to 9 inches: channery silt loam Bw1 - 9 to 15 inches: channery silt loam Bw2 - 15 to 25 inches: channery loam E - 25 to 29 inches: channery loam Bx - 29 to 52 inches: very channery silt loam C - 52 to 72 inches: very channery silt loam Properties and qualities Slope:5 to 15 percent Surface area covered with cobbles, stones or boulders:0.0 percent Depth to restrictive feature:26 to 38 inches to fragipan Drainage class:Well drained Capacity of the most limiting layer to transmit water (Ksat):Very low to moderately low (0.00 to 0.14 in/hr) Depth to water table:About 24 to 36 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Available water supply, 0 to 60 inches: Low (about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F140XY030NY - Well Drained Dense Till Custom Soil Resource Report 13 Hydric soil rating: No Description of Valois Setting Landform:End moraines, lateral moraines, valley sides Landform position (two-dimensional):Shoulder Landform position (three-dimensional):Crest Down-slope shape:Convex Across-slope shape:Convex Parent material:Loamy till derived mainly from sandstone, siltstone, and shale Typical profile H1 - 0 to 2 inches: gravelly silt loam H2 - 2 to 32 inches: gravelly silt loam H3 - 32 to 49 inches: gravelly silt loam H4 - 49 to 60 inches: gravelly silt loam Properties and qualities Slope:5 to 15 percent Depth to restrictive feature:24 to 36 inches to fragipan Drainage class:Well drained Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:About 24 to 35 inches Frequency of flooding:None Frequency of ponding:None Available water supply, 0 to 60 inches: Low (about 4.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F140XY027NY - Well Drained Till Uplands Hydric soil rating: No Minor Components Mardin Percent of map unit:5 percent Landform:Mountains, hills Landform position (two-dimensional):Summit, shoulder Landform position (three-dimensional):Interfluve, side slope Down-slope shape:Convex Across-slope shape:Convex Hydric soil rating: No Lordstown Percent of map unit:5 percent Landform:Hills, mountains Landform position (two-dimensional):Backslope Landform position (three-dimensional):Mountainflank, nose slope, side slope Down-slope shape:Linear Across-slope shape:Linear Hydric soil rating: No Volusia Percent of map unit:5 percent Custom Soil Resource Report 14 Landform:Mountains, hills Landform position (two-dimensional):Footslope, summit Landform position (three-dimensional):Base slope, interfluve, side slope Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No Erie Percent of map unit:5 percent Landform:Hills Landform position (two-dimensional):Footslope, summit Landform position (three-dimensional):Base slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No Langford Percent of map unit:5 percent Landform:Hills Landform position (two-dimensional):Backslope, shoulder Landform position (three-dimensional):Interfluve, side slope Down-slope shape:Linear Across-slope shape:Linear Hydric soil rating: No EbB—Erie channery silt loam, 3 to 8 percent slopes Map Unit Setting National map unit symbol: 2wn35 Elevation: 330 to 2,460 feet Mean annual precipitation: 31 to 70 inches Mean annual air temperature: 39 to 52 degrees F Frost-free period: 105 to 180 days Farmland classification: Farmland of statewide importance Map Unit Composition Erie and similar soils:80 percent Minor components:20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Erie Setting Landform:Hills Landform position (two-dimensional):Footslope, summit Landform position (three-dimensional):Base slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Parent material:Till Custom Soil Resource Report 15 Typical profile Ap - 0 to 9 inches: channery silt loam E - 9 to 13 inches: channery silt loam Bg - 13 to 15 inches: channery silt loam Bx - 15 to 38 inches: channery silt loam C - 38 to 72 inches: channery loam Properties and qualities Slope:3 to 8 percent Depth to restrictive feature:10 to 21 inches to fragipan Drainage class:Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat):Moderately low (0.01 to 0.14 in/hr) Depth to water table:About 7 to 14 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:10 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: D Ecological site: F140XY024NY - Moist Dense Till Hydric soil rating: No Minor Components Langford Percent of map unit:10 percent Landform:Hills Landform position (two-dimensional):Backslope, shoulder Landform position (three-dimensional):Interfluve, side slope Down-slope shape:Linear Across-slope shape:Linear Hydric soil rating: No Chippewa Percent of map unit:5 percent Landform:Depressions Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Base slope Down-slope shape:Concave Across-slope shape:Concave Hydric soil rating: Yes Fremont Percent of map unit:5 percent Landform:Hills Landform position (two-dimensional):Footslope, summit Landform position (three-dimensional):Base slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No Custom Soil Resource Report 16 EbC—Erie channery silt loam, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 2wn36 Elevation: 330 to 2,460 feet Mean annual precipitation: 31 to 70 inches Mean annual air temperature: 39 to 52 degrees F Frost-free period: 105 to 180 days Farmland classification: Farmland of statewide importance Map Unit Composition Erie and similar soils:80 percent Minor components:20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Erie Setting Landform:Hills Landform position (two-dimensional):Footslope Landform position (three-dimensional):Side slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Parent material:Till Typical profile Ap - 0 to 9 inches: channery silt loam E - 9 to 13 inches: channery silt loam Bg - 13 to 15 inches: channery silt loam Bx - 15 to 38 inches: channery silt loam C - 38 to 72 inches: channery loam Properties and qualities Slope:8 to 15 percent Depth to restrictive feature:10 to 21 inches to fragipan Drainage class:Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat):Moderately low (0.01 to 0.14 in/hr) Depth to water table:About 7 to 14 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:10 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: D Ecological site: F140XY024NY - Moist Dense Till Custom Soil Resource Report 17 Hydric soil rating: No Minor Components Langford Percent of map unit:10 percent Landform:Hills Landform position (two-dimensional):Backslope Landform position (three-dimensional):Head slope, side slope Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No Chippewa Percent of map unit:5 percent Landform:Depressions Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Base slope Down-slope shape:Concave Across-slope shape:Concave Hydric soil rating: Yes Fremont Percent of map unit:5 percent Landform:Hills Landform position (two-dimensional):Footslope Landform position (three-dimensional):Interfluve, side slope Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No EcA—Chippewa and Alden soils, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 2v32v Elevation: 330 to 2,460 feet Mean annual precipitation: 31 to 70 inches Mean annual air temperature: 39 to 52 degrees F Frost-free period: 105 to 180 days Farmland classification: Farmland of statewide importance Map Unit Composition Chippewa and similar soils:55 percent Alden and similar soils:30 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chippewa Setting Landform:Depressions Custom Soil Resource Report 18 Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Base slope Down-slope shape:Concave Across-slope shape:Concave Parent material:Loamy till dominated by siltstone, sandstone, and shale fragments Typical profile Ap - 0 to 7 inches: silt loam Eg - 7 to 15 inches: channery silt loam Bxg - 15 to 45 inches: channery silt loam C - 45 to 72 inches: channery silt loam Properties and qualities Slope:0 to 8 percent Surface area covered with cobbles, stones or boulders:0.0 percent Depth to restrictive feature:8 to 20 inches to fragipan Drainage class:Poorly drained Capacity of the most limiting layer to transmit water (Ksat):Very low to moderately low (0.00 to 0.14 in/hr) Depth to water table:About 0 to 6 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Available water supply, 0 to 60 inches: Low (about 3.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: D Ecological site: F140XY016NY - Mineral Wetlands Hydric soil rating: Yes Description of Alden Setting Landform:Depressions Landform position (two-dimensional):Toeslope, footslope Landform position (three-dimensional):Base slope, side slope Down-slope shape:Concave Across-slope shape:Concave, linear Parent material:A silty mantle of local deposition overlying loamy till Typical profile H1 - 0 to 10 inches: mucky silt loam H2 - 10 to 23 inches: silt loam H3 - 23 to 36 inches: channery silt loam H4 - 36 to 60 inches: channery silt loam Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Very poorly drained Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.57 in/hr) Depth to water table:About 0 to 6 inches Frequency of flooding:None Frequency of ponding:Frequent Custom Soil Resource Report 19 Calcium carbonate, maximum content:5 percent Available water supply, 0 to 60 inches: High (about 9.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Ecological site: F140XY016NY - Mineral Wetlands Hydric soil rating: Yes Minor Components Volusia Percent of map unit:10 percent Landform:Mountains, hills Landform position (two-dimensional):Footslope Landform position (three-dimensional):Side slope, interfluve Down-slope shape:Concave Across-slope shape:Linear Hydric soil rating: No Chippewa, very poorly drained Percent of map unit:5 percent Landform:Depressions Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Base slope Down-slope shape:Concave Across-slope shape:Concave Hydric soil rating: Yes Custom Soil Resource Report 20 Soil Information for All Uses Suitabilities and Limitations for Use The Suitabilities and Limitations for Use section includes various soil interpretations displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each interpretation. Land Classifications Land Classifications are specified land use and management groupings that are assigned to soil areas because combinations of soil have similar behavior for specified practices. Most are based on soil properties and other factors that directly influence the specific use of the soil. Example classifications include ecological site classification, farmland classification, irrigated and nonirrigated land capability classification, and hydric rating. Hydric Rating by Map Unit This rating indicates the percentage of map units that meets the criteria for hydric soils. Map units are composed of one or more map unit components or soil types, each of which is rated as hydric soil or not hydric. Map units that are made up dominantly of hydric soils may have small areas of minor nonhydric components in the higher positions on the landform, and map units that are made up dominantly of nonhydric soils may have small areas of minor hydric components in the lower positions on the landform. Each map unit is rated based on its respective components and the percentage of each component within the map unit. The thematic map is color coded based on the composition of hydric components. The five color classes are separated as 100 percent hydric components, 66 to 99 percent hydric components, 33 to 65 percent hydric components, 1 to 32 percent hydric components, and less than one percent hydric components. In Web Soil Survey, the Summary by Map Unit table that is displayed below the map pane contains a column named 'Rating'. In this column the percentage of each map unit that is classified as hydric is displayed. 21 Hydric soils are defined by the National Technical Committee for Hydric Soils (NTCHS) as soils that formed under conditions of saturation, flooding, or ponding long enough during the growing season to develop anaerobic conditions in the upper part (Federal Register, 1994). Under natural conditions, these soils are either saturated or inundated long enough during the growing season to support the growth and reproduction of hydrophytic vegetation. The NTCHS definition identifies general soil properties that are associated with wetness. In order to determine whether a specific soil is a hydric soil or nonhydric soil, however, more specific information, such as information about the depth and duration of the water table, is needed. Thus, criteria that identify those estimated soil properties unique to hydric soils have been established (Federal Register, 2002). These criteria are used to identify map unit components that normally are associated with wetlands. The criteria used are selected estimated soil properties that are described in "Soil Taxonomy" (Soil Survey Staff, 1999) and "Keys to Soil Taxonomy" (Soil Survey Staff, 2006) and in the "Soil Survey Manual" (Soil Survey Division Staff, 1993). If soils are wet enough for a long enough period of time to be considered hydric, they should exhibit certain properties that can be easily observed in the field. These visible properties are indicators of hydric soils. The indicators used to make onsite determinations of hydric soils are specified in "Field Indicators of Hydric Soils in the United States" (Hurt and Vasilas, 2006). References: Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service. U.S. Department of Agriculture Handbook 436. Soil Survey Staff. 2006. Keys to soil taxonomy. 10th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. Custom Soil Resource Report 22 23 Custom Soil Resource Report Map—Hydric Rating by Map Unit 46 9 5 7 6 0 46 9 5 8 5 0 46 9 5 9 4 0 46 9 6 0 3 0 46 9 6 1 2 0 46 9 6 2 1 0 46 9 6 3 0 0 46 9 6 3 9 0 46 9 6 4 8 0 46 9 5 7 6 0 46 9 5 8 5 0 46 9 5 9 4 0 46 9 6 0 3 0 46 9 6 1 2 0 46 9 6 2 1 0 46 9 6 3 0 0 46 9 6 3 9 0 46 9 6 4 8 0 378350 378440 378530 378620 378710 378800 378890 378350 378440 378530 378620 378710 378800 378890 42° 24' 40'' N 76 ° 2 8 ' 4 2 ' ' W 42° 24' 40'' N 76 ° 2 8 ' 1 7 ' ' W 42° 24' 16'' N 76 ° 2 8 ' 4 2 ' ' W 42° 24' 16'' N 76 ° 2 8 ' 1 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:3,690 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons Hydric (100%) Hydric (66 to 99%) Hydric (33 to 65%) Hydric (1 to 32%) Not Hydric (0%) Not rated or not available Soil Rating Lines Hydric (100%) Hydric (66 to 99%) Hydric (33 to 65%) Hydric (1 to 32%) Not Hydric (0%) Not rated or not available Soil Rating Points Hydric (100%) Hydric (66 to 99%) Hydric (33 to 65%) Hydric (1 to 32%) Not Hydric (0%) Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Tompkins County, New York Survey Area Data: Version 19, Sep 5, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2020—Oct 1, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 24 Table—Hydric Rating by Map Unit Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BgC Bath and Valois soils, 5 to 15 percent slopes 0 4.8 21.5% EbB Erie channery silt loam, 3 to 8 percent slopes 5 16.2 72.1% EbC Erie channery silt loam, 8 to 15 percent slopes 5 0.2 0.9% EcA Chippewa and Alden soils, 0 to 8 percent slopes 90 1.2 5.5% Totals for Area of Interest 22.4 100.0% Rating Options—Hydric Rating by Map Unit Aggregation Method: Percent Present Component Percent Cutoff: None Specified Tie-break Rule: Lower Custom Soil Resource Report 25 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 26 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 27 Farmland Classification—Tompkins County, New York Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/15/2026 Page 1 of 5 46 9 5 8 2 0 46 9 5 9 0 0 46 9 5 9 8 0 46 9 6 0 6 0 46 9 6 1 4 0 46 9 6 2 2 0 46 9 6 3 0 0 46 9 6 3 8 0 46 9 5 8 2 0 46 9 5 9 0 0 46 9 5 9 8 0 46 9 6 0 6 0 46 9 6 1 4 0 46 9 6 2 2 0 46 9 6 3 0 0 46 9 6 3 8 0 378510 378590 378670 378750 378830 378910 378510 378590 378670 378750 378830 378910 42° 24' 38'' N 76 ° 2 8 ' 3 6 ' ' W 42° 24' 38'' N 76 ° 2 8 ' 1 5 ' ' W 42° 24' 17'' N 76 ° 2 8 ' 3 6 ' ' W 42° 24' 17'' N 76 ° 2 8 ' 1 5 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 150 300 600 900 Feet 0 45 90 180 270 Meters Map Scale: 1:3,100 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons Not prime farmland All areas are prime farmland Prime farmland if drained Prime farmland if protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated and drained Prime farmland if irrigated and either protected from flooding or not frequently flooded during the growing season Prime farmland if subsoiled, completely removing the root inhibiting soil layer Prime farmland if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Prime farmland if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance Farmland of statewide importance, if drained Farmland of statewide importance, if protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated Farmland of statewide importance, if drained and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated and drained Farmland of statewide importance, if irrigated and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if subsoiled, completely removing the root inhibiting soil layer Farmland of statewide importance, if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Farmland of statewide importance, if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance, if drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough, and either drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough Farmland of statewide importance, if thawed Farmland of local importance Farmland of local importance, if irrigated Farmland of unique importance Not rated or not available Soil Rating Lines Not prime farmland All areas are prime farmland Prime farmland if drained Prime farmland if protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated and drained Prime farmland if irrigated and either protected from flooding or not frequently flooded during the growing season Farmland Classification—Tompkins County, New York Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/15/2026 Page 2 of 5 Prime farmland if subsoiled, completely removing the root inhibiting soil layer Prime farmland if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Prime farmland if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance Farmland of statewide importance, if drained Farmland of statewide importance, if protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated Farmland of statewide importance, if drained and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated and drained Farmland of statewide importance, if irrigated and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if subsoiled, completely removing the root inhibiting soil layer Farmland of statewide importance, if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Farmland of statewide importance, if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance, if drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough, and either drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough Farmland of statewide importance, if thawed Farmland of local importance Farmland of local importance, if irrigated Farmland of unique importance Not rated or not available Soil Rating Points Not prime farmland All areas are prime farmland Prime farmland if drained Prime farmland if protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Prime farmland if irrigated and drained Prime farmland if irrigated and either protected from flooding or not frequently flooded during the growing season Prime farmland if subsoiled, completely removing the root inhibiting soil layer Prime farmland if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Prime farmland if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance Farmland of statewide importance, if drained Farmland of statewide importance, if protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated Farmland Classification—Tompkins County, New York Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/15/2026 Page 3 of 5 Farmland of statewide importance, if drained and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if irrigated and drained Farmland of statewide importance, if irrigated and either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if subsoiled, completely removing the root inhibiting soil layer Farmland of statewide importance, if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Farmland of statewide importance, if irrigated and reclaimed of excess salts and sodium Farmland of statewide importance, if drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough, and either drained or either protected from flooding or not frequently flooded during the growing season Farmland of statewide importance, if warm enough Farmland of statewide importance, if thawed Farmland of local importance Farmland of local importance, if irrigated Farmland of unique importance Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Tompkins County, New York Survey Area Data: Version 21, Sep 2, 2025 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 1, 2020—Oct 1, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Farmland Classification—Tompkins County, New York Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/15/2026 Page 4 of 5 Farmland Classification Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BgC Bath and Valois soils, 5 to 15 percent slopes Farmland of statewide importance 4.8 16.3% BgD Bath and Valois soils, 15 to 25 percent slopes, eroded Not prime farmland 0.1 0.2% EbB Erie channery silt loam, 3 to 8 percent slopes Farmland of statewide importance 22.6 76.0% EbC Erie channery silt loam, 8 to 15 percent slopes Farmland of statewide importance 1.0 3.3% EcA Chippewa and Alden soils, 0 to 8 percent slopes Farmland of statewide importance 1.2 4.2% Totals for Area of Interest 29.7 100.0% Description Farmland classification identifies map units as prime farmland, farmland of statewide importance, farmland of local importance, or unique farmland. It identifies the location and extent of the soils that are best suited to food, feed, fiber, forage, and oilseed crops. NRCS policy and procedures on prime and unique farmlands are published in the "Federal Register," Vol. 43, No. 21, January 31, 1978. Rating Options Aggregation Method: No Aggregation Necessary Tie-break Rule: Lower Farmland Classification—Tompkins County, New York Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/15/2026 Page 5 of 5 July 17, 2026 Ryan McCune Nexamp Solar, LLC 101 Summer Street, Floor 2 Boston, MA 02110 RE: NLEB and Glaucous Sedge Habitat Assessment Memo Bomber Heights Solar 117 Troy Road Town of Ithaca, Tompkins County, New York LaBella Project Number: 2240665 Dear Mr. McCune: This summary report presents the findings of a northern long-eared bat (NLEB) (Myotis septentrionalis), glaucous sedge (Carex glaucodea), and reflexed sedge (Carex retroflexa) habitat assessment for an approximately 60-acre parcel (Study Area) located at 117 Troy Road, Town of Ithaca, Tompkins County, New York. LaBella Associates D.P.C. (LaBella) conducted a field survey on January 20th, 2026, to document existing habitats, plants, and wildlife within the Study Area. Suitable habitat for the NLEB and associated species of the glaucous sedge and reflexed sedge community were documented on-site, and existing conditions were noted. In addition, the monarch butterfly, which is currently proposed to be federally-listed as threatened, may potentially be found on site, and is addressed below. Resources reviewed prior to conducting the fieldwork included the following: • Concept plans for potential development provided by the client • United States Fish and Wildlife Service (USFWS) Environmental Conservation Online System Information for Planning and Consultation Species List (Dated July 16, 2026) • USFWS – New York Towns of NLEB Summer Roosts (Updated March 2019) • New York State Department of Environmental Conservation (NYSDEC) Environmental Resource Mapper for rare wildlife, plants, and significant habitats in the vicinity of the site (NYSDEC, 2019) • NYSDEC Map of NLEB Occurrences by Town August 2022 Data (NYSDEC, 2022) PROPOSED PROJECT AND STUDY AREA DESCRIPTION The proposed Project entails the development of solar energy. The Project is proposed within a suburban area and the Study Area contains forests, streams, wetlands, and utility lines. The trees within the Study Area consist of red maple (Acer rubrum), northern red oak (Quercus rubra), white oak (Quercus alba), shagbark hickory (Carya ovata), white pine (Pinus strobus), and white ash (Fraxinus americana). The open areas consist of overgrown shrubs, invasive privet and buckthorn, and wetland plants such as soft rush (Juncus effusus) and sensitive fern (Onoclea sensibilis). 2 The habitat assessment is based on the suitable roosting habitat for NLEB which consists of forested areas with trees greater than 3 inches in diameter at breast height (DBH) that are dead, dying, or alive with crevices/peeling bark. Additionally, the habitat assessment included identifying potential habitat for the glaucous sedge and reflexed sedge. SPECIES OF CONCERN AND HABITAT SURVEY Myotis septentrionalis – Northern Long-Eared Bat NLEB was relatively common in New York prior to the wide-spread fungal infection known as “white- nose syndrome” (WNS) (NYNHP, 2026). NLEB was listed as endangered by both USFWS and NYSDEC in March 2023. NLEB overwinter in hibernacula that includes caves and abandoned mines. After emerging from hibernation in the spring, NLEB will typically migrate about 40 to 50 miles to summer roost sites. Suitable roosting habitat typically consists of trees (dead, dying, or alive) with loose or peeling bark. Trees such as shagbark hickory and black locust (Robinia pseudoacacia) often have loose exfoliating bark, though many other tree species can be considered suitable roosting habitat. NLEB could also potentially use cracks or crevices in trees and have also been known to occasionally use tree cavities. In general, suitable roost trees are over 3 inches DBH and include snags (dead trees/tree sections) and trees with exfoliating bark. WNS is the predominant threat to NLEB. Other threats to NLEB include winter habitat loss and disturbance to winter habitat, the loss of summer habitat which may result in longer flights between suitable roosting and foraging habitat, the fragmentation of maternity colonies, and direct impacts to bats while bats are active on the landscape or roosting in trees. To avoid potential direct impacts to roosting NLEB, tree removal is generally recommended by USFWS to occur between November 1 and March 31 of any given year, though other restrictions may apply due to overall acreage or tree removal or if known roost trees or hibernacula are in the vicinity of a proposed project. NYSDEC concurs with USFWS that NLEB population decline is not the result of habitat loss (NYSDEC, 2023), and with the exception of Suffolk County, trees are not currently a limiting resource for NLEB in New York. However, this bat species utilizes all types of forests for foraging and other life behaviors and when forests are converted to another use, such areas no longer provide benefits to NLEB. NYSDEC encourages the voluntary implementation of all forest management activities during the hibernation period for NLEB, which is between November 1 and March 31 throughout New York State, with the exception of Suffolk County, which is between December 1 and February 28. In areas deemed as occupied habitat by NYSDEC, which means a project site within 5 miles of a known hibernation site or 3 miles from a documented summer occurrence, additional protections for such occupied habitat are required which usually entails various restrictions on tree cutting to avoid a take of NLEB. Based on the NYSDEC Map of NLEB Occurrences by Town August 2022 data (NYSDEC, 2022), there are no confirmed NLEB occurrences in Tompkins County. The closest known summer occurrence is located approximately 25 miles to the west, in the Town of Hector in Schuyler County. 3 LaBella reviewed the Project Area to assess the potential for summer roosting habitat for NLEB. The assessment entailed documenting the presence of suitable roost trees over 3 inches DBH , such as snags (dead trees/tree sections) and trees with exfoliating bark. Labella found trees within the Project Area that could potentially provide suitable NLEB habitat. The suitable roost tree species that were found include white ash, white pine, red maple, northern red oak, white oak, and shagbark hickory. All the suitable habitat trees were dead, dying, or alive with hollows, crevices, or peeling bark. All the white ash suitable roost trees were dead. Each tree had a DBH greater than 3 inches with some greater than 50 inches. White oaks and red oaks with a larger DBH and multiple crevices on site may offer potential maternity roosts. The distribution of suitable roost trees was used to determine the outlined habitat areas found in Figure 1. Photographs of the suitable roost trees and different habitat areas can be found in the attached photolog. Project information entered into the Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key (DKey) on the USFWS IPaC website issued a determination of “Not Likely to Adversely Affect” for the Project. The DKey is attached to this memo. Carex glaucodea and Carex retroflexa - Glaucous and Reflexed Sedges Glaucous sedge and reflexed sedge are both listed as threatened by New York State. The glaucous sedge occurs in wet to dry-mesic deciduous forests in seasonally wet depressions and old fields. It can be associated with ecological communities such as Appalachian oak-hickory forests, perched swamp white oaks, and successional old fields. Some of the associated species of the glaucous sedge include red maple, white ash, white pine, white oak, northern red oak, yellow star-grass (Hypoxis hirsuta), and black-edged sedge (Carex nigromarginata). The reflexed sedge occurs in dry-mesic to mesic deciduous forests. It can be associated with ecological communities such as Appalachian oak-hickory forests and Appalachian oak-pine forests. Some of the associated species of the reflexed sedge include white ash, northern red oak, white oak, oval-headed sedge (Carex cephalophora), and Pennsylvania sedge (Carex pensylvanica). Within the Study Area, glaucous sedge- and reflexed sedge-associated species consisted of red maple, white ash, white pine, white oak, and northern red oak. Therefore, there is associated habitat fo r the glaucous sedge and reflexed sedge within the Study Area. However, no glaucous sedge or reflexed sedge were found in January. The presence of these species may need to be confirmed during the growing season, between May and July. Danaus plexippus - Monarch Butterfly The monarch butterfly is large, easily recognizable butterfly with orange and black wings that is well known for its transcontinental migrations each year. This butterfly is found throughout New York in the summer months, and prefers weedy areas along roadsides, pastures, and fields where milkweed (Asclepias spp.) is found. Female monarch butterflies lay eggs on milkweed, their obligate host plant species, and in the spring and monarch caterpillars feed on the milkweed plant. Habitat loss and fragmentation have occurred throughout the range of the monarch butterfly, and populations have declined significantly over the past 20 years (USFWS, 2024). USFWS announced in December 2024 a proposed rule to list the monarch butterfly as a threatened species under the Endangered Species Act with a 4(d) rule. The proposed listing and draft 4(d) rule 4 were published and a 90-day comment period ended on March 12, 2025. It is anticipated that USFWS will publish guidance on the species to facilitate agency coordination. Lasmigona subviridis – Green Floater Green floater (Lasmigona subviridis) is a freshwater mussel listed as a state-threatened species in New York and federally proposed as threatened. The green floater prefers streams with slow to medium flows and high-water quality (USFWS, 2026). Typical habitat for this mussel in New York includes calm waters of large creeks and small rivers with good water quality. The species spend the majority of their time buried in sand or small gravel substrates at the bottom of streams and rivers feeding on algae and other small, suspended particles (NYNHP, 2026). Green floater has not been documented in the Study Area or within the vicinity according to NYSDEC ERM and EAF mappers. Based on the probable absence of this species from the Project ROW and the lack of in-water work proposed by the Project, impacts to green floater are not anticipated. Project information entered into the Northeast Determination Key on the USFWS IPaC website issued a determination of “No Effect” for the Project. The DKey is attached to this memo. SUMMARY OF FINDINGS The Study Area provides suitable habitat and roost trees for the NLEB, such as forested areas that are suitable for foraging and roosting in the summer, travel corridors along streams and utility clearings, and several wetland areas for foraging bats. Either all forest management activities should take place between November 1 and March 31 to avoid the removal of suitable roost trees while bats are active on the landscape or an acoustic bat survey can be conducted between May 15 and August 15 to determine presence or probable absence. The Project Site is further than 3 miles from a documented summer occurrence and further than 5 miles from a known hibernacula site, therefore additional mitigation measures are not currently necessary. No glaucous sedge or reflexed sedge was found within the Study Area in January, though associated species of the glaucous sedge and reflexed sedge community within the Study Area. An additional survey may need to be conducted during the growing season to confirm or deny the presence of these species. The monarch butterfly is only proposed for listing and coordination is voluntary. The project plans may increase the amount of meadowland habitat for the monarch and the project can also implement a native pollinator seed mix, maintained by the project, to provide host plants and flowering species preferable to monarch butterfly. The green floater is not currently federally-listed and NYSDEC did not indicate and occurrence records of green floater in the vicinity of the Study Area. Further coordination for this species is not warranted at this time. If you have any questions regarding our findings, please contact us at 607-308-4145. 5 Sincerely, LaBella Associates, D.P.C. Claire Leonardi Field Ecologist Attachments Figure 1 – Locations of suitable habitat areas and roost trees for the NLEB Photolog – Habitat areas and suitable roost trees Agency Correspondence USFWS Official Species List Northern Long-eared Bat and Tricolored Bat Range-wide DKey Northeast DKey NYSDEC ERM References FR, 2022. Federal Register, Volume 87, Issue 229: Endangered and Threatened Wildlife and Plants; Endangered Species Status for Northern Long-Eared Bat. Department of the Interior, United States Fish and Wildlife Service. NYNHP. 2026A. Online Conservation Guide for Myotis septentrionalis. Available from: http://www.acris.nynhp.org/guide.php?id=7407. January 21, 2026. NYNHP. 2026B. Online Conservation Guide for Carex glaucodea. Available from: https://guides.nynhp.org/glaucous-sedge/. Accessed January 21, 2026. NYNHP. 2026C. Online Conservation Guide for Carex retroflexa. Available from: https://guides.nynhp.org/reflexed-sedge/. Accessed January 21, 2026. NYNHP. 2026D. Online Conservation Guide for Green Floater. Available at: https://guides.nynhp.org/green-floater/. Accessed July 2026. NYSDEC. 2026A. Environmental Resource Mapper. New York State Department of Environmental Conservation, Albany, NY. Available at: http://www.dec.ny.gov/gis/erm/. Accessed July, 2026. 6 NYSDEC. 2026B. Environmental Assessment Form Mapper. New York State Department of Environmental Conservation, Albany, NY. Available at: https://gisservices.dec.ny.gov/eafmapper/. Accessed July, 2026. NYSDEC. 2022. Northern Long-eared Bat Occurrences by Town (August 24, 2018). Bureau of Wildlife, Albany, NY NYSDEC. 2023. New York State Guidance on Northern Long-eared Bats and Forest Management (May 03, 2023). Division of Fish and Wildlife, Albany, NY USFWS, 2023. Interim Consultation Framework for the Northern Long-eared Bat. USFWS Midwest Regional Division of Ecological Services, Bloomington IN. USFWS, 2023. Standing Analysis and Implementation Plan- Northern Long-Eared Bat Assisted Determination Key. USFWS Midwest Regional Division of Ecological Services, Bloomington IN. USFWS, 2024. Save the Monarch. Available At: https://www.fws.gov/initiative/pollinators/save- monarch. Accessed January 2026. USFWS. 2026. United States Fish and Wildlife Service – Green Floater. Available at: https://www.fws.gov/species/green-floater-lasmigona-subviridis. Accessed July 2026. E King Rd Sa r a n a c W a y Tr o y R d Wh i t e t a i l D r Whi t e t a i l D r Cod d i n g t o n R d Sources: 1. Study Area: Created by LaBella using information provided by the client. 2. Basemap: New York State, Vantor, 2025 0 150 300 Feet Pa t h : B : \ G L O B A L \ P r o j e c t s \ N e x a m p \ 2 2 4 0 6 6 5 - 1 3 4 3 9 3 T r o y H e i g h t s S o l a r P V \ 0 6 _ D r a w i n g s \ E n v i r o n m e n t a l \ H a b i t a t S u r v e y 1 _ 2 0 _ 2 6 \ H a b i t a t S u r v e y M a p \ H a b i t a t S u r v e y . a p r x FIGURE 1 LaBella Project No: 2240665 Date: 1/21/2026 Potential Habitat Area/Roost Tree Northern Long-eared Bat Habitat Assessment Memo Bomber Heights Solar 141 Troy Road Ithaca, NY 14850 Nexamp Cr e a t o r : K B R e v i e w e r : L D 1 inch = 300 feet Legend Study Area Potential Roost Tree Potential Habitat Area Road 1 Suitable roost tree - White ash snag near open field Suitable roost tree - Red maple snag Two suitable roost trees – Red oak and white oak Suitable roost tree crevice Bomber Heights Solar Habitat Assessment Photos Ithaca, New York – January 20th, 2026 2 Habitat area – Forested area with oak and pine species and snags Open space Wetland area Stream in forested area Bomber Heights Solar Habitat Assessment Photos Ithaca, New York – January 20th, 2026 07/16/2026 20:27:01 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 Phone: (607) 753-9334 Fax: (607) 753-9699 Email Address: fw5es_nyfo@fws.gov In Reply Refer To: Project Code: 2026-0117477 Project Name: Bomber Heights Solar Subject:List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) Project code: 2026-0117477 07/16/2026 20:27:01 UTC   2 of 7 (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/sites/default/files/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts. Any activity resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/program/migratory-bird-permit/what-we-do. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project-related stressors or minimize the exposure of birds and their resources to the project-related stressors. For more information on avian stressors and recommended conservation measures see https:// www.fws.gov/library/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation- migratory-birds. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Project code: 2026-0117477 07/16/2026 20:27:01 UTC   3 of 7 ▪ Attachment(s): Official Species List OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 (607) 753-9334 Project code: 2026-0117477 07/16/2026 20:27:01 UTC   4 of 7 PROJECT SUMMARY Project Code:2026-0117477 Project Name:Bomber Heights Solar Project Type:Power Gen - Solar Project Description:Proposed solar project on a 60-acre parcel in Town of Ithaca, Tompkins County, NY Project Location: The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@42.4077955,-76.47531519778039,14z Counties:Tompkins County, New York Project code: 2026-0117477 07/16/2026 20:27:01 UTC   5 of 7 1. ENDANGERED SPECIES ACT SPECIES There is a total of 3 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 1 Project code: 2026-0117477 07/16/2026 20:27:01 UTC   6 of 7 MAMMALS NAME STATUS Northern Long-Eared Bat Myotis septentrionalis No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/9045 Endangered CLAMS NAME STATUS Green floater Lasmigona subviridis There is proposed critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/7541 Proposed Threatened INSECTS NAME STATUS Monarch butterfly Danaus plexippus There is proposed critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/9743 Proposed Threatened CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HAVE EFFECTS ON ALL ABOVE LISTED SPECIES. Project code: 2026-0117477 07/16/2026 20:27:01 UTC    7 of 7 IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Claire Leonardi Address:21 Fox Street City:Poughkeepsie State:NY Zip:12601 Email Phone:5858135691 07/16/2026 20:39:28 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 Phone: (607) 753-9334 Fax: (607) 753-9699 Email Address: fw5es_nyfo@fws.gov In Reply Refer To: Project code: 2026-0117477 Project Name: Bomber Heights Solar Federal Nexus: yes Federal Action Agency (if applicable): Army Corps of Engineers Subject:Technical assistance for 'Bomber Heights Solar' Dear Claire Leonardi: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on July 16, 2026, for 'Bomber Heights Solar' (here forward, Project). This project has been assigned Project Code 2026-0117477 and all future correspondence should clearly reference this number. Please carefully review this letter. Your Endangered Species Act (Act) requirements may not be complete. Ensuring Accurate Determinations When Using IPaC The Service developed the IPaC system and associated species’ determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key (Dkey), invalidates this letter. Answers to certain questions in the DKey commit the project proponent to implementation of conservation measures that must be followed for the ESA determination to remain valid. Note that conservation measures for northern long-eared bat and tricolored bat may differ. If both bat species are present in the action area and the key suggests more conservative measures for one of the species for your project, the Project may need to apply the most conservative measures in order to avoid adverse effects. If unsure which conservation measures should be applied, please contact the appropriate Ecological Services Field Office Determination for the Northern Long-Eared Bat and Tricolored Bat Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  2 of 12 ▪ ▪ 1. 2. 3. Based upon your IPaC submission and a standing analysis completed by the Service, your project has reached the following effect determination(s): Species Listing Status Determination Northern Long-Eared Bat (Myotis septentrionalis)Endangered NLAA Other Species and Critical Habitat that May be Present in the Action Area The IPaC-assisted determination key for the northern long-eared bat and tricolored bat does not apply to the following ESA-protected species and/or critical habitat that also may occur in your Action area: Green floater Lasmigona subviridis Proposed Threatened Monarch butterfly Danaus plexippus Proposed Threatened You may coordinate with our Office to determine whether the Action may cause prohibited take of the animal species listed above. Note that if a new species is listed that may be affected by the identified action before it is complete, additional review is recommended to ensure compliance with the Endangered Species Act. Next Steps Consultation with the Service is necessary. The project has a federal nexus (e.g., Federal funds, permit, etc.), but you are not the federal action agency or its designated (in writing) non-federal representative. Therefore, the ESA consultation status is incomplete and no project activities should occur until consultation between the Service and the Federal action agency (or designated non-federal representative), is completed. As the federal agency or designated non-federal representative deems appropriate, they should submit their determination of effects to the Service by doing the following. Log into IPaC using an agency email account and click on My Projects, click "Search by record locator" to find this Project using 654-184778766. (Alternatively, the originator of the project in IPaC can add the agency representative to the project by using the Add Member button on the project home page.) Review the answers to the Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key to ensure that they are accurate. Click on Review/ Finalize to convert the ‘not likely to adversely affect’ technical assistance letter to a concurrence letter. Download the concurrence letter for your files if needed. If no changes occur with the Project or there are no updates on listed species, no further consultation/coordination for this project is required for the northern long-eared bat. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location of the Project changes (includes any project changes or amendments); 2) new information reveals the Project may impact (positively or negatively) federally listed species or designated critical habitat; or 3) a new species is listed, or critical Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  3 of 12 habitat designated. If any of the above conditions occurs, additional coordination with the Service should take place before project implements any changes which are final or commits additional resources. If you have any questions regarding this letter or need further assistance, please contact the New York Ecological Services Field Office and reference Project Code 2026-0117477 associated with this Project. Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  4 of 12 Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Bomber Heights Solar 2. Description The following description was provided for the project 'Bomber Heights Solar': Proposed solar project on a 60-acre parcel in Town of Ithaca, Tompkins County, NY The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@42.4077955,-76.47531519778039,14z Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  5 of 12 1. 2. 3. 4. 5. DETERMINATION KEY RESULT Based on the answers provided, the proposed Action is consistent with a determination of “may affect, but not likely to adversely affect” for a least one species covered by this determination key. QUALIFICATION INTERVIEW Does the proposed project include, or is it reasonably certain to cause, intentional take of listed bats or any other listed species that is not covered by an existing section 10 (a)(1)(A) Recovery Permit, exempted under section 4(d) or authorized by a section 6 cooperative agreement? Note: Intentional take is defined as take that is the intended result of a project. Intentional take could refer to research, direct species management, surveys, and/or studies that include intentional handling/ encountering, harassment, collection, or capturing of any individual of a federally listed threatened, endangered or proposed species? No Is the action area wholly within Zone 2 of the year-round active area for northern long- eared bat and/or tricolored bat? Automatically answered No Does the action area intersect Zone 1 of the year-round active area for northern long-eared bat and/or tricolored bat? Automatically answered No Does any component of the action involve leasing, construction or operation of wind turbines? Answer 'yes' if the activities considered are conducted with the intention of gathering survey information to inform the leasing, construction, or operation of wind turbines. No Is the proposed action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? Note for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S. Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP), which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such, if proposing to use the PASPGP, you would answer ‘yes’ to this question.  Yes Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  6 of 12 6. 7. 8. 9. 10. 11. 12. 13. 14. Is the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA), or Federal Transit Administration (FTA) funding or authorizing the proposed action, in whole or in part? No Are you an employee of the federal action agency or have you been officially designated in writing by the agency as its designated non-federal representative for the purposes of Endangered Species Act Section 7 informal consultation per 50 CFR § 402.08? Note: This key may be used for federal actions and for non-federal actions to facilitate section 7 consultation and to help determine whether an incidental take permit may be needed, respectively. This question is for information purposes only. No Is the lead federal action agency the Environmental Protection Agency (EPA) or Federal Communications Commission (FCC)? Is the Environmental Protection Agency (EPA) or Federal Communications Commission (FCC) funding or authorizing the proposed action, in whole or in part? No Is the lead federal action agency the Federal Energy Regulatory Commission (FERC)? No [Semantic] Is the action area located within 0.5 miles of a known bat hibernaculum or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your state wildlife agency. Automatically answered No Does the action area contain any winter roosts or caves (or associated sinkholes, fissures, or other karst features), mines, rocky outcroppings, or tunnels that could provide habitat for hibernating bats? No Is the action located in New England (CT, MA, ME, NH, RI, or VT)? No Will the action cause effects to a bridge? Note: Covered bridges should be considered as bridges in this question. No Will the action result in effects to a culvert or tunnel at any time of year? No Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  7 of 12 15. 16. 17. 18. 19. 20. Are trees present within 1000 feet of the action area? Note: If there are trees within the action area that are of a sufficient size to be potential roosts for bats answer "Yes". If unsure, additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range- wide Indiana Bat and Northern long-eared bat Survey Guidelines. Yes Does the action include the intentional exclusion of bats from a building or building-like structure? Note: Exclusion is conducted to deny bats’ entry or reentry into a building. To be effective and to avoid harming bats, it should be done according to established standards. If your action includes bat exclusion and you are unsure whether northern long-eared bats or tricolored bats are present, answer “Yes.” Answer “No” if there are no signs of bat use in the building/structure. If unsure, contact your local Ecological Services Field Office to help assess whether northern long-eared bats or tricolored bats may be present. Contact a Nuisance Wildlife Control Operator (NWCO) for help in how to exclude bats from a structure safely without causing harm to the bats (to find a NWCO certified in bat standards, search the Internet using the search term “National Wildlife Control Operators Association bats”). Also see the White-Nose Syndrome Response Team's guide for bat control in structures. No Does the action involve removal, modification, or maintenance of a human-made building- like structure (barn, house, or other building) known or suspected to contain roosting bats? No Will the action cause construction of one or more new roads open to the public? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Will the action include or cause any construction or other activity that is reasonably certain to increase average night-time traffic permanently or temporarily on one or more existing roads? Note: For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). . No Will the action include or cause any construction or other activity that is reasonably certain to increase the number of travel lanes on an existing thoroughfare? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  8 of 12 21. 22. 23. 24. 25. 26. 27. 28. 29. Will the proposed Action involve the creation of a new water-borne contaminant source (e.g., leachate pond, pits containing chemicals that are not NSF/ANSI 60 compliant)? Note: For information regarding NSF/ANSI 60 please visit https://www.nsf.org/knowledge-library/nsf-ansi- standard-60-drinking-water-treatment-chemicals-health-effects No Will the proposed action involve the creation of a new point source discharge from a facility other than a water treatment plant or storm water system? No Will the action include drilling or blasting? No Will the action involve military training (e.g., smoke operations, obscurant operations, exploding munitions, artillery fire, range use, helicopter or fixed wing aircraft use at night)? No Will the proposed action involve the use of herbicides or pesticides (e.g., fungicides, insecticides, or rodenticides)? No Will the action include or cause activities that are reasonably certain to cause chronic or intense nighttime noise (above current levels of ambient noise in the area) in suitable summer habitat for the northern long-eared bat or tricolored bat during the active season? Chronic noise is noise that is continuous or occurs repeatedly again and again for a long time. Sources of chronic or intense noise that could cause adverse effects to bats may include, but are not limited to: road traffic; trains; aircraft; industrial activities; gas compressor stations; loud music; crowds; oil and gas extraction; construction; and mining. Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. No Does the action include, or is it reasonably certain to cause, the use of permanent or temporary artificial lighting within 1000 feet of suitable forested northern long-eared bat or tricolored bat roosting habitat? Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. No Will the action include tree cutting or other means of knocking down or bringing down trees, tree topping, or tree trimming? Yes Is the project related to the production of coal, including projects that support the mining of coal, as well as the production and/or distribution of energy produced from coal? No Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  9 of 12 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. Will the proposed action occur exclusively in an already established and currently maintained utility right-of-way? No Does the action include emergency cutting or trimming of hazard trees in order to remove an imminent threat to human safety or property? See hazard tree note at the bottom of the key for text that will be added to response letters Note: A "hazard tree" is a tree that is an immediate threat to lives, public health and safety, or improved property. No Does the project intersect with the 0- 9.9% forest density category? Automatically answered No Does the project intersect with the 10.0- 19.9% forest density category map? Automatically answered No Does the project intersect with the 20.0- 29.9% forest density category map? Automatically answered No Does the project intersect with the 30.0- 100% forest density category map? Automatically answered Yes Will the action cause trees to be cut, knocked down, or otherwise brought down across an area greater than 100 acres in total extent? No Will the proposed action result in the use of prescribed fire? Note: If the prescribed fire action includes other activities than application of fire (e.g., tree cutting, fire line preparation) please consider impacts from those activities within the previous representative questions in the key. This set of questions only considers impacts from flame and smoke. No Does the action area intersect the northern long-eared bat species list area? Automatically answered Yes [Semantic] Is the action area located within 0.5 miles of radius of an entrance/opening to any known NLEB hibernacula or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency. Automatically answered No Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  10 of 12 40. 41. 42. 43. 44. 45. [Semantic] Is the action area located within 0.25 miles of a culvert that is known to be occupied by northern long-eared or tricolored bats? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency. Automatically answered No [Semantic] Is the action area located within 150 feet of a documented northern long-eared bat roost site? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency.Have you contacted the appropriate agency to determine if your action is within 150 feet of any documented northern long-eared bat roosts? Note: A document with links to Natural Heritage Inventory databases and other state- specific sources of information on the locations of northern long-eared bat roosts is available here. Location information for northern long-eared bat roosts is generally kept in state natural heritage inventory databases – the availability of this data varies by state. Many states provide online access to their data, either directly by providing maps or by providing the opportunity to make a data request. In some cases, to protect those resources, access to the information may be limited. Automatically answered No Is suitable summer habitat for the northern long-eared bat present within 1000 feet of project activities? If unsure, answer "Yes." Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines Yes Are any of the trees proposed for cutting or other means of knocking down, bringing down, topping, or trimming suitable for northern long-eared bat roosting (i.e., live trees and/or snags ≥3 inches dbh that have exfoliating bark, cracks, crevices, and/or cavities)? Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. Yes Will any tree cutting/trimming or other knocking or bringing down of trees occur during the Summer Occupancy season for northern long-eared bats in the action area? Note: Bat activity periods for your state can be found in Appendix 2 of the Service's Northern long-eared Bat and Tricolored Bat Voluntary Environmental Review Process for Development Projects. No Do you have any documents that you want to include with this submission? No Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  11 of 12 PROJECT QUESTIONNAIRE Enter the extent of the action area (in acres) from which trees will be removed - round up to the nearest tenth of an acre. For this question, include the entire area where tree removal will take place, even if some live or dead trees will be left standing. Project code: 2026-0117477 IPaC Record Locator: 654-184778766 07/16/2026 20:39:28 UTC DKey Version Publish Date: 07/16/2026  12 of 12 IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Claire Leonardi Address:21 Fox Street City:Poughkeepsie State:NY Zip:12601 Email Phone:5858135691 LEAD AGENCY CONTACT INFORMATION Lead Agency:Army Corps of Engineers 07/16/2026 20:47:48 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 Phone: (607) 753-9334 Fax: (607) 753-9699 Email Address: fw5es_nyfo@fws.gov In Reply Refer To: Project code: 2026-0117477 Project Name: Bomber Heights Solar Federal Nexus: yes Federal Action Agency (if applicable): Army Corps of Engineers Subject:Federal agency coordination under the Endangered Species Act, Section 7 for 'Bomber Heights Solar' Dear Claire Leonardi: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on July 16, 2026, for “Bomber Heights Solar” (here forward, Project). This project has been assigned Project Code 2026-0117477 and all future correspondence should clearly reference this number. The Service developed the IPaC system and associated species’ determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into the IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northeast Determination Key (DKey), invalidates this letter. Answers to certain questions in the DKey commit the project proponent to implementation of conservation measures that must be followed for the ESA determination to remain valid. The IPaC results indicated the following species is (are) potentially present in your project area and, based on your responses to the Service’s Northeast DKey, you determined the proposed Project will have the following effect determinations: Species Listing Status Determination Green floater (Lasmigona subviridis)Proposed Threatened No effect Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  2 of 9 ▪ ▪ Conclusion If there are no updates on listed species, no further consultation/coordination for this project is required for the species identified above. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location of the Project changes (includes any project changes or amendments); 2) new information reveals the Project may impact (positively or negatively) federally listed species or designated critical habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions occurs, additional consultation with the Service should take place before project implements any changes which are final or commits additional resources. Other Species and Critical Habitat that May be Present in the Action Area In addition to the species listed above, the following species and/or critical habitats may also occur in your project area and are not covered by this conclusion: Monarch butterfly Danaus plexippus Proposed Threatened Northern Long-Eared Bat Myotis septentrionalis Endangered Please Note: If the Action may impact bald or golden eagles, additional coordination with the Service under the Bald and Golden Eagle Protection Act (BGEPA) (54 Stat. 250, as amended, 16 U.S.C. 668a-d) by the prospective permittee may be required. Please contact the Migratory Birds Permit Office, (413) 253-8643, or PermitsR5MB@fws.gov, with any questions regarding potential impacts to Eagles. If you have any questions regarding this letter or need further assistance, please contact the New York Ecological Services Field Office and reference the Project Code associated with this Project. Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  3 of 9 Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Bomber Heights Solar 2. Description The following description was provided for the project 'Bomber Heights Solar': Proposed solar project on a 60-acre parcel in Town of Ithaca, Tompkins County, NY The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@42.4077955,-76.47531519778039,14z Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  4 of 9 1. 2. 3. 4. 5. 6. 7. 8. QUALIFICATION INTERVIEW As a representative of this project, do you agree that all items submitted represent the complete scope of the project details and you will answer questions truthfully? Yes Does the proposed project include, or is it reasonably certain to cause, intentional take of listed species? Note: This question could refer to research, direct species management, surveys, and/or studies that include intentional handling/encountering, harassment, collection, or capturing of any individual of a federally listed threatened, endangered, or proposed species. No Is the action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? Note: for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S. Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP), which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such, if proposing to use the PASPGP, you would answer ‘yes’ to this question.  Yes Are you including in this analysis all impacts to federally listed species that may result from the entirety of the project (not just the activities under federal jurisdiction)? Note: If there are project activities that will impact listed species that are considered to be outside of the jurisdiction of the federal action agency submitting this key, contact your local Ecological Services Field Office to determine whether it is appropriate to use this key. If your Ecological Services Field Office agrees that impacts to listed species that are outside the federal action agency's jurisdiction will be addressed through a separate process, you can answer yes to this question and continue through the key. Yes Are you the lead federal action agency or designated non-federal representative requesting concurrence on behalf of the lead Federal Action Agency? No Is the lead federal action agency the Environmental Protection Agency (EPA) or Federal Communications Commission (FCC)? No Is the lead federal action agency the Federal Energy Regulatory Commission (FERC)? No Is the lead federal action agency the Natural Resources Conservation Service? No Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  5 of 9 9. 10. 11. 12. 13. 14. 15. 16. Will the proposed project involve the use or storage of herbicide? No Will the proposed project involve herbaceous native vegetation removal (including prescribed fire that would result in burning of plants) or mowing? Yes Will the proposed project result in permanent changes to surface water or groundwater quantity, retention, quality or timing? For example, will the proposed project include any activities that would alter stream flow, surface water or groundwater such as water withdrawal, water recharge, wells, infiltration effects, stormwater outlets, hydropower energy production, impoundments, intake structures, water or stream diversion structures, mining, impoundments, dams, surface water drainage, and/or turbines? Projects that include temporary and limited water reductions that will not displace listed species or appreciably change water availability for listed species (e.g. listed species will experience no changes to feeding, breeding or sheltering) can answer "No". Note: This question refers only to the amount of water present in a stream, other water quality factors, including sedimentation and turbidity, will be addressed in following questions. Yes Does the project include activity in or within 300 feet of a freshwater wetland? This includes, for example, project activities within wetlands, project activities within 300 feet of wetlands that may have impacts on wetlands, water withdrawals and/or discharge of contaminants (even with a NPDES). Activities include, but are not limited to wetland draining, ditching, tilling, filling, excavation, stream diversion, impoundments, mowing, grazing of vegetation, access roads, detention basins, water or sewer lines, irrigation, increase in impervious surfaces, and application of pesticides, deicing agents, or fertilizers. Yes Does any component of the project associated with this action include activities or structures that may pose a collision risk to birds (e.g., plane-based surveys, land-based or offshore wind turbines, new or enlarged communication towers or broadcast towers, high voltage transmission lines, any type of towers with or without guy wires)? No Will the proposed project involve demolition, rehabilitation, property elevation, renovation, and/or rebuilding of one or more existing buildings (e.g., residential, commercial and industrial buildings, or utilities)? Note: if project activities include modification of bridges and/or culverts, answer this question "No". No Does the project area intersect the boundary of VAFO? Automatically answered No Does the project area intersect the boundary of CBFO? Automatically answered No Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  6 of 9 17. 18. 19. 20. 21. 22. 23. 24. 25. Are federally listed freshwater mussels known to be present in the action area? Note: If unsure, contact the appropriate Ecological Services Field Office for additional information or answer "NO" and continue through the key. No Did a qualified surveyor conduct a survey for freshwater mussels within the action area with the appropriate level of search effort according to local survey guidance? Note: Answer this question "Yes" if the project is located in WV and the action area is located outside the stream reaches where mussel surveys are required following the West Virginia Mussel Survey Protocol No [Hidden Semantic] Is the proposed project in NY? Automatically answered Yes Will the proposed project activities (including upland project activities) occur within 0.125 miles of the water's edge of a stream or tributary of a stream where listed species may be present? No Will the proposed project directly affect a streambed (below ordinary high water mark (OHWM)) of the stream? No Will the proposed project bore underneath (directional bore or horizontal directional drill) a stream where listed species may be present? No Will the proposed project involve a new point source discharge into a stream or change an existing point source discharge (e.g., outfalls; leachate ponds, fracking fluid) including changes to pH, temperature and/or chemical composition (e.g., choloride, nickel,etc.)? No Will the proposed project involve the removal of sediment or debris, dredging or in-stream gravel mining where listed species may be present? No Will the proposed project involve the creation of a new water-borne contaminant source where listed species may be present? Note: New water-borne contaminant sources occur through improper storage, usage, or creation of chemicals. For example: leachate ponds and pits containing chemicals that are not NSF/ANSI 60 compliant have contaminated waterways. Sedimentation will be addressed in a separate question. No Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  7 of 9 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. Will the proposed project involve perennial stream loss, in a stream or tributary of a stream where listed species may be present, that would require an individual permit under 404 of the Clean Water Act? No Will the proposed project involve pesticide use or storage within 200 feet of a karst feature or perennial stream bank where aquatic listed species may be present? No Will the proposed project include activities that could negatively affect fish movement temporarily or permanently (including fish stocking, harvesting, or creation of barriers to fish passage). No Will the proposed project involve earth moving or other ground disturbance that could cause erosion and sedimentation, and/or contamination within 300 feet of a freshwater wetland or along a stream? Note: Answer "Yes" to this question if erosion and sediment control measures will be used. Yes Will the proposed project impact streams or tributaries of streams where aquatic listed species may be present through activities such as, but not limited to, valley fills, large- scale vegetation removal that could result in ground destabilization, and/or change in site topography? No Will the proposed project involve vegetation removal within 300 feet of a perennial stream bank where aquatic listed species may be present? No Will erosion and sedimentation control Best Management Practices (BMPs) associated with applicable state and/or Federal permits, be applied to the project? Note: If BMPs have been provided by and/or coordinated with and approved by the appropriate Ecological Services Field Office, answer "Yes" to this question. Yes Is the project being funded, lead, or managed in whole or in part by U.S Fish and Wildlife Restoration and Recovery Program (e.g., Partners, Coastal, Fisheries, Wildlife and Sport Fish Restoration, Refuges)? No [Hidden Semantic] Does the project intersect WV? Automatically answered No Do you have any other documents that you want to include with this submission? No Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  8 of 9 1. 2. 3. PROJECT QUESTIONNAIRE Approximately how many acres of trees would the proposed project remove? Approximately how many total acres of disturbance are within the disturbance/ construction limits of the proposed project? Briefly describe the habitat within the construction/disturbance limits of the project site. Project code: 2026-0117477 IPaC Record Locator: 654-184780569 07/16/2026 20:47:48 UTC DKey Version Publish Date: 06/10/2026  9 of 9 IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Claire Leonardi Address:21 Fox Street City:Poughkeepsie State:NY Zip:12601 Email Phone:5858135691 LEAD AGENCY CONTACT INFORMATION Lead Agency:Army Corps of Engineers          !" #$  % () *+,% -./0123.44/05/0521 6,% 7151 8,"% :.137.0/441;5.400. 8+"% 7;37     !" #$  %KLR[Z \Z>N^_` gchi^be  j!  kEUQAR lDRAHm UR \QmUQnHKHmF NBKHUAHQHmF ?K oUKH pq GJ>UVt?Q DR IDABDQ ?K QHUK UQ UKHU IDAB U KUKH UQDOUEF U PHKODA OUq pH KHu@DKHm Dr ABH RPHVDHKHUAHQHm UQm ABH mHPUKAOHQA mHAHKODQHR ABH UVt?Q OUq pH BUKOr@E A? ABH RPHVDHR ?K DAUVt?Q DR IDABDQ ?K QHUK UQ UKHU IDAB KUKH PEUQAR UQmv?K RDnQDwVUQA QUA@KUE V?OO@QDtHRF                 !  "#$ %&' ! ! ( )*+, &-! . /   ,    ,,    ( "#$ %&'   ,,! ! "#$ %&'  )* 0 1!  .  + 2   2  $  . .-       , !*34567 348958: 05/29/2026 15:44:24 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 Phone: (607) 753-9334 Fax: (607) 753-9699 Email Address: fw5es_nyfo@fws.gov In Reply Refer To: Project code: 2026-0093630 Project Name: Bomber Heights Federal Nexus: no Federal Action Agency (if applicable): Subject:Federal agency coordination under the Endangered Species Act, Section 7 for 'Bomber Heights' Dear Kiana Bacon: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on May 29, 2026, for “Bomber Heights” (here forward, Project). This project has been assigned Project Code 2026-0093630 and all future correspondence should clearly reference this number. The Service developed the IPaC system and associated species’ determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into the IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northeast Determination Key (DKey), invalidates this letter. Answers to certain questions in the DKey commit the project proponent to implementation of conservation measures that must be followed for the ESA determination to remain valid. To make a no effect determination, the full scope of the proposed project implementation (action) should not have any effects (either positive or negative effect(s)), to a federally listed species or designated critical habitat. Effects of the action are all consequences to listed species or critical habitat that are caused by the proposed action, including the consequences of other activities that are caused by the proposed action. A consequence is caused by the proposed action if it would not occur but for the proposed action and it is reasonably certain to occur. Effects of the action may occur later in time and may include consequences occurring outside the immediate area involved in the action. (See § 402.17). Under Section 7 of the ESA, if a federal action agency makes a no effect determination, no further consultation with, or concurrence from, the Service is Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  2 of 9 ▪ ▪ required (ESA §7). If a proposed Federal action may affect a listed species or designated critical habitat, formal consultation is required (except when the Service concurs, in writing, that a proposed action "is not likely to adversely affect" listed species or designated critical habitat [50 CFR §402.02, 50 CFR§402.13]). The IPaC results indicated the following species is (are) potentially present in your project area and, based on your responses to the Service’s Northeast DKey, you determined the proposed Project will have the following effect determinations: Species Listing Status Determination Green Floater (Lasmigona subviridis)Proposed Threatened No effect Conclusion If there are no updates on listed species, no further consultation/coordination for this project is required for the species identified above. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location of the Project changes (includes any project changes or amendments); 2) new information reveals the Project may impact (positively or negatively) federally listed species or designated critical habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions occurs, additional consultation with the Service should take place before project implements any changes which are final or commits additional resources. Other Species and Critical Habitat that May be Present in the Action Area In addition to the species listed above, the following species and/or critical habitats may also occur in your project area and are not covered by this conclusion: Monarch Butterfly Danaus plexippus Proposed Threatened Northern Long-eared Bat Myotis septentrionalis Endangered Please Note: If the Action may impact bald or golden eagles, additional coordination with the Service under the Bald and Golden Eagle Protection Act (BGEPA) (54 Stat. 250, as amended, 16 U.S.C. 668a-d) by the prospective permittee may be required. Please contact the Migratory Birds Permit Office, (413) 253-8643, or PermitsR5MB@fws.gov, with any questions regarding potential impacts to Eagles. If you have any questions regarding this letter or need further assistance, please contact the New York Ecological Services Field Office and reference the Project Code associated with this Project. Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  3 of 9 Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Bomber Heights 2. Description The following description was provided for the project 'Bomber Heights': Solar development The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@42.407804,-76.4753174977804,14z Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  4 of 9 1. 2. 3. 4. 5. 6. 7. 8. QUALIFICATION INTERVIEW As a representative of this project, do you agree that all items submitted represent the complete scope of the project details and you will answer questions truthfully? Yes Does the proposed project include, or is it reasonably certain to cause, intentional take of listed species? Note: This question could refer to research, direct species management, surveys, and/or studies that include intentional handling/encountering, harassment, collection, or capturing of any individual of a federally listed threatened, endangered, or proposed species. No Is the action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? Note: for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S. Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP), which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such, if proposing to use the PASPGP, you would answer ‘yes’ to this question.  No Will the proposed project involve the use or storage of herbicide? No Will the proposed project involve herbaceous native vegetation removal (including prescribed fire that would result in burning of plants) or mowing? Yes Does any component of the project associated with this action include activities or structures that may pose a collision risk to birds (e.g., plane-based surveys, land-based or offshore wind turbines, new or enlarged communication towers or broadcast towers, high voltage transmission lines, any type of towers with or without guy wires)? No Will the proposed project involve demolition, rehabilitation, property elevation, renovation, and/or rebuilding of one or more existing buildings (e.g., residential, commercial and industrial buildings, or utilities)? Note: if project activities include modification of bridges and/or culverts, answer this question "No". No Does the project area intersect the boundary of VAFO? Automatically answered No Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  5 of 9 9. 10. 11. 12. 13. 14. Are federally listed freshwater mussels known to be present in the action area? Note: If unsure, contact the appropriate Ecological Services Field Office for additional information or answer "NO" and continue through the key. No Did a qualified surveyor conduct a survey for freshwater mussels within the action area with the appropriate level of search effort according to local survey guidance? Note: Answer this question "Yes" if the project is located in WV and the action area is located outside the stream reaches where mussel surveys are required following the West Virginia Mussel Survey Protocol No Will the proposed project result in permanent changes to surface water or groundwater quantity, retention, quality or timing? Note: Projects may affect stream flow, surface water, or groundwater through various activities such as; water withdrawal, water recharge, well drilling, infiltration impacts, stormwater outlets, hydropower production, water impoundments, intake structures, stream diversion, mining operations, dams, surface water drainage, or hydroelectric turbines. If a project only involves temporary and limited reductions in water that will not displace listed species or significantly alter their water availability (meaning there are no changes to their feeding, breeding, or sheltering), you can answer "No" to this question. This question specifically addresses the quantity of water in a stream. Other water quality issues, such as sedimentation and turbidity, will be covered in subsequent questions. No Does the project include activity in or within 300 feet of a freshwater wetland? Note: This encompasses various project activities related to wetlands, including activities taking place within wetlands, activities occurring within 300 feet of wetlands that could impact them, and water withdrawals and/or discharge of contaminants, even if covered by a National Pollutant Discharge Elimination System (NPDES) permit. Examples of such activities include, but are not limited to; wetland draining, ditching, tilling, filling, excavation, stream diversion, impoundments, mowing, grazing vegetation, construction of access roads, creation of detention basins, installation of water or sewer lines, irrigation, increase of impervious surfaces, and application of pesticides, deicing agents, or fertilizers.. Yes Will the proposed project activities (including upland project activities) occur within 0.125 miles of the water's edge of a stream or tributary of a stream where listed species may be present? No Will the proposed project directly affect a streambed (below ordinary high water mark (OHWM)) of the stream? No Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  6 of 9 15. 16. 17. 18. 19. 20. 21. 22. 23. Will the proposed project bore underneath (directional bore or horizontal directional drill) a stream where listed species may be present? No Will the proposed project involve a new point source discharge into a stream or change an existing point source discharge (e.g., outfalls; leachate ponds, fracking fluid) including changes to pH, temperature and/or chemical composition (e.g., choloride, nickel,etc.)? No Will the proposed project involve the removal of sediment or debris, dredging or in-stream gravel mining where listed species may be present? No Will the proposed project involve the creation of a new water-borne contaminant source where listed species may be present? Note: New water-borne contaminant sources occur through improper storage, usage, or creation of chemicals. For example: leachate ponds and pits containing chemicals that are not NSF/ANSI 60 compliant have contaminated waterways. Sedimentation will be addressed in a separate question. No Will the proposed project involve perennial stream loss, in a stream or tributary of a stream where listed species may be present, that would require an individual permit under 404 of the Clean Water Act? No Will the proposed project involve pesticide use or storage within 200 feet of a karst feature or perennial stream bank where aquatic listed species may be present? No Will the proposed project include activities that could negatively affect fish movement temporarily or permanently (including fish stocking, harvesting, or creation of barriers to fish passage). No Will the proposed project involve earth moving or other ground disturbance that could cause erosion and sedimentation, and/or contamination within 300 feet of a freshwater wetland or along a stream? Note: Answer "Yes" to this question if erosion and sediment control measures will be used. No Will the proposed project impact streams or tributaries of streams where aquatic listed species may be present through activities such as, but not limited to, valley fills, large- scale vegetation removal that could result in ground destabilization, and/or change in site topography? No Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  7 of 9 24. 25. 26. 27. 28. 29. 30. 31. 32. Will the proposed project involve vegetation removal within 300 feet of a perennial stream bank where aquatic listed species may be present? No Will erosion and sedimentation control Best Management Practices (BMPs) associated with applicable state and/or Federal permits, be applied to the project? Note: If BMPs have been provided by and/or coordinated with and approved by the appropriate Ecological Services Field Office, answer "Yes" to this question. Yes Is the project being funded, lead, or managed in whole or in part by U.S Fish and Wildlife Restoration and Recovery Program (e.g., Partners, Coastal, Fisheries, Wildlife and Sport Fish Restoration, Refuges)? No Does the project area intersect the Species List Area of the Green Floater Mussel? Automatically answered Yes Does the project area intersect the Birdwing Pearlymussel species list area? Automatically answered No Does the project area intersect the Dromedary Pearlymussel species list area? Automatically answered No Does the project area intersect the Finerayed Pigtoe species list area? Automatically answered No Does the project area intersect the Slabside Pearlymussel species list area? Automatically answered No Do you have any other documents that you want to include with this submission? No Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  8 of 9 1. 2. 3. PROJECT QUESTIONNAIRE Approximately how many acres of trees would the proposed project remove? 23 Approximately how many total acres of disturbance are within the disturbance/ construction limits of the proposed project? 23 Briefly describe the habitat within the construction/disturbance limits of the project site. Deciduous and coniferous forests, open wetland areas, and utility lines. Project code: 2026-0093630 IPaC Record Locator: 884-182050427 05/29/2026 15:44:24 UTC DKey Version Publish Date: 04/24/2026  9 of 9 IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Kiana Bacon Address:4104 Vestal Road, Suite 105 City:Vestal State:NY Zip:13850 Email Phone:6073729093 05/29/2026 14:26:50 UTC United States Department of the Interior FISH AND WILDLIFE SERVICE New York Ecological Services Field Office 3817 Luker Road Cortland, NY 13045-9385 Phone: (607) 753-9334 Fax: (607) 753-9699 Email Address: fw5es_nyfo@fws.gov In Reply Refer To: Project code: 2026-0093630 Project Name: Bomber Heights Federal Nexus: no Federal Action Agency (if applicable): Subject:Technical assistance for 'Bomber Heights' Dear Kiana Bacon: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on May 29, 2026, for 'Bomber Heights' (here forward, Project). This project has been assigned Project Code 2026-0093630 and all future correspondence should clearly reference this number. Please carefully review this letter. Your Endangered Species Act (Act) requirements may not be complete. Ensuring Accurate Determinations When Using IPaC The Service developed the IPaC system and associated species’ determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key (Dkey), invalidates this letter. Answers to certain questions in the DKey commit the project proponent to implementation of conservation measures that must be followed for the ESA determination to remain valid. Note that conservation measures for northern long-eared bat and tricolored bat may differ. If both bat species are present in the action area and the key suggests more conservative measures for one of the species for your project, the Project may need to apply the most conservative measures in order to avoid adverse effects. If unsure which conservation measures should be applied, please contact the appropriate Ecological Services Field Office Determination for the Northern Long-Eared Bat and Tricolored Bat Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  2 of 11 ▪ ▪ Based upon your IPaC submission and a standing analysis completed by the Service, your project has reached the following effect determination(s): Species Listing Status Determination Northern Long-eared Bat (Myotis septentrionalis)Endangered NLAA Other Species and Critical Habitat that May be Present in the Action Area The IPaC-assisted determination key for the northern long-eared bat and tricolored bat does not apply to the following ESA-protected species and/or critical habitat that also may occur in your Action area: Green Floater Lasmigona subviridis Proposed Threatened Monarch Butterfly Danaus plexippus Proposed Threatened You may coordinate with our Office to determine whether the Action may cause prohibited take of the animal species and/or critical habitat listed above. Note that if a new species is listed that may be affected by the identified action before it is complete, additional review is recommended to ensure compliance with the Endangered Species Act. Next Steps Coordination with the Service is complete. This letter serves as technical assistance. All conservation measures should be implemented as proposed. Thank you for considering federally listed species during your project planning. If no changes occur with the Project or there are no updates on listed species, no further consultation/coordination for this project is required for the northern long-eared bat. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location of the Project changes (includes any project changes or amendments); 2) new information reveals the Project may impact (positively or negatively) federally listed species or designated critical habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions occurs, additional coordination with the Service should take place before project implements any changes which are final or commits additional resources. If you have any questions regarding this letter or need further assistance, please contact the New York Ecological Services Field Office and reference Project Code 2026-0093630 associated with this Project. Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  3 of 11 Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Bomber Heights 2. Description The following description was provided for the project 'Bomber Heights': Solar development The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@42.407804,-76.4753174977804,14z Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  4 of 11 1. 2. 3. 4. 5. DETERMINATION KEY RESULT Based on the answers provided, the proposed Action is consistent with a determination of “may affect, but not likely to adversely affect” for a least one species covered by this determination key. QUALIFICATION INTERVIEW Does the proposed project include, or is it reasonably certain to cause, intentional take of listed bats or any other listed species? Note: Intentional take is defined as take that is the intended result of a project. Intentional take could refer to research, direct species management, surveys, and/or studies that include intentional handling/encountering, harassment, collection, or capturing of any individual of a federally listed threatened, endangered or proposed species? No Is the action area wholly within Zone 2 of the year-round active area for northern long- eared bat and/or tricolored bat? Automatically answered No Does the action area intersect Zone 1 of the year-round active area for northern long-eared bat and/or tricolored bat? Automatically answered No Does any component of the action involve leasing, construction or operation of wind turbines? Answer 'yes' if the activities considered are conducted with the intention of gathering survey information to inform the leasing, construction, or operation of wind turbines. No Is the proposed action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? Note for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S. Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP), which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such, if proposing to use the PASPGP, you would answer ‘yes’ to this question.  No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  5 of 11 6. 7. 8. 9. 10. 11. 12. 13. [Semantic] Is the action area located within 0.5 miles of a known bat hibernaculum or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your state wildlife agency. Automatically answered No Does the action area contain any winter roosts or caves (or associated sinkholes, fissures, or other karst features), mines, rocky outcroppings, or tunnels that could provide habitat for hibernating bats? No Is the action located in New England (CT, MA, ME, NH, RI, or VT)? No Will the action cause effects to a bridge? Note: Covered bridges should be considered as bridges in this question. No Will the action result in effects to a culvert or tunnel at any time of year? No Are trees present within 1000 feet of the action area? Note: If there are trees within the action area that are of a sufficient size to be potential roosts for bats answer "Yes". If unsure, additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range- wide Indiana Bat and Northern long-eared bat Survey Guidelines. Yes Does the action include the intentional exclusion of bats from a building or building-like structure? Note: Exclusion is conducted to deny bats’ entry or reentry into a building. To be effective and to avoid harming bats, it should be done according to established standards. If your action includes bat exclusion and you are unsure whether northern long-eared bats or tricolored bats are present, answer “Yes.” Answer “No” if there are no signs of bat use in the building/structure. If unsure, contact your local Ecological Services Field Office to help assess whether northern long-eared bats or tricolored bats may be present. Contact a Nuisance Wildlife Control Operator (NWCO) for help in how to exclude bats from a structure safely without causing harm to the bats (to find a NWCO certified in bat standards, search the Internet using the search term “National Wildlife Control Operators Association bats”). Also see the White-Nose Syndrome Response Team's guide for bat control in structures. No Does the action involve removal, modification, or maintenance of a human-made building- like structure (barn, house, or other building) known or suspected to contain roosting bats? No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  6 of 11 14. 15. 16. 17. 18. 19. 20. 21. Will the action cause construction of one or more new roads open to the public? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Will the action include or cause any construction or other activity that is reasonably certain to increase average night-time traffic permanently or temporarily on one or more existing roads? Note: For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). . No Will the action include or cause any construction or other activity that is reasonably certain to increase the number of travel lanes on an existing thoroughfare? For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1) part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit, funding, etc.). No Will the proposed Action involve the creation of a new water-borne contaminant source (e.g., leachate pond, pits containing chemicals that are not NSF/ANSI 60 compliant)? Note: For information regarding NSF/ANSI 60 please visit https://www.nsf.org/knowledge-library/nsf-ansi- standard-60-drinking-water-treatment-chemicals-health-effects No Will the proposed action involve the creation of a new point source discharge from a facility other than a water treatment plant or storm water system? No Will the proposed action involve blasting or drilling? No Will the action involve military training (e.g., smoke operations, obscurant operations, exploding munitions, artillery fire, range use, helicopter or fixed wing aircraft use at night)? No Will the proposed action involve the use of herbicides or pesticides (e.g., fungicides, insecticides, or rodenticides)? No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  7 of 11 22. 23. 24. 25. 26. 27. 28. 29. 30. Will the action include or cause activities that are reasonably certain to cause chronic or intense nighttime noise (above current levels of ambient noise in the area) in suitable summer habitat for the northern long-eared bat or tricolored bat during the active season? Chronic noise is noise that is continuous or occurs repeatedly again and again for a long time. Sources of chronic or intense noise that could cause adverse effects to bats may include, but are not limited to: road traffic; trains; aircraft; industrial activities; gas compressor stations; loud music; crowds; oil and gas extraction; construction; and mining. Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. No Does the action include, or is it reasonably certain to cause, the use of permanent or temporary artificial lighting within 1000 feet of suitable forested northern long-eared bat or tricolored bat roosting habitat? Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. No Will the action include tree cutting or other means of knocking down or bringing down trees, tree topping, or tree trimming? Yes Is the project related to the production of coal, including projects that support the mining of coal, as well as the production and/or distribution of energy produced from coal? No Will the proposed action occur exclusively in an already established and currently maintained utility right-of-way? No Does the action include emergency cutting or trimming of hazard trees in order to remove an imminent threat to human safety or property? See hazard tree note at the bottom of the key for text that will be added to response letters Note: A "hazard tree" is a tree that is an immediate threat to lives, public health and safety, or improved property. No Does the project intersect with the 0- 9.9% forest density category? Automatically answered No Does the project intersect with the 10.0- 19.9% forest density category map? Automatically answered No Does the project intersect with the 20.0- 29.9% forest density category map? Automatically answered No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  8 of 11 31. 32. 33. 34. 35. 36. Does the project intersect with the 30.0- 100% forest density category map? Automatically answered Yes Will the action cause trees to be cut, knocked down, or otherwise brought down across an area greater than 100 acres in total extent? No Will the proposed action result in the use of prescribed fire? Note: If the prescribed fire action includes other activities than application of fire (e.g., tree cutting, fire line preparation) please consider impacts from those activities within the previous representative questions in the key. This set of questions only considers impacts from flame and smoke. No Does the action area intersect the northern long-eared bat species list area? Automatically answered Yes [Semantic] Is the action area located within 0.5 miles of radius of an entrance/opening to any known NLEB hibernacula or winter roost? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency. Automatically answered No [Semantic] Is the action area located within 0.25 miles of a culvert that is known to be occupied by northern long-eared or tricolored bats? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency. Automatically answered No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  9 of 11 37. 38. 39. 40. 41. [Semantic] Is the action area located within 150 feet of a documented northern long-eared bat roost site? Note: The map queried for this question contains proprietary information and cannot be displayed. If you need additional information, please contact your State wildlife agency.Have you contacted the appropriate agency to determine if your action is within 150 feet of any documented northern long-eared bat roosts? Note: A document with links to Natural Heritage Inventory databases and other state- specific sources of information on the locations of northern long-eared bat roosts is available here. Location information for northern long-eared bat roosts is generally kept in state natural heritage inventory databases – the availability of this data varies by state. Many states provide online access to their data, either directly by providing maps or by providing the opportunity to make a data request. In some cases, to protect those resources, access to the information may be limited. Automatically answered No Is suitable summer habitat for the northern long-eared bat present within 1000 feet of project activities? If unsure, answer "Yes." Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines Yes Are any of the trees proposed for cutting or other means of knocking down, bringing down, topping, or trimming suitable for northern long-eared bat roosting (i.e., live trees and/or snags ≥3 inches dbh that have exfoliating bark, cracks, crevices, and/or cavities)? Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat can be found in the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey Guidelines. Yes Will any tree cutting/trimming or other knocking or bringing down of trees occur during the Summer Occupancy season for northern long-eared bats in the action area? Note: Bat activity periods for your state can be found in Appendix 2 of the Service's Northern long-eared Bat and Tricolored Bat Voluntary Environmental Review Process for Development Projects. No Do you have any documents that you want to include with this submission? No Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  10 of 11 PROJECT QUESTIONNAIRE Enter the extent of the action area (in acres) from which trees will be removed - round up to the nearest tenth of an acre. For this question, include the entire area where tree removal will take place, even if some live or dead trees will be left standing. 23 Project code: 2026-0093630 IPaC Record Locator: 884-181770660 05/29/2026 14:26:50 UTC DKey Version Publish Date: 05/01/2026  11 of 11 IPAC USER CONTACT INFORMATION Agency:Private Entity Name:Kiana Bacon Address:4104 Vestal Road, Suite 105 City:Vestal State:NY Zip:13850 Email Phone:6073729093 KATHY HOCHUL Governor KATHY MOSER Acting Commissioner May 04, 2026 Kristina Garenani Archaeological Principal Investigator LaBella Associates 300 State Street Suite 201 Rochester, NY 14614 Re: SEQRA Solar Array / Up to 5 MWac / 30 Acre 24PR01080 Dear Kristina Garenani: Thank you for requesting the comments of the Office of Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the project in accordance with the New York State Historic Preservation Act of 1980 (Section 14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are those of the OPRHP and relate only to Historic/Cultural resources. They do not include potential environmental impacts to New York State Parkland that may be involved in or near your project. Based upon this review, it is the opinion of OPRHP that no properties, including archaeological and/or historic resources, listed in or eligible for the New York State and National Registers of Historic Places will be impacted by this project. If further correspondence is required regarding this project, please be sure to refer to the OPRHP Project Review (PR) number noted above. If you have any questions, please contact Tamara Pilson at the following email address: Tamara.Pilson@parks.ny.gov Sincerely, R. Daniel Mackay Deputy Commissioner for Historic Preservation Division for Historic Preservation New York State Office of Parks, Recreation and Historic Preservation Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189 (518) 237-8643 • https://parks.ny.gov/shpo 1 Bomber Heights Solar LLC 101 Summer St, Flr 2 Boston, MA, 02110 Subject: Proposed Visual Simulation Review Approach for the Bomber Heights Solar Community Solar Project Date: June 2026 Introduction Bomber Heights Solar LLC (“the Applicant”), in partnership with the underlying landowner Troy Heights, LLC , appreciates the Town of Ithaca’ forthcoming review of the proposed Bomber Heights Solar Community Solar Project. The Town is evaluating visual information to assist in its assessment of the project’s potential aesthetic effects and glare impacts. This memorandum outlines the agreed upon approach for assessing potential areas of impact within a 2-mile radius of the project, preparing photo-realistic visual simulations (“renderings”) for impact areas, and glare studies including thoughtfully selected viewpoints and receptor locations that represent publicly accessible locations and realistic lines of sight in the vicinity of the project. The Applicant has created high-resolution visual renderings and glare reports that: - Utilize industry-standard photography and modeling protocols; - Clearly depict existing conditions and simulated “with-project” conditions; - Place the proposed solar array within a verified digital terrain model; - Accurately incorporate proposed screening, setbacks, and vegetation; - Provide context-appropriate narrative explaining methodology and assumptions. Part 1: Viewshed Analysis & Glare Study Glare Study A solar glare analysis has been conducted to evaluate the potential for reflected sunlight from a proposed solar facility to affect nearby residences, roadways, aviation receptors, or other sensitive viewpoints. The analysis uses specialized glare modeling software (commonly tools such as Sandia National Laboratories’ Solar Glare Hazard Analysis Tool (SGHAT)) that simulate the reflective characteristics of photovoltaic (PV) panels and the position of the sun throughout the year. The proposed solar array layout—including panel locations, tilt angles, orientation, and mounting height—is entered into the model along with the geographic coordinates of the project site. Potential receptor locations, such as nearby homes, public roads, or airports, are identified and included as observation points with defined viewing heights and directions. 2 The software calculates when and where reflected sunlight could occur by modeling the solar path for every day of the year and evaluating whether reflected rays from the panel surfaces intersect with identified receptors. The analysis accounts for the low reflectivity of modern PV modules, which are designed with anti-reflective coatings that absorb most incoming sunlight, as well as terrain and relative elevation where applicable. Results typically identify the timing, duration, and intensity of potential glare events, often categorized as “no glare,” “low potential for glare,” or “potential for temporary glare.” Project design characteristics—such as panel tilt, array orientation, setbacks, screening, and topography—are incorporated into the model to reflect the proposed configuration and evaluate whether these features reduce or eliminate potential glare impacts. The resulting analysis has provided a technical assessment of whether glare from the solar facility could affect surrounding receptors and will facilitate discussion about if design adjustments are necessary. This analysis has been provided to the town via OpenGov and our public-facing data room as attachment 9.1. Viewshed Analysis As discussed with the Town’s planning board at its March sketch plan meeting, and further clarified via an email from the Town Planning Department on March 20th,2026 the applicant has conducted a viewshed analysis to identify areas in the vicinity where the project may be visible. A viewshed analysis has been conducted using publicly available LiDAR-derived elevation data to determine where a proposed development may be visible within the surrounding landscape. LiDAR point cloud data (e.g., from the USGS 3DEP program) has been processed to generate high-resolution digital terrain models (DTM) and digital surface models (DSM) that represent ground elevations and surface features such as vegetation and structures. These datasets have been used to create an analysis surface within GIS software (e.g., ArcGIS or QGIS). Potential observation points—such as residences, public roads, and recreational areas—have been identified and assigned a typical viewer height (approximately 1.5–1.7 meters above ground). The proposed project has been modeled using the maximum anticipated heights and locations of project components (e.g., panels, fences, BESS units), resulting in line-of-sight calculations that have determined whether any portion of the development is visible from each observer location. The resulting viewshed maps identify areas where the project may theoretically be visible and help evaluate potential visual impacts. A (DSM) viewshed overlay has been prepared to illustrate the areas of potential visibility within a 2 mile radius of the project. This analysis is binary, showing visibility of any type. It does not take into account the % of the facility visible. This “land cover” condition identifies 3 the geographic area where one would reasonably expect some portion of the Facility to be visible. Part 2: Proposed Viewshed Locations To ensure representativeness, the Applicant has agreed to several areas for the initial set of visual simulations. Several viewsheds have been prepared for the Preliminary Site Plan Approval Meeting, including; • Looking East From Troy Road Down Access Road This location provides a direct but local view corridor eastward toward the project area. This area is also the location of the project’s proposed access and near its interconnection point. • Looking East from Troy Road Across Setback Area This location provides a direct but local view corridor eastward toward the project area. This area has large setbacks, but show the most common impacts to residents west of the project area looking downhill. • Looking North from Adjacent Substation This viewshed provides an estimation as to the worst-case impacts to residents along King Road. • Looking West From Coddington Road. This viewshed demonstrates impacts to residents on Coddington road, and targets the area where the array is closest to adjacent residents. • Looking Southwest from the Intersection of Burns Road and Route 79. This viewshed demonstrates impact to residents on Route 79 – and those traversing the Burns Rd corridor. • Looking Southwest from the East Ithaca Nature Preserve Gazebo. This viewshed demonstrates impacts to residents of the Eastern Heights neighborhood. These visual simulations have been provided to the Town via OpenGov as exhibit 9.4. Methodology Overview Photo simulations were developed by superimposing a rendering of a three-dimensional (3D) computer model of the proposed project onto the base photograph from each selected location. The 3D model has been constructed in sufficient detail to accurately convey design intent. Models have been conducted with leaf-on and leaf-off seasonal variability to better demonstrate potential impacts throughout the seasons. Simulations include solar arrays, fencing, access roads, inverters, interconnect equipment (e.g., utility poles), proposed landscape mitigation, and other visible project components. 4 Proposed landscape mitigation plantings will be simulated at two growth stages: at the time of installation and five to seven years after installation. 5 Exhibit A– Viewshed Analysis Study Radius 6 Exhibit B –Initial Visual Simulation Locations !“t “Sao os =~a i|{\::i Legend Bale irene ~Area of Likely Visibility (incl.screening vegetation or structures) Area of Theoretical Visibility (excl.screening vegetation or structures) a ed “= Fr o n d +s t.a egcatne boone Figure A-1 NexXxamM PHOTO SIMULATIONS ‘P BOMBER HEIGHTS SOLAR PROJECT' ithaca,NY VIEWSHED MAP -2 MILE RADIUS SARATOGAASSOCIATES S28.PEREIDSTE EVANEE URED BLOTINIT Legend Area ofLikely Visibility (incl.screening vegetation or structures) V Photo Simulation O PhotoLocation VIEWSHED MAP -1/2 MILE RADIUS Figure A-2 ,PHOTO SIMULATIONSSARATOGANEXAMPBOMBERHEIGHTSSOLARPROJECT ASSOCIATES re ‘inée s.and P ee weyohind Photo |Location 01 |Troy Road near #122 Photo |Location 02 |.Troy Road near #136 EXISTING CONDITION PHOTOGRAPHS SARATOGAASSOCIATES Landscape Architects,Architects, Engineers,and Planners,P.C. |ithaca Municipality Ithaca nexame |Dist.to Fence-line |Facility Visible |650 ft |Filtered/Seasonal |Dist.to Fence-line |Facility Visible|500 ft |Yes Figure B-1 PHOTO LOG BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca,NY 14850 —:atin,am Photo |Location |Municipality |Dist.to Fence-line |Facility Visible O03 |Troy Road near #136 |Ithaca 450 ft |Yes >: -*r i tN SN "SN b> Photo |Location |Municipality |Dist.to Fence-line O04 |Troy Road near #142 |Ithaca |410 ft EXISTING CONDITION PHOTOGRAPHS Figure B-2PHOTOLOG¢SARATOGA NEXAMP | BomBeER HEIGHTS SOLAR PROJECT©ASSOCIATES emmcane iets,weet ny naseIthaca,NY 14850 Wine «HPA ea te a Photo Location |Ithaca |380 ft |YesO05|Troy Road near #146 aed tee J, Photo |Location 06 |Troy Road near #148 Dist.to Fence-line |Facility Visible|Ithaca |350 ft |Filtered/Seasonal Figure B-3PHOTOLOGNEXAMP | BoMmBER HEIGHTS SOLAR PROJECTSARATOGALandscapeArchitects,Architects,Troy RoadASSOC|ATES Engineers,and Planners,P.C.Ithaca,NY 14850 EXISTING CONDITION PHOTOGRAPHS OSSPTAN‘edeyyYd‘SsauuRjgpure‘ssaaubug peoyAol“‘syBNYy‘spoWydiysdeospurqSJLV|JOSSV L93fOUdYVIOSSLHDIHwaaWogGUYOUVIOLVAVS 901OLOHd v-aunsi4SHdVYDOLOHdNOILIGNODONILSIX] jeuoseas/pa1ai|iy|YO6E|eeu|MOYUOISSiUsSUe!]DIDa}IYePeOYyAOI|30 |Aqiyjedioiuny\|Uo1e907|010d BERNAoySesseeeaoe |euoseas/pa1a}|I4|YOSE|edeyy|OST#JeaupeoyAol|LO J}qIsiaAor}|QUI|-9DUd4O1}SIG|Ayjediniuny|uole907|010uUd etyOSsLA3Gales: coe teas SeaSeePa PPOAKSRNSostwatsORTainaBeoP Photo Location O9 Municipality |Dist.to Fence-line Facility Visible East King Road at Electric Transmission ROW |Ithaca |780 ft |No Photo |Location |Municipality |Dist.to Fence-line |Facility Visible 10 |East King Road at Electric Transmission ROW |Ithaca 890 ft |No EXISTING CONDITION PHOTOGRAPHS Figure B-5PHOTOLOGARATOCANEXAMP | BomBeER HEIGHTS SOLAR PROJECT~ASSOCIATES Litessspedrticcs,sachies,HYLBIthaca,NY 14850 wv To )@> ke te ee n s , = ie 2 ae By ld tt ; G O Si l a ul Z 2 @ a, o Bo w COcwiLSl . ee # Sa na e ~ CT i —— f — 0p or t Ri e t i A ea e ta r ne SA T ON Cet RN ee e oP ak F ma y RN AL Y Pe e t Pt a ee . SE R , ys ES se e , 2 “, te 2 : a mo n t a n e Bl CO E| 8 s/ s AY oh ee ee so w Photo |Location 1] |East King Road near #208 ility VisibleC|Fa|Dist.to Fence-line|MunicipalityLocation No1,100ftIthaca|East King Roadat Electric Transmission ROW.12 Photo ;BOWMIBER HEIGHTS SOLAR PROJECT oO Bi n oo ee o — oo Ss O0 0 € bo fF a & “ O S L = oO = nexamo Landscape Architects,Architects, Engineers,and Planners,P.C. XISTING CONDITION PHOTOGRAPHS ASSOCIATESARATOGA : ine a haaeySfas Ee ae es SO aca |as |Municipality |Dist.to Fence-line Photo |Location No13|Coddington Road (CR 119)near #653a)|Ithaca |580 ft EXISTING CONDITION PHOTOGRAPHS Figure B-7 PHOTO LOGNeExAMPBOMBERHEIGHTSSOLARPROJECTSAR\O G \Landscape Architects,Architects,Troy Road Ithaca,NY 14850ASSOC|ATES Engineers,and Planners,P.C. Prepared For: Nexamp Inc. 101 Summer St. 2 nd Floor Boston, MA 02110 Submitted by: LaBella Associates 300 State Street, Rochester, NY 14614 Nexamp: Bomber Heights Glint-Glare Analysis Report March 2026 Project No. 2243110 Glint-Glare Analysis Report March 2026 Nexamp Page 2 of 7 Project No. 2243110 Technically, glare is the reflection of diffuse light sources like the sky, while glint is the reflection of directed light sources like the sun. Glint is far more intense that glare, and often what is referred to in the context of solar PV assessments. Despite these formal definitions, we will refer to the reflection of sunlight from the surface of solar panels as glare given its common usage. When light reflects from the surface of an object, the angle of incidence is always equal to the angle of reflection, as shown in the image to the right. In addition, as the angle of incidence increases so does the amount of light reflected. For solar panels, less than 5% of light from the sun reflects at angles common throughout the heart of the day, while between 15 and 40% of sun light reflects during the early morning and late afternoon hours due to the steeper sun angles. Figure 1 – Reflection Path The tilt of the solar panels above the horizontal, their elevation above the ground, and the higher reflectivity of the panels at steeper solar angles mean that the only times glare from these facilities could potentially impact observers close to the ground, like those in cars or in homes, would be when the sun is quite low in the eastern or west ern sky during dawn or dusk . Additionally, since the panels are oriented to the south, no locations to the north of the array could ever receive glare from the panels, regardless of the time of year. While solar panels will reflect some light as described above, solar glass is designed to capture as much sunlight as possible and thus will generally have similar or less reflectivity than other materials. For example, the smooth s urface of a pond will reflect roughly the same amount of sunlight as a solar panel at the angles of interest here, while a freshly covered field of snow will reflect more than twice as much light on average and a steel surface would reflect more than four times as much light over these same angles. Thus, glare from solar facilities is not generally found to be a concern when compared to other materials common in the natural and built environments. This can be seen, for example, in the fact that several solar facilities have been built near airports with findings from the Federal Aviation Administration (FAA) that glare from them poses no hazard to air navigation. Glint-Glare Analysis Report March 2026 Nexamp Page 3 of 7 Project No. 2243110 To ensure there is no glare set by the solar array the FAA developed Technical Guidance for Evaluating Selected Solar Technologies on Airports in 2010 (FAA Guidance). The FAA Guidance recommends use of the Solar Glare Hazard Analysis Tool (SGHAT) by Sandia National Laboratory to determine any potential glare impacts a result of the construction of a solar array. Given this, LaBella assessed the site based on the topography of the area and the natural and proposed vegetative screening around the Project site using the tool outline d a bove. The solar panel surfaces are modeled to an average of 17 feet above the natural ground on the project site. The project site generally slopes from the North to the South, with a max elevation of 1157.55 feet MSL to the elevation of 1016.31 feet MSL, with a total elevation change of roughly 141 feet. The SGHAT that was used in this assessment was adopted by the FAA in October 2013 for use in assessing solar systems located on or near airports and can predict both the size and intensity of glare for every minute of every day of the year. Of particular importance when using these projections is to note that the Sandia tool is designed to be conservative with two assumptions acting to substantively overestimate the potential for near surface glare. First, the tool models the solar facility as large unbroken sheets of glass despite the fact that roughly 40 to 50% of the facility’s area is undisturbed ground between the rows of panels.. And second, it makes no detailed accounting of cloud cover which could hide the sun and prevent direct solar reflections entirely on some days. The details of this analysis for the present system are included below. Glint-Glare Analysis Report March 2026 Nexamp Page 4 of 7 Project No. 2243110 Figure 2 – Site Configuration with Receptor Locations The SGHAT analysis was performed for the observation points at some of the residences adjacent to the site and included a route analysis for the roads on the north, west, south, and east sides of the site. The following table summarizes the potential annual minutes of glare at each of the observation points shown on the map above. For the purposes of this report Green Glare is defined as glare with a low potential to c ause flash blindness. Yellow Glare is defined as gla re with the potential to cause temporary flash blindness. Red Glare is defined as glare with potential to cause permanent retinal damage. Receptor Annual Green Glare Annual Yellow Glare min. hr. min. hr. Route 1 0 0 0 0 Route 2 0 0 0 0 Route 3 0 0 0 0 Route 4 160 2.7 0 0 OP1 0 0 0 0 OP2 0 0 0 0 OP3 0 0 0 0 OP4 0 0 0 0 OP5 0 0 0 0 OP6 0 0 0 0 OP7 0 0 0 0 OP8 0 0 0 0 OP9 0 0 0 0 OP10 0 0 0 0 OP11 0 0 0 0 OP12 0 0 0 0 OP13 0 0 0 0 OP14 0 0 0 0 OP15 0 0 0 0 OP16 0 0 0 0 OP17 0 0 0 0 OP18 0 0 0 0 OP19 0 0 0 0 OP20 0 0 0 0 OP21 0 0 0 0 Glint-Glare Analysis Report March 2026 Nexamp Page 5 of 7 Project No. 2243110 OP22 0 0 0 0 OP23 21 .03 0 0 OP24 0 0 0 0 OP25 71 1.2 0 0 OP26 20 .3 0 0 OP27 0 0 0 0 OP28 0 0 0 0 OP29 0 0 0 0 OP30 0 0 0 0 OP31 0 0 0 0 OP32 0 0 0 0 OP33 0 0 0 0 OP34 0 0 0 0 OP35 0 0 0 0 OP36 0 0 0 0 OP37 0 0 0 0 OP38 19 .3 0 0 OP39 0 0 0 0 OP40 0 0 0 0 OP41 0 0 0 0 OP42 0 0 0 0 Figure 3 – Proposed Glare Summary Table Forty-two (42) observation points were reviewed during the analysis, occasionally resulting in a pair of observation points per location, one at s even (7) feet (simulating a first story window or person on the ground) above ground height and one at 15 feet above ground height (simulating a second story window ). Four (4) observation points, as well as one (1) travel routes have the potential fo r green glare based on SGHAT analysis. No areas analyzed have the potential f or yellow or red glare. As noted above, the SGHAT does not fully consider vegetation between the observation points and the array. The SGHAT model does not fully account for existing vegetation between the project site and the observation points. Field conditions indicate that vegetation is present in several areas and may partially or fully screen views of the array, thereby reducing potential glare at these locations. As a review of the minimally impacted areas, portions of Bomber Heights have the potential for green glare at a limited number of locations. The greatest modeled exposure occurs along Route 4, with a potential for 2.7 hours of green glare annually. Among the observation points, OP25 has the highest modeled exposure, with a potential for 1.2 hours of green glare per year. OP26 and OP38 each have the potential for 0.3 hours of green glare annually, and OP23 has the potential for 0.03 hours of green gla re annually. For reference, one (1) full year contains 8,760 hours. Glint-Glare Analysis Report March 2026 Nexamp Page 6 of 7 Project No. 2243110 Overall, the SGHAT analysis indicates that potential glare impacts are limited in duration and extent, and no yellow or red glare is predicted at any observation point or travel route analyzed. The full SGHAT Glare Analysis Report can be found in Appendix A. Given the conservative nature of the above analysis, there are several features that will act to further minimize any potential impacts from glare at this site. First, the panels proposed for use at this facility are manufactured with specialized glass and include anti-reflective coatings that substantially reduce their potential to generate glare. Second, the panels will be mounted on single -axis tracking systems designed to optimize solar exposure throughout the day. These tracking systems continuously adjust the orientation of the panels to follow the sun’s position. As a result, the panels are le ss likely to remain in a fixed position that would direct reflected sunlight toward a receptor for extended periods, thereby reducing both the likelihood and duration of potential glare. Third, several of the identified receptors, including portions of Bomber Heights, are partially or fully screened from the project site by existing forested vegetation located along multiple sides of the facility. This vegetation was not fully incorporated into the SGHAT model and may serve to further reduce or eliminate actual glare visibility in field conditions. Finally, areas of the project site that are not currently vegetated are proposed to include additional vegetative screening as part of the project design. This supplemental planting is anticipated to provide additional visual buffering over time. While the exact height and density of existing and proposed vegetation are not fully quantified in the analysis, these features are expected to provide additional screening and may further reduce potential glare exposure at nearby receptors. Given the above analysis, a limited number of selected observation points and travel routes may experience some green glare from the proposed solar facility at certain times of the year. Specifically, four (4) observation points and one (1) travel routes have the potential for green glare. Total potential annual glare at the noted observation points accumulated to 291 minutes or 4.8 hours per year. However, there is no potential impact for yellow or red glare at any evaluated location. Green glare is considered to pose little to no risk to human health or safety, particularly when compared to red glare, which has the potential to cause temporary after -image effects. The absence of predicted yellow and red glare indicates that no signific ant glare-related safety concerns are anticipated as a result of the proposed facility. When considering the anti -reflective properties of the solar panels proposed for use at this facility, along with existing site characteristics, including intervening vegetation, potential glare impacts are expected to be minimized or eliminated at certain locations. It should be noted that vegetation was not fully modeled in the SGHAT analysis, and existing or future vegetative conditions may further reduce visibility of the array. Additional field verification would be Glint-Glare Analysis Report March 2026 Nexamp Page 7 of 7 Project No. 2243110 required to fully quantify the extent of this screening effect. Overall, the results of the analysis indicate that potential glare impacts are limited in duration, infrequent, and will not result in significant adverse impacts. 2018, Technical Guidance for Evaluating Selected Solar Technologies on Airports, www.faa.gov/airports/environmental/policy_guidance/media/FAA-Airport-Solar-Guide- 2018.pdf ForgeSolar, 2016, www.forgesolar.com FORGESOLAR GLARE ANALYSIS Glare Policy Adherence The following table estimates the policy adherence of this glare analysis according to the 2021 U.S. Federal Aviation Administration Policy: Review of Solar Energy System Projects on Federally-Obligated Airports This policy may require the following criteria be met for solar energy systems on airport property: No glare of any kind for Air Traffic Control Tower(s) ("ATCT") at cab height. Default analysis and observer characteristics, including 1-minute time step. ForgeSolar is not affiliated with the U.S. FAA and does not represent or speak officially for the U.S. FAA. ForgeSolar cannot approve or deny projects - results are informational only. Contact the relevant airport and FAA district office for information on policy and requirements. COMPONENT STATUS DESCRIPTION Analysis parameters PASS Analysis time interval and eye characteristics used are acceptable ATCT(s)N/A No ATCT receptors assessed The referenced policy can be read at https://www.federalregister.gov/d/2021-09862 Project: Bomber Heights Nexamp ("Client") is developing on 5.0 MWac Solar array with a 5.0 MW/20 Mwh battery energy storage system (BESS) at 141 Troy Road in the Town of Ithaca, Tompkins County, New York. Site configuration: Bomber Heights-expanded Calculated via ForgeSolar Radiometric Physics Engine v3.1.1 Client: Nexamp Created 23 Mar, 2026 Updated 26 Mar, 2026 Time-step 1 minute Timezone offset UTC-5 Minimum sun altitude 0.0 deg DNI peaks at 1,000.0 W/m Site ID 173838.28792 Ocular transmission coefficient 0.5 Pupil diameter 0.002 m Eye focal length 0.017 m Sun subtended angle 9.3 mrad 2 • • Page 1 of 11 Component Data This report includes results for PV arrays and Observation Point ("OP") receptors marked as ATCTs. Components that are not pertinent to the policy, such as routes, flight paths, and vertical surfaces, are excluded. PV Arrays Observation Point ATCT Receptors No ATCT receptors were included in the analysis. Name: PV array 1 Axis tracking: Single-axis rotation Backtracking: Shade Tracking axis orientation: 180.0° Max tracking angle: 60.0° Resting angle: 0.0° Ground Coverage Ratio: 0.25 Rated power: - Panel material: Smooth glass with AR coating Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.404947 -76.475714 1157.55 17.00 1174.55 2 42.404891 -76.469802 1060.89 17.00 1077.89 3 42.408313 -76.473364 1016.31 17.00 1033.31 4 42.408757 -76.472806 1038.28 17.00 1055.28 5 42.409898 -76.474695 1052.06 17.00 1069.06 6 42.409874 -76.476089 1012.05 17.00 1029.05 7 42.407632 -76.475955 1041.61 17.00 1058.61 Page 2 of 11 Obstruction Components Name: Obstruction 1 Top height: 32.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.404777 -76.473850 1112.13 2 42.404761 -76.477605 1166.04 3 42.403303 -76.477498 1199.86 4 42.403367 -76.473979 1117.43 5 42.404777 -76.473850 1112.13 Name: Obstruction 11 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.413754 -76.449684 841.98 2 42.411837 -76.445682 858.11 3 42.411259 -76.446229 843.53 4 42.413318 -76.450778 800.44 5 42.413754 -76.449684 841.98 Page 3 of 11 Name: Obstruction 12 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409040 -76.482201 1166.56 2 42.408708 -76.482566 1188.31 3 42.405998 -76.478634 1152.91 4 42.407274 -76.478612 1112.54 5 42.408185 -76.480286 1143.76 6 42.409040 -76.482201 1166.56 Name: Obstruction 12 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409589 -76.441552 840.92 2 42.408951 -76.442394 874.92 3 42.407386 -76.439207 886.57 4 42.407972 -76.438091 866.72 5 42.409589 -76.441552 840.92 Page 4 of 11 Name: Obstruction 13 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.421102 -76.448682 1167.09 2 42.420769 -76.448468 1166.23 3 42.420816 -76.448049 1165.90 4 42.420943 -76.447642 1177.12 5 42.420246 -76.447599 1178.95 6 42.420222 -76.449036 1159.64 7 42.420706 -76.449047 1165.31 8 42.421102 -76.448682 1167.09 Name: Obstruction 13 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.424183 -76.458450 1005.07 2 42.422468 -76.457533 1032.88 3 42.422358 -76.458461 999.14 4 42.423811 -76.459368 996.51 5 42.424183 -76.458450 1005.07 Page 5 of 11 Name: Obstruction 14 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.420708 -76.456956 970.42 2 42.418268 -76.453705 912.99 3 42.417999 -76.453984 897.55 4 42.420439 -76.457310 918.76 5 42.420708 -76.456956 970.42 Name: Obstruction 2 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409188 -76.477146 1027.74 2 42.407730 -76.476116 1043.13 Page 6 of 11 Name: Obstruction 3 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409845 -76.476267 1011.40 2 42.408871 -76.476203 1031.53 Name: Obstruction 4 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409901 -76.476832 1017.39 2 42.409916 -76.475920 1017.76 Page 7 of 11 Name: Obstruction 5 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.408002 -76.477765 1065.79 2 42.404818 -76.477594 1163.75 3 42.404849 -76.475813 1165.36 4 42.407543 -76.476135 1056.82 5 42.408002 -76.477765 1065.79 Name: Obstruction 6 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409096 -76.472036 992.36 2 42.408287 -76.473088 1066.90 3 42.404247 -76.468839 1067.61 4 42.404580 -76.467702 1000.67 5 42.409096 -76.472036 992.36 Page 8 of 11 Name: Obstruction 7 Top height: 40.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.410885 -76.476368 1022.98 2 42.410109 -76.476261 1011.35 3 42.410085 -76.474651 1044.33 4 42.408817 -76.472548 1056.80 5 42.409190 -76.472087 986.49 6 42.410132 -76.473943 1057.21 7 42.410885 -76.476368 1022.98 Page 9 of 11 Glare Analysis Results Summary of Results No glare predicted PV Array Tilt Orient Annual Green Glare Annual Yellow Glare Energy °°min hr min hr kWh PV array 1 SA tracking SA tracking 0 0.0 0 0.0 - No ATCT receptors were included in the analysis. PV: PV array 1 No ATCT receptors assessed. Page 10 of 11 Assumptions Default glare analysis parameters and observer eye characteristics (for reference only): Analysis time interval: 1 minute Ocular transmission coefficient: 0.5 Pupil diameter: 0.002 meters Eye focal length: 0.017 meters Sun subtended angle: 9.3 milliradians © 2026 Sims Industries d/b/a ForgeSolar, All Rights Reserved. This analysis was conducted using the best available radiometric modeling at the time of generation. Future updates to the modeling methodology may yield different results. "Green" glare is glare with low potential to cause an after-image (flash blindness) when observed prior to a typical blink response time. "Yellow" glare is glare with potential to cause an after-image (flash blindness) when observed prior to a typical blink response time. Times associated with glare are denoted in Standard time. For Daylight Savings, add one hour. The algorithm does not rigorously represent the detailed geometry of a system; detailed features such as gaps between modules, variable height of the PV array, and support structures may impact actual glare results. However, we have validated our models against several systems, including a PV array causing glare to the air-traffic control tower at Manchester-Boston Regional Airport and several sites in Albuquerque, and the tool accurately predicted the occurrence and intensity of glare at different times and days of the year. Random number computations are utilized by various steps of the annual hazard analysis algorithm. Predicted minutes of glare can vary between runs as a result. This limitation primarily affects analyses of Observation Point receptors, including ATCTs. Note that the SGHAT/ ForgeSolar methodology has always relied on an analytical, qualitative approach to accurately determine the overall hazard (i.e. green vs. yellow) of expected glare on an annual basis. The analysis does not automatically consider obstacles (either man-made or natural) between the observation points and the prescribed solar installation that may obstruct observed glare, such as trees, hills, buildings, etc. The subtended source angle (glare spot size) is constrained by the PV array footprint size. Partitioning large arrays into smaller sections will reduce the maximum potential subtended angle, potentially impacting results if actual glare spots are larger than the sub-array size. Additional analyses of the combined area of adjacent sub-arrays can provide more information on potential glare hazards. (See previous point on related limitations.) The variable direct normal irradiance (DNI) feature (if selected) scales the user-prescribed peak DNI using a typical clear-day irradiance profile. This profile has a lower DNI in the mornings and evenings and a maximum at solar noon. The scaling uses a clear-day irradiance profile based on a normalized time relative to sunrise, solar noon, and sunset, which are prescribed by a sun-position algorithm and the latitude and longitude obtained from Google maps. The actual DNI on any given day can be affected by cloud cover, atmospheric attenuation, and other environmental factors. The ocular hazard predicted by the tool depends on a number of environmental, optical, and human factors, which can be uncertain. We provide input fields and typical ranges of values for these factors so that the user can vary these parameters to see if they have an impact on the results. The speed of SGHAT allows expedited sensitivity and parametric analyses. The system output calculation is a DNI-based approximation that assumes clear, sunny skies year-round. It should not be used in place of more rigorous modeling methods. Hazard zone boundaries shown in the Glare Hazard plot are an approximation and visual aid based on aggregated research data. Actual ocular impact outcomes encompass a continuous, not discrete, spectrum. Glare locations displayed on receptor plots are approximate. Actual glare-spot locations may differ. Refer to the Help page at www.forgesolar.com/help/ for assumptions and limitations not listed here. • • • • • Page 11 of 11 FORGESOLAR GLARE ANALYSIS Summary of Results Glare with low potential for temporary after-image predicted PV Array Tilt Orient Annual Green Glare Annual Yellow Glare Energy °°min hr min hr kWh PV array 1 SA tracking SA tracking 291 4.8 0 0.0 - Total glare received by each receptor; may include duplicate times of glare from multiple reflective surfaces. Receptor Annual Green Glare Annual Yellow Glare min hr min hr Route 2 0 0.0 0 0.0 Route 2 0 0.0 0 0.0 Route 3 0 0.0 0 0.0 Route 4 160 2.7 0 0.0 OP 1 0 0.0 0 0.0 OP 2 0 0.0 0 0.0 OP 3 0 0.0 0 0.0 OP 4 0 0.0 0 0.0 OP 5 0 0.0 0 0.0 OP 6 0 0.0 0 0.0 OP 7 0 0.0 0 0.0 Project: Bomber Heights Nexamp ("Client") is developing on 5.0 MWac Solar array with a 5.0 MW/20 Mwh battery energy storage system (BESS) at 141 Troy Road in the Town of Ithaca, Tompkins County, New York. Site configuration: Bomber Heights-expanded Calculated via ForgeSolar Radiometric Physics Engine v3.1.1 Client: Nexamp Created 23 Mar, 2026 Updated 26 Mar, 2026 Time-step 1 minute Timezone offset UTC-5 Minimum sun altitude 0.0 deg DNI peaks at 1,000.0 W/m Category 1 MW to 5 MW Site ID 173838.28792 Ocular transmission coefficient 0.5 Pupil diameter 0.002 m Eye focal length 0.017 m Sun subtended angle 9.3 mrad 2 Page 1 of 26 Receptor Annual Green Glare Annual Yellow Glare min hr min hr OP 8 0 0.0 0 0.0 OP 9 0 0.0 0 0.0 OP 10 0 0.0 0 0.0 OP 11 0 0.0 0 0.0 OP 12 0 0.0 0 0.0 OP 13 0 0.0 0 0.0 OP 14 0 0.0 0 0.0 OP 15 0 0.0 0 0.0 OP 16 0 0.0 0 0.0 OP 17 0 0.0 0 0.0 OP 18 0 0.0 0 0.0 OP 19 0 0.0 0 0.0 OP 20 0 0.0 0 0.0 OP 21 0 0.0 0 0.0 OP 22 0 0.0 0 0.0 OP 23 21 0.3 0 0.0 OP 24 0 0.0 0 0.0 OP 25 71 1.2 0 0.0 OP 26 20 0.3 0 0.0 OP 27 0 0.0 0 0.0 OP 28 0 0.0 0 0.0 OP 29 0 0.0 0 0.0 OP 30 0 0.0 0 0.0 OP 31 0 0.0 0 0.0 OP 32 0 0.0 0 0.0 OP 33 0 0.0 0 0.0 OP 34 0 0.0 0 0.0 OP 35 0 0.0 0 0.0 OP 36 0 0.0 0 0.0 OP 37 0 0.0 0 0.0 OP 38 19 0.3 0 0.0 OP 39 0 0.0 0 0.0 OP 40 0 0.0 0 0.0 OP 41 0 0.0 0 0.0 OP 42 0 0.0 0 0.0 Page 2 of 26 Component Data PV Arrays Route Receptors Name: PV array 1 Axis tracking: Single-axis rotation Backtracking: Shade Tracking axis orientation: 180.0° Max tracking angle: 60.0° Resting angle: 0.0° Ground Coverage Ratio: 0.25 Rated power: - Panel material: Smooth glass with AR coating Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.404947 -76.475714 1157.55 17.00 1174.55 2 42.404891 -76.469802 1060.89 17.00 1077.89 3 42.408313 -76.473364 1016.31 17.00 1033.31 4 42.408757 -76.472806 1038.28 17.00 1055.28 5 42.409898 -76.474695 1052.06 17.00 1069.06 6 42.409874 -76.476089 1012.05 17.00 1029.05 7 42.407632 -76.475955 1041.61 17.00 1058.61 Name: Route 2 Path type: Two-way Azimuthal view angle: 50.0° Downward view angle: 90.0° Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.415796 -76.478256 927.28 4.50 931.78 2 42.407812 -76.469158 946.01 4.50 950.51 3 42.403375 -76.463579 967.95 4.50 972.45 4 42.401062 -76.458815 972.35 4.50 976.85 Page 3 of 26 Name: Route 2 Path type: Two-way Azimuthal view angle: 50.0° Downward view angle: 90.0° Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.415786 -76.478353 928.04 4.50 932.54 2 42.410400 -76.478096 1018.84 4.50 1023.34 3 42.404221 -76.477709 1177.66 4.50 1182.16 4 42.402161 -76.477666 1234.81 4.50 1239.31 5 42.400133 -76.476508 1309.77 4.50 1314.27 6 42.390699 -76.471861 1456.91 4.50 1461.41 Name: Route 3 Path type: Two-way Azimuthal view angle: 50.0° Downward view angle: 90.0° Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.423369 -76.462935 850.52 4.50 855.02 2 42.420359 -76.458772 863.71 4.50 868.21 3 42.417159 -76.453193 888.21 4.50 892.71 4 42.414498 -76.448558 882.90 4.50 887.40 5 42.411900 -76.443537 895.07 4.50 899.57 6 42.407875 -76.434482 888.57 4.50 893.07 7 42.405245 -76.429332 883.68 4.50 888.18 8 42.402520 -76.423796 903.17 4.50 907.67 Page 4 of 26 Name: Route 4 Path type: Two-way Azimuthal view angle: 50.0° Downward view angle: 90.0° Vertex Latitude (°)Longitude (°)Ground elevation (ft)Height above ground (ft)Total elevation (ft) 1 42.408054 -76.503115 1064.87 4.50 1069.37 2 42.407167 -76.499424 1120.53 4.50 1125.03 3 42.406343 -76.493587 1237.15 4.50 1241.65 4 42.406090 -76.490583 1273.23 4.50 1277.73 5 42.404347 -76.485991 1290.54 4.50 1295.04 6 42.403206 -76.482859 1299.36 4.50 1303.86 7 42.399783 -76.481442 1347.56 4.50 1352.06 8 42.395632 -76.480670 1411.91 4.50 1416.41 9 42.394491 -76.481185 1428.03 4.50 1432.53 Page 5 of 26 Discrete Observation Point Receptors Name ID Latitude (°)Longitude (°)Elevation (ft)Height (ft) OP 1 1 42.403838 -76.472166 1069.87 7.00 OP 2 2 42.403675 -76.475785 1151.96 7.00 OP 3 3 42.409617 -76.478405 1034.57 7.00 OP 4 4 42.409063 -76.478448 1051.98 7.00 OP 5 5 42.408368 -76.478416 1067.14 7.00 OP 6 6 42.407687 -76.478340 1093.05 7.00 OP 7 7 42.406699 -76.478387 1124.15 7.00 OP 8 8 42.406157 -76.478231 1138.02 7.00 OP 9 9 42.405630 -76.478306 1152.38 7.00 OP 10 10 42.404472 -76.478322 1184.02 7.00 OP 11 11 42.404097 -76.478270 1193.47 7.00 OP 12 12 42.410365 -76.478544 1022.37 7.00 OP 13 13 42.410813 -76.476977 1010.91 7.00 OP 14 14 42.410097 -76.471064 924.98 7.00 OP 15 15 42.409229 -76.471375 946.11 7.00 OP 16 16 42.406465 -76.468254 960.82 7.00 OP 17 17 42.407582 -76.468211 937.53 7.00 OP 18 18 42.412884 -76.475586 942.36 7.00 OP 19 19 42.411577 -76.474089 955.61 7.00 OP 20 20 42.412179 -76.474867 950.28 7.00 OP 21 21 42.409944 -76.439416 880.40 7.00 OP 22 22 42.412777 -76.444670 900.40 7.00 OP 23 23 42.404508 -76.481244 1237.91 7.00 OP 24 24 42.404223 -76.480751 1237.84 7.00 OP 25 25 42.404877 -76.480885 1227.16 7.00 OP 26 26 42.404631 -76.480413 1222.51 7.00 OP 27 27 42.404445 -76.480236 1226.07 7.00 OP 28 28 42.408047 -76.482364 1192.36 7.00 OP 29 29 42.408099 -76.482981 1199.24 7.00 OP 30 30 42.407513 -76.483077 1203.44 7.00 OP 31 31 42.412314 -76.478626 1007.99 7.00 OP 32 32 42.412837 -76.478712 985.96 7.00 OP 33 33 42.413154 -76.477650 969.53 7.00 OP 34 34 42.424024 -76.457452 1022.86 5.00 OP 35 35 42.419224 -76.453628 980.97 6.00 OP 36 36 42.418923 -76.454240 939.34 7.00 OP 37 37 42.418606 -76.454047 930.08 7.00 OP 38 38 42.419916 -76.454284 978.30 12.00 OP 39 39 42.419784 -76.455019 962.70 12.00 OP 40 40 42.414661 -76.447634 914.25 7.00 OP 41 41 42.413834 -76.448213 862.94 7.00 OP 42 42 42.421020 -76.448326 1170.73 5.00 Page 6 of 26 Obstruction Components Name: Obstruction 1 Top height: 32.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.404777 -76.473850 1112.13 2 42.404761 -76.477605 1166.04 3 42.403303 -76.477498 1199.86 4 42.403367 -76.473979 1117.43 5 42.404777 -76.473850 1112.13 Name: Obstruction 11 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.413754 -76.449684 841.98 2 42.411837 -76.445682 858.11 3 42.411259 -76.446229 843.53 4 42.413318 -76.450778 800.44 5 42.413754 -76.449684 841.98 Page 7 of 26 Name: Obstruction 12 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409040 -76.482201 1166.56 2 42.408708 -76.482566 1188.31 3 42.405998 -76.478634 1152.91 4 42.407274 -76.478612 1112.54 5 42.408185 -76.480286 1143.76 6 42.409040 -76.482201 1166.56 Name: Obstruction 12 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409589 -76.441552 840.92 2 42.408951 -76.442394 874.92 3 42.407386 -76.439207 886.57 4 42.407972 -76.438091 866.72 5 42.409589 -76.441552 840.92 Page 8 of 26 Name: Obstruction 13 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.421102 -76.448682 1167.09 2 42.420769 -76.448468 1166.23 3 42.420816 -76.448049 1165.90 4 42.420943 -76.447642 1177.12 5 42.420246 -76.447599 1178.95 6 42.420222 -76.449036 1159.64 7 42.420706 -76.449047 1165.31 8 42.421102 -76.448682 1167.09 Name: Obstruction 13 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.424183 -76.458450 1005.07 2 42.422468 -76.457533 1032.88 3 42.422358 -76.458461 999.14 4 42.423811 -76.459368 996.51 5 42.424183 -76.458450 1005.07 Page 9 of 26 Name: Obstruction 14 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.420708 -76.456956 970.42 2 42.418268 -76.453705 912.99 3 42.417999 -76.453984 897.55 4 42.420439 -76.457310 918.76 5 42.420708 -76.456956 970.42 Name: Obstruction 2 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409188 -76.477146 1027.74 2 42.407730 -76.476116 1043.13 Page 10 of 26 Name: Obstruction 3 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409845 -76.476267 1011.40 2 42.408871 -76.476203 1031.53 Name: Obstruction 4 Top height: 20.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409901 -76.476832 1017.39 2 42.409916 -76.475920 1017.76 Page 11 of 26 Name: Obstruction 5 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.408002 -76.477765 1065.79 2 42.404818 -76.477594 1163.75 3 42.404849 -76.475813 1165.36 4 42.407543 -76.476135 1056.82 5 42.408002 -76.477765 1065.79 Name: Obstruction 6 Top height: 32.8 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.409096 -76.472036 992.36 2 42.408287 -76.473088 1066.90 3 42.404247 -76.468839 1067.61 4 42.404580 -76.467702 1000.67 5 42.409096 -76.472036 992.36 Page 12 of 26 Name: Obstruction 7 Top height: 40.0 ft Vertex Latitude (°)Longitude (°)Ground elevation (ft) 1 42.410885 -76.476368 1022.98 2 42.410109 -76.476261 1011.35 3 42.410085 -76.474651 1044.33 4 42.408817 -76.472548 1056.80 5 42.409190 -76.472087 986.49 6 42.410132 -76.473943 1057.21 7 42.410885 -76.476368 1022.98 Page 13 of 26 Glare Analysis Results Summary of Results Glare with low potential for temporary after-image predicted PV Array Tilt Orient Annual Green Glare Annual Yellow Glare Energy °°min hr min hr kWh PV array 1 SA tracking SA tracking 291 4.8 0 0.0 - Total glare received by each receptor; may include duplicate times of glare from multiple reflective surfaces. Receptor Annual Green Glare Annual Yellow Glare min hr min hr Route 2 0 0.0 0 0.0 Route 2 0 0.0 0 0.0 Route 3 0 0.0 0 0.0 Route 4 160 2.7 0 0.0 OP 1 0 0.0 0 0.0 OP 2 0 0.0 0 0.0 OP 3 0 0.0 0 0.0 OP 4 0 0.0 0 0.0 OP 5 0 0.0 0 0.0 OP 6 0 0.0 0 0.0 OP 7 0 0.0 0 0.0 OP 8 0 0.0 0 0.0 OP 9 0 0.0 0 0.0 OP 10 0 0.0 0 0.0 OP 11 0 0.0 0 0.0 OP 12 0 0.0 0 0.0 OP 13 0 0.0 0 0.0 OP 14 0 0.0 0 0.0 OP 15 0 0.0 0 0.0 OP 16 0 0.0 0 0.0 OP 17 0 0.0 0 0.0 OP 18 0 0.0 0 0.0 OP 19 0 0.0 0 0.0 OP 20 0 0.0 0 0.0 OP 21 0 0.0 0 0.0 OP 22 0 0.0 0 0.0 OP 23 21 0.3 0 0.0 OP 24 0 0.0 0 0.0 OP 25 71 1.2 0 0.0 OP 26 20 0.3 0 0.0 OP 27 0 0.0 0 0.0 Page 14 of 26 Receptor Annual Green Glare Annual Yellow Glare min hr min hr OP 28 0 0.0 0 0.0 OP 29 0 0.0 0 0.0 OP 30 0 0.0 0 0.0 OP 31 0 0.0 0 0.0 OP 32 0 0.0 0 0.0 OP 33 0 0.0 0 0.0 OP 34 0 0.0 0 0.0 OP 35 0 0.0 0 0.0 OP 36 0 0.0 0 0.0 OP 37 0 0.0 0 0.0 OP 38 19 0.3 0 0.0 OP 39 0 0.0 0 0.0 OP 40 0 0.0 0 0.0 OP 41 0 0.0 0 0.0 OP 42 0 0.0 0 0.0 Page 15 of 26 PV: PV array 1 low potential for temporary after-image Receptor results ordered by category of glare Receptor Annual Green Glare Annual Yellow Glare min hr min hr Route 4 160 2.7 0 0.0 Route 2 0 0.0 0 0.0 Route 2 0 0.0 0 0.0 Route 3 0 0.0 0 0.0 OP 23 21 0.3 0 0.0 OP 25 71 1.2 0 0.0 OP 26 20 0.3 0 0.0 OP 38 19 0.3 0 0.0 OP 1 0 0.0 0 0.0 OP 2 0 0.0 0 0.0 OP 3 0 0.0 0 0.0 OP 4 0 0.0 0 0.0 OP 5 0 0.0 0 0.0 OP 6 0 0.0 0 0.0 OP 7 0 0.0 0 0.0 OP 8 0 0.0 0 0.0 OP 9 0 0.0 0 0.0 OP 10 0 0.0 0 0.0 OP 11 0 0.0 0 0.0 OP 12 0 0.0 0 0.0 OP 13 0 0.0 0 0.0 OP 14 0 0.0 0 0.0 OP 15 0 0.0 0 0.0 OP 16 0 0.0 0 0.0 OP 17 0 0.0 0 0.0 OP 18 0 0.0 0 0.0 OP 19 0 0.0 0 0.0 OP 20 0 0.0 0 0.0 OP 21 0 0.0 0 0.0 OP 22 0 0.0 0 0.0 OP 24 0 0.0 0 0.0 OP 27 0 0.0 0 0.0 OP 28 0 0.0 0 0.0 OP 29 0 0.0 0 0.0 OP 30 0 0.0 0 0.0 OP 31 0 0.0 0 0.0 OP 32 0 0.0 0 0.0 OP 33 0 0.0 0 0.0 OP 34 0 0.0 0 0.0 Page 16 of 26 Receptor Annual Green Glare Annual Yellow Glare min hr min hr OP 35 0 0.0 0 0.0 OP 36 0 0.0 0 0.0 OP 37 0 0.0 0 0.0 OP 39 0 0.0 0 0.0 OP 40 0 0.0 0 0.0 OP 41 0 0.0 0 0.0 OP 42 0 0.0 0 0.0 Page 17 of 26 PV array 1 and Route: Route 4 Yellow glare: none Green glare: 160 min. PV array 1 and Route: Route 2 No glare found Page 18 of 26 PV array 1 and Route: Route 2 No glare found PV array 1 and Route: Route 3 No glare found PV array 1 and OP 23 Yellow glare: none Green glare: 21 min. Page 19 of 26 PV array 1 and OP 25 Yellow glare: none Green glare: 71 min. Page 20 of 26 PV array 1 and OP 26 Yellow glare: none Green glare: 20 min. Page 21 of 26 PV array 1 and OP 38 Yellow glare: none Green glare: 19 min. PV array 1 and OP 1 No glare found PV array 1 and OP 2 No glare found PV array 1 and OP 3 No glare found PV array 1 and OP 4 No glare found PV array 1 and OP 5 No glare found Page 22 of 26 PV array 1 and OP 6 No glare found PV array 1 and OP 7 No glare found PV array 1 and OP 8 No glare found PV array 1 and OP 9 No glare found PV array 1 and OP 10 No glare found PV array 1 and OP 11 No glare found PV array 1 and OP 12 No glare found PV array 1 and OP 13 No glare found PV array 1 and OP 14 No glare found PV array 1 and OP 15 No glare found PV array 1 and OP 16 No glare found PV array 1 and OP 17 No glare found PV array 1 and OP 18 No glare found PV array 1 and OP 19 No glare found Page 23 of 26 PV array 1 and OP 20 No glare found PV array 1 and OP 21 No glare found PV array 1 and OP 22 No glare found PV array 1 and OP 24 No glare found PV array 1 and OP 27 No glare found PV array 1 and OP 28 No glare found PV array 1 and OP 29 No glare found PV array 1 and OP 30 No glare found PV array 1 and OP 31 No glare found PV array 1 and OP 32 No glare found PV array 1 and OP 33 No glare found PV array 1 and OP 34 No glare found PV array 1 and OP 35 No glare found PV array 1 and OP 36 No glare found Page 24 of 26 PV array 1 and OP 37 No glare found PV array 1 and OP 39 No glare found PV array 1 and OP 40 No glare found PV array 1 and OP 41 No glare found PV array 1 and OP 42 No glare found Page 25 of 26 Assumptions Default glare analysis parameters and observer eye characteristics (for reference only): Analysis time interval: 1 minute Ocular transmission coefficient: 0.5 Pupil diameter: 0.002 meters Eye focal length: 0.017 meters Sun subtended angle: 9.3 milliradians © 2026 Sims Industries d/b/a ForgeSolar, All Rights Reserved. This analysis was conducted using the best available radiometric modeling at the time of generation. Future updates to the modeling methodology may yield different results. "Green" glare is glare with low potential to cause an after-image (flash blindness) when observed prior to a typical blink response time. "Yellow" glare is glare with potential to cause an after-image (flash blindness) when observed prior to a typical blink response time. Times associated with glare are denoted in Standard time. For Daylight Savings, add one hour. The algorithm does not rigorously represent the detailed geometry of a system; detailed features such as gaps between modules, variable height of the PV array, and support structures may impact actual glare results. However, we have validated our models against several systems, including a PV array causing glare to the air-traffic control tower at Manchester-Boston Regional Airport and several sites in Albuquerque, and the tool accurately predicted the occurrence and intensity of glare at different times and days of the year. Random number computations are utilized by various steps of the annual hazard analysis algorithm. Predicted minutes of glare can vary between runs as a result. This limitation primarily affects analyses of Observation Point receptors, including ATCTs. Note that the SGHAT/ ForgeSolar methodology has always relied on an analytical, qualitative approach to accurately determine the overall hazard (i.e. green vs. yellow) of expected glare on an annual basis. The analysis does not automatically consider obstacles (either man-made or natural) between the observation points and the prescribed solar installation that may obstruct observed glare, such as trees, hills, buildings, etc. The subtended source angle (glare spot size) is constrained by the PV array footprint size. Partitioning large arrays into smaller sections will reduce the maximum potential subtended angle, potentially impacting results if actual glare spots are larger than the sub-array size. Additional analyses of the combined area of adjacent sub-arrays can provide more information on potential glare hazards. (See previous point on related limitations.) The variable direct normal irradiance (DNI) feature (if selected) scales the user-prescribed peak DNI using a typical clear-day irradiance profile. This profile has a lower DNI in the mornings and evenings and a maximum at solar noon. The scaling uses a clear-day irradiance profile based on a normalized time relative to sunrise, solar noon, and sunset, which are prescribed by a sun-position algorithm and the latitude and longitude obtained from Google maps. The actual DNI on any given day can be affected by cloud cover, atmospheric attenuation, and other environmental factors. The ocular hazard predicted by the tool depends on a number of environmental, optical, and human factors, which can be uncertain. We provide input fields and typical ranges of values for these factors so that the user can vary these parameters to see if they have an impact on the results. The speed of SGHAT allows expedited sensitivity and parametric analyses. The system output calculation is a DNI-based approximation that assumes clear, sunny skies year-round. It should not be used in place of more rigorous modeling methods. Hazard zone boundaries shown in the Glare Hazard plot are an approximation and visual aid based on aggregated research data. Actual ocular impact outcomes encompass a continuous, not discrete, spectrum. Glare locations displayed on receptor plots are approximate. Actual glare-spot locations may differ. Refer to the Help page at www.forgesolar.com/help/ for assumptions and limitations not listed here. • • • • • Page 26 of 26 What Is Energy Storage? Energy Storage Systems are electrical devices that have the ability to store energy from the electric grid and/or renewable energy sources, like solar and wind, to be used at a later time when the power is needed most by a local electricity user or the regional electric grid. Energy Storage technologies are essential to accelerating the replacement of fossil fuels with renewable energy and improving the aging grid infrastructure across the United States. Lithium-ion battery- based technologies are the predominant energy storage technology used today in the United States and across the globe. Why Is Energy Storage Important? Energy storage fundamentally improves the way we generate, deliver, and consume electricity. The key benefits of deploying energy storage technologies are: Reduced Risk of Power Outages: Today’s electricity grid is increasingly vulnerable due to impacts from climate change, load growth from increased electrification, and global energy supply. Clean Energy Integration and Energy Independence: Energy storage systems help the grid to integrate locally produced, clean, renewable energy while offsetting the need for polluting fossil fuels. These systems allow for renewable energy to be shifted and utilized during peak periods when demand is at its highest, enabling more clean energy development. Saving Consumers Money: When electricity demand goes up, and traditional sources of energy are not able to keep up, the price of electricity rises as additional, more expensive resources are deployed to meet the demand. These charges are known as “time-of-use” or “peak” prices. Energy storage systems provide ready-to-use energy that can be scheduled to help consumers avoid using electricity during peak periods at surged prices driven by a reliance on fossil fuels. Economy and Jobs: The development of energy storage systems is generating thousands of U.S. jobs per year, including local jobs for construction and long-term operations and maintenance of these projects. Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. How Does Energy Storage Work? Energy storage systems work by charging from the grid and/or a renewable energy source (e.g., solar, wind, etc.), storing that energy for later use, and then discharging it to serve the load or the needs of the electric grid. When electricity prices are low, typically in the late evening or early morning, energy storage systems draw energy from the grid to charge. When electricity prices are high, typically in the afternoon or early evening, systems discharge and send electricity back to the grid. When paired with renewable energy, the systems draw energy in the middle of the day when solar energy production is at its highest and then discharge this energy during the higher usage time periods. This helps electricity providers balance electricity supply and demand in real-time while also reducing pollution and emissions on the grid. As the market currently stands, the vast majority of energy storage projects are lithium-ion-based battery solutions. However, there are various lithium-ion battery chemistries that exist in the market, with Nickel Manganese Cobalt (NMC) and Lithium-Iron-Phosphate (LFP) being the most prevalent types of lithium-ion batteries used for stationary energy storage systems. Nexamp primarily utilizes LFP-based energy storage systems. The LFP battery chemistry is preferred for several reasons, most importantly because the chemistry is safer than NMC and other lithium-ion chemistries. LFP battery cells are more stable and have a higher resistance to heat, making them less prone to thermal runaway. Other factors like increased battery cycle life are also considered when choosing an energy storage technology. While lithium-ion is the dominant energy storage technology, other technologies such as flow batteries, zinc-bromide, zinc-air, compressed air, flywheel, and others continue to be developed as emerging technology options. Currently, lithium-ion batteries are the preferred technology when balancing safety, performance history and track record, commercial viability, and technological advancements. What Standards and Best Practices Are There for Safety? Energy storage systems are held to a high degree of safety through national codes and standards. Technology providers undergo strict testing and approval processes prior to deploying a product on the market. Energy storage products are held to the following standards, certifications, and testing protocols: Codes • International Fire Code (IFC): IFC 2018/2021 • National Electrical Code (NEC): NEC 2020 Standards • National Fire Protection Association (NFPA) • NFPA 68 (Explosion Protection by Deflagration Venting) • NFPA 69 (Explosion Prevention Systems) • NFPA 70 (National Electrical Code) • NFPA 72 (Fire Alarm and Signaling) • NFPA 855 (Installation of Stationary Energy Storage Systems) Certifications • Underwriter’s Laboratory (UL): • UL 1642 (Battery Cell) • UL 1973 (Battery Module/Rack) • UL 9540 (Entire Energy Storage System) • UL 9540A 4th Edition (Thermal runaway testing of the battery cell, module, and unit) • United Nations (UN): UN 38.3 (Testing) The certifications and testing included above are conducted and accredited by independent Nationally Recognized Testing Laboratories (NRTL) that are OSHA-recognized (U.S.-based). A typical energy storage system has the following safety features and protection systems: • Fire protection • Explosion protection • Temperature, voltage, and current sensors • Emergency stops/electric isolation – remote and manual (local) capabilities • Battery Management Systems (BMS) and Energy Management Systems (EMS) • Supervisory Control and Data Acquisition (SCADA) controls and monitoring systems • Fault detection and correction action • Thermal management system (Air or liquid-cooled systems) • Environmentally rated enclosure Alarm systems and system data are captured at Nexamp’s Network Operating Center (NOC) and are monitored 24/7.. Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. What Are the Risks of Energy Storage? Energy storage systems are designed for a high level of safety and performance to prevent a system malfunction from turning into an event requiring support from local first responders. While the risk of fire is low, it is important to consider the risk factors of energy storage. Energy storage systems are high-voltage electrical equipment. As with any equipment utilizing electricity, there is a risk of fire. One of the main risk factors is thermal runaway, which is when batteries overheat, and the system’s thermal management system is not able to control the increase in temperature. In extreme circumstances, this can result in a deflagration or fire. Systems designed in accordance with NFPA 855, which in turn requires compliance with UL 9540 and testing to UL 9540A, have mitigations in place to limit and contain the spread of a fire to a single battery cell or module within an energy storage system container. Recent energy storage safety incidents have demonstrated that system performance in an extreme situation has met what was expected in the laboratory setting, with fire being contained and not spreading to other energy storage containers or structures nearby. What Is Nexamp’s Safety Record? Nexamp is proud to share that it has had zero energy storage safety incidents across its operational and in-construction (~190 MWh) energy storage portfolio. Nexamp strives for high quality and performance from our energy storage assets and maintains safety as a core priority for every project from inception to completion (end of equipment life and decommissioning). Safety is at the core of Nexamp’s hardware and software selection, integration, and operation. Nexamp procures equipment from Tier-1 manufacturers and service providers with reliable products and services. Beyond procurement due diligence, Nexamp ensures that its energy storage projects meet and exceed applicable energy storage codes (building, electric, and fire) with a thorough design process that aligns with local, state, and federal codes. In addition to adhering to codes and standards, Nexamp seeks to align with industry best practices that often exceed the existing code. An important feature of Nexamp’s plan for safety is its Energy Storage Emergency Response Program (ESERP). The Nexamp ESERP addresses key stages in development, construction, commissioning, and operations and involves key stakeholders such as nearby communities, fire departments, emergency services, and town representatives. Nexamp strives to continuously improve its safety standards and serve as a leader in setting industry best practices. Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. Who Oversees the Development of Energy Storage Projects? Nexamp is the developer, builder, owner, and operator of these projects. As such, we are a long- term partner with landowners, customers, and the community and are ultimately responsible for the successful development and deployment of energy storage. On top of addressing all design, operational, safety, and environmental aspects of the project, Nexamp will also work with key approval authorities to receive all required permits and approvals. These include; • Utility Interconnection – An agreement with the utility to connect the system to the electric grid to charge and discharge electricity. • Town Agency Review – Nexamp will work with the local Town and approval authorities for all required permits and will perform community outreach to answer any questions or concerns from abutters and other residents. Some of these approvals include Fire Departments and Environmental Agencies. • State Agencies – Depending on the project, Nexamp will work with State Agencies for either approval processes or to file required documentation to participate in state environmental or incentive programs. Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. Battery Module Environmentally rated battery enclosure Emergency Stop Buttons Thermal Management System (HVAC or Liquid Cooled Chiller) Anatomy of a Battery System Please Reach Out For More Information Please visit nexamp.com or email our team at storage@nexamp.com. BMS & Safety Sensors Fire Alarm & Strobe Transformer, DC/AC Inverter and Electrical Equipment Energy Management System and Control Supervisory Control and Data Acquisition Environmentally rated battery enclosureEnvironmentally rated battery enclosure Anatomy of a Battery System The images shown are for illustration purposes only and may not be an exact representation of the product. 1 Bomber Heights Solar PV And Battery Energy Storage System Emergency Response Plan 2 Table of Contents Table of Contents .......................................................................................................................................... 2 1 Introduction ............................................................................................................................................ 3 1.1 Scope and Purpose ..................................................................................................................... 3 1.2 Timeframe .................................................................................................................................... 4 1.3 Activation ..................................................................................................................................... 4 1.4 Agency Jurisdiction ...................................................................................................................... 4 1.5 Operations and Maintenance (O&M) ........................................................................................... 4 1.6 ERP Update Process ................................................................................................................... 4 2 Definitions and Acronyms ..................................................................................................................... 4 2.1 Definitions .................................................................................................................................... 4 2.2 Acronyms ..................................................................................................................................... 6 3 General Site Information ....................................................................................................................... 8 3.1 Owner/Operator Information ........................................................................................................ 8 3.2 Site Overview ............................................................................................................................... 8 3.3 Site Design................................................................................................................................... 9 3.4 Fire Department Access and Staging Area ............................................................................... 10 3.5 Site Security Perimeter .............................................................................................................. 11 3.6 Site Access ................................................................................................................................ 11 3.7 Equipment Access ..................................................................................................................... 11 3.8 Water Supply ............................................................................................................................. 11 3.9 Lock Box Access ....................................................................................................................... 11 3.10 Nearby Exposures ..................................................................................................................... 11 3.11 Site Maintenance ....................................................................................................................... 11 3.12 BESS Product Information ......................................................................................................... 11 3.12.1 BESS Product Features ........................................................................................................ 12 3.12.1.1 Battery Management System (BMS) ..................................................................................... 12 3.12.1.2 Customer Interface Bay ......................................................................................................... 13 3.12.1.3 Thermal Management System .............................................................................................. 13 3.12.1.4 Site Controller and Monitoring ............................................................................................... 13 3.12.1.5 Electrical Fault Protection Devices ........................................................................................ 13 3.13 Fire Protection Systems ............................................................................................................. 14 3.13.1.1 Explosion Control System ..................................................................................................... 14 3.14 Emergency Shutoffs .................................................................................................................. 15 3.15 Fire Detection ............................................................................................................................ 15 3 3.16 Emergency Contacts ................................................................................................................. 15 3.17 Fire Responder Contact Information ......................................................................................... 16 3.18 Other Contact Information ......................................................................................................... 16 3.19 Roles and Responsibilities ......................................................................................................... 17 4 Battery Management System (BMS) .................................................................................................. 20 4.1 Alarm Matrix ............................................................................................................................... 20 5 Notification Matrix ................................................................................................................................ 23 6 Emergency Response Considerations ................................................................................................ 23 6.1 Emergency Contacts ................................................................................................................. 23 6.2 Equipment and Personnel Protective Equipment (PPE) ........................................................... 23 6.3 APIE (Analyze, Plan, Implement, and Evaluate) Framework .................................................... 23 6.4 Scene Size-up – Command and Control ................................................................................... 24 6.5 Determine Fire Protection Approach ......................................................................................... 24 6.6 Incident Monitoring and Evaluation ........................................................................................... 25 7 Post Incident Operations ..................................................................................................................... 25 8 Training and Exercises ........................................................................................................................ 25 9 Revision Tracking ................................................................................................................................ 26 Disclaimer: This drafted Emergency Response Plan (ERP) is provided for information and guidance purposes only and establishes a suggested format. The ERP requires regular updates with sufficient detail to enable personnel to implement necessary emergency procedures without question or delay to ensure the continuity of operations. 1 Introduction 1.1 Scope and Purpose This Emergency Response Plan (ERP) or Emergency Operations Plan (EOP) has been developed for the Bomber Heights Solar + Battery Energy Storage System (BESS) located at 115 Troy Rd., Ithaca, NY 14850. The purpose of this document is to provide guidance and pertinent information regarding the roles, responsibilities, and chain of communication and command of the System Owner/Operator, Property Owner, Emergency Responders, and other required Subject Matter Experts (SMEs) for preparing for, and safely responding to, a fire, explosion, or other battery-related incident requiring a public safety response at the energy storage facility. The Operations and Maintenance (O&M) Manager for the project is an employee of Nexamp. “On- site personnel” include all individuals on the facility property who are direct employees of the Owner/Operator or affiliated contractors. The Owner/Operator and contractors are similarly responsible for establishing and maintaining contractor-specific Emergency Management Plans and reporting procedures that will work in conjunction with the overall energy storage facility plan. 4 Life safety shall be the highest priority during any event type associated with this energy storage facility. 1.2 Timeframe This ERP covers the timeframe beginning at the final approval of the Ithaca Fire Department to the beginning of decommissioning and removal of the energy storage system. 1.3 Activation This ERP shall be activated during any emergency response to energy storage facility-related incident on site. 1.4 Agency Jurisdiction This plan has been strictly developed for the Ithaca Fire Department and does not cover multi- agency response. 1.5 Operations and Maintenance (O&M) Operations and maintenance procedures for the energy storage facility and associated equipment are outside the scope of this document. Procedures for inspection and testing of associated alarms, interlocks, and controls are provided in the O&M plan. Please refer to manufacturer Operations and Maintenance (O&M) manuals for all associated equipment and protocols related to the site prior to beginning any maintenance work on this facility. 1.6 ERP Update Process Dates for draft issuance, revisions and final issuance of this ERP are provided in Section 14 of the document. A review of this emergency response plan shall be conducted and documented:  at minimum on an annual basis; or  if there is a change in design, construction, operation, or maintenance that affects emergency response planning. Ensure all relevant stakeholders receive a complete copy of this Emergency Response Plan. Plan retirement will coincide with decommissioning of the facility. All decommissioning procedures shall be performed by trained and knowledgeable people in alignment with the Decommissioning Plan provided for this installation. Decommissioning shall be performed under the supervision of the System Owner/Operator and manufacturer. 2 Definitions and Acronyms 2.1 Definitions Approved – Acceptable to the authority having jurisdiction Battery – A single cell or a group of cells connected electrically in series, in parallel, or a combination of both. Battery cell - The basic electrochemical unit, characterized by an anode and a cathode, used to receive, store, and deliver electrical energy. 5 Battery management system (BMS) - A system that monitors and controls performance of an energy storage system and can have the ability to disconnect the energy storage unit from the system in the event abnormal or hazardous conditions are detected. Battery module – A subset of battery cells, connected in series, parallel, or a combination of both, with some amount of monitoring and passive disconnect capabilities Battery rack – A subset of interconnected modules, typically in series, which typically includes switchgear, BMS, and active disconnect capabilities Certifications – In this context, certifications address primarily Underwriters Laboratory standards, including UL (Underwriters Laboratories) 1642, UL 1973, UL 1741, and UL 9540. Also, UL 9540A testing will be included in this context. Deflagration – Combustion event which propagates through explosive gases released by batteries during abnormal failure events at subsonic speeds. In this context, deflagration risk may be managed through a variety of mitigative measures, such as vent design, exhaust, or suppression systems. Electrical Event - Internal short circuit due to internal cell defects, overvoltage charging or a defect on internal resistance. Energy storage system - One or more devices, assembled, capable of storing energy to supply electrical energy at a future time. Battery energy storages system is called a BESS (Battery Energy Storage System). Energy Storage Management System (ESMS) - A system that monitors, controls, and optimizes the performance of an energy storage system and can control the disconnection of the energy storage system in the event of abnormal conditions. Fire Command Center - The principal attended or unattended room or area where the status of the detection, alarm communications, control systems, and other emergency systems is displayed and from which the system(s) can be manually controlled. Incident Action Plan (IAP) – IAP formally documents incident goals/control objectives, operation period objectives, and the response strategy defined by incident command during response planning. Inverter – A piece of electrical equipment which converts DC (Direct Current) energy of the batteries into AC (Alternating Current) energy of the grid and vice versa Monitoring Company – alerted in the event of activation of Nexamp’s aspirating smoke detection (ASD) system. Mechanical Failures - Physical damage to a cell which may have occurred during the manufacturing or installation process, as well as damage caused by vibration or expansion. Off-gassing – Gases released by batteries during abnormal events prior to thermal runaway Subject matter expert (SME) – One or more parties who have skills and knowledge related to the operation of the electrical equipment and installations and has received safety training to recognize and avoid the hazards involved. These parties will be responsible for communication during failures with facility personnel, system operators, and emergency personnel. The SME will be qualified in workplace and electrical safety in local jurisdiction of the system. Thermal Event - A chemical process where self-heating in a battery exceeds the rate of cooling causing high internal temperatures, melting, off-gassing/venting, and in some cases, fire, or explosion. Thermal, 6 mechanical, and electrical abuse can lead to thermal runaway; internal short circuit from manufacturing defects; or the development of metallic dendrites that form an internal short over time. Lithium-ion batteries undergoing thermal runaway can vent their internal contents in the form of gas. Without proper ventilation a combination of gases can build up in an enclosed space. The Lower Explosive Limit (LEL) for this mixture can vary. Oxygen starvation fire suppression in lithium-ion battery systems is not recommended. Smoke can be toxic and smoke from batteries is no exception. Use of a positive pressure breathing apparatus is recommended whenever responding to battery system fires. Thermal runaway - The condition when an electrochemical cell increases its temperature through self- heating in an uncontrollable fashion and progresses when the cell’s heat generation is at a higher rate than can dissipate leading to fire, explosion, and gassing. 2.2 Acronyms Abbreviation / Acronym Description AR Arc-Rated BESS / ESS Battery Energy Storage System – the complete facility including bidirectional inverter(s), step- up transformer(s), protection devices, HVAC system(s) and control systems. BMS Battery Management System – the electronic control system that manages the battery installation, maintaining operation within safe limits and monitoring and reporting status to the PPC (Power Plant Controller). DAS Data Acquisition System (synonymous with SCADA) E-Stop/EPO Emergency Stop / Emergency Power Off ERP Emergency Response Plan EMS Energy Management System – The system running the PPC and providing an HMI for the user interface FACP Fire Alarm Control Panel FDC Fire Department Connection FSS Fire Suppression System HVAC Heating, Ventilation, Air Conditioning system 7 Abbreviation / Acronym Description IC Incident Commander ICS Incident Command System kW Kilowatt(s) kWh Kilowatt-hour(s) LFL/LEL Lower Flammability Limit / Lower Explosive Limit MW Megawatt(s) MWh Megawatt-hour(s) O&M Operations and Maintenance SCBA Self-Contained Breathing Apparatus SDS Safety Data Sheets – a document that contains information on the potential hazards (health, fire, reactivity and environmental) and how to work safely with the chemical product. PCS Power Conversion System – Includes bidirectional inverter and integrated control system PPC Power Plant Controller – The main BESS computer that provides user interaction for all available systems via the EMS HMI. SCADA Supervisory Control and Data Acquisition – Control system architecture that provides an interface for monitoring and issuing commands to the BESS via the RTUs (Remote Telemetry Unit). 8 Abbreviation / Acronym Description SME Subject Matter Expert SOC State of Charge – The percent level of charge of the batteries relative to their capacity. SOH State of Health – The percent merit of condition of the batteries relative to ideal conditions. Will decrease over time with use. UICS Unified Incident Command System UFL / UEL Upper Flammability Limit / Upper Explosive Limit 3 General Site Information 3.1 Owner/Operator Information The owner of the BESS is Bomber Heights Solar PV, which is an LLC of Nexamp. The Operator of the BESS is Nexamp. Nexamp is a vertically integrated Independent Power Producer (IPP) based in Boston that has constructed, owns, and operates 200+MWh of energy storage across Massachusetts and New York. Nexamp also operates over 1GW of solar across the United States, and continues to develop and construct a multi-GW pipeline of energy storage and solar projects across the U.S. More information about Nexamp can be found here: https://www.nexamp.com/ 3.2 Site Overview The Bomber Heights Solar and Energy Storage facility is located at 115 Troy Rd., Ithaca, NY 14850. The Bomber Heights Solar and Energy Storage facility consists of Four (4) Megapack 2XL rated at 979.2 kW / 3,916.8 kWh (4-hour duration) with a total BESS capacity of 3,916.8 kW / 15,667.2 kWh. The BESS is AC-coupled with a Solar PV array spread across the property. The PV capacity is 4,500 kWac. 9 Figure 1 Site Layout 3.3 Site Design The BESS is located on the southern portion of the property as shown in Figure 2. The BESS is adjacent to the access road and provides fire apparatus access. Figure 2 BESS Layout - zoomed in In the event of an emergency, all site personnel, visitors, Nexamp, and emergency response personnel (including the fire department) should remain outside the 100ft radius seen below. In the event of an emergency, the neighboring property owners should be notified of the event and provided updates throughout the duration of the event. 10 Figure 3 - 100 ft radius Electrical equipment including metering enclosures, transformers, Data Acquisitions System cabinets are located within the BESS area, with at least a 10 ft setback between the BESS unit, the equipment, the solar array, and the access road. The BESS enclosure is installed on a concrete pad, elevated above the flood plain with the surrounding area noted as gravel. The gravel will extend to the access road and between the BESS and the PV array towards the east. 3.4 Fire Department Access and Staging Area An entrance point is located on the northwest end of the property. Staging areas are recommended to be conducted at the access road just at the entrance gate of the site facility as shown in Figure 3. Staging areas should be based on the IC and the initial size-up. The Fire Department should not attempt to enter the site fence line unless there is a clear threat to life safety. Figure 3 Fire Department Access and Staging Area 11 3.5 Site Security Perimeter The site is enclosed with a locked gate as the primary entrance to the facility and is surrounded by a fence. The BESS units are each individually locked. As noted above, the Fire Department should not attempt to enter the BESS area unless there is a clear threat to life safety. 3.6 Site Access The site is enclosed within protective steel fencing with a 10-ft gated entrance located at the northern side of the site. As noted above, the Fire Department should not attempt to enter the site fence unless there is a clear threat to life safety. 3.7 44Equipment Access The Tesla Megapack enclosures are only accessible for maintenance purposes via cabinet-style enclosure doors and cannot be physically entered by personnel at any time. The Fire Department should not attempt to open the enclosure doors at any time. 3.8 Water Supply Primary water source to be confirmed with fire department. 3.9 Lock Box Access A lock box openable by a standard key (Fire Department approved) containing a physical copy of the EPRP, operational permits, O&M logs, product manuals, etc., is provided at the site entrance shown in Figure 3. 3.10 Nearby Exposures The following nearby exposures are in the immediate area, as shown in Figure 1 above. 1. Residences to North, South, East, and West a. Location: ~750 – 1,500 ft from BESS b. Construction: To be identified 2. PV Array a. Location: Surrounding the BESS, with ~50 ft clearance to the South (closest location) b. Construction: Steel and PV modules 3.11 Site Maintenance The facility’s interior access roads should be maintained to guarantee accessibility to the site by emergency personnel, especially during inclement weather. Nexamp shall ensure snow removal, landscaping, and other ongoing upkeep activities are in place prior to construction. 3.12 BESS Product Information The BESS Technology/Product incorporated into the design of this project is the Tesla Megapack 2XL (MP2XL). The Megapack 2XL is a pre-engineered and integrated energy storage unit that utilizes Lithium-ion batteries to store and discharge power/energy. More specifically, the batteries use lithium Iron Phosphate (LFP) battery cell chemistry where battery cells are configured into battery modules, which are then integrated into battery racks that are housed in the enclosure/container as shown Figure 56. The Megapack 2XL is offered in various configurations of varying power/energy capacities. The MP2XL arrives at the site fully assembled needing just the alternate current (AC) connection and communications cable to be connected on site. The MP2XL is approximately 28.9 ft in length, 12 5.4ft deep, and 9.2ft in height. The MP2XL is intended for outdoor installations, ground-mounted to a foundation or base strong enough to support the weight of the equipment and anchor loads (including concrete pads, grade beams, etc.). The thermal roof (part of the thermal management system) is enclosed within an IP20 enclosure that sits above the battery module bays. The lithium- ion batteries are housed inside an IP66 steel enclosure (battery module bay) that provides protection against particles and water ingress. Figure 5 Tesla Megapack 2XL Overview Megapack 2XL is listed to the following standards by OSHA-recognized Nationally Recognized Testing Laboratories:  UL 1642 (cell-level certification)  UL 1973 and IEC 62619 (battery module-level certification)  UL 9540, IEC 62933-5-2, IEC 62109-1 (System-level certification)  UL 1741, CSA C22.2 #107.1 (power electronics)  UL 1998 and IEC 60730 Annex H (functional safety of software)  IEC 61000-6-2, and EN 55011 (EMC)  UN 38.3 (transportation, self-certified)  IEEE 693 (seismic safety)  UL 9540A (large-scale fire testing): Tested the cell, module, and unit level The Megapack 2XL is designed to comply with major installation codes for energy storage systems, including NFPA 855, IFC 2018 and 2021, and NEC 2020. The Megapack 2XL has been reviewed and validated by an Independent Engineer, both at the product level and for the results of large-scale fire testing. 3.12.1 BESS Product Features 3.12.1.1 Battery Management System (BMS) See Section 4. 13 3.12.1.2 Customer Interface Bay The Customer Interface Bay (CIB) is a user-accessible area designed for operation and service. The CIB includes the main AC breaker, a status panel and controller area network (CAN) interface for service personnel, customer input/output (I/O) terminals, and the keylock switch (a “Lock Out/Tag Out” switch), which shuts down the AC bus to permit MP2XL maintenance by service personnel. 3.12.1.3 Thermal Management System The thermal management system (TMS) provides suitable operating temperature for the MP2XL. The thermal bay and thermal rood house the components of the TMS. The TMS contains a closed-loop liquid cooling system that circulates a 50/50 mixture of ethylene glycol and water throughout the battery modules and power electronics to maintain an optimum battery operating temperature. The TMS works autonomously and does not require user feedback or controls to turn the system on when needed or to adjust temperature settings. The thermal cabinet includes pumps that circulate the liquid coolant through the MP2XL, an in-line heater that can warm the coolant and a compressor that maintains control for the cabinet. The thermal roof, located above the battery bays within its own IP20 enclosure, provides a ventilation airspace for the MP2XL. It contains fans and radiators that cool the ethylene glycol-water resolution. Cool air enters the thermal roof through the grates on the front of the MP2XL. The cool air then passes over the radiators, absorbing heat, and then is exhausted out of the top of the thermal roof via fans. 3.12.1.4 Site Controller and Monitoring Beyond the built-in safeguards of the BMS described in Section 5, the MP2XL is supported by a Tesla Local Operations Center (LOC). The MP2XL has 24/7 remote monitoring by Tesla’s LOC, but also Nexamp’ s Network Operating Center (NOC) located in Lawrence, MA. The 24/7 remote monitoring is accompanied by 24/7 diagnostics and troubleshooting capabilities, without needing a technician on site. All faults are transmitted to the LOC and NOC, alerting Tesla and the Operator abnormal conditions that may require corrective action, either through remote means or an in-person field service. This communication link is accomplished via the Tesla Site Controller (TSC). The TSC provides the single point of interface for the Utility, network operator, and/or the System Owner/Operator’s SCADA systems to control and monitor the entire energy storage facility. 3.12.1.5 Electrical Fault Protection Devices The MP2XL has several passive and active safety control mechanisms installed within the battery module circuit and distribution circuit that would be available to interrupt a fault condition. At a high level, these electrical fault protection features include:  Battery module overcurrent protection: The battery modules contain DC single-use fusible links mounted directly on the battery modules. These fuses are one-time-use safety devices that can interrupt the flow of an overcurrent in the battery module during an off-normal electrical event.  Inverter DC protection: The inverter modules, which are installed at each of the battery modules, are equipped with a high-speed pyrotechnic fuse that can isolate the battery module passively or actively during an off-normal event.  Inverter AC protection: In addition, each inverter module is equipped with its own AC contactor and AC fuses should an off-normal electrical event occur at the inverter module on the AC side of the circuit.  Ground fault protection: Finally, the MP2XL is also provided with a DC ground fault detection system. It measures insulation resistance prior to operation and looks for excessive leakage current during operation. Additionally, the MP2XL also contains an AC 14 circuit breaker, with ground-fault trip settings, which is installed within the CIB to provide distribution system protection 3.13 Fire Protection Systems 3.13.1.1 Explosion Control System The MP2XL includes an explosion control system to mitigate the risk of an uncontrolled deflagration. The system includes pressure-sensitive vents (overpressure vents), and sparkers installed throughout the battery module bay. The sparkers are designed to ignite flammable gases exceedingly early in a thermal runaway event before they accumulate within the enclosure and become an explosion hazard. They are installed at a variety of locations and heights throughout the battery module bays to ensure the flammable gases released during thermal runaway quickly meet an ignition source. Note, this explosion control system is the same approach that Tesla has utilized in previous versions of the Megapack (Megapack 1 and Megapack 2) and is not a new concept. It has been extensively validated through installation level testing for these previous Megapack versions as well as the MP2XL and its performance has been demonstrated in the field during thermal events involving Megapacks. The overpressure vents are installed in the roof of the sealed battery bay’s IP66 enclosure, as shown in Figure 6. When activated, the overpressure vents open into the enclosed thermal roof, ensuring that the release of the overpressure vents does not create a projectile hazard. In addition, since they are installed in between the battery module bays and the thermal roof, the overpressure vents are not exposed to the environment, which means they are protected from the elements, such as falling tree limbs or snow, which could impact their functionality. Figure 6 MP2XL Overpressure vent overview Once opened, the overpressure vents permit gases, products of combustion, and flames to safely exhaust through the roof of the MP2XL during a thermal event. By designing this natural ventilation flow path, flammable gases are not permitted to accumulate within the MP2XL cabinet, reducing the risk of a deflagration or explosion that could compromise the cabinet’s integrity, push open the front doors, or expel projectiles from the cabinet. In addition, the ventilation path creates a controlled fire condition, should one occur, out the top of the MP2XL cabinet. By maintaining the MP2XL cabinet’s integrity, keeping all the doors shut during a fire event, reducing the risk of projectiles, and creating a controlled path for flames to exit the top of the MP2XL cabinet, the likelihood of a thermal event having an impact on life safety, site personnel or first responders, is reduced. In addition, by maintaining these features, the likelihood of a fire propagating to adjacent MP2XL cabinets, electrical equipment, or other exposures is also reduced. 15 The overpressure vents themselves are passive and are not actuated or controlled by another device. They are designed to release during an overpressure event, such as the rapid ignition of flammable gases by a sparker. The number and total area of overpressure vents were sized following the guidance of NFPA 68 with a safety factor of two times the enclosure’s strength, including the front doors. Tesla developed the overpressure vents and sparker system because the direct application of NFPA 68 or NFPA 69 is not suitable for the MP2XL cabinet, which does not have large volumes of open-air space. This engineered approach is permitted by NFPA 855 §9.7.6.7.3.3 provided it is validated by installation-level fire and explosion testing and an engineering evaluation, which Tesla has performed. 3.14 Emergency Shutoffs Emergency shut-offs are provided at multiple levels, though the Fire Department should not engage with E-Stops, as BESS shutdown may adversely affect the electrical grid. The Fire Department should not engage with E-Stops, as BESS shutdown may adversely affect the electrical grid. Any interaction with E-Stops should only be initiated in coordination with Nexamp, and other SMEs as is deemed necessary. Automatic E-Stop Automatic shutdown is provided at different levels for the Tesla Megapack battery modules, depending on the type of failure:  For major faults within battery module(s) – such overtemperature, overcharge, or ground fault – the failed module(s) will be isolated by DC-DC converters, disconnects, and/or DC fuses, and an alarm will be generated. This may not result in complete shutdown of the system.  If a large propagating thermal runaway occurs, the faulted Megapack is isolated by opening its AC contactors and over temperature loss faults will be sent to the service team. Enclosure-Level E-Stop Each Megapack unit is equipped with an AC circuit breaker located within the Megapack Customer Interface Bay door and is to be used only by authorized maintenance or operations personnel. In the event of a battery-related failure, the Fire Department should not approach any battery enclosures or engage with any enclosure E-Stops. 3.15 Fire Detection The MP2XL does not have an internal fire detection system or one that is integral to its design/construction. Temperature and voltage sensors and alarms will indicate a potential hazard before a fire can begin. As such, Nexamp can shut down the system before a fire can begin or escalate. 3.16 Emergency Contacts  Local Fire Department: Ithaca Fire Department o Address: 310 W. Green St, Ithaca, NY 14850 o Emergency: 9-1-1 (if dialing locally from BESS location)  Local Hospital: TBD with Fire Department o Address: o Emergency: 9-1-1 (if dialing locally from BESS location) 16  Nexamp Emergency Response Coordinator: o Sean Banaee, 757-971-7732  Nexamp Emergency Line - (857) 239-0057 3.17 Fire Responder Contact Information  Local Fire Department: Ithaca Fire Department o Address: 310 W. Green St, Ithaca, NY 14850 o Emergency: 9-1-1 (if dialing locally from BESS location) o Non-Emergency: (607) 272-1234  Local Hospital: To be updated o Address: To be updated o Emergency: 9-1-1 (if dialing locally from BESS location) o Emergency Room: To be updated o Non-Emergency: To be updated 3.18 Other Contact Information Nexamp Site Contacts Name Role Phone Number Nexamp Emergency Call Center 857-239-0057 Bomber Heights Solar PV BESS Owner 617-431-1440 Sean Banaee Emergency Response Coordinator 752-971-7732 Mohamed Kassamali BESS SME 516-355-1466 Nexamp/BESS Vendor Subject Matter Expert Name Role Phone Number Nexamp BESS Operator 857-239-0057 Back up: 617-431-1440 Tesla BESS Manufacturer 650-681-6060 Chemtrec HAZMAT Remediation 800-424-9300 17 3.19 Roles and Responsibilities The following table provides a high-level summary of key stakeholders’ responsibilities regarding emergency preparedness and response. The BESS Owner and Operator will assist in the implementation of this plan by knowing and communicating evacuation routes to work during emergency evacuation and reporting the status of the incident and evacuation to the Ithaca Fire Department. All facility personnel have a responsibility to immediately report any emergencies to the SME and/or BESS Operator or local emergency responders when appropriate. No delay to report emergency events that require the local emergency responders. The SME and designated alternative will be always contactable by telephone; be readily available to first responders in the event of an emergency. The SME shall be well versed in battery failure modes and hazards. If SME is not available, a toll-free phone number for first responders to call at any time shall be provided. Additionally, first responders shall be given operational data on the system, including the current state of health, system alarm notifications and advice on how to proceed during an emergency event shall be provided. BESS Owner Identity Bomber Heights Solar PV (Nexamp) Responsibilities Shall coordinate with the Emergency Response Coordinator and/or its contractors with access to the site, as necessary, for them to perform their duties and obligations. Emergency Response Coordinator Identity Sean Banaee (Nexamp) Responsibilities Shall provide a site-specific Emergency Response Plan for each site that was developed during the engineering, construction, and commissioning phases of the projects. The Emergency Response Plan should be submitted to the local fire department, the BESS Operators, and the BESS Maintenance Contractors prior to going live. The Emergency Response Coordinator will also be responsible for introductory training of the ERP, the BESS project site, and introduction amongst all emergency response stakeholders listed in this table. BESS SME Identity Mohamed Kassamali and Nickole Gagne (Nexamp) 18 Responsibilities The BESS SME role consists of at least two people, one of which is the battery technology expert, and the other being a qualified electrical expert. The two parties are responsible for communicating with each other, the BESS operator, and the Local Fire Department. The description of these two parties and their respective responsibilities are listed below. Qualified Electrical Expert (Nexamp) One person employed by the BESS Owner has the skills and knowledge related to the operation of the electrical equipment and installations and has received safety training to recognize and avoid the hazards involved. This party will be qualified in the workplace and electrical safety in local jurisdiction of the system. This party will be responsible for the following during an emergency or failure: - Prepare for and conduct exchange of information with battery technology experts (BESS SME), Emergency Response Coordinator, Local Fire Department, and BESS operators - Communicate proper methods for isolation and shutdown the system based on available information on the emergency event - Determine electrical hazards and failures and communicate them to the Local Fire Department Battery Technology Expert (Nexamp) One person employed by the BESS Owner has knowledge of the normal and abnormal operation of the BESS and associated equipment. This person will have a deep understanding of the BESS failure modes, automatic and passive safety systems associated with the BESS, and correct emergency response procedures and action plans. This party will be responsible for the following during an emergency of failure: - Communicating with the Qualified Electrical Expert (BESS SME), Emergency Response Coordinator, Local Fire Department, and BESS Operator. - Communicating the required setbacks and evacuation points that the Local Fire Department should maintain to the Local Fire Department - Collecting information from the BESS Operator regarding the BESS status and its alarms - Direct communication will be made from BESS SME to the BESS manufacturer following an emergency event. BESS Operator Identity Nexamp 19 Responsibilities The following responsibilities fall under the BESS Operator’s scope during an emergency event: - Actively monitor and control the BESS during its normal and abnormal operations to the best of their ability. All monitoring and controlling will be performed in line with the BESS Manufacturer’s recommendations. - Directly communicate with the Local Fire Department, Emergency Response Coordinator, and BESS SME at the onset of the emergency event and for the remainder of the emergency event. - Dispatching qualified personnel to the site Local Fire Department / Emergency Response Personnel Identity Ithaca Fire Department Responsibilities Will receive and review a copy of the Emergency Response Plan (ERP) for each site and approve of the ERP prior to the BESS Owner sharing the document with all stakeholders and conducting training. Upon alarm, will coordinate with the Emergency Response Coordinator, and BESS SME to receive an update on the emergency and ensure the BESS site is safe to approach prior to engaging. Will be required to maintain training for new members of the FD and maintaining a copy of the ERP accessible to all members of the FD. Incident Commander (IC) Identity Ithaca Fire Department Responsibilities The party responsible for overall management of the incident and determines which Command or General Staff position is to maintain a manageable span of control and ensure appropriate attention to the necessary incident management functions. Site Owner Identity Troy Heights, LLC 20 4 Battery Management System (BMS) MP2XL has an integrated battery management system (BMS) that tracks the performance, voltage, current, and state of charge of the cells (among many other datapoints). The BMS is a layered system, where each battery module has its own BMS and the MP2XL itself has a bus controller supervising the output of all the battery modules at the AC bus level. The BMS is engineered to react to fault conditions in an autonomous manner, with safeguards built into firmware. These fault conditions include, but are not limited to, over-temperature, loss of communication, over-voltage, and isolation. For instance, to prevent a cell over-temperature the TMS is enabled by the BMS to cool the cells/module. This action by the BMS (which is just one example of many ways the BMS can respond to a fault condition) can either prevent thermal runaway from occurring in the cell or prohibit the propagation of thermal runaway to adjacent cells. Depending on the severity of the fault condition, the BMS can automatically isolate the affected battery module temporarily (less severe fault) or it can permanently disconnect the module. The BMS is the brain behind the energy storage system. Like how the Chief Officer will locate a residential or commercial facility FACP to allow them to begin their basic size-up, the BMS alongside the Site Controller will provide similar insight into the type of alarm, location and how much of the energy storage system may be involved. As such, BMS data should be leveraged to make informed decisions. The BESS SME will provide an interpretation of the BMS data and convey the data to the Chief Officer. 4.1 Alarm Matrix List of Alarm Conditions Requiring Ithaca Fire Department Response An alarm matrix that explains the alarm, alarm description, and the resulting action from the BMS is provided in Table 1. However, there may be additional indicators or information communicated directly from Tesla to Nexamp that may be shared with the Ithaca Fire Department. Responsibilities The owner of the premises upon which the battery system is installed. 21 Table 1 Alarms Matrix Alarm Name/Code Alarm description Alarm Response Maximum Battery Temperature Maximum battery cell temperatures across all battery modules within a Megapack If this alarm occurs, Tesla will immediately contact Nexamp and provide the system diagnosis. Simultaneously, Nexamp’ s NOC will be seeing alarms which will trigger an immediate call to the Ithaca Fire Department. Nexamp will request that the Ithaca Fire Department is dispatched, and Nexamp will dispatch their EH&S and Asset Management personnel. Upon further diagnosis, additional action may be administered. If this alarm results in a battery fire, the Emergency Response Plan (ERP) will be in effect. Megapack Inverter Fault All inverters in the Megapack are faulted If this alarm occurs, Tesla will immediately contact Nexamp and provide the system diagnosis. Simultaneously, Nexamp’ s NOC will be seeing alarms which will trigger an immediate call to the Ithaca Fire Department. Nexamp will notify Ithaca Fire Department of the alarm and provide a diagnosis (if available). Nexamp will communicate that they will update the fire department on the conditions of the BESS. Tesla and Nexamp will shut down the BESS to troubleshoot the issue. Personnel will be dispatched if the issue cannot be resolved remotely. 22 Extreme Temperature Warning Battery cells have reached a temperature above the cell temperature warning threshold If this alarm occurs, Tesla will immediately contact Nexamp and provide the system diagnosis. Simultaneously, Nexamp’ s NOC will be seeing alarms which will trigger an immediate call to the Ithaca Fire Department. Nexamp will notify Ithaca Fire Department of the alarm and provide a diagnosis (if available). Nexamp will communicate that they will update the fire department on the conditions of the BESS. Tesla and Nexamp will shut down the BESS to troubleshoot the issue. Personnel will be dispatched if the issue cannot be resolved remotely. Extreme Temperature Fault Battery cells have reached a temperature above the cell temperature fault threshold If this alarm occurs, Tesla will immediately contact Nexamp and provide the system diagnosis. Simultaneously, Nexamp’ s NOC will be seeing alarms which will trigger an immediate call to the Ithaca Fire Department. Nexamp will ask that Ithaca Fire Department is dispatched, and Nexamp will dispatch their EH&S and Asset Management personnel. Upon further diagnosis, added action may be administered. If this alarm results in a battery fire, the Emergency Response Plan (ERP) will be in effect. Power Electronics Over Temperature Megapack Power Electronics are experiencing an overtemperature If this alarm occurs, Tesla will immediately contact Nexamp and provide the system diagnosis. Simultaneously, Nexamp’ s NOC will be seeing alarms which will trigger an immediate call to the Ithaca Fire Department. Nexamp will notify Ithaca Fire Department of the alarm and provide a diagnosis (if available). Nexamp will communicate that 23 they will update the fire department on the conditions of the BESS. Tesla and Nexamp will shut down the BESS to troubleshoot the issue. Personnel will be dispatched if the issue cannot be resolved remotely. A safe start up procedure following an alarm event is covered in the O&M manual and Tesla emergency response guide included in Nexamp’s supporting documentation package. 5 Notification Matrix To be updated upon discussion with Ithaca Fire Department 6 Emergency Response Considerations 6.1 Emergency Contacts A list of emergency contacts associated with this installation is provided in Section 3.15. 6.2 Equipment and Personnel Protective Equipment (PPE) Full firefighter protective gear shall be worn in any response to a fire and/or explosion event or if there is any sign a fire may be present or likely to be present at any time during the event. The Officer in Charge should have a 4/5 gas meter available, along with a thermal imaging camera (TIC). If there is no risk of fire or explosion present, arc-related (AR) protective clothing to protect against arc flash and electrical shock shall be worn. Jewelry such as necklaces, rings, bracelets, etc. shall be removed to avoid contact with any electrical hazard Proper PPE shall include use of Self-Contained Breathing Apparatus (SCBA). 6.3 APIE (Analyze, Plan, Implement, and Evaluate) Framework APIE is a framework commonly used for emergency incident preparation and development of proper response protocol(s). The four elements of the framework are Analyze, Plan, Implement, and Evaluate. An example of APIE framework with simplified sample details pertaining to an emergency incident is as follows:  Analyze: Provide signs and monitoring signals that indicate incident escalation (e.g., fire or explosion) may take place which first responders should be aware of. 24  Plan: Delineate the danger zone to mitigate first responders and bystanders (pedestrians, vehicular traffic, residents, etc.)  Implement: Enforce evacuations, street closures, reduced pedestrian, and first responder exposure, and other impact areas that have a life safety concern, as applicable.  Evaluate: Provide continuous monitoring and feedback of the incident and adjust accordingly to ensure ongoing safety of any bystander or responder in the impact area. 6.4 Scene Size-up – Command and Control  Initiation of emergency response shall be activated as per the current protocol. If there is any threat or potential threat to life safety, 911 shall immediately be called to the aid of public safety responders. An initial scene assessment shall be conducted from all sides (360-degree scene size up) if possible, and a concise assessment shall be given to incoming responders. Hazards and facility safety concerns such as high voltage areas or electrical concerns shall be announced to all responders. The scene assessment shall include the following in plain language (no codes, abbreviations, acronyms, etc.):  Location of the incident (Where)  What has happened  What is currently happening  Whether there are any injuries or unaccounted for individuals  What needs or other resources should be requested or brought to site An Incident Command System (ICS) should be established immediately and should include the designation of roles. The primary command post location shall be located at the Fire Department Staging Area. If public safety is summoned to the incident, the ICS shall be a Unified Incident Command System (ICS). One-site staff (if applicable) shall immediately go to the designated muster point(s), which will be the command post location unless designated differently by the Incident Commander. Incident Command shall designate the individual in charge of accountability. Accountability should be reported as soon as possible. If available and able, another individual shall control any traffic and guide first responders to the scene. At the same time as these activities are occurring, the Emergency Response Coordinator or other designated SME shall immediately contact the 24/7 Networks Operations Center to establish available data from the BMS and communicate this to the Incident Commander or other appropriate individuals. 6.5 Determine Fire Protection Approach The decision to utilize water spray or to provide thermal cooling via hose lines should be made in coordination with System Owner / Operator, and any other required SMEs. Caution should be exercised if water is applied directly to the exterior of an affected Energy Storage System enclosure, as this will not stop a thermal runaway event and may potentially delay combustion. Defensive firefighting tactics are generally recommended, with water being applied to nearby exposures for cooling, as necessary. Any hose line operations should be limited to hose and master stream application from outside of the BESS area at least 100ft away from the BESS, and as far back as hose and stream range allow. A fog pattern from a handline or monitor nozzle may potentially be utilized to control smoke and gas released from the affected enclosure and prevent them from moving to unwanted areas. 25 In all instances, power shutdown and isolation involving any high voltage feeder lines must be confirmed before any defensive measures are taken involving application of water to the site. 6.6 Incident Monitoring and Evaluation Continuous monitoring and feedback on the incident should be provided as the situation evolves. Consultation with the System Owner/ Operator, and any other required SMEs should be held to guide incident response and determine appropriate next steps. If available, real-time BMS data from the 24/7 Networks Operations Center should be utilized (e.g., temperature, voltage, or other critical measurements) to monitor the spread of failure and assess the health the ESS to help guide response procedures as the event unfolds. 7 Post Incident Operations Handoff Procedures Upon determination by Ithaca Fire Department Incident Commander, when the energy storage system is deemed safe, the System Operator shall ensure that the site is safeguarded until the damaged system is removed, repaired, or replaced based on the approved Decommissioning Plan filed with the building permit. Activation of Decommissioning Plan Decommissioning of the system shall take place in accordance with the Decommissioning Plan filed with the building permit. Deactivation, de-energizing, dismantling and removal of the system shall be conducted by trained and knowledgeable people in accordance with manufacturer’s specifications. 8 Training and Exercises The ERP serves as the platform for the training program and includes the following:  System Overview  Equipment  BMS  Detection and Suppression  Emergency System Shutdown  Hazards  Suppression agents and exposure control  Response tactics  Post-fire operations Initial training for all stakeholders included in this ERP shall be undertaken before the construction of the BESS facility. Refreshment training of the ERP will be offered at least one time annually However, Nexamp will provide additional training at the request of any stakeholders included in the ERP, particularly the Ithaca Fire Department. In accordance with best practices such as NFPA 855, drills should be conducted regularly to exercise knowledge of the ERP and prepare stakeholders for a potential emergency. Over a three-year cycle, drills will grow in complexity and will be evaluated to ensure the ERP can be executed as written. 26 Drills may be desktop, functional, or full-scale and will follow the FEMA/HSEEP doctrine (Link provided below).  Plan Cycle 1 o Cycle 1 drills will be basic in nature and consider the reasonable conditions that may cause the Fire Service to respond to the Facility.  Plan Cycle 2 o Cycle 2 will begin to evaluate more complex equipment failures where facility personnel will collaborate with members of the first response community to mitigate and contain the event.  Plan Cycle 3 o Cycle 3 will represent the most complex scenario that can impact major system components, neighbors, and the environment. https://www.fema.gov/emergency-managers/national-preparedness/exercises/hseep 9 Revision Tracking Rev Author(s) Effective Date Description of Revision(s) 0 Mohamed Kassamali, Eli Shandelman 03/12/2026 First Draft of Emergency Response Plan –Technology, Site, and Contact information included 1 2 3 4 5 - es si l a e De t i o m n a c n e r i e r n e n d i n c ts na t e h a e m m m e n e n d e e T i b e n i l , ah s AT O N E AE SO L E S AG A R Oe ~~ |hj} ifiit | ; } ; ; i $Omncs Se e n 1 / N-TYPE CELL TECHNOLOGY Manufactured exclusively in the USA. ¢Improved Shade Tolerance -Improved Low-Light Performance -Increased Performance in High Temperatures e Efficient Bifacial Energy Yield e Enhanced Durability «Reduced Degradation Rate e 25-Year Product Warranty/ 30-Year Performance Warranty Oe ahateVea sa]a(oVel)fo Test Conditions STC STC BSTC NOCT STC —BSTC._~———SNNOCT Module Power (Pmax)Wp 620 686.96 46348 630 698.04 470.96 640 |709.12 478.44 Maximum power voltage (Vpmax)48.16 48.16 |44.95 48.47 48.47 45.24 |48.78 |48.78 |45.53 Maximum power current(lpmax)|12.87 14.26 |10.31 13.00 14.40 10.41 |13.12 |14.54 |10.51 Open circuit voltage (Voc)V Di.21 57.50 |53.85 57.49 57.78 54.11 :57.76 |58.05 54.37 Short circuit current (Isc)A 13.55 15.01 |10.91 |13.66 15.13 11.00 |13.76 15.25 11.09 Module efficiency %22.20%22.56%22.92% Maximum system voltage (VDC)V 1500 Series fuse rating A 30 Power Tolerance Wp 0 to +10 Bifaciality Factor %80+10 Performance conditions:Measurementtolerance <3%«Standard Test Conditions (STC):1000 W/m’,AM 1.5,Temperature 25 °C »Nominal Operating Cell Temperature (NOCT):800 W/m?,AM 1.5 «Bifacial Standard Test Conditions (BSTC):1000 W/m2 +@ x 135 W/m2 ,p=80 %,AM 1.5 +Electrical characteristics may vary by +5%. ee MECHANICAL alas i elroy a tae Bis). Module weight 29.5 kg +0.25 kg 65.8 lbs +0.5 Ibs Dimensions (H x L x D)2465 mm x 1133 mm x 35mm 97.0 in x 44.6 in x 1.4 in Maximum surface load (wind/snow)*2400 Pa rear load /5400 Pa front load 50.1 lb/ft?rear load /112.8 lb/ft?front load Hail impact resistance 225 mm at 83 km/h @1linat51.6mph Cells Glass 156 Half cells -N-Type Silicon solar cell 91x182 mm 3.2 mm high transmittance,tempered, antireflective coating 58x 7.16 in 156 Half cells -N-Type Silicon solar cell 2. 0.126 in high transmittance,tempered, antireflective coating Cables and connectors(refer to installation manual)(+)1350 mm,(-)350 mm,@ 5.7 mm,EVO2 from Staubli (+)53.1 in,(-)13.8 in,@ 0.22 in (12ZAWG),EVO2 from Staubli Backsheet Frame Junction Box IP68 rated,3 diodes Anodized Aluminum (Silver) High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, transparent PV backsheet 0.04 %/°C -0.24 %/°C -0.29 %/°C 45°C -40/+85 °C Temperature Coefficient Isc Temperature Coefficient Voc Temperature Coefficient Pmax NOCT(+2°C) Operating temperature Linear power performance Module product workmanship warranty 25 years** 30 years >98%end Ist yr >94.7%end 12th yr >90.8%end 25th yr 2 89.3%end 30th yr SHIPPING SPECS CERTIFICATIONS Product UL 61215,UL 61730,CSA C22.2#61730,IEC 61215,IEC 61730,IEC 61701 (Salt Mist ModulesPer Pallet:31 or 31 (California) Corrosion),IEC 62716 (Ammonia Corrosion),UL Fire Rating:Type 1 | Pallets Per Truck 19 or 18 (California) PAGO IS09001:2015 ModulesPer Truck 589 or 558 (California) * AWarning.Read the Safety and Installation Manual for mounting specifications and before handling,installingarand operating modules. **12 year extendable to 25 years subject to registration and conditions outlined under “Warranty”at siifebsolarcom., || |I|97"[2465mm]|—=>_Ee |+E 21"[532.5mm]|55.1"[1400mm]_~69,|~24"[532.5mm]|8"[200mm]|Tracker Mounting Hole (x8 -10x7)- ||,MountingHole (x4 -14x9) Grounding Hole :=A p :1 1 i ji iT ]T T |7 |1]7 1]T 1 7]|Pa ya]TT?tel lll ||a |LEE TEE eee |that I|ee |ee a Ld Led Rell i__—=SS53345 |ey Rese 1.4"[35mm]|||ai i La =[1350mm]|oFPotat||enat >=we |oe”|____|__|__Fable Lenath S Ly=rs corr c ror rr iH ae =|.3 Pe (eamt py 3 E £<Ho pa i Hf in 2]Eo(LL et La 3 006"aeyy)i SST TTT em ||£5PP|A ee :het dad -in ©PEEE Te +=|&E “ILhoococ||FEPieers)Oy rermaddToray)|)deat [350mm]|ly LyPL5|CableLength | |i |oy |=|roiye|ry |Hoy |Tat tt or |||,Ho ee a ee || :—s 7 -~*\-2g"i 15.7"[400mm]\\prain|Diea "W \~age|0.17"[O4.2mm](x2)-|___[60mm]Z 31.1"[790mm]102)Hole (x8) SILFAB SOLARINC. 1770 Port Drive Burlington WA 98233 USA T +1 360.569.4733 info@silfabsolar.com SILFABSOLAR.COM 7149 Logistics Lane Fort Mill SC 29715 USA T +1 839.400.4338 4080 Confederation Parkway,Suite 301 Mississauga ON L5B 0G4 Canada T +1 905.255.2501 Sales &Customer Support T +1.833.998.6642 Silfab -SIL-620-630-640-XL-BIFACIAL 20260113 No reproduction of any kind is allowed without permission. Data and informationis subject to modifications without notice. ©Silfab Solar Inc.,2024.Silfab Solar®is a registered trademark of Silfab Solar Inc. ALL TERRAIN TRACKER BECAUSETHE WOR! Nevados is the premier solar tracker company for PV power plants built on sloped and rolling terrain. We offer innovative all-terrain trackers paired with a comprehensive software suite in an integrated technology platform that optimizes solar performance,improves plant reliability and respects the natural landscape. tt fa errr e(1)FOLLOW THE LAND e Industry's first and most capable terrain following tracker e Eliminates civil grading &eases permitting e Reduced pile length saves steel 2) RD ae a MANAGE EXTREME “—~WEATHER RISK ( ia i e Extensive wind tunnel studies on variable terrain e@ /5°hail stow e Integrated friction dampers for unparalleled wind performance NevadosALlLTerrain 17 SLOPE CHANGE AT EVERYPILE BEARING TYPE SLOPE CHANGE (%) Articulating +26 (2)INCREASE SITE OPTIONS NS e Convert sites from fixed tilt to tracker Revisit sites previously disqualified due to grading e Build on sites with differential settlement risk e Fastest installation,zero custom tools orjigs E SITE DESIGNAN e Proprietary TRACE Terrain-Aware Backtracking schedules for zero shading &increased energy yield e Unique software for site design optimization e Off-azimuth,variable GCR,variable tilt schedules Tracker (ATT) BECAUSE THE WORLD IS NOT FLAT ROW CONFIGURATION TRACKING ANGLE CAPABILITIES TERRAIN FOLLOWING FOUNDATION GROUND COVERAGE RATIO DESIGN LOADS INCLUDED SERVICES OPERATING TEMPERATURE MODULE CONNECTION/GROUNDING: TOLERANCES CONTROLS WARRANTY 55 4th St, Up to 96 modules per row 5 to 8 modules per bay +60°tracking expandable to +75°tracking Single row actuation with 24VDC slew drive Straight Through bearing:+3.5%slope change at each foundation Articulating bearing:+26%slope change at each foundation 37%max N-S and E-W slope |-Beam or ground screw foundations installed at consistent reveal throughout site Configurable,typically greater than or equal to 28% Designed to applicable ASCE Configurable to any wind speeds Configurable to 50+PSF snow load Loads studied in wind tunnels for variable terrain;no external dampers required for wind dynamics Preliminary layouts and site design optimization Structural calculations,IFC package and foundation design TRACE Terrain-Aware Backtracking or True Tracking -20°C —55°C Self-grounding module brackets UL2703 and UL3703 Reveal height:+4”/-0”,N-S:1.5”(expandable),2°vertical plumb,9°twist Flat-land:+12”vertical &E-W at each pile,may change based on neighboring foundations Web-based dashboard for monitoring &operation with row-level control SCADA integration via Modbus TCP/IP for monitoring &operation with row-level control Wireless,self-powered row controllers and weather stations AC-powered Zone Controllers 10-year structural,5-year drive &controls warranty Oakland CA 94607 e 415-730-0159 «Nevados.Solar MENTS The Nevados control system is designed to optimize power which can manage up to 100 row controllers.The system generation from yourproject site and account for variable provides detailed operational information from each row, shadow fall on flat,sloped,and rolling terrain.Each row is which can be utilized to increase row-to-row efficiency and monitored by a single row controller.Row controllers are maximize output. connected and optimized through zone controllers,each of Nevados Row Controller (RC) 1-100 per ZC Nevados Zone Controller (ZC) with TRACE Terrain-Aware Backtracking Schedules(included) "Wireless o ZigBee Mesh )(AES-128 Encrypted) .-(Optional)r Existing On-sitea24msSCADAHMIeo?we.-a a A we a m-7 a %,f:— &z ~aeea?¥ooetS&oe A Ethernet ~syf..o?~&i “>S Modbus TCP/IP o*(TCP:502)oe~f#~ee o Su3*<(hepmOn-site LAN (Optional)os”SA .On-site Nevados 7 “Existing On-siteDashboard/SCADAHMI >eangees)z Firewall &7 =KS AL HTTPS~Secure MQTT (TCP:443)>(TCP:8883)" o7 7~o”aw or on s ~o ,Nevados Piloy7erver}27,7 =;Infrastructure .poL7DaaSsSSS. ,%(Optional)Daa ee Be ~\~Control System 2 oS eat software updatesof;&~&~{&~o”(Included)a oeHostedNevadosO&M “ee |e 2” Dashboard (1)ROW CONTROLLER e Configurable for most environments e O&M reporting e IP65 e IP65 MODULES ee ue Ma |aes ee,WEATHERoea DASHBOARD_CONTROLLER #§CONTROLLER |STATION om:49¥?mya§S53)‘ii;my a i % ¥,LS AEG?i fa Sabresiy% ALL TERR .\DOS AIN TRACKER BECAUSE THE WORLD IS NOT FLAT ZONE CONTROLLER WIRELESS WIRED @ @ SIZE (LxWxD) DESIGN SERVICE/ACCESS MOUNTING POWER BATTERY INPUTS OUTPUTS BOARD COMPONENTS e Zigbee 8P8C or SFP between ZC and site network Optional RS 485 communication link 10”x 12”x 3.5"—max external dimension of enclosure (not including mounting tabs) IP65,Plastic (injection molded), Membrane vent Access battery field serviceable Direct mount RC to torque tube Auxiliary solar module,40+W and 30V, approx 645mm x 345mm x 25mm 150+Wh LiFePO4 battery with optional cold weather package RS485 port for string current sensor E-Stop Built-in keypad with status LEDs Auxiliary module power cables Motor Cable Antenna Zigbee radio Motor over-current monitoring and protection Accelerometer Cell-level battery monitoring and charge management Zigbee communication to RC Manage with SCADA over Modbus Reporting to cloud-hosted monitoring & control dashboard Cat5/6 between ZC and SCADA 12”x 10”x 6" IP65,Polycarbonate Access for configuration Mounted near or on inverter skid,or other ethernet and power access point. 120V,277V AC wired to enclosure 120V,277V AC e Ethernet or fiber (SFP) e Antenna 55 4th St,Oakland CA 94607 e 415-730-0159 e Nevados.Solar 6 a ele ORMERLESS FEATURES 7 *Made in the USA with global «AEB, components VAS KAWA aof t ¢Buy American Act (BAA)compliant a | ¢Four models: *T25kKW/125kVA, *125KW/1I50kVA, -JBOkW/I66KVA, -166KW/I66kKVA ¢Additional models available certified to UL1699b,Photovoltaic !SOLECTRIA XGI ate DC Arc-Fault Circuit Protection ae -99.0%peak efficiency >Flexible solution for distributed and see centralized system architecture = ¢Advanced grid-support functionality Rule 21/UL1741SB -Robust,dependable,&built to last «Lowest O&M and installation costs >Access all inverters on site via WiFi a o from one location ee ney -Remote diagnostics and firmware i" upgrades ¢SunSpec Modbus Certified .;Yaskawa Solectria Solar’s XGI 1500 OPTIONS utility-scale string inverters are -String combiners for distributed designed for high reliability and built and centralized systems 'j»Web bused monitoring of the highest quality components -Extended warranty that were selected,tested and proven to last beyond their warranty. XGI 1500 inverters provide advanced grid-support functionality and meetthe latest IEEE 1547 and UL1741SB standards for safety.They are the most powerful 1500 VDC string inverters in the PV market and have been engineered for both distributed and centralized system architecture. Designed and engineered in Lawrence,MA,XGI inverters are assembled and tested at Yaskawa America’s facilities in Buffalo Grove,IL.They are Made in the USA with global components and are compliant with the Buy American Act. VAS KAWA YaskawaSolectria Solar 1-978-683-9700 |Email:sales@solectria.com |solectria.com SOLECTRIA SOLAR Document No.FL.XGI1500.01 |05/07/2025 |©2021 Yaskawa America,Inc. SOLECTRIA®XGI 1500-166 SERIES TECHNICAL DATA SPECIFICATIONS PRODUCT SPECIFICATION XGI 1500 INVERTER MODEL XGI 1500-125/125-UL XGI 1500-125/150-UL XGI 1500-150/166-UL XGI1500-166/166-UL | XGI 1500-125/125-UL-A XGI 1500-125/150-UL-A XGI 1500-150/166-UL-A XGI 1500-166/166-UL-A DC Input AC Output Efficiency Temperature Communications Testing & Certifications Warranty Enclosure YASKAWA Absolute Max Input Voltage Max Power Input Voltage Range (MPPT) Operating Voltage Range (MPPT) Number of MPP Trackers Max Operating Input Current Max Operating PV Power Max DC/AC Ratio |Max Rated PV Power Max Rated PV Short-Circuit Current (YIsc x 1.25) Nominal Output Voltage AC Voitage Range Continuous Real Output Power Continuous Apparent Output Power Max Output Current Nominal Output Frequency Power Factor (Unity default) Total Harmonic Distortion (THD)@ Rated Load Grid Connection Type Fault Current Contribution (1 cycle RMS) Peak Efficiency CEC Average Efficiency Tare Loss Ambient Temp Range De-Rating Temperature Storage Temperature Range Relative Humidity (non-condensing) Operating Altitude Advanced Graphical User Interface Communication Interface Third-Party Monitoring Protocol Web-Based Monitoring Firmware Updates Safety Listings &Certifications Advanced Grid Support Functionality Testing Agency FCC Compliance Standard and Options Acoustic Noise Rating DC Disconnect Mounting Angle Dimensions Weight Enclosure Rating and Finish SOLECTRIA SOLAR 1500 VDC 860-1250 VDC 860-1450 VDC 1500 VDC 860-1250 VDC 860-1450 VDC 1500 VDC 860-1250 VDC 860-1450 VDC 1500 VDC 860-1250 VDC 860-1450 VDC 1 MPPT 1 MPPT 1 MPPT 1 MPPT 148.3 A 148.3 A 178.0 A 197.7 A 128 kw 128 kw 153 kw 170 kw 2.6 |332 kW 2.6 |332 kw 2.2 |332 kw 2.0 |332 kw 500A 500 A 500 A SOOA 600 VAC,3-Ph 600 VAC,3-Ph 600 VAC,3-Ph 600 VAC,3-Ph -12%to +10%-12%to +10%-12%to +10%-12%to +10% 125 kW 125 kw 150 kw 166 kW 125 kVA 150 kVA 166 kVA 166 kVA 120A 144A 160 A 160 A 60 Hz 60 Hz 60 Hz 60 Hz +/-0.80 +/-0.80 +/-0.80 +/-0.80 Adjustable Adjustable Adjustable Adjustable <3%<3%<3%<3% 3-Ph +N/GND 3-Ph +N/GND 3-Ph +N/GND 3-Ph +N/GND 144A 173 A 192 A 192A 98.9%98.9%99.0%99.0% 98.5%98.5%98.5%98.5% 2.75 W 2.75 W 2.75 W 2.75 W -40°F to 140°F (-40C to 60C)-A0°F to 140°F (-40C to 60C) 113°F (45C) -A40°F to 167°F (-40C to 75C) 122°F (50C) -40°F to 167°F (-40C to 75C) O-95%0 -95% Full Power up to 9,840 ft (3.0 km);De-Rate to 70%of Full Power at 13,123 ft (4.0 km) WiFi Ethernet SunSpec Modbus TCP/IP Optional Remote and Local UL1741SB,IEEE 1547,UL 1699b Photovoltaic Arc-Fault Circuit Protection Certified (-A models) Rule 21,UL 1741SB ETL FCC Part 15 (Subpart B,Class A) 5 Years Standard;Option for 10 Years 73 dBA @1m;67dBA@3m Integrated 2-Pole 250 A DC Disconnect Vertical only Height:29.5 in.(750 mm)|Width:39.4 in.(IOOO mm)|Depth:15.1 in.(380 mm) 270 Ibs (122 kg) Type 4X,Polyester Powder-Coated Aluminum Yaskawa Solectria Solar 1-978-683-9700 |Email:sales@solectria.com |solectria.com Document No.FL.XGI1500.01 |05/07/2025 |©2021 Yaskawa America,Inc. MEGAPACK wmctmsrialatnneaicSEPattonugteneta Megapack is anall-in-one utility-scale energy storage system that is scalable to the space,power,and energy requirements of any site from 1 MWhto over 1 GWh.Megapack is optimized for cost,performance,and ease of installation,and includes a standard systemvVarranty of up to 15 years. FULLY INTEGRATED SYSTEM OPTIMIZATION SOFTWARE ENHANCED SYSTEM SAFETY Megapack ships with battery modules,Proprietary optimization software,Parallel DC/DC converters,integrated bi-directional inverter,thermal developed in parallel with the Megapack heating and cooling at the cell level.and management system,and AC main hardware,learns and predicts local energy dedicated hazard venting are just a fewof breaker all pre-installed and pre-tested patterns,offering autonomous charge the safety and hazard mitigation features within a single enclosure.This turnkey and discharge and seamiess SCADA built into Megapack.Designed to meet system is designed to have the industry's integration.Fast-respanse controls can international safety standards,Megapack fastest,lowest cost installation without integrate co-located renewables and helps ensure ease-of-permitting wherever sacrificing performance or reliability.enable market participation it's installed. INDUSTRY-LEADING RELIABILITY Ay duct from hardware design and sourcing to software development,Megapackoffers significantop-=a ee 5 rr th iO “Quet p oo cm~~© reliability advantages over the competition.These design advantages are exemplified by a cooling system optimized specifically—_- for Megapack that provides superior heating and cooling while factoring its HVAC energy consumption into its performance,and module-level DC/DCconverters that can keep the system running uninterrupted in case of a partial failure. LOWEST ENGINEERING,PROCUREMENT,AND CONSTRUCTION (EPC)COSTS y storage2Megapackisshippedonsitefullyassembledandpre-tested,offering customers the world’s fastest utility-scale ener installation.Once on site,Megapack only requires seismic anchoring and connection of AC conductors and a communication cable.The EPC benefit is clear:no other current utility-scale solution offers such a simplified process. GLOBAL SERVICE FOOTPRINT As a vertically integrated manufacturer and supplier,8 provides a streamlined service offering on all components of Megapack.With Tesla,customers enjoy a single point of contact through all stages of product life.Our operational fleet of 2+ GWhprovides valuable data that informs our maintenance models and our performance guarantees,and the entire Megapack system is covered bya standard warranty of up to 15 years,with the option of a 20-year Capacity Maintenance Agreement (CMA) in certain cases. TESLA SL Decommissioning Plan – Bomber Heights Solar, LLC January 2025 Bomber Heights, LLC (The Company), has prepared this Decommissioning Plan (Plan) for its proposed solar photovoltaic facility to be constructed on private property located at 117 Troy Road, Ithaca, NY, tax map 49.-1-26.2. The Plan describes the process for decommissioning the Facility in accordance with state and local requirements. Facility Description The Facility will consist of a 5,000-kilowatt (or 5 megawatts, MW) alternating current (AC) capacity solar power-generating array, and a 5MW Energy Storage System secured within an NEC-compliant farm fence surrounding the solar panels and equipment, accessed through a locked gate located inside the property. Each Facility will include the following site features: • PV Modules, inverter(s), and transformer (filled with biodegradable mineral oil) • Combiner boxes and switchgear • Battery storage – Tesla Megapacks • Concrete pad(s) • Screw or driven piles and racking to support the PV modules • DC and AC wiring and conduit • A gravel access drive • Stormwater management features including swales • Landscaping • Exterior 8-foot agricultural fencing • A metal security gate at the entrance to the array area • Overhead utility lines and poles Stakeholders Role Contact Information Bomber Heights, LLC Asset Owner Attn: Bomber Heights 101 Summer St, Flr 2 Boston, MA 02110 Phone: 617.431.1440 Email: Legal@Nexamp.com Town of Ithaca – Codes Office Town Code Enforcement and Site Inspection Town of Ithaca Codes Office 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 Town of Ithaca – Planning Board Site Plan Jurisdiction Town of Ithaca Planning Board Chair 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 Town of Ithaca – Town Board Decommissioning Bond Holder Town Board 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 NYSEG Utility Operator Distributed Generation Office 18 Link Drive Binghamton, NY All listed stakeholders will receive a copy of the decommissioning plan when executed, and will receive revised copies when revisions are made. All subsequent changes to the Decommissioning Plan will need to be approved by the Town Board, and recorded with the County Clerk upon execution. Expected Lifetime Bomber Heights, LLC has a land lease agreement with the owner of the parcel in question for upwards of 40 years, and has permission to operate the system during that time. Panels are warrantied for 25 years, and the Company anticipates the replacement of inverters with equivalent models as necessary. The project is expected to operate for a bare minimum of 25 years, but is expected to operate for the full term of its lease with the landowner. Triggers and Notices Decommissioning plan will be implemented if the following circumstances occur, per guidance in the Town of Ithaca Local Law §270-219.1-C(4)(i)(i) • lack of production for six continuous months (or for 12 of any 18 months); • lack of a current local permit; • failure to maintain any required decommissioning bond or other security; and • a violation of any site plan conditions or permit conditions that continue more than 90 days after the Town provides written notice of such violation, providing the asset owner has commenced cures within 30 days of the written notice. If the asset owner does not commence cures within 30-days of notice, the plan shall be implemented and the bond shall be drawn upon. Every effort will be made to adhere to the decommissioning event criteria outlined above. However, the asset owner will have an opportunity for appeal for extension of the abandonment timeline with adequate proof that the delay can be attributed to supply chain, permitting, or labor issues outside of the owner’s reasonable control. Prior to the decommissioning plan execution, the asset owner will transmit an electronic notice followed by a hard copy letter to the Town Clerk and/or Code Enforcement Office in the event of any decommissioning, sale, transfer, or any event that may result in partial or complete decommissioning of the site. Notices will be delivered to the addresses below; Town of Ithaca Code Enforcement Office Email: codes@town.ithaca.ny.us 215 North Tioga St Ithaca, NY 14850 Decommissioning Plan The Facility will be decommissioned by completing the following major steps: Dismantlement, Demolition, and Disposal or Recycle; and Site Stabilization, as further described below. In addition to the tasks outlined below, Bomber Heights agrees that all Decommissioning obligations will be done in accordance with the the stricter of the Town of Ithaca’s Zoning Law, Local Law 10, 2023, Section 6; Construction Standards, hereto attached at Exhibit A to this agreement, and/or the NYS Department of Agriculture and Markets (NYSDAM) Guidelines, as set forth in the NYSDAM Guidelines for Agricultural Mitigation for Solar Energy Projects (Revised October 18th, 2019), Hereto attached as Exhibit B to this agreement, unless otherwise waived by the Town. Bomber Heights has the sole responsibility to remove the system per the terms of this agreement, and the terms of its lease agreement with the Rancich Family Limited Partnership. Should Bomber Heights be sold or transferred, all Decommissioning responsibilities will transfer to the owning entity. Bomber Heights will provide a surety to the Town to pay for the costs associated with Decommissioning the system, should the asset holder not fulfill its responsibility to Decommission the system as stated by the Town Law. Decommissioning timeline is anticipated to be about six months (180 days) and will be weather dependent, with extensions resulting due to the time of year and overall weather conditions as to not adversely affect the land or provide unsafe working conditions for site employees. Soil Decompaction and stabilization may prolong the decommissioning process due to seasonality of these activities and the need to protect soil from erosion. Dismantlement, Demolition, and Disposal or Recycle A significant portion of the components that comprise each Facility will include recyclable or re-saleable components, including copper, aluminum, galvanized steel, and modules. Due to their re-sale monetary value, these components will be dismantled, disassembled, and recycled rather than being demolished and disposed of. Typically, salvage value is taken into account when estimating net decommissioning costs. Nexamp has proceeded to omit those costs to alleviate concerns about recycling availability and market instability. Following coordination with NYSEG (“Utility”) regarding timing and required procedures for disconnecting each Facility from the utility distribution network, all electrical connections to the system will be disconnected and all connections will be tested locally to confirm that no electric current is running through them before proceeding. All electrical connections to the PV modules will be severed at each module, and the modules will then be removed from their framework by cutting or dismantling the connections to the supports. Modules will be removed and sold to a purchaser or recycler. In the event of a total fracture of any modules, the interior materials are silicon-based and substantially recyclable. Should disposal be necessary, disposal of these materials at a DEC-approved landfill will be permissible. The PV mounting system framework will be dismantled and recycled. The metal piles will be removed and recycled. All other associated structures will be demolished and removed from the site for recycling or disposal. This will include the site fence and gates, which will likely be reclaimed or recycled. Grade slabs will be broken and removed to a depth of four feet below grade, and clean concrete will be crushed and disposed of off-site or recycled (reused either on- or off- site). The portion of the gravel access road created specifically for the project, will be removed as well, or as otherwise required in the ground lease with the landowner. The Town of Ithaca is not a party to, and cannot enforce ground lease decommissioning or removal requirements. Aboveground utility poles owned by Bomber Heights, LLC will be completely removed and disposed of off-site in accordance with utility best practices. Any overhead wires will be removed from each Facility and will terminate at the utility-owned connections inside the property. Underground wires buried less than 4’ deep will be removed per Town of Ithaca regulations(§270-219.1-C(4)(i)(v). The access road will remain in place to the final utility-owned electrical poles and the Utility will be responsible for dismantling those overhead wires and poles under its ownership. Coordination with The Utility, personnel will be conducted to facilitate removal of any poles and overhead wires located on the site. A final site walkthrough will be conducted to remove debris and/or trash generated during the decommissioning process, and will include removal and proper disposal of any debris that may have been wind-blown to areas outside the immediate footprint of each Facility being removed. All solid and/or hazardous waste will be disposed of in accordance with local, state, and federal regulations. Should the Town have reason to suspect the contamination of soils on the property, following confirmation of said contamination by third party contractor, soils will be removed and disposed of in accordance with local, state and federal regulations. Road Removal All access road materials will be removed, and graded areas will be returned to grade using unless otherwise specified by the landowner. Regraded areas will be graded in such a way as to not inhibit the access or traversing of agricultural vehicles. Re-graded area will be seeded and stabilized with native species, or applicable seed mixes that substantially match surrounding areas immediately upon completion. Stormwater Feature Removal All stormwater features will be removed and regraded to establish and restore prior drainage patterns. Where appropriate, vegetation will be removed and all stormwater features will be filled. Regraded areas will be graded in such a way as to not inhibit the access or traversing of agricultural vehicles. Re-graded area will be seeded and stabilized with native species, or applicable seed mixes that substantially match surrounding areas immediately upon completion. Decompaction Any agricultural areas disturbed by construction or decommissioning activities shall be decompacted, restored and seeded in accordance with Section 270-291.1(G)(2)(c )(6)[e] of the Town Code. Screening Removal Removal of screening will be conditional based on Town feedback at the time of Building Permit Review. Without explicit town approval, all vegetative screening features will remain on site following decommissioning. Should removal be mandated, screening will be disposed of offsite in an appropriate manner. Where appropriate and necessary, soil depressions will be filled. Re-graded area will be seeded and stabilized immediately upon completion. Soil Management and Site Stabilization It is anticipated that the removal of the facility will cause disturbance of more than 5 acres, and will thus be subject to a SPDES permit and SWPPP. Erosion control measures will be designed and established with the Town at the time of Building Permit issuance. Per Town regulations, all agricultural areas shall be decompacted to a depth of 18” following removal of materials from the site. Rocks and large aggregate will be removed from site and topsoil replaced. The areas of each Facility that are disturbed during decommissioning will be re-graded to establish a uniform slope and stabilized via hydroseeding with a ground treatment approved by the Building Inspector. Environmental Monitoring Given the Project’s limits of disturbance is anticipated to be less than 50 acres, an environmental monitor is not required according to NYSDAM guidelines. Per the Town of Ithaca’s local law, a monitor would be required if prime soils existed on site, but as this is not the case we do not anticipate a local requirement for this oversight during active decommissioning. Instead, the asset owner will coordinate with the Town to hire a qualified environmental monitor who will consult on the restoration, and post-construction monitoring for no less than two years. Inspections shall take place in spring, summer and fall per Town Regulations. Permitting Requirements Given the size and location of each Facility, several approvals will be obtained prior to initiation of the decommissioning process. Table 1 provides a summary of the expected approvals if the decommissioning were to take place in April 2023. Noting that the decommissioning is expected to occur at a much later date, the permitting requirements listed in the table below will be reviewed at that time and updated based on then current local, state, and federal regulations. Table 1. Current Permitting Requirements for Decommissioning Permit Agency Threshold/Trigger State Pollutant Discharge Elimination System (SPDES) General Permit for Discharges from Construction Activity New York State Department of Environmental Conservation (NYSDEC) Ground disturbance of greater than 1 acre with discharge to wetlands or water bodies. Requires preparation of a Stormwater Pollution Prevention Plan, including erosion and sedimentation controls. Building Permit or Demolition Permit Town Building Department A building permit must be obtained for any construction, alteration, repair, demolition, or change to the use or occupancy of a building. Decommissioning Surety Proposal – Bomber Heights January, 2026 Consistent with the approach it has taken in other communities, Bomber Heights, LLC, offers to provide a decommissioning surety bond, to be posted prior at the commercial operation date, in the amount of $499,875.00, for decommissioning of the solar and BESS systems in the event that the company is unable to meet its contractual obligations for solar project removal and restoration. The decommissioning bond, of which Bomber Heights will serve as the principal and the Town of Ithaca shall serve as the as the obligee, starting at the commercial operation date, shall remain in place for the life of the system and for 18 months following the removal of the system. The Town shall have the right to draw on this bond should the Asset Owner not action and implement the decommissioning plan as stated herein. In developing the decommissioning surety bond, the company utilized recent decommissioning costs estimate from similar Community Solar and storage projects. The estimation leading to this rate is attached to this proposal as Exhibit B. These costs have been affirmed by our engineering partners at LaBella Associates. This bond will be reviewed every three years until which time the company’s decommissioning obligations have been fulfilled. Bomber Heights agrees to submit revised removal cost estimates to the Town and the bond company on three-year intervals. Posted bonds will reflect this estimate for the next three years, until which time the costs of removal are reassessed. The bond’s start date shall be the first month following the commercial operation date of the facility. The bond has no set term, and will remain in place for until 18 months following system removal. Below is a summary of the analysis: Project Size (MWAC) 5 Decommissioning 25% Adder $399,900.00 $99,975.00 Total $499,875.00 [Signatures on the following page] Bomber Heights, LLC agrees that if the surety is not renewed or cancelled it will forfeit its Certificate of Occupancy and right to continue to operate until a replacement surety has been posted. TOWN OF ITHACA, NY Authorized Signature: _________________________ Name: Title: Supervisor BOMBER HEIGHTS, LLC Authorized Signature: _________________________ Name: Title: EXHIBIT A – Town Of Ithaca Zoning Law, Solar Facilities [Attached] EXHIBIT B – Decommissioning Estimate Category Deco Total MODULES $37,500.00 BESS $37,500.00 MODULE MOUNTING $28,000.00 BOS EQUIPMENT $12,500.00 INVERTERS $12,000.00 DAS $2,000.00 ELECTRICAL - MATERIAL Array Wiring $12,500.00 MV overhead conductor & equipment $3,400.00 DC equipment $40,000.00 $25,500.00 LABOR Racking Removal $55,000.00 Module Removal $10,000.00 CIVIL FEATURE REMOVAL Access Roads & Laydown areas $55,000.00 Stormwater management features removal $17,500.00 Trenching & directional boring $10,000.00 Seeding / Hydroseeding $12,500.00 Equipment & Storage Pads $5,000.00 FENCING & GATE $14,000.00 CONSTRUCTION MANAGEMENT Permits $2,000.00 Environmental Monitor $4,500.00 General Conditions $3,500.00 TOTAL $399,900.00 EXHIBIT D – Decommissioning Certification [Attached] This Decommissioning Plan and Estimate for Bomber Heights Solar, LLC as prepared by Nexamp and LaBella Associates, dated January 2026, has been reviewed by a Professional Engineer licensed in the State of New York: Name and Title: Mufuta J. Tshimanga, PE, Civil Engineer Date: Issued 7/8/2026 Operations and Maintenance Plan Bomber Heights Solar, LLC Jul. 2026 Submitted by: Ryan McCune – Business Development Manager O&M Services Contact: 978-653-4448 101 Summer Street, 2nd Floor Boston, MA 02110 2 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Table of Contents TABLE OF CONTENTS ............................................................................................................................ 2 OVERVIEW ........................................................................................................................................... 3 SITE DESCRIPTION AND ACCESS ........................................................................................................... 4 STAKEHOLDERS AND RESPONSIBILITIES ............................................................................................... 5 SERVICES AREA .................................................................................................................................... 6 SERVICES & SCHEDULE ......................................................................................................................... 7 REPORTING PROCEDURES .................................................................................................................. 12 COMPANY CONTACTS ........................................................................................................................ 13 CHANGE LOG ..................................................................................................................................... 14 APPENDIX A: NYSDEC STORMWATER INSPECTION CHECKLIST ............................................................ 15 3 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Overview As an owner-operator of solar systems nationwide, Nexamp has cultivated an in-house operations and maintenance team on par with the best in the industry. Nexamp’s veteran team of power and solar professionals understands what it takes to manage, maintain and deliver ongoing performance and reliability from our solar plants. We provide full spectrum operations and maintenance services for our own, as well as third party systems. Our team actively monitors and provides preventative, corrective, and condition-based maintenance for over Hundreds of MWs at commercial, residential and government owned plants in NY and across the Country. This wide range of managed assets gives our team unprecedented knowledge that helps us keep facilities on-line and delivering clean, renewable energy to our customers consistently, with little downtime. Our integrated O&M team should give the Town of Ithaca the confidence it needs to know that the 5 MW facility we’re seeking to permit will remain operational, and not prove to be a burden on the Town or its residence at any point during the facilities operation. This Operations and Maintenance plan serves as an outline for the maintenance services and schedules that will be employed at Bomber Heights Solar. This plan will be filed with the Town codes office for reference and use during inspections. Nexamp will be held responsible to adherence of this plan, and shall notify the town if changes are made to the plan within 30 days of modification. 4 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Site Description and Access Bomber Heights Solar , LLC (The Company), has prepared this Operations and Maintenance Plan (Plan) for its proposed solar photovoltaic facility to be constructed on private property located at 117 Troy Road, Ithaca, NY, tax map number 49.-1-26.22. The site includes a solar array, mounted using Single-Axis trackers on approximately 31 acres land currently occupied by a mix of forest and prairie. The system is accessed via an access road from Troy road, and is encompassed by a 8ft tall farm fence for security and wildlife management. The system includes centralized string inverters, and energy storage facilities. Nexamp is responsible for the entire leased area of the facility, including all easement areas and storm water control maintenance and improvements. The facility will be actively monitored 7 days a week, 365 days a year. Access to the site will be through keyed entry and knox boxes will be located at the facility entrance for emergency response purposes. Site access for vendors and/or town inspection officials will be coordinated by Nexamp Asset Management Services. Parking during construction will be restricted to the temporary construction laydown area as shown in the Site Plan Designs submitted in January 2026. Parking for the site shall occur on access road spurs during operations. Site plan designs have been included on this plan as an appendix for reference. 5 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Stakeholders and Responsibilities Role Contact Information Bomber Heights Solar, LLC System Owner Attn:Bomber Heights Solar 101 Summer St, Flr 2 Boston, MA 02110 Phone: 617.431.1440 Email: Nexamp Asset Management Services System Operations Manager Attn:Bomber Heights Solar Attn: Skip Provost 101 Summer St, Flr 2 Boston, MA 02110 Phone: 978.910.1503 Email: Town of Ithaca– Codes Office Town Code Enforcement and Site Inspection Town of Ithaca Codes Office 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 Town of Ithaca– Planning Board Site Plan Jurisdiction Town of Ithaca Codes Office 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 NYSEG Utility Operator Distributed Generation Office 18 Link Drive Binghamton, NY Email: 6 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Services Area Bomber Heights Solar is committed to an operations and maintenance schedule that encompasses both the project area, and the immediate area that will be “stranded” due to setback requirements. Regular operations and maintenance practices will take place in the area shown below; 7 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Services & Schedule As one of the largest operators of Solar Farm facilities in New York State, Nexamp manages O&M activities on dozens of facilities across the state. Nexamp has prepared a standard annual service schedule as well as site-specific service items pertaining to the nuances of the Bomber Heights Solar site. ANNUAL SCHEDULED MAINTENANCE Nexamp’s annual service schedules are intended to identify needs to preventative maintenance, and ensure our plants are physically and fiscally productive for 25 years or more. All facilities owned and/or managed by Nexamp are subject to the following annual maintenance schedule. • Visually inspect all feeder terminations for corrosion. • Visually check power terminations/connections including DC combiner boxes, DC and AC disconnects, inverters and PV modules and re-torque as necessary. • Test ground continuity and correct any unsafe or abnormal issues. • Check all fuses in inverters, combiner boxes, and disconnects (AC&DC). • Test and record voltage and amperage of the arrays at the string level and provide data values in summary report. • Inspect combiner boxes, disconnects (AC&DC), and inverters with an infrared camera to detect damage, hotspots, loose connections, etc. • Check mechanical and structural integrity of the system. • Inspect and clean inverter heat sinks and replace inverter air filters where applicable as necessary. • Check and replace unserviceable or missing system labeling as necessary. • Remove accumulated trash and debris. Check arrays for shading, including such shading caused by vegetation. • Check modules for excessive dirt and debris. • Module washing in accordance with manufacturer requirements • Warranty and spare parts management • Third party commissioning and performance testing • Aerial infrared inspections, photography and analysis • Provide documentation to include summary report of findings including actions taken and recommendations for additional maintenance or repairs. REPAIR SERVICES • Respond to alarms, alerts, and service requests pertaining to the Facility within 24 hours of such alarm, alert, or service request, as personnel safety and weather conditions permit. 8 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 o Please note this does not pertain to emergency services, which are to be notified immediately in the case of an emergency. An emergency contact sign and knox box is located at the entrance of the facility. • Provide all warranty, spare parts and other repair or maintenance related activities on a time and materials basis. SITE SPECIFIC ACTIVITIES Site storm water controls maintenance and improvements – Quarterly or As Needed o Feature Management and Maintenance § Features will be inspected during every vegetation management visit, and quarterly by Nexamp Operation Management employees. § Vegetation management of features will occur quarterly, or on an as needed basis. Vegetation in swales shall not exceed 16 inches in height. o Erosion Prevention and Soil Stabilization § The facility will be seeded prior to construction start, and immediately following the conclusion of construction. If during the following growing season, areas of bare earth are identified they will be seeded and stabilized within 30 days of identification or report. § Should areas of erosion occur between panel rows, or in areas of frequent runoff exposure, fissures will be filled, seeded and stabilized within 30 days of identification or report. o Drain and Outlet Management and Maintenance § Drains, outlets and other sections of pipe such as culverts or yard drains will be routinely inspected and cleared of any vegetation or debris that could inhibit functionality. § In areas where drains occur on land with higher than 5% slopes, stone will be routinely applied to drain outlets when areas of bare soil are present. o Inspections and Maintenance § Inspection of the stormwater management system, including installed vegetated features will take place throughout the growing season. § Annual inspections or all permanent Stormwater features shall be conducted prior to October in accordance with Town law, and a report of findings shall be filed with the Town. § Inspectors shall follow documentation and remediation protocols as outlined in NYSDEC Stormwater Management Design Manual inspection sheets included as an exhibit to this agreement. 9 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Access Management and Repair – Quarterly or as needed o Road inspections will occur with every visit by Nexamp Operations personnel, or third-party vendors. o The access road, will be always kept in physical condition conducive to access by large scale emergency vehicles. o Areas of erosion or wear that effect the consistency of the road surface or areas of ingress and egress to Mecklenburg Road that occur will be repaired within 30- days of identification or report. o Full-scale Road resurfacing will be conducted as necessary, as indicated by annual reporting and inspection. o Vegetation management of the road surface will occur quarterly or as needed, manual removal of vegetation or herbicide use will be applied in areas not conducive to grazing or machine removal. o Broken equipment will be removed from the property as soon as mechanically possible in case of replacement. When broken equipment must remain on site, it shall not stay on the property for more than six months, and shall not be stored in such a manner as to produce any risks for contamination of soils and groundwater. Vegetation Management – Quarterly or As Needed Vegetation Management activities will be flexibly scheduled and performed to adjust for growth conditions. Within the fence , for the first three years, visits to the site will occur no less than 2-3 times during the Spring and summer months. After the first three years, landscaping maintenance will increase to no less than 3-4 visits during the spring and summer months depending on vegetation growth. Outside of the fence, mowing and clearing will happen 50-75% less often than within the fence to allow for deep root growth and wildlife proliferation. o Ground-Level Vegetation § Ground level vegetation management will commence following the commercial operation date. § Ground cover will be left for 3-6 months of its first growing season to promote root growth and coverage. During this time, areas of stunted growth will be supplemented with further seeding and stabilization. § Mechanical vegetation management will be conducted onsite; • Inside the fence line for the first full year or until grasses have been sufficiently established • Outside of the fence line throughout the lease area for the life of the system. § Herbicide Use will be considered on the site, on a species-by-species basis, specifically for the targeting and removal of invasive species that may encroach on the property. While, due to the uncertainty as to what 10 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 species are being targeted, Bomber Heights Solar cannot commit to specific chemistries at this time, it does commit to all utilized herbicides being EPA and NYSDEC compliant in their chemistry and application. § Agrivoltaics • Grazing will be entertained following the first full growing season on the property. • Grazing plans will be filed as an amendment to this plan upon commencement. • Grazing will be rotated throughout the site and comply with ASGA grazing best practices. o Screening Management and Replacement § Inspection of screening will occur at every site visit by Nexamp Operations staff or Maintenance vendors. § Maintenance of screening and onsite vegetation will be performed by a company with a licensed arborist on staff. § Vegetative screening will be maintained throughout the life of the project. Standard maintenance includes watering*, treating for disease, fertilization and pruning when necessary. § Pest-resistant species have been utilized, and physical protection of vegetation will be installed when necessary. § Should vegetation show consistent signs of disease, drought or malnourishment following 3 months of identification and maintenance, plantings will be replaced at the earliest viable time, adjusting for soil saturation and seasonality. o Invasive Species Prevention and Management Construction and maintenance activities have the potential to introduce or spread invasive plant species through the movement of vehicles, equipment, soil, or plant materials. Bomber Heights Solar, LLC will implement preventative measures during construction and operations to minimize this risk. All vehicles and heavy equipment entering the site during construction will be inspected for soil, vegetation, seeds, or other organic material. Inspections will include tires, tracks, undercarriages, buckets, and trailers. Equipment containing visible soil or plant material will be cleaned prior to entering the site. Cleaning will be conducted in a manner that prevents wash water or debris from spreading vegetation or seeds. Disturbed soils will be stabilized as soon as practicable following construction activities. Imported soil or fill will be sourced from locations free of known invasive plant infestations where feasible. Disturbed areas will be revegetated with approved seed mixes to establish vegetative cover and reduce the likelihood of invasive species establishment 11 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Routine inspections during vegetation management and maintenance visits will include monitoring for invasive plant species, particularly along access roads, fence lines, drainage features, and other disturbed areas. Management of invasive species will follow an integrated approach; • Small infestations may be addressed through manual removal such as hand pulling or digging. • Where necessary, mechanical control methods including mowing, brush cutting, or excavation may be used depending on the species and extent of infestation. • Herbicide use may be considered when manual or mechanical methods are ineffective or impractical. Any herbicide application will comply with New York State pesticide regulations and will be performed by properly licensed applicators using targeted treatment methods Plowing and Snow Removal – Seasonally or As Needed o The access road, through utility disconnect poles, will be always kept in conditions conducive to access by large scale emergency vehicles. o Plowing will occur following snow events that result in a total accumulation of 6 inches or more during the winter season. Unless otherwise requested by the Town of Ithaca Fire Department due to extenuating circumstances or concerns about the accessibility of the site for safety personnel. 12 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Reporting Procedures Should town officials, residents or representatives find Nexamp’s management of the facility unsatisfactory, Nexamp requests standardized notification of the conditions present, and a 30- day window to remedy the conditions to the town’s standards. Nexamp proposes execution of items on an as needed, or as requested basis in addition to its scheduled maintenance procedures. Should this plan change in any material way, including the addition of new activities or the cessation of activities listed, the project company must notify the Town of proposed changes. Notifications shall be delivered digitally and in writing to all the following locations; Nexamp Inc Attn:Bomber Heights Solar 101 Summer St, Flr 2 Boston, MA 02110 Phone: 617.431.1440 Email: Nexamp Asset Management Services Attn:Bomber Heights Solar Attn: Skip Provost 101 Summer St, Flr 2 Boston, MA 02110 Phone: 978.910.1503 Email: Town of Ithaca– Codes Office Town of Ithaca Codes Office 215 N Tioga St Ithaca, NY 14850 Phone: 1 607 273 1721 All Notifications and Maintenance requests should be accompanied by descriptions of conditions and locations, photo documentation of items of concern, name, title, company, and contact information for the filing party, as well as the date and time of both observation and filing. 13 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Company Contacts Nexamp Inc Attn:Bomber Heights Solar 101 Summer St, Flr 2 Boston, MA 02110 Phone: 617.431.1440 Email: Nexamp Asset Management Services Attn:Bomber Heights Solar Attn: Skip Provost 101 Summer St, Flr 2 Boston, MA 02110 Phone: 978.910.1503 Email: 14 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 CHANGE LOG 1/21/2026 Initial Filing to Town RMM 3/26/26 Addition of Invasive Species Management Plan RMM 07/01/2026 Revision of Snow Plowing Requirements RMM 15 Bomber Heights Solar, LLC – Draft Operations and Maintenance Plan – Jan 2026 – v1 Appendix A: NYSDEC Stormwater Inspection Checklist BO M B E R H E I G H T S S O L A R , L L C TR O Y R O A D I T H A C A , N Y 1 4 8 5 0 NE X A M P PR O J E C T N O : 2 2 4 0 6 6 5 IS S U E D F O R R E V I E W JU L Y 2 0 2 6 101 SUMMER STREET, 2ND FLOOR BOSTON, MA 02110 PROJECT NO: 2240665 DECEMBER 2025 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 LOCATION MAP N.T.S. BOMBER HEIGHTS SOLAR, LLC 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com PROJECT LOCATION DRAWING INDEX C001 COVER SHEET C002 GENERAL NOTES, LEGEND, & DRAWING INDEX C100 EXISTING CONDITIONS & DEMOLITION PLAN C101 EXISTING CONDITIONS & DEMOLITION PLAN C200 OVERALL SITE PLAN C201 SITE PLAN C202 SITE PLAN C203 TURNING MOVEMENTS C401 GRADING & EROSION CONTROL PLAN C402 GRADING & EROSION CONTROL PLAN C403 ROAD PROFILE C404 ROAD PROFILE C405 SITE SLOPE HEAT MAP C406 SITE SLOPE HEAT MAP C407 PHASING PLAN C501 CONSTRUCTION DETAILS C502 CONSTRUCTION DETAILS C503 CONSTRUCTION DETAILS C504 CONSTRUCTION DETAILS L100 LANDSCAPING PLAN L101 LANDSCAPING PLAN L102 LANDSCAPING PLAN C001 GENERAL NOTES, LEGEND, & DRAWING INDEX LEGEND 1.THE CONTRACTOR ALONE SHALL BE RESPONSIBLE TO LOCATE UTILITIES OUTSIDE THE RIGHT-OF-WAY INCLUDING PRIVATE ROADS. 2.SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE WORK CONTAINED IN THIS CONTRACT. 4.THE SIZES AND MATERIAL OF CONSTRUCTION OF WATER MAINS, SANITARY SEWERS AND STORM SEWERS TO REMAIN ARE REPUTED. THE CONTRACTOR SHALL VERIFY SIZES OF ALL UTILITIES WHERE CONNECTIONS TO SAID EXISTING UTILITIES ARE REQUIRED. EXCAVATION TO VERIFY THESE UTILITIES SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR REMOVAL. 6.UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE ARCHITECT/ENGINEER, THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND PROTECTING FROM DAMAGE ALL TREES, SHRUBS AND PLANTS IN THE VICINITY OF THE PROPOSED WORK. 7.THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO REMAIN FOR THE DURATION OF THE CONTRACT. 8.ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE PROJECT MANAGER OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER. 9.APPROVAL BY THE MS4 (TOWN OF ITHACA) IS REQUIRED PRIOR TO NOI AND NOT SUBMISSIONS TO THE DEC. THE TOWN OF ITHACA IS AN "MS4 ADDITIONALLY DESIGNATED AREA''. 1.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS AND DIMENSIONS. 2.PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY DIG SAFE NEW YORK AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES. 3.WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN ACTIVE AND FUNCTIONAL FACILITY. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO MINIMIZE DISRUPTION TO THE OPERATIONS OF THE FACILITY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES. 4.THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS ARE APPROXIMATE AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF AND ADJACENT TO THE PROPOSED WORK. 5.SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 6.CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO REMAIN FOR THE DURATION OF THE CONTRACT. 7.THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT, LOCAL FIRE DEPARTMENT AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) AS NECESSARY AND SHALL OBTAIN ANY REQUIRED PERMITS PRIOR TO BEGINNING WORK. COPIES OF ANY REQUIRED PERMITS SHALL BE PROVIDED TO THE OWNER PRIOR TO BEGINNING THE WORK. 8.CONTRACTOR SHALL REMOVE FROM SITE, MATERIALS NOT INDICATED TO BE SALVAGED INCLUDING ALL DEBRIS. ALL REMOVED MATERIALS SHALL BECOME THE PROPERTY OF CONTRACTOR WHO SHALL LEGALLY DISPOSE OF SAME. 9.ALL TREES, SHRUBS AND PLANTS DESIGNATED TO REMAIN AND DISTURBED BY CONSTRUCTION OPERATIONS, SHALL BE REPLACED IN-KIND AS DIRECTED BY THE ARCHITECT/ENGINEER AND/OR OWNER'S DESIGNATED REPRESENTATIVE AT NO ADDITIONAL COST TO THE OWNER. 10.THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE EXISTING BUILDINGS FOR THE DURATION OF THE CONTRACT. 11.WHEN EXISTING CONSTRUCTION WHICH IS TO REMAIN IS DAMAGED DURING THE COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, AT NO COST TO THE OWNER. ALL REPAIRS AND/OR REPLACEMENTS WILL BE SUBJECT TO OWNERS APPROVAL. 12.COORDINATE LOCATION OF TEMPORARY CONSTRUCTION FENCE AND TEMPORARY STONE STAGING AREA WITH OWNER 1.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS. 2.THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD AND PRESERVE ALL SURVEY MARKERS AND RIGHT-OF-WAY MARKERS IN THE AREA OF CONSTRUCTION. 3.ANY IRON PINS, MONUMENTS OR OTHER ITEMS DEFINING PROPERTY LINES WHICH ARE DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE PROPERLY TIED AND ACCURATELY RESET BY A NYS LICENSED SURVEYOR UPON COMPLETION OF THE WORK. 4.HORIZONTAL DATUM BASED OFF NAD83 (2011) UTILIZING GNSS OBSERVATIONS ON THE NYSDOT RTN NETWORK, GEOID 18. . 5.VERTICAL BASED OFF OF NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). 6.SURVEY INFORMATION PROVIDED BY LABELLA ASSOCIATES DATED JULY 2024. INFORMATION WAS COMPILED FROM A FIELD SURVEY COMPLETED BY LABELLA ASSOCIATES ON JANUARY 29-31, FEBRUARY 1, AND FEBRUARY 6-9, 2024. 1.CONTRACTOR SHALL COORDINATE ANY STORM SEWER REPLACEMENT WITH THE NYSDOT AND THE TOWN OF ITHACA. 2.CONTRACTOR SHALL COORDINATE INSTALLATION OF ELECTRIC SERVICE LINES WITH NYSEG. 1.THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF OSHA, AND ANY OTHER AGENCY HAVING JURISDICTION WITH REGARD TO SAFETY PRECAUTIONS WITH TRENCHING OPERATIONS. THE REQUIREMENTS SET FORTH HEREIN ARE INTENDED TO SUPPLEMENT REQUIREMENTS ESTABLISHED BY THESE AGENCIES. IN THE CASE OF A CONFLICT BETWEEN REQUIREMENTS OF OTHER JURISDICTIONAL AGENCIES AND THESE DOCUMENTS, THE MORE STRINGENT REQUIREMENT ON THE CONTRACTOR SHALL APPLY. 2.SHEETING, IF REQUIRED DURING CONSTRUCTION, IS CONSIDERED TO BE PART OF THIS CONTRACT AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 3.ALL TRENCHES THROUGH PAVEMENT SHALL BE SAW CUT PRIOR TO EXCAVATION AND AGAIN PRIOR TO PAVEMENT RESTORATION. 4.CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE BOXES AND OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS REQUIRING REPAVING OR REGRADING AS PART OF THE WORK, INCLUDING THOSE THAT MAY NOT BE SHOWN ON THE PLANS. 5.VOIDS LEFT BY UTILITY OR STRUCTURE REMOVAL OR GRUBBING OPERATIONS SHALL BE BACKFILLED AND PROPERLY COMPACTED WITH STRUCTURAL FILL (NYSDOT ITEM 304.12) IN AREAS UNDER AND WITHIN 5 FEET HORIZONTALLY OF ALL STRUCTURES, BUILDINGS AND PAVEMENTS. IN GRASSED AREAS, VOIDS LEFT SHALL BE FILLED AND PROPERLY COMPACTED WITH SUITABLE ON-SITE OR IMPORTED EARTHEN BACKFILL. ALL DISTURBED AREAS SHALL BE RESTORED. 6.THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS TO PREVENT THE INTRODUCTION OF GROUNDWATER INTO THE TRENCHES/EXCAVATIONS. PROVIDE ALL EQUIPMENT NECESSARY TO MAINTAIN THE GROUNDWATER LEVEL AS NECESSARY. 7.THE CONTRACTOR SHALL PLACE AT MINIMUM 6 INCHES OF CLEANED SCREENED TOPSOIL IN ALL DISTURBED AREAS PRIOR TO SEEDING. 1.ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NEW YORK STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND LOCAL GOVERNING SOIL AND WATER CONSERVATION AGENCY RECOMMENDATIONS AND STANDARDS. CONTRACTOR SHALL SUBMIT PROPOSED EROSION CONTROL PLAN INCLUDING SEQUENCING OF WORK TO THE ENGINEER FOR REVIEW PRIOR TO START OF WORK. 2.UTILIZE CONSTRUCTION METHODS/TECHNIQUES, WHICH WILL LIMIT THE EXPOSED EARTHEN AREAS AND MINIMIZE THE EFFECT OF EARTH DISTURBANCE ACTIVITIES ON SOIL EROSION. THE AREA OF DISTURBANCE SHALL BE LIMITED TO A MAXIMUM OF 5 ACRES UNLESS OTHERWISE APPROVED BY THE ENGINEER AND THE DEC. 3.ALL SEDIMENTATION BARRIERS AND OTHER TEMPORARY OR PERMANENT MEASURES SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. PLANS SHOW THE SUGGESTED MINIMUM MEASURES REQUIRED. 4.REMOVAL OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE COMPLETED AT THE APPROVAL OF THE OWNER AND ENGINEER. THE COST OF REMOVING THESE MEASURES SHALL ALSO BE INCLUDED IN THE BID PRICE. 5.FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL ON-SITE, ADJACENT AND/OR DOWNSTREAM STORM/SANITARY SEWERS, AND/OR OTHER WATER COURSES FROM CONTAMINATION BY WATER BORNE SILTS, SEDIMENTS, FUELS, SOLVENTS, LUBRICANTS OR OTHER POLLUTANTS ORIGINATING FROM ANY WORK DONE ON, OR IN SUPPORT OF THIS PROJECT. 6.DURING CONSTRUCTION NO WET OR FRESH CONCRETE OR LEACHATE SHALL BE ALLOWED TO ESCAPE INTO STORM/SANITARY SEWERS, DITCHES OR OTHER WATERS OF NEW YORK STATE, NOR SHALL WASHINGS FROM CONCRETE TRUCKS, MIXERS OR OTHER DEVICES BE ALLOWED TO ENTER ANY STORM/SANITARY SEWERS, DITCHES, RIVERS, OR WATER COURSES. 7.ALL EXCAVATED OR IMPORTED EARTHEN STOCKPILES SHALL BE SUITABLY STABILIZED AND PROTECTED BY SILT FENCE SO THAT IT CANNOT REASONABLY ENTER ANY WATER BODY, OR STORM OR SANITARY SEWER. 8.ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE WORK FOR EROSION AND POLLUTION CONTROL SHALL BE SUBJECT TO APPROVAL OF THE ENGINEER. 9.THE CONTRACTOR SHALL BE REQUIRED TO TREAT TRAVELED AREAS TO CONTROL DUST. WATER SHALL BE APPLIED TO SUCH TRAVELED AREAS AS THE ARCHITECT/ENGINEER OR OWNER'S DESIGNATED REPRESENTATIVE MAY DESIGNATE. THE NUMBER OF APPLICATIONS AND THE AMOUNT OF WATER SHALL BE BASED UPON FIELD AND WEATHER CONDITIONS. 10.ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT WHICH WILL NOT BE SUBJECT TO FURTHER EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL BE PERMANENTLY SEEDED TO ESTABLISH GRASS, AND MULCHED WITH HAY OR STRAW WITHIN ONE WEEK OF FINAL DISTURBANCE. MULCH SHALL BE MAINTAINED UNTIL A SUITABLE VEGETATIVE COVER IS ESTABLISHED. 11.CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE COORDINATED WITH THE OWNER PRIOR TO START OF CONSTRUCTION. STABILIZED CONSTRUCTION ENTRANCE(S), AS SHOWN ON THE PLANS SHALL BE PROVIDED. ALL DISTURBED AREAS SHALL BE RESTORED. 12.ALL CATCH BASINS/DRAINAGE INLETS SHALL HAVE STONED INLET PROTECTION AROUND THEM AND GEOTEXTILE FABRIC OVER THE GRATE TO PREVENT SEDIMENTATION FROM ENTERING THE STORM SYSTEM. 13.TILL ALL COMPACTED SOILS LOCATED IN LAWN AREAS TO RESTORE THE ORIGINAL PROPERTIES OF THE SOIL PRIOR TO SEEDING. 14.THE NYS DEC BLUE BOOK REQUIRES A MULCH APPLICATION RATE OF 2 TONS/ACRE AND A SEED APPLICATION RATE OF 200 LBS/ACRE. 15.IF STRAW MULCH ALONE IS USED FOR WINTER STABILIZATION, THE APPLICATION RATE SHALL BE 4 TONS PER ACRE. OTHER MANUFACTURED MULCHES SHALL BE APPLIED AT DOUBLE THE MANUFACTURER'S RECOMMENDED RATE. 16.WINTER STABILIZATION APPLIES TO ALL CONSTRUCTION ACTIVITIES INVOLVED WITH ONGOING LAND DISTURBANCE AND EXPOSURE BETWEEN NOVEMBER 15TH TO THE FOLLOWING APRIL 1ST. IN AREAS WHERE SOIL DISTURBANCE ACTIVITY HAS TEMPORARILY OR PERMANENTLY CEASED, THE APPLICATION OF SOIL STABILIZATION MEASURES SHOULD BE INITIATED BY THE END OF THE NEXT BUSINESS DAY AND COMPLETED WITHIN THREE BUSINESS DAYS. UTILITY NOTES GRADING NOTES EROSION AND SEDIMENT CONTROL NOTES GENERAL NOTES SURVEY NOTES DEMOLITION NOTES EXISTING PROPOSED DESCRIPTION PROJECT BENCHMARK / CONTROL POINTS UTILITY REMOVAL FENCE REMOVAL SAWCUT TREE PROTECTION OBJECT REMOVAL X X X X WETLAND WETLAND BUFFER OBJECT REMOVAL BORING LOCATIONS TREE/VEGETATION LIMIT CHAIN LINK FENCE BUILDING/STRUCTURE PROPERTY LINE SETBACK LINE EASEMENTS RIGHT-OF-WAY PE ORNAMENTAL FENCE BOARD-ON-BOARD FENCE GUIDE RAIL BLDG ⅊⅊ RETAINING WALL SIGN BOLLARD DECIDUOUS TREE CONIFEROUS TREE FLAG POLE UTILITY POLE WITH LIGHT HYDRANT VALVE CATCH BASIN CLEAN OUT DOWN SPOUTDS INLET MANHOLE END SECTION MANHOLE (SOLID COVER) LIGHT POLE DOUBLE LIGHT POLE TRIPLE LIGHT POLE QUAD CO INLET DRYWELL DRAIN BASIN HANDHOLEHH E UTILITY POLE FLOW ARROW MANHOLE SAMPLING TAP ST UD UD UD STORM LINE WATER LINE OVERHEAD ELECTRIC STORM UNDERDRAIN PIPE UE UE W UNDERGROUND ELECTRIC CATV COMMUNICATIONS CTV CTV G GAS LINE POWER LINEP SIGNAL LINESIG SANITARY LINESA T T TELEPHONE LINE WATER FIRE SERVICE LINEFS SANITARY FORCEMAINFMFM FIBER OPTICSFOFO COMBINED SANITARY AND STORMST-SA FUEL LINES (DIESEL/UNLEADED) MAJOR CONTOUR510 MINOR CONTOUR ℄ OF DRAINAGE SWALE EROSION FENCE SILT SOCK INLET PROTECTION SILT FENCE INLET PROTECTION CHECK DAM 509 FLOW/SLOPE DIRECTION STABILIZED CONSTRUCTION ENTRANCE BIORETENTION OUTLET PROTECTION LIGHT POLE SINGLE BOLLARD LIGHT POLE TREE STUMP OBJECT REMOVAL R.O.W. EXISTING PROPOSED DESCRIPTION 1.WELL COMPACTED SUBGRADE SHALL BE UTILIZED UNDERNEATH CONSTRUCTION OF PAVEMENT AND CONCRETE BASES. 2.ALL STAKEOUT FOR THE PROPOSED SITE IMPROVEMENTS SHALL BE COMPLETED BY A NEW YORK STATE LICENSED LAND SURVEYOR. 3.IF ANY DISCREPANCIES ARE NOTED BETWEEN THESE CONSTRUCTION DOCUMENTS AND INFORMATION PROVIDED OR AN ERROR IS SUSPECT, IT SHALL BE IMMEDIATELY REPORTED TO THE CONSTRUCTION MANAGER AND LABELLA ASSOCIATES PROJECT MANAGER IN WRITING. 4.ANY PROOF-ROLLING OF EXPOSED SUBBASE BY A MINIMUM 10 TON SMOOTH DRUM ROLLER SHALL BE DONE UNDER THE GUIDANCE OF, AND OBSERVED BY, QUALIFIED ENGINEERING PERSONNEL PRIOR TO PLACEMENT OF SUBBASE MATERIAL. THE ROLLER SHOULD BE OPERATED IN THE STATIC MODE AND COMPLETE AT LEAST TWO (2) PASSES OVER THE EXPOSED SUBGRADES. 5.EXISTING WETLANDS DELINEATED BY GZA GEOENVIRONMENTAL, INC. ON OCTOBER 2023, MARCH AND MAY 2026. 6.ADJOINING PARCEL LINES ARE SHOWN FOR REFERENCE ONLY FROM TOMPKINS COUNTY GIS DATABASE, FOR THE TOWN OF ITHACA. SITE NOTES C C D S D Y DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS SCHEDULE OF CONSTRUCTION ACTIVITIES 1.SCHEDULE A PRE-CONSTRUCTION MEETING WITH TOWN OFFICIALS, OWNER, EMERGENCY SERVICES, UTILITY & OTHER AGENCIES IN ATTENDANCE. 2.SUBMIT EROSION CONTROL MEASURES AND SEQUENCING FOR REVIEW AND APPROVAL BY THE QUALIFIED INSPECTOR. 3.STAKEOUT AND FLAG THE LIMITS OF ON-SITE WETLANDS, IF APPLICABLE. 4.INSTALL STABILIZED CONSTRUCTION ENTRANCE. 5.INSTALL PERIMETER SEDIMENT CONTROLS, SUCH AS SEDIMENT COMPOST FILTER SOCK. 6.INSTALL TEMPORARY CONSTRUCTION MEASURE SUCH AS CONSTRUCTION ROAD, LAYDOWN AREA, CONSTRUCTION AREA, DESIGNATED TOPSOIL STOCKPILE AREA, STAGING AREA FENCING, ETC. 7.PROTECT EXISTING VEGETATION AND OTHER ENVIRONMENTAL FEATURES TO BE PRESERVED WITH ORANGE CONSTRUCTION FENCE OR TREE PROTECTION. 8.CLEAR AND GRUB BRUSH, SHRUBS, AND OTHER DEBRIS WITHIN DESIGNATED AREAS. 9.INSPECT, CLEAN, AND MAINTAIN EROSION CONTROL MEASURES AS NECESSARY AND AS ORDERED BY THE QUALIFIED INSPECTOR. SWEEP PUBLIC OR PRIVATE ROADWAYS, DRIVES AND PARKING AREAS AS NECESSARY TO MAINTAIN CLEAN FROM DEBRIS. RELOCATED AND RESET EROSION CONTROL MEASURES AND CONSTRUCTION FENCING AS REQUIRED TO COMPLETE WORK. ALL APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE AND FUNCTIONAL BEFORE COMMENCEMENT OF CONSTRUCTION OF ANY SEGMENT OF THE PROJECT THAT REQUIRES SUCH MEASURES. 10.STABILIZE DISTURBED AREAS AND STOCKPILES WITHIN 14 DAYS OF LAST CONSTRUCTION ACTIVITY IN EACH AREA. (7 DAYS IF GREATER THAN 5 ACRES DISTURBED). 11.INSTALL UTILITIES. EXCESS MATERIALS NOT BACKFILLED IN UTILITY TRENCHES SHALL BE REMOVED FROM THE SITE OR SPOILED IN AREAS APPROVED BY THE OWNER. EROSION CONTROL MEASURES ARE NOT REQUIRED AROUND SOILS (EARTHEN MATERIALS) EXCAVATED, SIDE CAST AND BACKFILLED INTO THE TRENCH WITHIN THE SAME DAY. 12.DEWATER EXCAVATIONS AS NECESSARY. PUMPED WATER SHALL BE TREATED TO REMOVE SEDIMENT PRIOR TO DISCHARGE. 13.RESTORE TO EXISTING GRADE AS TRENCH BACKFILLING PROGRESSING. MAINTAIN PROPER SITE DRAINAGE TO PROTECT WORK AREA, ADJACENT PROPERTIES, SWALES, AND OTHER WATERCOURSES. 14.BOX OUT AREAS FOR EQUIPMENT PADS. AS UTILITY REPLACEMENTS ARE COMPLETE, PREPARE THE SUBGRADE AS REQUIRED. 15.INSTALL CONCRETE WASHOUT AREA. NO WET OR FRESH CONCRETE, WASHINGS FROM CONCRETE TRUCKS, MIXERS, OR OTHER DEVICES, OR CONCRETE LEACHATE SHALL BE ALLOWED TO ESCAPE INTO ANY WETLANDS OR WATERS. 16.INSTALL CONCRETE ELECTRICAL EQUIPMENT PADS AND THE APPROPRIATE STORMWATER MANAGEMENT FACILITIES. 17.IMPLEMENT PERMANENT EROSION AND SEDIMENT CONTROL ITEMS. 18.COMPLETE GRADING IF REQUIRED, REAPPLY TOPSOIL, INSTALL PERMANENT SEEDING, FERTILIZER, AND MULCH. 19.INSTALL STORMWATER MANAGEMENT PRACTICES, CONSISTING OF DRY SWALES AND BIORETENTIONS, UPON FINALIZATION OF GRADING AND APPROVAL OF FINAL STABILIZATION BY THE QUALIFIED INSPECTOR. 20.CAPTURE, REMOVE, AND DISPOSE OF ACCUMULATED SILT OR SEDIMENT FROM SILT FENCE, CHECK DAMS, INLET PROTECTION, AND SEDIMENT BASINS. 21.CLEAN THE SITE OF ALL INCIDENTAL CONSTRUCTION MATERIALS THAT ARE NOT INCORPORATED INTO THE WORK, AND PROPERLY DISPOSE OFFSITE. 22.SEED, MULCH, AND FERTILIZE TO ESTABLISH VEGETATION AT DISTURBED AREAS NOT DESIGNATED FOR PAVEMENT OR OTHER SURFACES. WHERE SEED DOES NOT GERMINATE OR WHERE WASHOUT, EROSION, RUTTING, OR OTHER DAMAGE OCCURS, REPAIR DAMAGE, RE-SEED AND RE-FERTILIZE AS NECESSARY TO ACHIEVE 80% GERMINATION OVER 100% OF THE SITE. 23.REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES UPON APPROVAL OF FINAL STABILIZATION BY THE QUALIFIED INSPECTOR. DRAWING INDEX C001 COVER SHEET C002 GENERAL NOTES, LEGEND, & DRAWING INDEX C100 EXISTING CONDITIONS & DEMOLITION PLAN C101 EXISTING CONDITIONS & DEMOLITION PLAN C200 OVERALL SITE PLAN C201 SITE PLAN C202 SITE PLAN C203 TURNING MOVEMENTS C401 GRADING & EROSION CONTROL PLAN C402 GRADING & EROSION CONTROL PLAN C403 ROAD PROFILE C404 ROAD PROFILE C405 SITE SLOPE HEAT MAP C406 SITE SLOPE HEAT MAP C407 PHASING PLAN C501 CONSTRUCTION DETAILS C502 CONSTRUCTION DETAILS C503 CONSTRUCTION DETAILS C504 CONSTRUCTION DETAILS L100 LANDSCAPING PLAN L102 LANDSCAPING PLAN L103 LANDSCAPING PLAN NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE TR O Y R O A D 75 ' S I D E Y A R D SE T B A C K 75' FRONT YARD SETBACK 75 ' S I D E Y A R D SE T B A C K 75' R E A R Y A R D SET B A C K 75' R E A R Y A R D SET B A C K LO D LO D LO D LO D LO D LO D LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLOD LOD LO D LOD LOD SOIL DISTURBANCE ACTIVITIES WITHIN WETLANDS TO BE PILE DRIVEN POSTS ONLY. NO DIGGING OR TRENCHING IS PERMITTED WITHIN THE WETLANDS. EXISTING WETLAND 84,639 SF ±1.943 AC EXISTING WETLAND 214,520 SF ±4.924 AC EXISTING WETLAND 882 SF ±0.020 AC SOIL DISTURBANCE ACTIVITIES WITHIN WETLANDS TO BE PILE DRIVEN POSTS ONLY. NO DIGGING OR TRENCHING IS PERMITTED WITHIN THE WETLANDS. EXISTING CULVERT TO BE REMOVED PROPOSED TREE CLEARING LINE PROPOSED LIMITS OF DISTURBANCE C100 EXISTING CONDITIONS AND DEMOLITION PLAN C100 1 EXISTING CONDITIONS AND DEMOLITION PLAN SCALE: 1" = 80' N 0'80'160'240' LEGEND EXISTING DESCRIPTION UTILITY POLE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC TREE/VEGETATION LIMIT FENCE PROPERTY LINE SETBACK LINE RIGHT-OF-WAY ⅊ WETLAND WETLAND BUFFER TREE STORM LINE TREE CLEARING WITH STUMP REMOVAL DEMOLITION DATA APPLICANT NEXAMP PARCEL AREA ±61.98 ACRES TREE CLEARING AND GRUBBING ±23.16 ACRES MATCHLINE SEE SHEET C101 DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS OBJECT REMOVAL NOW OR FORMERLY WILLIAM E. MURRAY AND JEANETTE M. MURRAY TAX ACCT: 49-1-17.1 NOW OR FORMERLY THOMAS HOWARTH TAX ACCT: 49-1-21.4 NOW OR FORMERLY NEW YORK STATE ELECTRIC AND GAS CORPORTATION TAX ACCT: 49-1-25 NOW OR FORMERLY JAMES E. SEMP TAX ACCT: 49-1-30 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 49-1-26.3 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.51 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.50 NOW OR FORMERLY COLE LACOVELLI KRYSTINA LACOVELLI TAX ACCT: 44-1-4.50 NOW OR FORMERLY NATHANIEL M VACANTI ELENA PANIZZA TAX ACCT: 44-1-4.48 NOW OR FORMERLY JOHN J FLAHERTY TAX ACCT: 44-1-4.47 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE 75' FRONT YARD SETBACK 75' R E A R Y A R D SET B A C K LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LOD LO D LOD LOD SOIL DISTURBANCE ACTIVITIES WITHIN WETLANDS TO BE PILE DRIVEN POSTS ONLY. NO DIGGING OR TRENCHING IS PERMITTED WITHIN THE WETLANDS. NO TREE CLEARING OR GRUBBING WITHIN THE 35' TOWN OF ITHACA STREAM OFFSET PROPOSED TREE CLEARING LINE PROPOSED LIMITS OF DISTURBANCE C101 EXISTING CONDITIONS AND DEMOLITION PLAN C101 1 EXISTING CONDITIONS AND DEMOLITION PLAN SCALE: 1" = 80' N 0'80'160'240' LEGEND EXISTING DESCRIPTION UTILITY POLE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC TREE/VEGETATION LIMIT FENCE PROPERTY LINE SETBACK LINE RIGHT-OF-WAY ⅊ WETLAND WETLAND BUFFER TREE STORM LINE TREE CLEARING WITH STUMP REMOVAL DEMOLITION DATA APPLICANT NEXAMP PARCEL AREA ±61.98 ACRES TREE CLEARING AND GRUBBING ±23.16 ACRES MATCHLINE SEE SHEET C100 DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LO D LO D LO D LOD LOD LOD LO D LOD LOD LO D LO D LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LO D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LODLODLODLODLODLODLOD LOD LOD OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE R1 5 . 0 0 ' R15.00' R55 . 0 0 ' R5 5 . 0 0 ' 445.99' 17 8 . 7 6 ' 75. 6 0 ' 82 . 7 4 ' 340.35' 75.0 1 ' 155 . 0 0 ' PROPOSED UTILITY POINT OF INTERCONNECTION (POI) - FEEDER NO: 4302204, IX VOLTAGE 12.47KV 23,500 SQ.FT LAYDOWN AREA CAMERA 8' AGRICULTURAL FENCE (TYP) 4' PERSONNEL GATE 24' VEHICLE GATE 24' VEHICLE GATE ENERGY STORAGE SYSTEM (TYP) EQUIPMENT PAD (INVERTER AND TRANSFORMER LOCATION) TRANSFORMER FOR ENERGY STORAGE SYSTEM (TYP) EQUIPMENT PAD (INVERTER LOCATION) MISC. ANCILLARY RACKING (TRACKER POWER) 4' PERSONNEL GATE 4' PERSONNEL GATE 4' PERSONNEL GATE UTILITY RECLOSER PAD (U1) CUSTOMER ENCLOSURE FOR UTILITY METER - PCC (C2) CUSTOMER FEDERAL PACIFIC 3IN1 PAD(C1) 8' AGRICULTURAL FENCE (TYP) SERVICE STAGING AREA TREE FALL ZONE PROPOSED 20' ACCESS ROAD 24/7 ACCESS PROPOSED 20' ACCESS ROAD UNDERGROUND MV LINE 1.08 ACRES OF SPACE ALLOCATED FOR 137423 - SOUTH HILL STANDALONE STORAGE 4' PERSONNEL GATE 4' PERSONNEL GATE 24' VEHICLE GATE SECTIONALIZING CABINET PROTECTED BY BOLLARDS 4' PERSONNEL GATE PROPOSED FOREBAY PROPOSED DETENTION BASIN PROPOSED BIORETENTION BASIN NEW SOLAR PV ARRAY NEW SOLAR PV ARRAY 8' AGRICULTURAL FENCE (TYP) 8' AGRICULTURAL FENCE (TYP) NEW SOLAR PV ARRAY PROPOSED 20' ACCESS ROAD NEW SOLAR PV ARRAY 4' PERSONNEL GATE PROPOSED 40 LF DRY SWALE PROPOSED 120 LF DRY SWALE PROPOSED CULVERT PROPOSED CULVERT PROPOSED FOREBAY 4' PERSONNEL GATE BOLLARDS (TYP) PROPOSED CULVERT PROPOSED CULVERT PROPOSED LIMIT OF DISTURBANCE R75.00' R110.00 ' PROPOSED CULVERT PROPOSED CHECK DAM DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C200 OVERALL SITE PLAN C200 1 SITE PLAN SCALE: 1" = 100' N PROJECT DATA PARCEL INFORMATION APPLICANT NEXAMP OWNER BOMBER HEIGHTS, LLC PARCEL ADDRESS 117 TROY ROAD, TOWN OF ITHACA, TOMPKINS COUNTY, NY 14850 TAX NUMBER 49-1-26.2 SYSTEM SIZE 4.5 MW AC PARCEL AREA (TOTAL)61.98 ACRES TOTAL PROJECT AREA 30.00 ACRES PROPOSED IMPERVIOUS WITHIN PROJECT AREA 1.30 ACRES PANEL COVERAGE 18.33 ACRES TOTAL DISTURBANCE AREA ±40.78 ACRES WOODED DISTURBANCE ±23.16 ACRES ZONING INFORMATION REQUIRED PROPOSED CLASSIFICATION: PARCEL WITHIN SOLAR OVERLAY LDR- LOW DENSITY RESIDENTIAL LDR- LOW DENSITY RESIDENTIAL FRONT SETBACK ≥75 FT ±340.35 FT SIDE SETBACK ≥75 FT ±75.60 FT REAR SETBACK ≥75 FT ±75.01 FT MAXIMUM HEIGHT 20 FT 20 FT NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE TR O Y R O A D 75 ' S I D E Y A R D SE T B A C K 75' FRONT YARD SETBACK 75 ' S I D E Y A R D SE T B A C K 75' R E A R Y A R D SET B A C K 75' R E A R Y A R D SET B A C K UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST ST ST ST LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LOD LODLODLODLODLODLODLODLODLOD LOD LOD 75. 6 0 ' 82 . 7 4 ' 340.35' 75.0 1 ' PROPOSED CHECK DAM PROPOSED UTILITY POINT OF INTERCONNECTION (POI) - FEEDER NO: 4302204, IX VOLTAGE 12.47KV 23,500 SQ.FT LAYDOWN AREA CAMERA 8' AGRICULTURAL FENCE (TYP) 4' PERSONNEL GATE 24' VEHICLE GATE 24' VEHICLE GATE ENERGY STORAGE SYSTEM (TYP) EQUIPMENT PAD (INVERTER AND TRANSFORMER LOCATION) TRANSFORMER FOR ENERGY STORAGE SYSTEM (TYP) EQUIPMENT PAD (INVERTER LOCATION) MISC. ANCILLARY RACKING (TRACKER POWER) 4' PERSONNEL GATE UTILITY RECLOSER PAD (U1) CUSTOMER ENCLOSURE FOR UTILITY METER - PCC (C2) CUSTOMER FEDERAL PACIFIC 3IN1 PAD(C1) 8' AGRICULTURAL FENCE (TYP) SERVICE STAGING AREA PROPOSED 20' ACCESS ROAD 24/7 ACCESS PROPOSED 20' ACCESS ROAD UNDERGROUND MV LINE 4' PERSONNEL GATE 4' PERSONNEL GATE 24' VEHICLE GATE SECTIONALIZING CABINET PROTECTED BY BOLLARDS 4' PERSONNEL GATE PROPOSED FOREBAY PROPOSED DETENTION BASIN PROPOSED BIORETENTION BASIN NEW SOLAR PV ARRAY NEW SOLAR PV ARRAY NEW SOLAR PV ARRAY 4' PERSONNEL GATE PROPOSED 40 LF DRY SWALE PROPOSED 120 LF DRY SWALE PROPOSED CULVERT PROPOSED CULVERT 4' PERSONNEL GATE BOLLARDS R1 5 . 0 0 ' R15.00' R55 . 0 0 ' R5 5 . 0 0 ' PROPOSED CULVERT PROPOSED CULVERT R110.00 ' R75.00 ' R110.00 ' 135 . 0 0 ' R15.00' R15.00' WETLAND AREA DELINEATED BY GZA GEOENVIRONMENTAL OF NEW YORK ON JAN 2, 2024 (TYP) WETLAND AREA DELINEATED BY GZA GEOENVIRONMENTAL OF NEW YORK ON JAN 2, 2024 (TYP) STREAM/DITCH AREA DELINEATED BY GZA GEOENVIRONMENTAL OF NEW YORK ON JAN 2, 2024 (TYP) DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C201 SITE PLAN C201 1 SITE PLAN SCALE: 1" = 80' N PROJECT DATA PARCEL INFORMATION APPLICANT NEXAMP OWNER BOMBER HEIGHTS, LLC PARCEL ADDRESS 117 TROY ROAD, TOWN OF ITHACA, TOMPKINS COUNTY, NY 14850 TAX NUMBER 49-1-26.2 SYSTEM SIZE 4.5 MW AC PARCEL AREA (TOTAL)61.98 ACRES TOTAL PROJECT AREA 30.00 ACRES PROPOSED IMPERVIOUS WITHIN PROJECT AREA 1.30 ACRES PANEL COVERAGE 18.33 ACRES TOTAL DISTURBANCE AREA ±40.78 ACRES WOODED DISTURBANCE ±23.16 ACRES ZONING INFORMATION REQUIRED PROPOSED CLASSIFICATION: PARCEL WITHIN SOLAR OVERLAY LDR- LOW DENSITY RESIDENTIAL LDR- LOW DENSITY RESIDENTIAL FRONT SETBACK ≥75 FT ±340.35 FT SIDE SETBACK ≥75 FT ±75.60 FT REAR SETBACK ≥75 FT ±75.01 FT MAXIMUM HEIGHT 20 FT 20 FT MATCHLINE SEE SHEET C202 NOW OR FORMERLY WILLIAM E. MURRAY AND JEANETTE M. MURRAY TAX ACCT: 49-1-17.1 NOW OR FORMERLY THOMAS HOWARTH TAX ACCT: 49-1-21.4 NOW OR FORMERLY NEW YORK STATE ELECTRIC AND GAS CORPORTATION TAX ACCT: 49-1-25 NOW OR FORMERLY JAMES E. SEMP TAX ACCT: 49-1-30 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 49-1-26.3 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.51 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.50 NOW OR FORMERLY COLE LACOVELLI KRYSTINA LACOVELLI TAX ACCT: 44-1-4.50 NOW OR FORMERLY NATHANIEL M VACANTI ELENA PANIZZA TAX ACCT: 44-1-4.48 NOW OR FORMERLY JOHN J FLAHERTY TAX ACCT: 44-1-4.47 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE 75' FRONT YARD SETBACK 75' R E A R Y A R D SET B A C K LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 17 8 . 7 6 ' 4' PERSONNEL GATE 4' PERSONNEL GATE 8' AGRICULTURAL FENCE (TYP) 8' AGRICULTURAL FENCE (TYP) NEW SOLAR PV ARRAY R110.00 ' 135 . 0 0 ' R15.00' R15.00' WETLAND AREA DELINEATED BY GZA GEOENVIRONMENTAL OF NEW YORK ON JAN 2, 2024 (TYP) DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C202 SITE PLAN C202 1 SITE PLAN SCALE: 1" = 80' N MATCHLINE SEE SHEET C201 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LODLODLODLODLODLODLOD LOD LOD WB-67 - I n t e r s t a t e S e m i - T r a i l e r R110.00 ' R75.00 ' R110.00 ' 135 . 0 0 ' R15.00' R15.00' OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LODLODLODLODLODLODLOD LOD LOD WB-67 - I n t e r s t a t e S e m i - T r a i l e r R110.00 ' R75.00 ' R110.00 ' 135 . 0 0 ' R15.00' R15.00' 53 27.9 Max 68.5° Horiz Max 10° Vert 3 43.5 4 45.5 2.5 23.5 4 17.4 4.2 19.5 WB-67 - Interstate Semi-Trailer Overall Length 73.501ft Overall Width 8.500ft Overall Body Height 13.500ft Min Body Ground Clearance 1.334ft Max Track Width 8.500ft Lock-to-lock time 6.00s Max Steering Angle (Virtual)28.40° DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C203 TURNING MOVEMENTS C203 1 TURNING MOVEMENTS SCALE: 1"=100' N C203 2 TURNING MOVEMENTS SCALE: 1"=100' N VEHICLE BODY PATH (FORWARD MOVEMENT) VEHICLE BODY ENVELOPE (FORWARD MOVEMENT) VEHICLE BODY PATH (BACKWARDS MOVEMENT) VEHICLE BODY ENVELOPE (BACKWARDS MOVEMENT) VEHICLE TRACKING LEGEND TESLA HEAVYWEIGHT TRAILER (FORWARD MOVEMENT) TESLA HEAVYWEIGHT TRAILER (BACKWARDS MOVEMENT) NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE TEMPORARY TOPSOIL STOCKPILE AREA (TYP.) PROPOSED SILT SOCKS (TYP.) PROPOSED SILT SOCKS (TYP.) STABILIZED CONSTRUCTION ENTRANCE PROPOSED LIMITS OF DISTURBANCE (TYP) TEMPORARY LAYDOWN AREA 23,500 SQ FT INSTALL AND MAINTAIN CONCRETE WASHOUT UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST ST ST ST LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LOD LODLODLODLODLODLODLODLODLOD LOD LOD 99 LF OF 18" HDPE @ 2.27% INV. = 1031.00 INV. = 1033.23 INV. = 1028.92 INV. = 1028.50 83 LF OF 18" HDPE @ 0.50% INV: 1018.66 INV: 1018.45 42 LF OF 12" HDPE @ 0.50% PROPOSED 40 LF DRY SWALE PROPOSED 120 LF DRY SWALE PROPOSED CONVEYANCE SWALE PROPOSED BIO RETENTION FACILITY FILTER MEDIA AREA = 5,100 SF PROPOSED SEDIMENT FOREBAY PROPOSED 12" END SECTION INV. = 1001.00 PROPOSED 5' X 10' OVERFLOW WEIR INV. = 1005.00 PROPOSED 37' LF OF 12" HDPE @ 2.70% PROPOSED 2'X2' INLET TOP INV. = 1005.00 INV. OUT = 1002.00 SOME LOCALIZED GRADING MAY BE REQUIRED UNDER THE PROPOSED ARRAY PROPOSED OVERFLOW WEIR INV. = 1019.40 PROPOSED 2'X2' INLET TOP INV. = 1018.30 INV. = 1014.40 PROPOSED 18" END SECTION INV.= 1001.00 DRY SWALE UNDERDRAIN INV. = 1021.04 DRY SWALE UNDERDRAIN INV. = 1020.94 INV. = 1020.00 18 LF OF 6" HDPE @ 5.21% INV. = 1020.00 18 LF OF 6" HDPE @ 5.73% INV. = 1020.48 INV. = 1016.00 74 LF OF 36" HDPE @ 6.14% INV. = 1020.86 INV. = 1016.00 75 LF OF 18" HDPE @ 6.55% 1035 10 3 0 10 2 5 10 2 0 101 5 101 5 1005 100 5 10 0 5 PROPOSED FLOW DIFFUSER PROPOSED FLOW DIFFUSER (TYP) PROPOSED FLOW DIFFUSER (TYP) PROPOSED 5' BERM ST ST ST ST DRY SWALE UNDERDRAIN INV: 1013.09 INV: 1012.94 29 LF OF 6" HDPE @ 0.50% PROPOSED 120 LF DRY SWALE PROPOSED 70 LF DRY SWALE INV: 1012.38 DRY SWALE UNDERDRAIN INV: 1012.64 44 LF OF 6" HDPE @ 0.50% INV. = 1053.46 37 LF OF 12" HDPE @ 4.23% INV. = 1051.89 103 5 1040 104 5 105 0 105 5 106 0 10 6 5 1070 1030 102 5 102 0 102 0 1020 1025 3+12 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+00 7+ 0 0 8+ 0 0 9+ 0 0 10+ 0 0 11+ 0 0 12 + 0 0 13 + 0 0 14+ 0 0 15 + 0 0 16+ 0 0 17+ 0 0 PROPOSED LOW WATER CROSSING (TYP) 1030 1025 PROPOSED OVERFLOW WEIR INV.= 1018.9 C401 GRADING & EROSION CONTROL PLAN N DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS MATCHLINE SEE SHEET C402 C401 1 GRADING & EROSION CONTROL PLAN SCALE: 1" = 80' NOW OR FORMERLY WILLIAM E. MURRAY AND JEANETTE M. MURRAY TAX ACCT: 49-1-17.1 NOW OR FORMERLY THOMAS HOWARTH TAX ACCT: 49-1-21.4 NOW OR FORMERLY NEW YORK STATE ELECTRIC AND GAS CORPORTATION TAX ACCT: 49-1-25 NOW OR FORMERLY JAMES E. SEMP TAX ACCT: 49-1-30 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 49-1-26.3 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.51 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.50 NOW OR FORMERLY COLE LACOVELLI KRYSTINA LACOVELLI TAX ACCT: 44-1-4.50 NOW OR FORMERLY NATHANIEL M VACANTI ELENA PANIZZA TAX ACCT: 44-1-4.48 NOW OR FORMERLY JOHN J FLAHERTY TAX ACCT: 44-1-4.47 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE PROPOSED LIMITS OF DISTURBANCE (TYP) LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD INV. = 1053.46 37 LF OF 12" HDPE @ 4.23% INV. = 1051.89 104 5 105 0 105 5 106 0 10 6 5 1070 18+00 16+ 0 0 17+ 0 0 C402 GRADING & EROSION CONTROL PLAN N DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS MATCHLINE SEE SHEET C401 C402 1 GRADING & EROSION CONTROL PLAN SCALE: 1" = 80' NO W O R F O R M E R L Y TR O Y H E I G H T S , L L C TAX A C C T : 4 9 - 1 - 2 6 . 2 NO W O R F O R M E R L Y ELS I E C R A W L I N S TAX A C C T : 4 9 - 1 - 2 6 . 1 NO W O R F O R M E R L Y JEF F R E Y L A C O V E L L I AN D S A L L Y L A C O V E L L I TAX A C C T : 4 4 - 1 - 5 . 2 NO W O R F O R M E R L Y CH E R Y L A W E L S H A N D MAR K W E L S H TAX A C C T : 4 4 - 1 - 5 . 3 NO W O R F O R M E R L Y JO H N W W H I T E TAX A C C T : 4 4 - 1 - 4 . 5 8 NO W O R F O R M E R L Y HER I T A G E P A R K TO W N H O U S E S , I N C TAX A C C T : 4 4 - 1 - 4 . 5 7 NO W O R F O R M E R L Y NAN C Y S Q U A R R I E R TAX A C C T : 4 4 - 1 - 4 . 5 6 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE STSTST ST LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLOD LOD LODLODLODLOD LOD LOD LODLOD LOD LODLOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 10 3 5 1030 ST STSTST 1035 1040 1045 1050 1055 1060 1065 1070 10 3 0 1025 10201020 1020 102 5 0+00 1+00 2+ 0 0 18+00 0+00 1+0 0 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+0 0 13+ 0 0 14+00 15+ 0 0 16 + 0 0 17 + 0 0 103 0 1000 1010 1020 1030 1040 1050 1060 1070 1000 1010 1020 1030 1040 1050 1060 1070 -0+250+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 5.10% 0.92% 4.00% 3.02% 4.00% -1.69% 9.85 % -0.51%0.51% -2.97% -1.84% PVI STA: 3+79.40 PVI ELEV: 1016.70 K: 15.54 LVC: 90.73 PV C : 3 + 3 4 . 0 3 EL E V : 1 0 1 7 . 5 3 PV T : 4 + 2 4 . 7 7 EL E V : 1 0 1 8 . 5 1 PVI STA: 9+60.60 PVI ELEV: 1025.50 K: 28.65 LVC: 100.00 PV C : 9 + 1 0 . 6 0 EL E V : 1 0 2 5 . 2 4 PV T : 1 0 + 1 0 . 6 0 EL E V : 1 0 2 7 . 5 0 PVI STA: 14+27.61 PVI ELEV: 1034.71 K: 47.84 LVC: 200.00 PV C : 1 3 + 2 7 . 6 1 EL E V : 1 0 3 3 . 7 9 PV T : 1 5 + 2 7 . 6 1 EL E V : 1 0 3 9 . 8 1 PVI STA: 7+86.03 PVI ELEV: 1024.61 K: 49.39 LVC: 50.52 PV C : 7 + 6 0 . 7 7 EL E V : 1 0 2 4 . 7 4 PV T : 8 + 1 1 . 2 9 EL E V : 1 0 2 4 . 7 4 PVI STA: 1+85.24 PVI ELEV: 1020.27 K: 72.60 LVC: 82.36 PV C : 1 + 4 4 . 0 6 EL E V : 1 0 2 1 . 4 9 PV T : 2 + 2 6 . 4 2 EL E V : 1 0 1 9 . 5 1 PVI STA: 5+53.65 PVI ELEV: 1023.67 K: 38.12 LVC: 37.31 PV C : 5 + 3 5 . 0 0 EL E V : 1 0 2 2 . 9 2 PV T : 5 + 7 2 . 3 1 EL E V : 1 0 2 4 . 2 3 PVI STA: 11+20.09 PVI ELEV: 1031.88 K: 32.48 LVC: 100.00 PV C : 1 0 + 7 0 . 0 9 EL E V : 1 0 2 9 . 8 8 PV T : 1 1 + 7 0 . 0 9 EL E V : 1 0 3 2 . 3 4 PVI STA: 0+92.34 PVI ELEV: 1023.03 K: 39.04 LVC: 50.00 PV C : 0 + 6 7 . 3 4 EL E V : 1 0 2 3 . 4 5 PV T : 1 + 1 7 . 3 4 EL E V : 1 0 2 2 . 2 9 PVI STA: 6+13.90 PVI ELEV: 1025.49 K: 7.87 LVC: 27.80 PV C : 6 + 0 0 . 0 0 EL E V : 1 0 2 5 . 0 7 PV T : 6 + 2 7 . 8 0 EL E V : 1 0 2 5 . 4 2 12 + 0 5 . 9 1 = C L I N T X AC C E S S S T U B S T A . = 0 + 0 0 . 0 0 6+ 1 7 . 2 1 = 1 8 " S I C P P IN V . = 1 0 1 9 . 4 5 @ C L 11 + 4 4 . 5 5 = 1 8 " S I C P P IN V . = 1 0 2 8 . 7 9 @ C L 0+ 1 0 . 0 0 = B E G I N A C C E S S R O A D EL E V . = 1 0 2 4 . 4 2 0+ 0 0 . 0 0 = C L I N T X . T R O Y R O A D EL E V . = 1 0 2 5 . 0 6 4.33' COVER 2.33' COVER PROPOSED GRADE @ CL EXISTING GRADE @ CL 1.58' COVER 7+ 8 6 . 0 3 = 3 6 " S I C P P IN V . = 1 0 1 9 . 1 4 @ C L C403 ROAD PROFILE C403 2 ACCESS ROAD PROFILE SCALE: HORIZ: 1" = 80' VERT: 1" = 8' DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C403 1 ACCESS ROAD PLAN SCALE: 1''=80' N OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 1035 10 3 0 10 2 5 10 2 0 101 5 101 5 ST 1030 3+12 0+00 1+00 2+00 3+00 9+ 0 0 10+ 0 0 11+ 0 0 12 + 0 0 13 + 0 0 1030 1025 1000 1010 1020 1030 1040 1050 1060 1000 1010 1020 1030 1040 1050 1060 -0+50 0+00 1+00 2+00 3+00 4+00 4+50 0.98% -5.00 % GR A D E B R E A K S T A = 0 + 0 0 . 0 0 EL E V = 1 0 3 2 . 6 3 GR A D E B R E A K S T A = 3 + 1 1 . 5 4 EL E V = 1 0 2 3 . 4 4 PVI STA: 1+06.64 PVI ELEV: 1033.68 K: 33.43 LVC: 200.00 PV C : 0 + 0 6 . 6 4 EL E V : 1 0 3 2 . 7 0 PV T : 2 + 0 6 . 6 4 EL E V : 1 0 2 8 . 6 8 -5.00 % -5.00 % DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C404 ROAD PROFILE C404 2 ACCESS ROAD PROFILE SCALE: HORIZ: 1" = 80' VERT: 1" = 8' C404 1 ACCESS ROAD PLAN SCALE: 1''=80' N NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST ST ST ST LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LOD LODLODLODLODLODLODLODLODLOD LOD LOD 1035 10 3 0 10 2 5 10 2 0 101 5 101 5 1005 100 5 10 0 5 ST ST ST ST 103 5 1040 104 5 105 0 105 5 106 0 10 6 5 1070 1030 102 5 102 0 102 0 1020 1025 3+12 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+00 7+ 0 0 8+ 0 0 9+ 0 0 10+ 0 0 11+ 0 0 12 + 0 0 13 + 0 0 14+ 0 0 15 + 0 0 16+ 0 0 17+ 0 0 1030 1025 C405 SITE SLOPE HEAT MAP N DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS MATCHLINE SEE SHEET C402 C405 1 SITE SLOPE HEAT MAP SCALE: 1" = 80' LEGEND 8% - 10% SLOPES 10% - 20% SLOPES 20% - 35% SLOPES > 35% SLOPES NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST ST ST ST LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LOD LODLODLODLODLODLODLODLODLOD LOD LOD 1035 10 3 0 10 2 5 10 2 0 101 5 101 5 1005 100 5 10 0 5 ST ST ST ST 103 5 1040 104 5 105 0 105 5 106 0 10 6 5 1070 1030 102 5 102 0 102 0 1020 1025 3+12 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+00 7+ 0 0 8+ 0 0 9+ 0 0 10+ 0 0 11+ 0 0 12 + 0 0 13 + 0 0 14+ 0 0 15 + 0 0 16+ 0 0 17+ 0 0 1030 1025 C405 SITE SLOPE HEAT MAP N DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS MATCHLINE SEE SHEET C402 C405 1 SITE SLOPE HEAT MAP SCALE: 1" = 80' LEGEND 8% - 10% SLOPES 10% - 20% SLOPES 20% - 35% SLOPES > 35% SLOPES OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ST ST LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LO D LO D LO D LOD LO D LO D LO D LOD LO D LO D LO D LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LODLOD LO D LO D LOD LO D LO D LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D PHASE 2 1.78 AC (4.73 TOTAL) PHASE 2 2.95 AC (4.73 TOTAL) PHASE 1 4.58 AC PHASE 3 4.57 AC PHASE 4 4.85 AC PHASE 5 1.99 AC PHASE 6 4.60 AC PHASE 7 4.73 AC PHASE 8 4.67 AC PHASE 9 1.27 AC DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS C407 PHASING PLAN C407 1 PHASING PLAN SCALE: 1" = 100' N PHASE 1 - 4.58 ACRES - INSTALL CONSTRUCTION ACCESS ROAD. INSTALL PORTION OF STORM WATER MANAGEMENT. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WILL BE IMPLEMENTED PRIOR TO THE START OF PHASE 1. PHASING LEGEND PHASE 2 - 4.73 ACRES - INSTALL CONSTRUCTION ACCESS ROAD. INSTALL PORTION OF STORM WATER MANAGEMENT. PHASE 4 - 4.85 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 3 - 4.57 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 5 - 1.99 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. THE OWNER OR OPERATOR OF A CONSTRUCTION ACTIVITY SHALL NOT DISTURB GREATER THAN FIVE (5) ACRES OF SOIL AT ANY ONE TIME WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE DEPARTMENT OR, IN AREAS UNDER THE JURISDICTION OF A REGULATED, TRADITIONAL LAND USE CONTROL MS4, THE REGULATED, TRADITIONAL LAND USE CONTROL MS4 (PROVIDED THE REGULATED, TRADITIONAL LAND USE CONTROL MS4 IS NOT THE OWNER OR OPERATOR OF THE CONSTRUCTION ACTIVITY). PHASED AREAS SHALL BE DELINEATED WITH CONSTRUCTION FENCING TO CONTAIN DISTURBANCES WITHIN EACH PHASE. THE PHASING DELINEATION SHALL BE COMPLETED FOR AN AREA PRIOR TO THE START OF CONSTRUCTION IN THAT AREA. THE PHASING PLAN FOR THE SOLAR PROJECT SHALL BE PERFORMED AS FOLLOWS: PHASE 1 (4.58 ACRES):INSTALLATION OF THE CONSTRUCTION ACCESS ROAD AND ITS REQUIRED GRADING. THE LIMITED USE PERVIOUS ACCESS ROAD WILL BE INSTALLED IN THE FINAL PHASE. ALL TEMPORARY EROSION AND SEDIMENT CONTROL ITEMS WILL BE IMPLEMENTED PRIOR TO THE START OF PHASE 1. ONCE INSTALLATION OF THESE ITEMS ARE COMPLETE, ALL DISTURBED AREAS SHALL BE SEEDED AND STABILIZED WITH STRAW. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 2 (4.73 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 3 (4.57 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 4 (4.85 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 5 (1.99 ACRES): INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 6 (4.60 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 7 (4.73 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 8 (4.67 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 9 (1.27 ACRES):INSTALLATION OF PORTION OF SOLAR ARRAY. INSTALLATION OF THE PROPOSED LEVEL SPREADERS AS REQUIRED. ONCE LEVEL SPREADERS ARE INSTALLED, GEOTEXTILE FABRIC SHALL BE PLACED OVER THEM TO PROTECT FROM SILT ACCUMULATION DURING CONSTRUCTION. ONCE FINAL GRADE IS ACHIEVED, THEY SHALL BE IMMEDIATELY SEEDED AND STABILIZED WITH STRAW. INSTALLATION OF SOLAR PANEL ARRAYS AND THEIR REQUIRED ELECTRICAL APPURTENANCES, UTILITY POLES, AND OVERHEAD AND UNDERGROUND WIRES. THE PERIMETER FENCE SHALL BE INSTALLED AS TO NOT INTERFERE WITH THE INSTALLATION OF THE SOLAR ARRAYS. ALL DISTURBED AREAS DORMANT FOR 7 DAYS SHALL BE SEEDED AND STABILIZED. ANTICIPATED TIME FRAME: 6 WEEKS PHASE 10 (1.27 ACRES):REMOVE CONSTRUCTION ACCESS ROAD MATERIAL TO SUBGRADE. TILL ALL COMPACTED SOILS LOCATED WITHIN THE LIMITED USE PERVIOUS ROAD AREAS TO RESTORE THE ORIGINAL PROPERTIES OF THE SOIL PRIOR TO PERVIOUS ROAD INSTALLATION. REFER TO THE NYSDEC DIVISION OF WATER GUIDANCE "DEEP-RIPPING AND DECOMPACTION" DATED APRIL 2008. UPON COMPLETION OF SOIL DECOMPACTION, THE LIMITED USE PERVIOUS ACCESS ROAD MAY BE INSTALLED. ANTICIPATED TIME FRAME: 4 WEEKS PHASING PLAN NOTES PHASE 6 - 4.60 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 7 - 4.73 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 8 - 4.67 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 9 - 1.27 ACRES - INSTALLATION OF PORTION OF SOLAR ARRAY. PHASE 10 - 1.27 ACRES - SOIL DECOMPACTION AND INSTALLATION OF LIMITED USE PERVIOUS ACCESS ROAD. 2' 3 3 / 4 " 1' - 4 " TREE/VEGETATION PROTECTION BARRIER N.T.S.C501 4 2' 4' 3' 5' CONSTRUCTION ZONE 10' MAX. 2' 4' SIGN TREE / VEGETATION PROTECTION BARRIER SILT FENCE EXISTING GRADE PROPOSED TOE OF SLOPE WARNING SIGN WOOD OR STEEL POST (TYP.) MIN. LENGTH 6' BARRIER FENCE (ORANGE SNOW FENCE) EXISTING GRADE WARNING SIGNELEVATION SECTION FLOW PROTECTED AREA CONCRETE WASHOUT AREA WITH STRAW BALES N.T.S.C501 6 BB NOTE: 1.CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH CONSTRUCTION SPECIFICATIONS 1.LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS, BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC. 2.SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD. TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP. 3.PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL. 4.PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY. 5.KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. 3' T Y P . 4" 2"10' TYP. 10 ' T Y P . 1/8" DIA. STEEL WIRE STAPLES (2 PER BALE) IMPERMEABLE SHEETING STRAW BALE (TYP.)WOOD OR METAL STAKES (2 PER BALE) BINDING WIRE STRAW BALE (TYP.) IMPERMEABLE SHEETING STAKE (TYP.) PLAN SECTION B-B STAPLE DETAIL SILT FENCE NYS DEC DETAIL: SILT FENCE NOTES: 1.WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD. 2.FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING. 3.WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABLINKA 140N, OR APPROVED EQUAL. 4.PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUAL. 5.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. FLOW 1 1 4" SQUARE HARDWOOD 36" MIN. FENCE POSTS, DRIVEN MIN. 16" INTO GROUND10' MAX. C. TO C. 16 " M I N . 20 " M I N . 36" MIN. FENCE POST WOVEN WIRE FENCE (MIN. 14 GAUGE W/ MAX. 6" MESH SPACING WITH FILTER CLOTH UNDISTURBED GROUND PERSPECTIVE VIEW SECTION VIEW COMPACTED SOIL FLOW 4" MIN. EMBED FILTER CLOTH A MIN. OF 6" IN GROUND FLOW WOVEN WIRE FENCE (MIN. 14 GAUGE W/ MAX. 6" MESH SPACING WITH FILTER CLOTH 6" MI N . HE I G H T O F FI L T E R = 1 8 " MI N . SYMBOL STABILIZED CONSTRUCTION ENTRANCE N.YS DEC DETAIL: STABILIZED CONSTRUCTION ACCESS CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY). 3.THICKNESS - NOT LESS THAN SIX (6) INCHES. 4.WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 5.GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 6.SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 7.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. 8.WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 9.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. C501 5 3'5:1 10 ' M I N . 12 ' M I N . 50' MIN. 6" MI N . 50' MIN. 12' MIN. PLAN VIEW EXISTING PAVEMENT MOUNTABLE BERM (OPTIONAL) EXISTING PAVEMENT FILTER CLOTHEXISTING GROUND EXISTING GROUND PROFILE VIEW SYMBOL COMPOST FILTER SOCK NYS DEC DETAIL: COMPOST FILTER SOCKC501 2 UNDISTURBED AREADISTURBED AREA BLOWN/PLACED FILTER MEDIA 2" X 2" WOODEN SPIKES PLACED 10' O.C. MIN 12" COMPOST FILTER SOCK PER THE NYSDEC 12 " MI N . EXISTING CONTOURS DISTURBED AREA UNDISTURBED AREA 8' 2" X 2" WOODEN STAKES PLACED 10' O.C. COMPOST FILTER SOCK MINIMUM (NONRESIDENTIAL) SIZE OF 12'' PER NYSDEC FL O W FL O W PLAN VIEW SECTION VIEW TEMPORARY SOIL STOCKPILE N.T.S.C501 1 MIN. SLOPE MIN. SLOPE SLOPE OR LESS1 2 NOTES: 1.AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE. 2.MAXIMUM SLOPE OF STOCKPILE SHALL BE 1V:2H. 3.UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED. 4.SEE SPECIFICATIONS AND DETAIL FOR INSTALLATION OF SILT FENCE. SILT FENCE C501 7 2:1 MAX S L O P E 4:1 TYP. S L O P E 2:1 MAX S L O P E 4:1 TYP. S L O P E 30 " P E R M E A B L E S O I L 4" M I N . 10 " BOTTOM WIDTH VARIES (SEE PLAN) BIO SOIL MIX UNDERDRAIN FILTER MATERIAL 6" PERFORATED UNDERDRAIN PIPE GEOTEXTILE FABRIC- MIRAFI 140N OR APPROVED EQUAL TOPSOIL PLANTED WITH FLOOD TOLERANT GRASSES DRY SWALE N.T.S.C501 3 STONE CHECK DAM NYS DEC DETAIL: STONE CHECK DAMC501 8 A A SLOPE SAME ELEVATION 1 1 1 1 1 22 1 H (Ft) SLOPE (FT/FT) X =1.5' MIN. B B 18" SYMBOL NOTES: 1.STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION TO THE LINES, GRADES AND LOCATIONS SHOWN IN THE PLAN. 2.SET SPACING OF CHECK DAMS TO ASSUME THAT THE ELEVATION OF THE CREST OF THE DOWNSTREAM DAM IS THE SAME ELEVATION OF THE TOE OF THE UPSTREAM DAM. 3.EXTEND THE STONE A MINIMUM OF 1.5 FEET BEYOND THE DITCH BANKS TO PREVENT OUTING AROUND THE DAM. 4.PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND EROSION WITH STONE OR LINER AS APPROPRIATE. 5.ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONE. MAXIMUM DRAINAGE AREA 2 ACRES. PERMEABLE GEOTEXTILE FILTER FABRIC CUTOFF TRENCH DESIGN BOTTOM PERMEABLE GEOTEXTILE FILTER FABRIC CUTOFF TRENCH 18" WIDE, 6" DEEP TOE (x) SPACING VARIES DEPENDING ON CHANNEL SLOPE (H ) C R E S T 24 " M A X A T C E N T E R 6" 24 " M A X AT C E N T E R 9" MI N . SECTION A-A SECTION B-B PROFILE IMPERMEABLE LINER TO BE ADDED TO BOTTOM AND ALL SIDES OF CHANNEL ADJACENT ROADWAY PEA GRAVEL DIAPHRAGM 12" MIN WIDTH 24 " M I N D E P T H C501 CONSTRUCTION DETAILS DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS NOTE:DETAILS ARE INDICATIVE FOR PERMITTING PURPOSES AND MAY BE REPLACED WITH SIMILAR ALTERNATIVES C502 1 FINAL GRADE WARNING MARKER OVER ENTIRE LENGTH SAND ENCASE CONDUIT 3" MIN. ON ALL SIDES. ENCASE CONDUIT (3" MIN ALL SIDES) SIZE AND QUANTITY OF CONDUITS TO BE DETERMINED. 18" 36" MIN. FOR SURFACE RESTORATION, SEE LIMITED USE PERVIOUS ACCESS ROAD DETAIL OR SOIL RESTORATION DETAIL 98% UNDER ROADS AND 90% UNDER VEGETATED SURFACES - COMPACTED BACKFILL ELECTRICAL CONDUIT TRENCH N.T.S. PEA GRAVEL DIAPHRAGM WITH VEGETATED FILTER STRIP N.T.S. 1' CLEAN WASHED PEA GRAVEL SEE ACCESS ROAD DETAIL GEOTEXTILE FABRIC (MIRAFI 140N OR APPROVED EQUAL) CONTRIBUTING SURFACE 150' MAX. 10% MAX. SLOPE 10' 2% MAX WIDTH VARIES - SEE PLANS 8% MAX MEET EXISTING GRADE NOTES: 1.PURPOSE: A PERMANENT PRACTICE USED TO REMOVE SEDIMENT FROM RUNOFF FROM IMPERVIOUS AREAS PRIOR TO REACHING SURFACE WATERS. 2.NO DEVELOPMENT IS ALLOWED ON FILTER STRIP AREA. 3.VEGETATED FILTER STRIPS MUST BE DELINEATED AND PERMANENTLY PROTECTED THROUGH ESTABLISHMENT OF A LEGAL CONSERVATION EASEMENT. FILTER STRIP 2' - 0 " TEMPORARY LAYDOWN YARD SECTION NOT TO SCALE CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE - USE 6 INCHES OF SUBBASE COURSE, NYSDOT CRUSHER RUN, TYPE 2 STONE OR APPROVED EQUAL. 2.THICKNESS - NOT LESS THAN SIX (6) INCHES. 3.GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 4.A MOUNTABLE BERM SHALL BE PROVIDED ON THE UPHILL SIDE OF THE TEMPORARY STAGING AREA WITH 5:1 SLOPES. 5.MAINTENANCE - THE TEMPORARY LAYDOWN AREA SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. 6.WHEN WASHING OF MATERIAL/EQUIPMENT IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 7.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. 8.WHEN CONSTRUCTION IS COMPLETE, REMOVE STONE AND GEOTEXTILE. TILL A MINIMUM OF 12" IN ORDER TO RESTORE THE ORIGINAL PROPERTIES OF THE SOIL. INSTALL 6" OF TOPSOIL AND SEED AND MULCH WITH PERMANENT SEED MIXTURE. SEE SHEET C002 FOR ADDITIONAL RESTORATION INFORMATION. 3'5:1 6" MI N . EXISTING PAVEMENT MOUNTABLE BERM ON UPHILL SIDE (OPTIONAL) MIRAFI 500X FILTER CLOTH OR APPROVED EQUAL EXISTING GROUND PROFILE VIEW UNDISTURBED AREA PLACED FILTER MEDIA 2" X 2" WOODEN SPIKES PLACED 10' O.C. COMPOST FILTER SOCK 12 " MI N . 24' WIDE FIXED KNOT FARM FENCE DOUBLE SWING GATE N.T.S. ALL JOINTS ARE WELDED TO MAKE A RIGID FRAME BRACE RAIL CENTER GATE STOP OR APPROVED EQUAL DROP BAR OR APPROVED EQUAL PROVISION PROVISION FOR PADLOCK AND KNOX BOX SIGN IDENTIFYING OWNER AND EMERGENCY CONTACT FIXED KNOT WIRE MESH OR APPROVED EQUAL 8' (TYP.) MATCH FENCE HEIGHT 6" MIN. 12" MIN. DIA. (TYP.) 4' MIN. ADJUST TO FROST DEPTH PER GEOTECH REPORT (TYP.) 24' WIDE OPENING MIN. HINGE POST (TYP.) 3" CLEAR NOTES 1.INSTALL ALL FENCING COMPONENTS PER MANUFACTURES SPECIFICATIONS. 2.ALL FENCING AND HARDWARE SHALL BE GALVANIZED, UNLESS OTHERWISE NOTED. 3.HINGE POSTS MAY BE TIMBER IF CONTRACTOR DESIRES, TIMBER HINGE POSTS DO NOT NEED TO BE SET IN CONCRETE. UTILIZE HINGE THRU BOLTS TO CONNECT TO TIMBER HINGE POSTS OR LAG SCREWS, PER MANUFACTURERS RECOMMENDATIONS. 4.IF CONTRACTOR UTILIZES METAL HINGE POST THAN POSTS SHALL BE SET IN CONCRETE AS SHOWN ON DETAIL. 5.BRACING REQUIRED AT FOR ALL GATES. SEE FIXED KNOT FARM FENCE DETAIL. 6.FIXED KNOT WIRE MESH TO BE BEKAERT SOLIDLOCK® PRO, 12.5 GAUGE, CLASS 3 GALVANIZED, 6" VERTICAL SPACING OR APPROVED EQUAL 7.BRACE RAIL SHOWN FOR REFERENCE ADDITIONAL BRACE RAILS MAY BE REQUIRED (NOT SHOWN) OR TRUSS RODS MAY BE REQUIRED PER MANUFACTURES RECOMMENDATIONS FIXED KNOT WIRE MESH OR APPROVED EQUAL ALL JOINTS ARE WELDED TO MAKE A RIGID FRAME PROVISION FOR PAD LOCK LATCH POST POST TOP 3" CLEAR 4' WIDE OPENING MIN. HINGE POST 8' (TYP.) MATCH FENCE HEIGHT ROUND POST HINGE (TYP.) 6" MIN. 12" MIN. DIA. (TYP.) 4' MIN. ADJUST TO FROST DEPTH PER GEOTECH REPORT (TYP.) NOTES 1.INSTALL ALL FENCING COMPONENTS PER MANUFACTURES SPECIFICATIONS. 2.ALL FENCING AND HARDWARE SHALL BE GALVANIZED, UNLESS OTHERWISE NOTED. 3.HINGE POSTS MAY BE TIMBER IF CONTRACTOR DESIRES, TIMBER HINGE POSTS DO NOT NEED TO BE SET IN CONCRETE. UTILIZE HINGE THRU BOLTS TO CONNECT TO TIMBER HINGE POSTS OR LAG SCREWS, PER MANUFACTURERS RECOMMENDATIONS. 4.IF CONTRACTOR UTILIZES METAL HINGE POST THAN POSTS SHALL BE SET IN CONCRETE AS SHOWN ON DETAIL. 5.BRACING REQUIRED AT FOR ALL GATES. SEE FIXED KNOT FARM FENCE DETAIL. 6.FIXED KNOT WIRE MESH TO BE BEKAERT SOLIDLOCK® PRO, 12.5 GAUGE, CLASS 3 GALVANIZED, 6" VERTICAL SPACING OR APPROVED EQUAL 7.BRACE RAILS AND/ OR TRUSS RODS ARE NOT SHOWN, MAY BE REQUIRED PER MANUFACTURES RECOMMENDATIONS FIXED KNOT FARM PERSONNEL GATE N.T.S. N.T.S. FIXED KNOT FARM FENCE CORNER OR END POST WIRE STRAINER 12.5 GAUGE TENSILE WIRE BRACE PIN BRACE PIN TOP POST / BRACE RAIL BRACE POST LINE POST ALL FENCE WIRE TO BE MIN. 2" ABOVE GROUND NOTES 1.INSTALL ALL FENCING COMPONENTS PER MANUFACTURES SPECIFICATIONS. 2.ALL FENCING AND HARDWARE SHALL BE GALVANIZED, UNLESS OTHERWISE NOTED. 3.ALL SQUARE POSTS TO BE MIN. 5"X5" NOMINAL SIZE OR ROUND POST WITH MIN. 5" OR 6" DIAMETER PRESSURE TREATED WOOD OR APPROVED EQUAL. PREFER POSTS TO HAVE A CHAMFERED TOP. 4.ALL LINE POST TO BE SET TO A MIN. DEPTH OF 4' BELOW GRADE, ALL CORNER, END OR GATE POSTS SHALL BE SET TO A MIN. DEPTH OF 6' BELOW GRADE, UNLESS OTHERWISE NOTED. 5.FIXED KNOT WIRE MESH TO BE BEKAERT SOLIDLOCK® PRO, 12.5 GAUGE, CLASS 3 GALVANIZED, 6" VERTICAL SPACING OR APPROVED EQUAL. 6.BRACING IS REQUIRED AT ALL CORNER, END, AND GATE POSTS. DOUBLE BRACING (TWO BRACE ASSEMBLIES IN A ROW) SHOULD BE USED FOR STRAIGHT RUNS OF FENCE THAT EXCEED 1,000 LF. AN ADDITIONAL BRACE ASSEMBLY SHOULD BE INSTALLED MID SPAN FOR STRAIGHT RUNS OF FENCE THAT EXCEED 1,320 LF. ADDITIONAL BRACING MAY BE STILL BE REQUIRED OVER UNEVEN TERRAIN, CONTRACTOR SHALL INSTALL ADDITIONAL BRACING AS NEEDED IF DEFLECTION IS NOTICED DURING TENSIONING. FIXED KNOT WIRE MESH TYP. SEE NOTE 5. 2 X H MIN. 2.5 X H PREFERRED H = 8' 10' O.C. INCREASING SPACING MUST BE PRE-APPROVED BY OWNER BURY DEPTH SEE NOTE 4 C502 2 C502 8 C502 6 C502 7 C502 3 MAX 20' FINISHED GRADE MODULE RACK 1X PORTRAIT @ +/-60° TILT SOLAR ARRAY RACK DETAIL N.T.S.C502 5 C502 4 TYPICAL PAVED AREA TYPICAL GRASS AREA NOTE: 1.FINAL LOCATION OF BOLLARDS SHALL BE APPROVED BY THE OWNER OR ARCHITECT/ENGINEER. 3' - 6 " BOLLARD N.T.S. 6" 8" MIN. 2" 3' - 6 " DOMED CONCRETE FILL 6" O.D. STEEL PIPE WITH PLASTIC SLEEVE (YELLOW) DOMED IN GRASS AREA 4000 PSI CONCRETE UNDISTURBED EARTH OR 18" SONOTUBE SUBBASE COURSE FLUSH IN CONCRETE OR PAVED AREA 8' PANEL ROW SPACING C502 CONSTRUCTION DETAILS DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS NOTE:DETAILS ARE INDICATIVE FOR PERMITTING PURPOSES AND MAY BE REPLACED WITH SIMILAR ALTERNATIVES STORM SEWER TO EXTEND INTO THE MANHOLE ONLY TO A POINT WHERE OUTSIDE OF SEWER MEETS THE INSIDE WALL OF THE MANHOLE OPENING FOR PIPE TO BE PRECAST OR MACHINE CORED. CONNECTION TO BE RESILIENT AND WATER TIGHT PROPOSED 12'' DIAMETER ORIFICE WITH TRASH RACK 4' x 4' SQUARE CATCH BASIN OR AS SPECIFIED ON PLANS PROPOSED 12'' DIAMETER HDPE STORM PIPE (SEE GRADING & EROSION CONTROL PLAN SHEET C012 FOR LOCATION) PLAN PROPOSED 12'' DIAMETER HDPE STORM PIPE (SEE GRADING & EROSION CONTROL PLAN SHEET C012 FOR INVERT AND LOCATION). PRECAST TOP SLAB WITH ECCENTIC OPENING (ASTM C-478) COMPACTED SELECT BACKFILL 48'' HEAVY DUTY FRAME AND GRATE. (SOLID RIM ELEVATION SEE GRADING & EROSION CONTROL PLAN SHEET C012) MANHOLE FRAME TO BE SET IN PORTLAND CEMENT MORTAR. GRADE RINGS AND BRICE COURSES (2 MAX.) USED TO ADJUST COVER TO REQUIRED ELEVATION. SEWER BRICK TO BE ASTM C-32 PRECAST CONCRETE (ASTM C-478) 6'' MIN. THICK PROPOSED 12'' DIAMETER ORIFICE WITH STORMRAX HDPE STRUCTURAL PLASTIC TRASH RACK BY CONTECH OR APPROVED EQUIVALENT. 4'' MINIMUM CLEAR OF ORIFICE IN ALL DIRECTIONS. SEE GRADING & EROSION CONTROL PLAN SHEET C401 FOR INVERT PROPOSED 6'' THICK CONCRETE WEIR WALL (SEE ORIFICE DETAIL, THIS SHEET) 3' 12 " 2'- 5 ' ' 1'- 1 0 ' ' 2'- 0 ' ' 1' - 6 ' ' 1' - 8 ' ' 2'- 10 ' ' 2'-6'' LEVEL SPREADER N.T.S. 3'-0" 3'-0" CLEAN CRUSHED STONE GEOTEXTILE FABRIC (MIRAFI 140N OR APPROVED EQUAL) SLOPE (SEE PLANS) 2" - 4 " D R O P 3' - 0 " MAINTENANCE NOTES 1.LEVEL SPREADERS SHOULD BE INSPECTED EVERY 2 TO 3 YEARS FOR EXCESS SEDIMENTATION AND CLOGGING. REPLACE MATERIAL IF NECESSARY. 2.CONTRACTOR TO PROVIDE AS-BUILTS TO THE TOWN OF THE SIZE AND LOCATIONS OF THE SPREADERS. 6.GEOTEXTILE FILTER FABRIC SHALL BE PLACED ON TOP OF THE GRAVEL DIAPHRAGMS DURING CONSTRUCTION TO MINIMIZE CLOGGING OF VOID SPACES. GRAVEL ACCESS ROAD SECTION N.T.S. FINISH GRADE RESTORE LAWN DISTURBED BY CONSTRUCTION AND PROVIDE NEW 4" MINIMUM DEPTH MECHANICALLY SCREENED TOPSOIL (TYP) COMPACTED SUBBGRADE 16" SUBBASE COURSE 6" GEOTEXTILE FABRIC - MIRAFI 500X OR APPROVED EQUAL APPLICATION NOTES: A.THE PURPOSE OF EROSION MATTING ON SLOPES IS TO REDUCE EROSION AND AID THE ESTABLISHMENT OF VEGETATION B.EROSION CONTROL MATTING SHALL BE USED FOR THE FOLLOWING REASONS: * SLOPES GREATER THAN 3H:1V OR WHERE ORDERED BY ENGINEER * AREAS WHERE SEED AND MULCH WILL NOT STAY IN PLACE ALONE * WHERE SEEDING IS OUTSIDE THE GROWING SEASON. GENERAL NOTES: 1.GRADE AND SMOOTH THE SLOPE TO PROVIDE GOOD MATTING TO SOIL SURFACE CONTACT. 2.APPLY FERTILIZER, LIME, AND SEED PRIOR TO PLACING MATTING. 3.ANCHOR MATTING AS SHOWN, UTILIZING ANCHOR STAPLES. STAPLE PLACEMENT SHALL BE DETERMINED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 4.UNROLL EROSION MATTING VERTICALLY DOWN SLOPE IN THE DIRECTION OF WATER FLOW. 5.OVERLAP UPPER MATTING OVER LOWER MATTING AS SHOWN, AND AS DIRECTED BY MANUFACTURER. 6.OVERLAP ADJACENT MATTING AS SHOWN, AND AS DIRECTED BY MANUFACTURER. 7.CUT EXCESS MATTING AT END OF SLOPE AND ANCHOR THE END. 8.EROSION MATTING SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OF A STORM EVENT OF 12" OR GREATER. 9.EROSION MATTING SHALL BE REPAIRED AND RESTAPLED AS NECESSARY TO ENSURE PROPER FUNCTION. 6" MIN. 6" MIN. 6" BIORETENTION N.T.S. DRAINAGE GRAVEL MAX. PONDING/ OVERFLOW ELEV.RIM OF CB 3.0H 1V 6" PERFORATED PVC @ 0.2%SUBGRADE OR EXISTING SOIL FILTER FABRIC 30 " M I N . 12" STONE DRAINAGE LAYER 3" MIN. SHREDDED HARDWOOD MULCH 12" MAX PONDING HEIGHT FILTER MEDIA GRAVEL EXTENTSEXTENTS OF CONCRETE PAD ELECTRICAL EQUIPMENT CONCRETE PAD N.T.S. GEOTEXTILE FABRIC (MIRAFI 180N OR APPROVED EQUAL) MIN. 6", 3/4" STONE 6", 3/4" CRUSHED STONE MIN.12" STRUCTURAL FILL MIN. 6" (TYP.) MIN. 36" (TYP.) FINISH GRADE COMPACTED SUBGRADE (SUITABLE SOIL MATERIAL) BEDDING SAND MIN. 6" COVER ELEC. CONDUIT SIZE VARIES 3" COMPACTED SAND SEE STRUCTURAL DRAWINGS FOR CONCRETE PAD DETAILSMIN. 4" SLAB ABOVE GRADE MIN. 4", 1-1/2" STONE, FLUSH WITH PAD C503 4 C503 8 C503 5 C503 6 N.T.S. OVERFLOW WEIR GEOTEXTILE BASE TO DETERMINED BY GEOTECHNICAL ENGINEER WIDTH VARIES (SEE PLAN) EMERGENCY SPILLWAY ELEVATION VARIES (SEE PLAN) TOP OF BANK VARIES (SEE PLAN) MEDIUM STONE FILL NYSDOT ITEM 304-2.02 TYPE 4 C503 7 OUTLET CONTROL STRUCTURE DETAIL N.T.S.C503 1 ROLLED EROSION CONTROL PRODUCT N.T.S.C503 2 LOW FLOW ORIFICE TRASH RACK DETAIL N.T.S.C503 3 LOW FLOW ORIFICE TRASH RACK SEE DETAIL THIS SHEET PROPERLY COMPACTED CRUSHED STONE, NYSDOT MIX NO.1 & 2 TO SPRINGLINE OF HIGHEST PIPE ENSURE BACKFILL IS PLACED UNDER PIPE AND PROPERLY COMPACTED, TYP. PROVIDE A-LOK WATER-STOP GASKET. SEAL ANNULAR VOID WITH NON SHRINK GROUT, TYP. OPENING OF EQUAL SIZE & SHAPE OF GRATE OR COVER FLOW DIFFUSER N.Y.S. DEC DETAIL: FLOW DIFFUSER DITCH SLIDE SLOPE D50 ROCK SIZE = VARIES (TYP. 6" OR LESS WITH MAX. D50 = 9") C503 9 2'6' MIN. 1' MI N . AVG. L = 3'6"6" 102 102 101 15 0 ' M I N . L E N G T H 96 100 99 98 97 99 101 100 100 97 98 96 98 98 W (VARIES) A A B B 1' SECTION A-A: ROADWAY 6" SECTION B-B: DITCH BOTTOM EXISTING GROUND STORMWATER CONVEYANCE TO DIFFUSER PONDING AREA DRAINAGE FABRIC DRAINAGE FABRIC NATIVE MATERIAL TYPICAL PLAN VIEW FLOW DIFFUSER LENGTH MEASURED TO THIS POINT AT EACH END NOTES: 1.TYPICAL ELEVATIONS SHOWN HERE ARE TO ILLUSTRATE THE OPERATION OF THE FLOW DIFFUSER. VEGETATED RECEIVING AREA <= 30% SLOPE DRAINAGE FABRIC EXTEND UNDER LIMITS OF FILL ON ENDS 6" ADDITIONAL BERM HEIGHT AT BOTH ENDS OF THE FLOW DIFFUSER TO PREVENT WASHOUT AT ENDS POOLING AREA AND DEBRIS COLLECTION DIVERSION SWALE EXISTING DRAINAGE PATTERN (TYP.) END SECTION N.T.S.C503 10 A A LIGHT STONE FILLING GALVANIZED STEEL END SECTION LIGHT STONE FILLING NYSDOT ITEM 620.03 1:3 MAX SLOPE 10' MIN. 8' MINIMUM PLAN STORM SEWER GALVANIZED STEEL END SECTION GEOTEXTILE SEPARATION FABRIC PLACEMENT THICKNESS: LIGHT - 18" WITH AT CULVERT END = 6' MIN. STORM SEWER GALVANIZED STEEL END SECTIONLIGHT STONE FILLING NYSDOT ITEM 620.03 1:3 MAX SLOPE 10' MIN. GEOTEXTILE SEPARATION FABRIC STORM SEWER SECTION A-A INLET OUTLET PLACEMENT THICKNESS: LIGHT - 18" IMPERMEABLE FABRIC LAYER C503 CONSTRUCTION DETAILS DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS NOTE:DETAILS ARE INDICATIVE FOR PERMITTING PURPOSES AND MAY BE REPLACED WITH SIMILAR ALTERNATIVES N.T.S.C504 2 VARIES (24' MAX.) VARIES (24' MAX.) 8" M I N . PLAN TYPICAL CUT SECTION LIMITED USE PERVIOUS ACCESS ROAD - 0% TO 10% SLOPES VARIES (24' MAX.)8" M I N . TYPICAL FILL SECTION GRAVEL MATERIAL GEOGRID MATERIAL, PRESTO GEOSYSTEMS GEOWEB LOAD SUPPORT SYSTEM (OR APPROVED EQUAL) LIMITED USE ACCESS ROAD TO BE FLUSH WITH ENTRANCE AND MATCH EXISTING ELEVATION EXISTING GRADE GEOTEXTILE FABRIC TO BE USED IN PLACID SOIL AREAS ONLY EXISTING SUBGRADE EXISTING GRADE CUT LINE FILL CUT AREA WITH GRAVEL MATERIAL GEOWEB SYSTEM (TYP.) GEOTEXTILE FABRIC EXISTING GRADE GEOTEXTILE FABRICCOMPACTED EXISTING SUBGRADE, PREPARED SUBGRADE CBR=2.0% FILL AREA WITH GRAVEL MATERIAL 6" THICK GEOWEB SYSTEM (TYP.) COMPACTED EXISTING SUBGRADE, PREPARED SUBGRADE CBR=2.0% 1:4 SLOPE TO EXISTING GRADE 12" MIN. GRAVEL MATERIAL 2" WE A R SU R F A C E ATRA ANCHOR 24 " NO. 4 (1/2") BAR ATRA STAKE CLIP PERMEABLE ACCESS ROAD GENERAL NOTES: 1.USE OF THIS DETAIL/CRITERION IS LIMITED TO ACCESS ROADS USED ON AN OCCASIONAL BASIS ONLY (I.E. PROVIDE ACCESS FOR MOWING EQUIPMENT REPAIR OR MAINTENANCE, ETC.) 2.LIMITED USE PERVIOUS ACCESS ROAD IS LIMITED TO LOW IMPACT IRREGULAR MAINTENANCE ACCESS ASSOCIATED WITH RENEWABLE ENERGY PROJECTS IN NEW YORK STATE. 3.REMOVE STUMPS, ROCKS AND DEBRIS AS NECESSARY, FILL VOIDS TO MATCH EXISTING NATIVE SOILS AND COMPACTION LEVEL. 4.REMOVED TOPSOIL MAY BE SPREAD IN ADJACENT AREAS AS DIRECTED BY THE PROJECT ENGINEER. COMPACT TO THE DEGREE OF THE NATIVE INSITU SOIL. DO NOT PLACE IN AN AREA THAT IMPEDES STORMWATER DRAINAGE. 5.GRADE ROADWAY, WHERE NECESSARY, TO NATIVE SOIL AND DESIRED ELEVATION. MINOR GRADING FOR CROSS SLOPE CUT AND FILL MAY BE REQUIRED. 6.REMOVE REFUSE SOILS AS DIRECTED BY THE PROJECT ENGINEER. DO NOT PLACE IN AN AREA THAT IMPEDES STORMWATER DRAINAGE. 7.ROADWAY WIDTH TO BE DETERMINED BY CLIENT. 8.THE LIMITED USE PERVIOUS ACCESS ROAD CROSS SLOPE SHALL BE 2% IN MOST CASES AND SHOULD NOT EXCEED 5%. THE LONGITUDINAL SLOPE OF THE ACCESS DRIVE SHOULD NOT EXCEED 15%. 9.LIMITED USE PERVIOUS ACCESS ROAD IS NOT INTENDED TO BE UTILIZED FOR CONSTRUCTION WHICH MAY SUBJECT THE ACCESS TO SEDIMENT TRACKING. THIS SPECIFICATION IS TO BE DEVELOPED FOR POST-CONSTRUCTION USE, SOIL RESTORATION PRACTICES MAY BE APPLICABLE TO RESTORE CONSTRUCTION RELATED COMPACTION TO PRE-EXISTING CONDITIONS AND SHOULD BE VERIFIED BY SOIL PENETROMETER READINGS. THE PENETROMETER READINGS SHALL BE COMPARED TO THE RESPECTIVE RECORDED READINGS TAKEN PRIOR TO CONSTRUCTION, EVERY 100 LINEAR FEET ALONG THE PROPOSED ROADWAY. 10.TO ENSURE THAT SOIL IS NOT TRACKED ONTO THE LIMITED USE PERVIOUS ACCESS ROAD, IT SHALL NOT BE USED BY CONSTRUCTION VEHICLES TRANSPORTING SOIL, FILL MATERIAL, ETC. IF THE LIMITED USE PERVIOUS ACCESS IS COMPLETED DURING INITIAL PHASES OF CONSTRUCTION, A STANDARD NEW YOK STATE STABILIZED CONSTRUCTION ACCESS SHALL BE CONSTRUCTED AND UTILIZED TO REMOVE SEDIMENT FROM CONSTRUCTION VEHICLES AND EQUIPMENT PRIOR TO ENTERING THE LIMITED USE PERVIOUS ACCESS ROAD FROM ANY LOCATION ON, OR OFF SITE. MAINTENANCE OF THE PERVIOUS ACCESS ROAD WILL BE REQUIRED IF SEDIMENT IS OBSERVED WITHIN THE CLEAN STONE. 11.THE LIMITED USE PERVIOUS ACCESS ROAD SHALL NOT BE CONSTRUCTED OR USED UNTIL ALL AREAS SUBJECT TO RUNOFF ONTO THE PERVIOUS ACCESS HAVE ACHIEVED FINAL STABILIZATION. 12.PROJECTS SHOULD AVOID INSTALLATION OF THE LIMITED USE PERVIOUS ACCESS ROAD IN POORLY DRAINED AREAS, HOWEVER IF NO ALTERNATIVE LOCATION IS AVAILABLE, THE PROJECT SHALL UTILIZE WOVEN GEOTEXTILE MATERIAL AS DETAILED IN FOLLOWING NOTES. 13.THE DRAINAGE DITCH IS OFFERED IN THE DETAIL FOR CIRCUMSTANCES WHEN CONCENTRATED FLOW COULD NOT BE AVOIDED. THE INTENTION OF THIS DESIGN IS TO MINIMIZE ALTERATIONS TO HYDROLOGY, HOWEVER WHEN DEALING WITH 5%-15% GRADES NOT PARALLEL TO THE CONTOUR, A ROADSIDE DITCH MAY BE REQUIRED. THE NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROLS FOR GRASSED WATERWAYS AND VEGETATED WATERWAYS ARE APPLICABLE FOR SIZING AND STABILIZATION. DIMENSIONS FOR THE GRASSED WATERWAY SPECIFICATION WOULD BE DESIGNED FOR PROJECT SPECIFIC HYDROLOGIC RUNOFF CALCULATIONS, AND A SEPARATE DETAIL FOR THE SPECIFIC GRASSED WATERWAY WOULD BE INCLUDED IN THIS PRACTICE. RUNOFF DISCHARGES WILL BE SUBJECT TO THE OUTLET REQUIREMENTS OF THE REFERENCED STANDARD. INCREASED POST-DEVELOPMENT RUNOFF FROM THE ASSOCIATED ROADSIDE DITCH MAY REQUIRE ADDITIONAL PRACTICES TO ATTENUATE RUNOFF TO PRE-DEVELOPMENT CONDITIONS. 14.IF A ROADSIDE DITCH IS NOT UTILIZED TO CAPTURE RUNOFF FROM THE ACCESS ROAD, THE PERVIOUS ACCESS ROAD WILL HAVE A WELL-ESTABLISHED PERENNIAL VEGETATIVE COVER, WHICH SHALL CONSIST OF UNIFORM VEGETATION (I.E. BUFFER), 20 FEET WIDE AND PARALLEL TO THE DOWN GRADIENT SIDE OF THE ACCESS ROAD. POST-CONSTRUCTION OPERATION AND MAINTENANCE PRACTICES WILL MAINTAIN THIS VEGETATIVE COVER TO ENSURE FINAL STABILIZATION FOR THE LIFE OF THE ACCESS ROAD. 15.THE DESIGN PROFESSIONAL MUST ACCOUNT FOR THE LIMITED USE PERVIOUS ACCESS ROAD IN THEIR SITE ASSESSMENT/HYDROLOGY ANALYSIS. IF THE HYDROLOGY ANALYSIS SHOWS THAT THE HYDROLOGY HAS BEEN ALTERED FROM PRE- TO POST-DEVELOPMENT CONDITIONS (SEE APPENDIX A OF GP-0-20-001 FOR THE DEFINITION OF “ALTER THE HYDROLOGY…”), THE DESIGN MUST INCLUDE THE NECESSARY DETENTION/RETENTION PRACTICES TO ATTENUATE THE RATES (10 AND 100 YEAR EVENTS) TO PRE-DEVELOPMENT CONDITIONS. GEOGRID MATERIAL NOTES: 1.THE GEOGRID, OR COMPARABLE PRODUCT, IS INTENDED FOR USE FOR ALL CONDITIONS, IN ORDER TO ASSIST IN MATERIAL SEPARATION FROM NATIVE SOILS AND PRESERVE ACCESS LOADS. 2.GRAVEL FILL MATERIAL SHALL CONSIST OF 1-4” CLEAN, DURABLE, SHARP-ANGLED CRUSHED STONE OF UNIFORM QUALITY, MEETING THE SPECIFICATIONS OF NYSDOT ITEM 703-02, SIZE DESIGNATION 3-5 OF TABLE 703-4. STONE MAY BE PLACED IN FRONT OF, AND SPREAD WITH, A TRACKED VEHICLE. GRAVEL SHALL NOT BE COMPACTED. 3.GEOGRID SHALL BE MIRAFI BXG110 OR APPROVED EQUAL. GEOGRID SHALL BE DESIGNED BASED ON EXISTING SOIL CONDITIONS AND PROPOSED HAUL ROAD SLOPES. 4.IF MORE THAN ONE ROLL WIDTH IS REQUIRED, ROLLS SHOULD OVERLAP A MINIMUM OF SIX INCHES. 5.REFER TO MANUFACTURER'S SPECIFICATION FOR PROPER TYING AND CONNECTIONS. 6.LIMITED USE PERVIOUS ACCESS ROAD SHALL BE TOP DRESSED AS REQUIRED WITH ONLY 1-4” CRUSHED STONE MEETING NYSDOT ITEM 703-02 SPECIFICATIONS. BASIS OF DESIGN: TENCATE MIRAFI BXG110 GEOGRIDS; 365 SOUTH HOLLAND DRIVE, PENDERGRASS, GA; 800-685-9990 OR 706-693-2226; WWW.MIRAFI.COM GEOWEB MATERIAL NOTES: 1.THE GEOWEB, OR COMPARABLE PRODUCT, IS SUGGESTED FOR USE ON ROAD PROFILES EXCEEDING 10%. THE GEOWEB PRODUCT IS INTENDED TO LIMIT SHIFTING STONE MATERIAL DURING USE. 2.INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 3.WHERE REQUIRED, A NATIVE SOIL WEDGE SHALL BE PLACED TO ACCOMMODATE ROAD CROSS SLOPE OF 2%. NATIVE SOIL SHALL BE COMPACTED TO MATCH EXISTING SOIL CONDITIONS. 4.GRAVEL FILL MATERIAL SHALL CONSIST OF 1-4” CLEAN, DURABLE, SHARP-ANGLED CRUSHED STONE OF UNIFORM QUALITY, MEETING THE SPECIFICATIONS OF NYSDOT ITEM 703-02, SIZE DESIGNATION 3-5 OF TABLE 703-4. STONE MAY BE PLACED IN FRONT OF, AND SPREAD WITH, A TRACKED VEHICLE. GRAVEL SHALL NOT BE COMPACTED. 5.GEOWEB SYSTEM SHALL BE PRESTO GEOSYSTEM GEOWEB OR APPROVED EQUAL. GEOWEB SHALL BE DESIGNED BASED ON EXISTING SOIL CONDITIONS AND PROPOSED HAUL ROAD SLOPES. 6.LIMITED USE PERVIOUS ACCESS ROAD SHALL BE TOP DRESSED AS REQUIRED WITH ONLY 1-4” CRUSHED STONE, SIZE 3A, MEETING NYSDOT ITEM 703-02 SPECIFICATIONS. 7.THE TOP EDGES OF ADJACENT CELL WALLS SHALL BE FLUSH WHEN CONNECTING. ALIGN THE I-SLOTS FOR INTERLEAF AND END TO END CONNECTIONS. THE GEOWEB PANELS SHALL BE CONNECTED WITH ATRA KEYS AT EACH INTERLEAD AND END TO END CONNECTIONS. REFER TO MANUFACTURER'S SPECIFICATION FOR PROPER INSTALLATION, TYING AND CONNECTIONS. 8.PREPARE THE SUBGRADE AS SHOWN ON THE CONSTRUCTION DRAWINGS. 9.COMPACT THE SOIL TO A MINIMUM 95% STANDARD PROCTOR. 10.VERIFY THAT THE SUBGRADE STRENGTH. IF UNACCEPTABLE, THE SOILS SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE ENGINEER. 11.WHERE REQUIRED, PROVIDE GEOTEXTILE SEPARATION LAYER. 12.WHERE REQUIRED, PLACE AND COMPACT SUBBASE MATERIAL TO A MINIMUM 95% STANDARD PROCTOR. 13.EXPAND THE GEOWEB SECTIONS INTO POSITION AND CONNECT THE END TO END INTERLEAF CONNECTIONS WITH ATRA KEYS. 14.PLACE THE SPECIFIED INFILL MATERIAL TO 2 INCHES ABOVE CELL WALLS AND COMPACT TO A MINIMUM 95% STANDARD PROCTOR. 15.PROVIDE ADDITIONAL SURFACE MATERIAL, AS SPECIFIED. BASIS OF DESIGN: PRESTO GEOSYSTEMS GEOWEB; 670 NORTH PERKINS STREET, APPLETON, WI; 800-548-3424 OR 920-738-1222; INFOR@PRESTOGEO.COM; WWW.PRESTOGEO.COM 20' WIDTH SEE PLANS FOR LENGTHS 10'11' 6" 12 " MI N . PLAN VIEW SECTION B-B SECTION A-A DIRECTION OF FLOW 12 " MI N . B B AA DOWNSTREAM/DOWNHILL LOW WATER CROSSING DETAIL N.T.S.C504 1 LOW WATER CROSSING NOTES 1.GEOTEXTILE SHALL BE MIRAFI RS380I OR APPROVED EQUIVALENT. 2.CONTRACTOR SHALL ENSURE THE BELLY OF THE LOW WATER CROSSING IS INSTALLED IN A MANNER THAT MATCHES THE ADJACENT GRADES ON BOTH UPSTREAM AND DOWNSTREAM SIDES OF THE ROAD. 3.THE LOW WATER CROSSING LOCATION(S) WAS BASED ON EXISTING TOPOGRAPHY AS SURVEYED. FIELD VERIFY LOCATION AND ADJUST ACCORDINGLY TO CAPTURE AND CONVEY FLOWS IN A NON-EROSIVE MANNER. TRANSITION POINT TRANSITION POINT LIME STABILIZED SUBGRADE CLEAN 4" DIAM. AGGREGATE COMPACTED NATIVE SOIL CLEAN 4" DIAM. AGGREGATE MATCH DOWNSTREAM ELEVATIONS MATCH UPSTREAM ELEVATIONS GEOTEXTILE TRANSITION POINTTRANSITION POINT ACCESS ROADACCESS ROAD C504 CONSTRUCTION DETAILS DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LOD LOD LODLODLODLODLODLODLODLODLOD LOD LOD NOW OR FORMERLY PARKER FAMILY LIMITED PARTNERSHIP, BY BRUCE PARKER AND CAROL PARKER TAX ACCT: 49-1-26.4 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.3 NOW OR FORMERLY JOHN M. ORAK AND STEPHANIE ORAK TAX ACCT: 49-1-12.2 NOW OR FORMERLY SOUTH HILL RENTALS, LLC TAX ACCT: 49-1-13 NOW OR FORMERLY ERIC S. LEVINE TAX ACCT: 49-1-17.4 NOW OR FORMERLY TROY HEIGHTS, LLC TAX ACCT: 49-1-26.2 NOW OR FORMERLY KURT LICHTMANN TAX ACCT: 49-1-15.2 NOW OR FORMERLY THOMAS J PFAFF AND JANICE PFAFF TAX ACCT: 49-1-10 NOW OR FORMERLY EDWARD SHIPOS AND JUNE SHIPOS TAX ACCT: 49-1-14 NOW OR FORMERLY ERIC LEVINE AND ANNE LEVINE TAX ACCT: 49-1-17.3 NOW OR FORMERLY MICHAEL F CARR AND LORI K CARR TAX ACCT: 49-1-16 NOW OR FORMERLY JEFFREY LACOVELLI AND SALLY LACOVELLI TAX ACCT: 44-1-5.2 NOW OR FORMERLY CHERYL A WELSH AND MARK WELSH TAX ACCT: 44-1-5.3 NOW OR FORMERLY JOHN W WHITE TAX ACCT: 44-1-4.58 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.57 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.56 NOW OR FORMERLY NANCY S QUARRIER TAX ACCT: 44-1-4.55 NOW OR FORMERLY JESSICA CAVIN DEBRA LANKFORD DEBRA LANKFORD TAX ACCT: 44-1-4.54 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY TOWN OF ITHACA TAX ACCT: 44-1-5.1 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE TR O Y R O A D 75 ' S I D E Y A R D SE T B A C K 75' FRONT YARD SETBACK 75 ' S I D E Y A R D SE T B A C K 75' R E A R Y A R D SET B A C K 75' R E A R Y A R D SET B A C K TR O Y R O A D DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS L101 LANDSCAPE PLAN L101 1 LANDSCAPE PLAN SCALE: 1" = 80' N 0'80'160'240' MATCHLINE SEE SHEET L102 LEGEND PROPOSED DESCRIPTION SCREEN BUFFER MODULE POLLINATOR SEED MIX - APPROX 22,130 SF WET AREA SEED MIX - APPROX 294,700 SF ARRAY AREA SEED MIX - APPROX 1,064,100 SF NOTES 1.SEE SHEET L103 FOR BUFFER MODULE DETAILS, PLANT MATERIALS - SPECIES LIST AND QUANTITIES. 2.BUFFER MODULE QUANTITIES: A. BUFFER MODULE: 9 FULL MODULE / 3 PARTIAL MODULE 3.SEE SHEET L103 FOR PLANTING AND SEEDING SPECIFICATIONS AND DETAILS . OVERALL QTY - FULL SITE OVERALL QTY - FULL SITE OVERALL QTY - FULL SITE MARCH 2026 DB RPK 02/28/2027 C:\Users\BRush\Documents\Seals & Signatures\RPK_Signed.png LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LO D LOD LOD LOD LOD LO D LO D LO D LOD LOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD NOW OR FORMERLY WILLIAM E. MURRAY AND JEANETTE M. MURRAY TAX ACCT: 49-1-17.1 NOW OR FORMERLY THOMAS HOWARTH TAX ACCT: 49-1-21.4 NOW OR FORMERLY NEW YORK STATE ELECTRIC AND GAS CORPORTATION TAX ACCT: 49-1-25 NOW OR FORMERLY JAMES E. SEMP TAX ACCT: 49-1-30 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 49-1-26.3 NOW OR FORMERLY BALLARD JUSTIN SMITH JESSICA PARRISH TAX ACCT: 44-1-4.52 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.51 NOW OR FORMERLY HERITAGE PARK TOWNHOUSES, INC TAX ACCT: 44-1-4.50 NOW OR FORMERLY COLE LACOVELLI KRYSTINA LACOVELLI TAX ACCT: 44-1-4.50 NOW OR FORMERLY NATHANIEL M VACANTI ELENA PANIZZA TAX ACCT: 44-1-4.48 NOW OR FORMERLY JOHN J FLAHERTY TAX ACCT: 44-1-4.47 OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE 75' FRONT YARD SETBACK 75' R E A R Y A R D SET B A C K DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS L102 LANDSCAPE PLAN L102 1 LANDSCAPE PLAN SCALE: 1" = 80' N 0'80'160'240' MATCHLINE SEE SHEET L101 LEGEND PROPOSED DESCRIPTION NOTES 1.SEE SHEET L103 FOR BUFFER MODULE DETAILS, PLANT MATERIALS - SPECIES LIST AND QUANTITIES. 2.BUFFER MODULE QUANTITIES: A. BUFFER MODULE: 9 FULL MODULE / 3 PARTIAL MODULE 3.SEE SHEET L103 FOR PLANTING AND SEEDING SPECIFICATIONS AND DETAILS . OVERALL QTY - FULL SITE OVERALL QTY - FULL SITE OVERALL QTY - FULL SITE MARCH 2026 DB RPK SCREEN BUFFER MODULE POLLINATOR SEED MIX - APPROX 22,130 SF WET AREA SEED MIX - APPROX 294,700 SF ARRAY AREA SEED MIX - APPROX 1,064,100 SF 02/28/2027 C:\Users\BRush\Documents\Seals & Signatures\RPK_Signed.png DRAWING NAME: 6/ 3 / 2 0 1 0 8 : 4 7 : 5 6 A M DRAWING NUMBER: DATE: ISSUED FOR: DRAWN BY: REVIEWED BY: PROJECT NUMBER: © 2025 LaBella Associates VE R S I O N 2 3 . 1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147 Sec. 7307, for any person, unless acting under the direction of a licensed architect, professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and date of such alteration, and a specific description of the alteration. 300 State Street, Suite 201 Rochester, NY 14614 585-454-6110 labellapc.com CERTIFICATE OF AUTHORIZATION NUMBER: PROFESSIONAL ENGINEERING: LAND SURVEYING: GEOLOGICAL: EXP:EXP: SOA KS PERMIT JULY 2026 NEXAMP 101 SUMMER STREET BOSTON, MASSACHUSETTS 02110 BOMBER HEIGHTS SOLAR TROY ROAD ITHACA, NY 14850 2240665 - 137423 Revisions NO:DATE:DESCRIPTION: 1 04/03/2026 PER TOWN COMMENTS 2 05/27/2026 PER CLIENT COMMENTS 3 07/10/2026 PER TOWN COMMENTS L103 LANDSCAPE PLAN PLANT SCHEDULE TREES KEY QNT.SCIENTIFIC NAME COMMON NAME SIZE ROOT NOTES AC 11 ABIES CONCOLOR WHITE FIR 6-8' HT B&B JV 33 JUNIPERUS VIRGINIANA EASTERN RED CEDAR 4-5' HT B&B PG 22 PICEA GLAUCA WHITE SPRUCE 6-8' HT B&B PO 22 PICEA OMORIKA SERBIAN SPRUCE 6-8' HT B&B 100 FT 20 F T L103 1 SCREEN PLANTING MODULE SCALE: NOT TO SCALE ABBREVIATED NOTES FOR ALL SHEETS WIRTGB 1.CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PLANT AND MATERIAL QUANTITIES PRIOR TO BIDDING AND PROCUREMENT. 2.THE CONTRACTOR IS HEREBY NOTIFIED THAT UNDERGROUND UTILITIES MAY EXIST AND THEY SHOULD OBTAIN CURRENT UTILITY RECORD MAPS AND SHALL NOTIFY ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK IN ACCORDANCE WITH. PER NYS CODE RULE 753, THE CONTRACTOR SHALL PROVIDE DUE AND TIMELY NOTICE TO UDIG-NY AT 1-800-962-7962 OR 811 AT LEAST TWO DAYS BUT NO MORE THAN TEN WORKING DAYS, NOT INCLUDING THE DATE OF EXCAVATION OR DEMOLITION (INCLUDING DRILLING, DRIVING POSTS, ETC.). THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF NYS CODE RULE 753. 3.ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF AMERICAN STANDARDS FOR NURSERY STOCK, LATEST EDITION, LATEST EDITION, ANSI Z60.1, AND SHALL MEET THE REQUIREMENTS OF NYSDOT STANDARD SPECIFICATIONS SECTION 611. ALL LAWNS, GROUND VEGETATION INCLUDING PREPARATION, ESTABLISHMENT AND MANAGAMENT MATERIALS AND METHODS SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF NYSDOT STANDARD SPECIFICATIONS SECTION 610. 4.ALL WOODY PLANT MATERIALS SHALL BE OBTAINED FROM NURSERY SOURCES OF SIMILAR HARDINESS ZONE, CLIMATE AND SOIL CONDITIONS TO THE PROJECT SITE. 5.IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS, REMOVE AND IMMEDIATELY REPLACE ALL PLANTS, AS DETERMINED BY THE OWNER'S REPRESENTATIVE, THAT ARE MISSING, DEAD, DO NOT DEVELOP FROM PLANTING STOCK, ARE IN UNHEALTHY OR UNSIGHTLY CONDITION, AND HAVE LOST THEIR SHAPE DUE TO DEAD OR BROKEN BRANCHES OR OTHER CAUSES DUE TO CONTRACTOR'S NEGLIGENCE. CONTRACTOR SHALL BEAR THE COST OF COMPLETE REPLACEMENT(S). IN CASE OF QUESTIONS REGARDING CONDITION AND SATISFACTORY ESTABLISHMENT OF A REJECTED PLANT, THE OWNER'S REPRESENTATIVE'S DECISION IS FINAL. PROVIDE A GUARANTEE FOR ALL REPLACEMENT PLANTS FOR A MINIMUM OF ONE FULL GROWING SEASON. 6.CONTRACTOR SHALL RETAIN AND SUBMIT PLANTING MATERIALS RECEIPTS TO THE OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL. PLANTING STOCK IS TO BE MADE AVAILABLE IN ORIGINAL PACKAGING AND LABELING FOR INSPECTION BY THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 7.NAMES OF WOODY PLANT MATERIALS SHALL COMPLY WITH "STANDARDIZED PLANT NAMES" AS ADOPTED BY THE LATEST EDITION OF THE AMERICAN JOINT COMMITTEE OF HORTICULTURAL NOMENCLATURE. PROVIDE STOCK TRUE TO BOTANICAL NAME AND LEGIBLY TAGGED. 8.PLANTED AREAS WILL BE INSPECTED AT COMPLETION OF INSTALLATION AND ACCEPTED SUBJECT TO COMPLIANCE WITH SPECIFIED MATERIALS AND INSTALLATION REQUIREMENTS. INSPECTION TO DETERMINE FINAL ACCEPTANCE OF PLANTED AREAS WILL BE MADE BY THE OWNER'S REPRESENTATIVE UPON CONTRACTORS REQUEST. PROVIDE NOTIFICATION AT LEAST 10 WORKING DAYS BEFORE REQUESTED INSPECTION DATE. PLANTED AREAS WILL BE ACCEPTED PROVIDED ALL MATERIALS ARE ALIVE AND IN A HEALTHY, VIGOROUS CONDITION. AFTER FINAL ACCEPTANCE AND AT THE END OF THE WARRANTY PERIOD, THE OWNER WILL ASSUME MAINTENANCE. 9.WARRANTY: A ONE YEAR GUARANTEE SHALL BE PROVIDED ON ALL NEW PLANTINGS FROM DATE OF FINAL ACCEPTANCE OF PLANTING INSTALLATION BY THE OWNER. 10.LANDSCAPE MATERIALS SHALL BE INSTALLED BY LOCAL CONTRACTORS FAMILIAR WITH REGIONAL AND LOCAL CONDITIONS WITH QUALIFIED EXPERIENCE IN SIMILAR INSTALLATIONS AND THAT EMPLOY NYS-CERTIFIED NURSERY PROFESSIONALS. 11.THE CONTRACTOR SHALL PERFORM A ROUGH FIELD STAKE OUT OF ALL PLANT MATERIALS . CONTACT THE OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL. LOCATIONS SHOWN ON THE PLAN CONVEY DESIGN INTENT ONLY. FINAL LOCATIONS WILL BE AS DIRECTED BY THE OWNER'S REPRESENTATIVE AT THE TIME OF INSTALLATION. 12.LOCATE TREES 5' MINIMUM FROM UNDERGROUND UTILITIES TO ROOT BALL. 13.LOCATE TREES 20' MINIMUM FROM OVERHEAD WIRES. 14.STAKE TREES IMMEDIATELY AFTER PLANTING. STAKES ARE TO BE REMOVED BY THE CONTRACTOR AT THE END OF THE WARRANTY PERIOD. 15.MULCH ALL TREE PLANTING PITS WITH 3 INCHES DEPTH NATURAL, UN-DYED, DOUBLE-GROUND HARDWOOD BARK MULCH. 16.CONTRACTOR SHALL PROVIDE A SPADE-CUT EDGE AROUND PLANTING PITS UNLESS OTHERWISE NOTED ON PLANS. 17.TOPSOIL SHALL BE FURNISHED FROM THE STOCKPILED ON-SITE MATERIAL. A.DETERMINE TOPSOIL SUITABILITY WITH SOIL TESTING; COLLECT SAMPLES AND PROVIDE THREE TESTS, MINIMUM, FROM ONSITE SOIL MATERIAL. TESTING: SOIL TEXTURE/GRADATION AND NUTRIENT ANALYSIS WITH PLANT ESTABLISHMENT RECOMMENDATIONS REPORT. B. ENGAGE A QUALIFIED SOIL LABORATORY AND/OR SOIL SCIENTIST TO DEVELOP A NUTRIENT MANAGEMENT PLAN TAILORED TO THE ESTABLISHEMENT OF WOODY PLANTING AND SEEDED HERBACEOUS VEGETATION. THE NUTRIENT MANAGEMENT PLAN SHALL SPECIFY SOIL AMENDMENTS, FERTILIZER AND ADDITIVES NECESSARY FOR THE ESTABLISHMENT AND MAINTENANCE OF THE SPECIFIED VEGETATION TYPES. C.IF EXISTING QUANTITY IS INSUFFICIENT TO MEET PROJECT NEEDS, FURNISH FROM OFF-SITE SOURCES IN QUANTITIES SUFFICIENT TO MEET SPECIFIED PROJECT REQUIREMENTS. TOPSOIL SHALL BE NATURAL, FRIABLE, FERTILE SOIL, CHARACTERISTIC OF PRODUCTIVE SOIL IN THE VICINITY, REASONABLE FREE FROM STONES, CLAY LUMPS, ROOTS AND OTHER FOREIGN MATTER WITH AN ACIDITY BETWEEN 6.0 AND 6.8 PH. PROPOSED TOPSOIL MATERIAL FROM OFF-SITE SOURCES SHALL BE SUBJECT TO REVIEW AND APPROVAL BY THE OWNER'S REPRESENTATIVE, PER SOIL TESTING RESULTS. SEE NOTES SHEET L100 FOR SOIL TESTING. 18.VERIFY DEPTH OF EXISTING TOPSOIL. PROVIDE TOPSOIL AS NEEDED FOR A MINIMUM OF 6" DEPTH TOPSOIL IN ALL AREAS TO BE SEEDED OR PLANTED. 33.PLANTING SOIL MIXTURE FOR TREE PITS: 4 PARTS EXISTING ON-SITE SURFACE SOIL OR STOCKPILED TOPSOIL; 1 PART APPROVED ORGANIC MATERIAL: COMPOST OR LEAF COMPOST. ADD AND INCORPORATE ORGANIC MATERIAL AND FERTILIZER TO INDIVIDUAL PLANTING PITS AS BACKFILL. 34.FERTILIZER FOR NEW PLANTINGS: NATURAL GRANULAR FERTILIZER WITH MYCORRHIZAL FUNGI WITH NPK 3-4-3 FORMULATION; PROVIDE ROOTS HEALTHY START ADVANCED MRT 3-4-3 BY LEBANON SEABOARD CORPORATION OR APPROVED EQUAL. APPLICATION RATES: EVERGREEN TREES 1.5 LBS, DECIDUOUS TREES 2.5 LBS, FLOWERING TREES 1.5 LBS, SHRUBS 0.5 LBS. 35.LAY OR STAKE OUT PLANTS AS INDICATED OR AS APPROVED IN THE FIELD. IF OBSTRUCTIONS ARE ENCOUNTERED THAT ARE NOT SHOWN ON THE DRAWINGS, DO NOT PROCEED PLANTING OPERATIONS UNTIL ALTERNATIVE PLANT LOCATIONS HAVE BEEN SELECTED. 36.WATERING BAGS OR HYDRATION SYSTEMS SHALL BE PROVIDED FOR ALL TREE PLANTINGS AND MAY BE USED FOR SHRUB PLANTINGS. WATERING BAGS OR HYDRATION SYSTEM UNITS SHALL BE APPROPRIATELY SIZED; PROVIDE MINIMUM 20-GALLON BAG CAPACITY OR 48-INCH DIA. SIZE HYDRATION UNIT. PROVIDE SPECIALLY-SHAPED HYDRATION UNITS OR WATERING BAGS FOR USE WITH EVERGREEN TREES AND SHRUBS. HYDRATION SYSTEM STANDARD OF QUALITY: TREEDIAPER TD48 ADVANCED HYDRATION SYSTEM BY ZYNNOVATION LLC OR APPROVED EQUAL. PRE-SOAK HYDRATION UNITS PRIOR TO INSTALLATION PER MANUFACTURER'S INSTRUCTIONS. 37.CONTRACTOR SHALL MAINTAIN PLANTS UNTIL FINAL ACCEPTANCE AND THROUGH THE WARRANTY PERIOD. MAINTENANCE SHALL INCLUDE WATERING AS REQUIRED FOR SATISFACTORY ESTABLISHMENT; MONITORING PLANT CONDITION; REPLENISHING MULCH; RESET SETTLED PLANTS OR CROOKED TREES TO PROPER GRADE AND POSITION; REMOVE AND REPLACE DEAD MATERIAL. 38.SEEDED VEGETATION: ALL DISTURBED AREAS NOT PAVED OR PLANTED, OR DESIGNATED TO REMAIN NATURAL, OR DESIGNATED FOR OTHER SURFACE TREATMENT SHALL BE SEEDED AND MULCHED TO ESTABLISH PERMANENT VEGETATION. 40.MULCH FOR SEEDING: STRAW CONSISTING OF STALKS OF OATS, WHEAT, RYE OR OTHER CROPS WHICH ARE FREE FROM NOXIOUS AND INVASIVE SPECIES, COMPLYING WITH NYSDOT 713-19. 41.SEED MIXES SHALL COMPLY WITH THE MATERIAL REQUIREMENTS OF 713-04 NYSDOT STANDARD SPECIFICATIONS. SEED ALL DISTURBED AREAS NOT PAVED, PLANTED, OR DESIGNATED TO REMAIN NATURAL OR FOR OTHER SURFACE TREATMENT. A.PERMANENT AND TEMPORARY SEED FOR STORMWATER MANAGEMENT- SEE SHEET EROSION CONTROL PLAN AND DETAILS AND THE SWPPP. B. ARRAY SEED MIXTURE - PROVIDE ERNST SOLAR FARM SEED MIX-ERNMX-186 MANUFACTURED BY ERNST CONSERVATION SEEDS OR APPROVED EQUAL. SEED MIX SHALL CONSIST OF THE FOLLOWING: % WEIGHT % PURITY CREEPING RED FESCUE 45.5 85 HARD FESCUE, 'STURGEON' 15 85 HARD FESCUE, 'SWORD II' 15 85 CHEWINGS FESCUE 10 97 KENTUCKY BLUEGRASS, 'NAVY' 5 97 KENTUCKY BLUEGRASS, 'WILDHORSE' 5 97 WHITE CLOVER, DUTCH 4.5 97 SEEDING RATE: 4 LBS. PER 1,000 SQ. FT. ; MECHANICAL - BROADCAST OR DRILL SEEDING METHOD. ALTERNATIVELY, HYDROSEEDING AS APPROVED BY OWNER'S REPRESENTATIVE. FERTILIZER: GRANULAR, NPK FORMULATION 2:1:1 WITH MIN. 50% WATER INSOLUBLE NITROGEN; COMPLYING WITH NYSDOT 713-04 TYPE A FERTILIZER APPLICATION RATE: TO SUPPLY 1 LB. OF NITROGEN PER SQ. FT. MULCH: MULCH ALL SEEDED AREAS WITH STRAW AT A RATE OF 2,000 LBS. PER ACRE WITH NON-ASPHALTIC TACKIFIER OR HYDROSEED USING HYDROSTRAW HE ORIGINAL NATURAL FIBER MULCH WITH BINDER BY PROFILE PRODUCTS LLC OR APPROVED EQUAL. C. WET AREA SEED MIX - PROVIDE ERNST SEED MIX-ERNMX-126 MANUFACTURED BY ERNST CONSERVATION SEEDS OR APPROVED EQUAL. SEED MIX SHALL CONSIST OF THE FOLLOWING: %WEIGHT % PURITY DEERTONGUE, TIOGA 20 85 ALKALIGRASS, FULTS 20 85 VIRGINIA WILDRYE, MADISON-NY ECOTYPE 18 85 CREEPING BETNTGRASS, 'PC-20' 15 85 FOWL BLUEGRASS 15 85 FOX SEDGE, PAS ECOTYPE 10 85 LURID SEDGE, PAS ECOTYPE 1 85 SOFT RUSH 1 85 SEEDING RATE: 20-40 LBS. PER ACRE OR 1 LB. 1,000 SQ. FT. WITH COVER CROP; MECHANICAL-DRILL SEEDING METHOD OR PER SEED MANUFACTURER'S RECOMMENDATIONS COVER CROP: GRAIN RYE (SEEDING 1 SEPT TO 30 APR; 30 LBS/ACRE) JAPANESE MILLET (SEEDING 1 MAY TO 31 AUG; A0 LBS/ACRE) BARNYARD GRASS (1 MAY TO 31 AUG; 10 LBS/ACRE) FERTILIZER: NONE MULCH: MULCH ALL SEEDED AREAS WITH STRAW AT A RATE OF 2,000 LBS. PER ACRE WITH NON-ASPHALTIC TACKIFIER OR APPLY HYDRAULICALLY USING HYDROSTRAW HE ORIGINAL NATURAL FIBER MULCH WITH BINDER BY PROFILE PRODUCTS LLC OR APPROVED EQUAL. LANDSCAPE NOTES D. BUFFER SEED MIX - PROVIDE ERNST SEED MIX-ERNMX-173 EASTERN NATIVE HABITAT & CREP MIX MANUFACTURED BY ERNST CONSERVATION SEEDS OR APPROVED EQUAL. SEED MIX SHALL CONSIST OF THE FOLLOWING: %WEIGHT % PURITY BIG BLUESTEM 37.2 85 VIRGINIA WILDRYE 33.1 85 SWITCHGRASS 15.0 85 INDIAN GRASS 5.0 85 PURPLE CONEFLOWER 3.0 85 PATRIDGE PEA 2.7 85 BLACKEYE SUSAN 2.7 85 OXEYE SUNFLOWER 0.9 85 COMMON MILKWEED 0.1 85 HEATH ASTER 0.1 85 WILD BERGAMOT 0.1 85 STIFF GOLDENROD 0.1 85 i. SEEDING RATE: 11 LBS. PER ACRE WITH 30 LBS. PER ACRE COVER CROP; MECHANICAL-DRILL SEEDING METHOD OR PER SEED MANUFACTURER'S RECOMMENDATIONS ii. COVER CROP: GRAIN OATS (SEEDING 1 JAN TO 31 JULY) GRAIN RYE (SEEDING 1 AUG TO 31 DEC) iii. FERTILIZER: NONE iv. MULCH: MULCH ALL SEEDED AREAS WITH STRAW AT A RATE OF 2,000 LBS. PER ACRE WITH NON-ASPHALTIC TACKIFIER OR APPLY HYDRAULICALLY USING "HYDROSTRAW HE ORIGINAL- NATURAL FIBER MULCH WITH BINDER" BY PROFILE PRODUCTS LLC OR APPROVED EQUAL. 2"x4"x2'-0" CEDAR OR PRESSURE-TREATED ANCHOR 3" DIAMETER X 8' CEDAR OR PRESSURE TREATED STAKE, TWO OPPOSITE. SET TOP OF ROOT BALL FLUSH TO GRADE GROUND LINE TO BE THE SAME AS AT THE NURSERY. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL BE TOTALLY REMOVED. CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD WITH WATER TWICE IN FIRST 24 HRS. BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR APPROVED EQUAL) 3" DIAMETER X 8' CEDAR OR PRESSURE TREATED STAKE, TWO OPPOSITE. SET TOP OF ROOT BALL FLUSH TO GRADE GROUND LINE TO BE THE SAME AS AT THE NURSERY. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL BE TOTALLY REMOVED. 3" MIN. SHREDDED HARDWOOD MULCH - KEEP 6" FROM TRUNK OF TREE, TO MAINTAIN VISIBLE ROOT FLARE CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD WITH WATER TWICE IN FIRST 24 HRS. BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR APPROVED EQUAL) BREAK SUBSOIL WITH A PICK NOTE: 1.REMOVE STAKES AND GUYS AT THE END OF THE FIRST GROWING SEASON AFTER PLANTING 2.PROVIDE A 5' DIA. MULCHED PLANTING BED AROUND EACH TREE. 3.DO NOT OVERSEED TREE PLANTING PITS. L103 2 EVERGREEN PLANTING DETAIL SCALE: NOT TO SCALE 1.BEGIN MAINTENANCE OPERATIONS IMMEDIATELY AFTER EACH PLANT IS PLANTED AND CONTINUE AS REQUIRED UNTIL ACCEPTANCE. WATER, MULCH, WEED, PRUNE, SPRAY, FERTILIZE, CULTIVATE, AND OTHERWISE MAINTAIN AND PROTECT PLANTS. RESET SETTLED PLANTS TO PROPER GRADE AND POSITION, RESTORE PLANTING SAUCERS, AND REMOVE DEAD, DISEASED, OR UNHEALTHY PLANT MATERIAL. TIGHTEN AND REPAIR STAKES AND WIRES. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER IT BECOMES APPARENT AND WEATHER AND SEASON PERMIT. 2.UPON COMPLETION OF THE PLANTING OPERATIONS, CLEAN UP PLANTED/SEEDED AREAS TO BE FREE OF STONES, CONTAINERS, TRASH AND OTHER WASTE AND DEBRIS. 3.PROVIDE WATERING TO SUPPLEMENT NATURAL PRECIPITATION DURING PERIODS OF DROUGHT AND AS NEEDED TO PROVIDE AN EQUIVALENT OF 1 INCH OF WATER PER WEEK UNTIL THE PLANTS HAVE ROOTED AND ARE ESTABLISHED. A.MAKE PERIODIC INSPECTIONS TO DETERMINE MOISTURE CONTENT OF SOIL AND ADJUST WATERING SCHEDULE TO FIT CONDITIONS (IF APPLICABLE). B.PROVIDE WATER FOR EXECUTION AND MAINTENANCE AT NO EXPENSE TO OWNER. FURNISH PORTABLE TANKS, PUMPS, HOSE, PIPE, CONNECTIONS, NOZZLES AND ANY OTHER EQUIPMENT REQUIRED TO TRANSPORT WATER FROM AVAILABLE OUTLETS AND APPLY IT TO SEEDED AREAS IN AN APPROVED MANNER. C.WATER IN SUCH A MANNER AND AS FREQUENTLY AS IS DEEMED NECESSARY BY OWNER TO ASSURE CONTINUED GROWTH OF VEGETATION. WATER AREAS OF SITE IN SUCH A MANNER AS TO PREVENT EROSION DUE TO EXCESSIVE QUANTITIES APPLIED OVER SMALL AREAS TO AVOID DAMAGE TO FINISHED SURFACE DUE TO WATERING EQUIPMENT. 4.MAINTAIN ALL PLANT MATERIAL IN A HEALTHY, VIGOROUS GROWING CONDITION. 5.AFTER SEEDED VEGETATION GROWTH HAS STARTED, RESEED AND MULCH AREAS THAT FAIL TO SHOW UNIFORM STAND OF VEGETATION IN ACCORDANCE WITH THE DOCUMENTS AND AS SPECIFIED HEREIN. CONTINUE REPEATEDLY UNTIL AREAS ARE COVERED WITH SATISFACTORY GROWTH OF PERMANENT WITH NO BARE SPOTS OR WEED AREAS GREATER THAN 2 SF PRESENT. 6.PROVIDE MOWING OF SEEDED AREAS THROUGHOUT THE GROWING SEASON WHEN VEGETATION HAS ATTAINED A HEIGHT OF 18-24" INCHES AND ROOTS ARE FIRMLY ESTABLISHED. MOW TO A HEIGHT NOT LOWER THAN 8" USING A BRUSH HOG MOWER OR STRING TRIMMER. 7.REMOVE FENCES, SIGNS, BARRIERS, OR OTHER TEMPORARY PROTECTIVE DEVICES AFTER FINAL ACCEPTANCE OF PLANTINGS AND SEEDED VEGETATION. 8.REMOVE AND REPLACE DISEASED, DISTRESSED, DEAD, OR REJECTED PLANTS PRIOR TO SUBSTANTIAL COMPLETION DATE. REPLACEMENTS SHALL BE PLANTS OF SAME VARIETY AND SIZE SPECIFIED ON THE DRAWINGS. FURNISH AND PLANT AS SPECIFIED HEREIN. 9.EXISTING AND NEW HERBACEOUS VEGETATION AREAS DAMAGED DURING PROCESS OF WORK SHALL BE RESTORED OR REPAIRED TO CONDITION SATISFACTORY TO THE OWNER. FILL GRADE, FERTILIZE, REPLANT, OR MULCH AS REQUIRED TO RESTORE TO THE CONTRACT REQUIREMENTS. ESTABLISHMENT PERIOD MAINTENANCE MARCH 2026 DB RPK 02/28/2027 C:\Users\BRush\Documents\Seals & Signatures\RPK_Signed.png E E A0+00 A2+00 A4+00 A6+00 A8+00 A10+00 A12+00 A14+00 A15+10 . 4 4 B0+0 0 B2+0 0 B4+0 0 B6+0 0 B8+0 0 B10+ 0 0 B11+ 3 2 C0+00C2+00C4+00C6+00C8+00C10+00C11+91 D0 + 0 0 D2 + 0 0 D4 + 0 0 D6 + 0 0 D8 + 0 0 D1 0 + 0 0 D1 2 + 0 0 D1 4 + 0 0 D1 5 + 1 3 LINE OF SIGHT PROFILE PLAN BOMBER HEIGHTS SOLAR FARM DATE: DECEMBER 2025 (11x17) PLAN VIEW SCALE 1" = 250' N 960 980 1000 1020 1040 1060 1080 1100 1120 1140 100 Ft.200 Ft.300 Ft.400 Ft.500 Ft.600 Ft.700 Ft.800 Ft.900 Ft.1000 Ft.1100 Ft.1200 Ft.1300 Ft.1400 Ft.1500 Ft. 960 980 1000 1020 1040 1060 1080 1100 1120 1140 1160 1180 100 Ft.200 Ft.300 Ft.400 Ft.500 Ft.600 Ft.700 Ft.800 Ft.900 Ft.1000 Ft.1100 Ft.1140 Ft. LINE OF SIGHT IS BASED ON THE EYE LEVEL OF A 6 FOOT TALL PERSON PROPOSED 8' HIGH FENCING (TYP.) PROPOSED ROAD PROPOSED POND PROPOSED 8' HIGH FENCING (TYP.) PROPOSED 8' HIGH FENCING (TYP.) LINE OF SIGHT IS BASED ON THE EYE LEVEL OF A 6 FOOT TALL PERSON PROPOSED ROAD LINE OF SIGHT PROFILE PLAN BOMBER HEIGHTS SOLAR FARM DATE: DECEMBER 2025 (11x17) PROFILE VIEW SCALE 1" = 100' LINE OF SIGHT FROM VIEW A LINE OF SIGHT FROM VIEW B 980 1000 1020 1040 1060 1080 1100 1120 1140 1160 100 Ft.200 Ft.300 Ft.400 Ft.500 Ft.600 Ft.700 Ft.800 Ft.900 Ft.1000 Ft.1100 Ft.1180 Ft. 980 1000 1020 1040 1060 1080 1100 1120 1140 1160 100 Ft.200 Ft.300 Ft.400 Ft.500 Ft.600 Ft.700 Ft.800 Ft.900 Ft.1000 Ft.1100 Ft.1200 Ft.1300 Ft.1400 Ft.1500 Ft. PROPOSED 8' HIGH FENCING (TYP.) PROPOSED ROAD LINE OF SIGHT IS BASED ON THE EYE LEVEL OF A 6 FOOT TALL PERSON LINE OF SIGHT IS BASED ON THE EYE LEVEL OF A 6 FOOT TALL PERSON PROPOSED 8' HIGH FENCING (TYP.) PROPOSED 8' HIGH FENCING (TYP.) PROPOSED 8' HIGH FENCING (TYP.) PROPOSED POND LINE OF SIGHT PROFILE PLAN BOMBER HEIGHTS SOLAR FARM DATE: DECEMBER 2025 (11x17) PROFILE VIEW SCALE 1" = 100' LINE OF SIGHT FROM VIEW C LINE OF SIGHT FROM VIEW D PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2a Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:14am 42° 24’ 36.36” N, 76° 28’ 40.98” W 450 feet 24mm EXISTING CONDITIONPhoto 03 - Troy Road near #136 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2b Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:14am 42° 24’ 36.36” N, 76° 28’ 40.98” W 450 feet 24mm SIMULATED CONDITION l No Landscape MitigationPhoto 03 - Troy Road near #136 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2c Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:14am 42° 24’ 36.36” N, 76° 28’ 40.98” W 450 feet 24mm SIMULATED CONDITION l With Landscape Mitigation (year 1 growth condition)Photo 03 - Troy Road near #136 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2d Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:14am 42° 24’ 36.36” N, 76° 28’ 40.98” W 450 feet 24mm SIMULATED CONDITION l With Landscape Mitigation (year 5-7 growth condition)Photo 03 - Troy Road near #136 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2e Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:20am 42° 24’ 33.68” N, 76° 28’ 40.82” W 380 feet 24mm EXISTING CONDITIONPhoto 05 - Troy Road near #146 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2f Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:20am 42° 24’ 33.68” N, 76° 28’ 40.82” W 380 feet 24mm SIMULATED CONDITION l No Landscape MitigationPhoto 05 - Troy Road near #146 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2g Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:20am 42° 24’ 33.68” N, 76° 28’ 40.82” W 380 feet 24mm SIMULATED CONDITION l With Landscape Mitigation (year 1 growth condition)Photo 05 - Troy Road near #146 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2h Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 11:20am 42° 24’ 33.68” N, 76° 28’ 40.82” W 380 feet 24mm SIMULATED CONDITION l With Landscape Mitigation (year 5-7 growth condition)Photo 05 - Troy Road near #146 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2i Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 12:19am 42° 24’ 11.67” N, 76° 28’ 25.57” W 820 feet 24mm EXISTING CONDITIONPhoto 10 - East King Road at Electric Transmission ROW PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2j Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 12:19am 42° 24’ 11.67” N, 76° 28’ 25.57” W 820 feet 24mm SIMULATED CONDITION l No Landscape MitigationPhoto 10 - East King Road at Electric Transmission ROW Approximate top edge of solar arrays. Approximate top edge of solar arrays. Arrays fully screened by foreground vegetation to remain.Arrays fully screened by foreground vegetation to remain. PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2k Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 12:44am 42° 24’ 34.99” N, 76° 28’ 16.57” W 580 feet 24mm EXISTING CONDITIONPhoto 13 - Coddington Road (CR 119) near #653 PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2l Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information 03.10.2026 / 12:44am 42° 24’ 34.99” N, 76° 28’ 16.57” W 580 feet 24mm SIMULATED CONDITION l No Landscape MitigationPhoto 13 - Coddington Road (CR 119) near #653 Approximate top edge of solar arrays. Approximate top edge of solar arrays. Arrays fully screened by foreground landform and vegetation to remain.Arrays fully screened by foreground landform and vegetation to remain. PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2m Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information N/A 42° 24’ 52.22” N, 76° 26’ 54.13” W 7,750 feet 24mm EXISTING CONDITIONPhoto 29 - Slaterville Road (NYS Rte 79) at Burns Road PHOTO SIMULATIONS BOMBER HEIGHTS SOLAR PROJECT Troy Road Ithaca, NY 14850 Figure C-2n Landscape Architects, Architects, Engineers, and Planners, P.C. Date / Time: Photo Location: Distance to Fence-line: Focal Length: Photograph Information N/A 42° 24’ 52.22” N, 76° 26’ 54.13” W 7,750 feet 24mm SIMULATED CONDITION l No Landscape MitigationPhoto 29 - Slaterville Road (NYS Rte 79) at Burns Road Approximate top edge of solar arrays. Approximate top edge of solar arrays. Arrays fully screened by foreground landform and vegetation to remain.Arrays fully screened by foreground landform and vegetation to remain. HOSkTAwEeUiLULUONTUSue1E50- pedaAdiSiOZETTSUY-BIUAYOL@SuULHISIC“SpoayOw2)JIHOUd¥VTOSSLHOISHYACINOSOuby,UJAA2.92LE682'°N.ZV9ITST.ZPTNONEIOFOJoOUg”||SNOILVTINAWISOLOHd¢OoWECOTL/OOSROPOeu/Sieg bz-9ainzi4UONEULOJULUdeiZooyd WPSAD0uIDE !DIYSGVOSPHVY SAISSidSINIBA)BowYYISOS-vzOlOUY soUSSee: meola!es*ba.‘Boee MaesoEyregSehapigiAeeaRe 2%©LANoeCte fe Se‘a’ * S a r g e e t a e c e re s “* Se ne l l os ~a a pc e me te r n s ac m e ~~ "a e iy , ee e ea t i n “—7 mwe ~_ Oe et e — ae ne m-~ ow e r “ at Pa y rv od P. gh u a t t ee ee s |) + fray Road Aithaca,NY Le ™: BSE§‘ Figure C-2r PHOTO SIMULATIONS Shae eile BOMBER HEIGHTS SOLAR PROJEC >ey™WwMsrs - cl cza to e a) Th s = at & ot a Sa a l cd o (G s 5 N - ™~ to = ow = os , {2 &S & a h o e t of oe s aa a . © fo n t Ye s 6 WN VY . So ba t e CO x rl wy aa }iay QS g@ e g E Oo fe % &— & pe B y r e oO 8 vu a Sa n 5 Yo Tn = om (D m7 Oo un ie ra n 5 O cu s auscaaZwa SI S we i Pa )+“t o a =wv_—oe RE St s Af )=Fd ‘ aPa Ww rf al vrs.and Planners,ngines Landscape Aictiftecty,Architects 24 ~ast Ithaca Nature Preservehate SIMULATED CONDITION |No Landscape MitigationPp 8/27/26, 12:10 PM a«f Outlook Comment on Bomber Heights Solar project From Nathanael Nerode <ncn_politics10@fastmail.fm> Date Thu 8/27/2026 11:55 AM To Town Of Ithaca Planning <planning@townithacany.gov> [You don't often get email from ncn_politics10@fastmail.fm. Learn why this is important at https://aka.ms/LearnAboutSenderldentification ] As someone who currently lives nearby (174 Troy Rd.) I support the project. It appears well-designed to me. The electrical grid in this area is unstable and suffers from frequent brief power outages, often on a weekly basis. I hope that this project, since it includes storage batteries, will help stabilize the local electrical grid. Nathanael C. Nerode ncn_politics1O@fastmail.fm https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAPTpdYGUU61FvA%2Ftl%2FMDbV...1/1 8/28/26,8:35 AM -- ar Outlook Bomber Heights Solar From kurt lichtmann <kurt@om108.net> Date Thu 8/27/2026 3:52 PM To Town Of Ithaca Planning <planning@townithacany.gov>;elevine@townithacany <elevine@townithacany> Ql 1 attachment (1 MB) Bomber Heights-lichtmann adjacent.png; You don't often get email from kurt@om108.net.Learn why this is important hello. regarding the proposed Bomber Heights Solar Project: My land is adjacent on 662 Coddington Rd -see attached. Well,I would rather see a solar farm than a data center,or a halfway house for violent sex offenders, or a low income housing project,on Giora Fix's land -is the town buying the entire parcel of Giora Fix's land? But I would like to see a map with proposed distances to my property line.And WHAT kind of stuff (equipment/devices)will be adjacent to my land.Can you do this for me? thank you. kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAF%2BtcXy%2FO%2B9LpjlMGUMp...1/1 8/28/26, 8:37 AM ar Outlook Bomber Heights Solar From kurt lichtmann <kurt@om108.net> Date Thu 8/27/2026 4:19 PM To Town Of Ithaca Planning <planning@townithacany.gov>; elevine@townithacany <elevine@townithacany> Ql 1 attachment (1 MB) Bomber Heights-lichtmann adjacent.png; You don't often get email from kurt@om108.net.Learn why this is important hello. regarding the proposed Bomber Heights Solar Project: My land is adjacent on 662 Coddington Rd -see attached. Well,I would rather see a solar farm than:a data center,or a halfway house for violent sex offenders, or a low income housing project,on Giora Fix's land -is the town buying the entire parcel of Giora Fix's land? But I would like to see a map with proposed distances to my property line.And WHAT kind of stuff (equipment/devices)will be adjacent to my land.Can you do this for me? thank you. kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQANHACEqVr7JJtAFOJrevj50%3D7n...1/1 8/28/26, 8:37 AM Outlook Bomber Heights Solar From kurt lichtmann <kurt@om108.net> Date Thu 8/27/2026 4:21 PM To Town Of Ithaca Planning <planning@townithacany.gov>; Eric Levine <elevine@townithacany.gov> Ql 1 attachment (1 MB) Bomber Heights-lichtmann adjacent.png; You don't often get email from kurt@om108.net.Learn why this is important hello. regarding the proposed Bomber Heights Solar Project: My land is adjacent on 662 Coddington Rd -see attached. Well,I would rather see a solar farm than:a data center,or a halfway house for violent sex offenders, or a low income housing project,on Giora Fix's land -is the town buying the entire parcel of Giora Fix's land? But I would like to see a map with proposed distances to my property line.And WHAT kind of stuff (equipment/devices)will be adjacent to my land.Can you do this for me? thank you. kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQALf3Le%2B%2BivxDqDSLcixmmNU...1/1 8/28/26, 8:38 AM Outlook Bomber Solar Farm take 2 From kurt lichtmann <kurt@om108.net> Date Fri 8/28/2026 8:25 AM To Town Of Ithaca Planning <planning@townithacany.gov> Ql 1 attachment (1 MB) Bomber Heights-lichtmann adjacent.png; You don't often get email from kurt@om108.net.Learn why this is important hi. talk to me about noise from inverters,transformers and Battery energy storage systems. how close to my property line will these be located? Again,I am in favor of the Solar Farm on Giora Fix's land,but give me a heads up please. see attached map kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAMP8bM7y1olLtWMhDpGXwJ8%3D...1/1 8/28/26,10:49 AM ar Outlook take 1 Fwd:Bomber Heights Solar From kurt lichtmann <kurt@om108.net> Date Fri 8/28/2026 9:16 AM To Town Of Ithaca Planning <planning@townithacany.gov> Q)2 attachments (3 MB) Bomber Heights-lichtmann adjacent.png;Bomber Heights-lichtmann adjacent.png; You don't often get email from kurt@om108.net.Learn why this is important Original Message From:kurt lichtmann <kurt@om108.net> To:"planning@townithacany.gov"<planning@townithacany.gov>, "elevine@townithacany.gov"<elevine@townithacany.gov> Date:08/27/2026 4:21 PM EDT Subject:Bomber Heights Solar hello. regarding the proposed Bomber Heights Solar Project: My land is adjacent on 662 Coddington Rd -see attached. Well,I would rather see a solar farm than:a data center,or a halfway house for violent sex offenders,or a low income housing project,on Giora Fix's land -is the town buying the entire parcel of Giora Fix's land? But I would like to see a map with proposed distances to my property line.And WHAT kind of stuff (equipment/devices)will be adjacent to my land. Can you do this for me? thank you. kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQALf3Le%2B%2BivxDqDSLcixmmNU...1/1 8/31/26, 9:15 AM Outlook Town of Ithaca - Bomber Heights Large Scale Solar Project site plan review From CJ Randall <cjrandall@townithacany.gov> Date Fri 8/28/2026 11:02 AM To kurt@om108.net <kurt@om108.net> Cc Town Of Ithaca Planning <planning@townithacany.gov>;Chris Balestra <CBalestra@townithacany.gov> 0)1 attachment (419 KB) Bomber Heights Public Comments 2-5.pdf; Hi Kurt, Nice talking to you just now relative to Nexamp's proposed Bomber Heights Large Scale Solar Project located on Troy Rd and Coddington Rd in the Town of Ithaca. Any Large-Scale solar energy system —defined as ground-mounted solar with a footprint larger than 7,000 square feet —proposed in the Town of Ithaca is subject to Site Plan review by the Town's Planning Board.Full details on the zoning and that review process are linked here: httDs://ecode360.com/42548589.To clarify,and as mentioned on the phone just now,the Town is not purchasing this property;the Town's Planning Board is conducting the required Site Plan review on this project,which is located on this property.And as also mentioned,there are many submittals associated with this project (for this coming Tuesday,September 1,2026 Planning Board meeting,held at 6:30 pm at Town Hall)located here:https://lfweb.townithacany.gov/WebLink/Browse.asDx? id=222243&dbid=0&reDO=TownQflthaca);the site civil plan set is labeled as attachment #20. You asked about a similarly-sized project and locally,I recommend a visit to Nexamp's (slightly larger) 6.8 MW Lansing Renewables project on Jerry Smith Rd (County Rd 184)in the Town of Lansing,which has been up and running for a few years:https://www.nexamp.com/project/lansinq-renewables.That project includes 3.0 MW Battery Energy Storage Systems as well,so it's a fairly analogous project to the proposed Bomber Heights project here in the Town of Ithaca. As additional background,the Town publishes Planning Board agendas and associated documents to the Town's Meeting Calendar &Agendas webpage (https://townithacany.gov/meetinq-calendar- agendas/).You received this notification as the Town mails notices to property owners within 500 feet of the boundary of a property for which a discretionary approval (such as,in this instance,site plan)is being sought. The Town also regularly posts to the Upcoming &Current Projects webpage,which lists the ongoing and upcoming projects proposed in the Town of Ithaca (direct link is httDs://townithacany.qov/uDcominq-current-projects/);you can also navigate to this list via the Town's homepage under the 'Town Government'header all the way to the right of your screen.Of course,you are welcome to attend meetings in person or via videoconference,as desired. Hope this helps —please reply all with any additional questions or concerns! C.J. C.J.Randall,LEEDAP ND Director of Planning Town of Ithaca 215 N Tioga St https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAG%2FRau1i3xROm5L218WNJKk%...1/2 8/31/26,9:10 AM e?Outlook fences on Bomber Project From kurt lichtmann <kurt@om108.net> Date Fri 8/28/2026 5:31 PM To Town Of Ithaca Planning <planning@townithacany.gov> Q)1 attachment (212 KB) Screenshot 2026-08-28 at 17-27-19 L103 -20.Bomber Heights Solar-Civil Planset 2.0.pdf.png; TJ, thanks for the suggestion:I went out to check out the Solar Farm on Jerry Smith Rd very quiet! I noticed it is surrounded by wire fences. quesiton -how close to my property line are those fences gonna be set? attached segment of your map focussed on:662 Coddington Rd,Ithaca NY 14850 AND is it possible that any trees on my property line might have to be cut down? ($1200-3000 compensation fee per tree depending on size) kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQABJb3uCEbL5Mh6jdxXLfX%2B4%3...1/1 8/31/26,9:11 AM e?Outlook name From kurt lichtmann <kurt@om108.net> Date Fri 8/28/2026 5:33 PM To Town Of Ithaca Planning <planning@townithacany.gov> ps -1 despise the name Bomber Project -so violent! and it has nothing whatsoever to do with Ithaca College, and possilby a trademark violaton for Ithaca College? kurt https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAJ0ASiaa591PI7FCmvO03QQ%3D?...1/1 8/31/26,9:12 AM e?Outlook Troy Rd Solar Project -herbicides? From kurt lichtmann <kurt@om108.net> Date Sat 8/29/2026 9:13 AM To Town Of Ithaca Planning <planning@townithacany.gov> Q)1 attachment (1 MB) Troy Rd Solar Farm lichtmann adjacent.png; after they clear the land for the solar farm -lots of stuff growing,very fertile -are they gonna use herbicides ? thanks kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQANn%2FidcsJcdLmS989jm66ok%3D...1/1 CW 8/31/26,9:13 AM e?Outlook Troy Road Solar Project:Nexamp From kurt lichtmann <kurt@om108.net> Date Sun 8/30/2026 12:35 AM To Town Of Ithaca Planning <planning@townithacany.gov> Hello. Again,I am very much in favor of the Solar Farm project on Giora Fix’s land on Troy Road.I cannot think of a more benign neighbor to my private meditation sanctuary on 662 Coddington Rd.The Solar Farm will totally get rid of the deer population,and hence also the annoying trespassing hunters. I assume we can blame the Nexamp marketing team for the ridiculous name “Bomber Heights Project.”?Hey,they can call it whatever they want,even though that name is totally insensitive to the residents of the area.I am an Ithaca College graduate,and I certainly do not consider myself living in “Bomber Heights”-a totally made-up name by Nexamp.I dare say that none of my neighbors consider ourselves living in “Bomber Heights.”And while I am on this topic,the “Ithaca College Bombers”is a rather regrettable name for a sports team in the post 9/11 world.Try checking though TSA in an airport with the name BOMBERS plastered on your luggage or jacket.But of course,you are free to call it whatever you want -1 will henceforth call it the “Troy Road Solar Project.” kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQAHEjHVghHBFJrfhn2i7WkR0%3D7n...1/1 8/31/26,9:14 AM e?Outlook Troy Road Solar Project aka "Bomber Heights" From kurt lichtmann <kurt@om108.net> Date Sun 8/30/2026 10:49 AM To Town Of Ithaca Planning <planning@townithacany.gov> Q)1 attachment (273 KB) L103 -20.Troy Rd Solar Project.jpg; While I am ranting casually on the topic of the truly regrettable name “Bomber Heights,”and the ill- conceived Ithaca College sports name “The Bombers,”the negative connotations extend far beyond the superficially researched creations of those names. Who are we celebrating here? Ted Kaczynski (The "Unabomber") Eric Rudolph (The "Olympic Park Bomber") George Metesky (The "Mad Bomber") Dzhokhar and Tamerlan Tsarnaev (Boston Marathon Bombers) Mark Anthony Conditt (The Austin Bomber) Richard Reid,(the Shoe Bomber) Ramzi Yousef (World Trade Center Bomber) Weather UndergroundBombers And that is why I have re-named the project “The Troy Road Solar Project” Attached :note the proximity of the project to my forest Meditation Sanctuary. I will send some nice pics of my Meditation Sanctuary in a suceeding email. kurt lichtmann 662 Coddington Rd,Ithaca NY 14850 607-266-0282 (voice,no text) https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmltNDBhYi04YTk2LWVIMjhiYzViYTc0MQAQANKuyrAySoBAIEZUUyTXw9g%3D?...1/1 OA FORMER -V WCHAEL F CARR AND LORJ K CARR IAS ACCt ^5-1-16 EDWARD SU PCS AND JUNE SHIFOS TAX ACCT 48*1-14 To: Planning Board Members From: Nick Quilty-Koval, Planner Date: August 25, 2026 RE: Plumbers and Steamfitters (Local 81 Union) Sketch Plan Review Please find attached materials related to sketch plan review for the proposed Plumbers and Steamfitters (Local 81 Union) new Joint Apprentice Training Center building project, located on Elmira Road, between Enfield Falls Road and Park Lane, in the Low Density Residential Zone and the Inlet Valley Overlay District (IVOD). The project involves constructing a +/- 23,700 square foot building on +/- 9 acres of land, along with parking facilities, outdoor training areas, a public walking trail, and other site elements. There is no official Planning Board action for this project on September 1 st, as it is a sketch plan review per Town Code § 270- 185 (B), which states that "the sole purpose of sketch plan review is to informally and generally review the proposed project, advise the applicant as to whether it is reasonable to anticipate a positive response to a formal application, and to highlight any concerns that may be readily apparent to the Planning Board." Based on an initial review of the application and a site visit, staff offers the following discussion items for consideration: Physical Characteristics The proposed Local 81 Union project will be located on vacant property that currently consists of two individual parcels, which will be combined into one property as part of this project. Portions of one parcel formerly associated with the Eddydale Farm Stand are characterized by gently sloping terrain with low-growing vegetation. The second parcel, not used by the farm stand, consists of early successional vegetation, including some larger deciduous and evergreen trees, overgrown shrubs, and tall grasses. Adjacent properties include New York State parklands and lands designated as a Tompkins County Unique Natural Area. According to application materials, the project is primarily proposed along Route 13 frontage, with limited disturbance anticipated in the rear portions of the property. Comprehensive Plan/Environmental Review The 2014 Comprehensive Plan and Future Land Use Map has characterized this property as “Semi Rural Neighborhood.” According to the Comprehensive Plan, development in this area should remain “sensitive to the established character of its setting.” TOWN OF ITHACA NEW YORK The Town Board adopted the IVOD provisions on February 13, 2023, to meet the goals of the Comprehensive Plan (2014) and the Inlet Valley Ithaca Plan (2018); more information on that initiative here: https://townithacany.gov/inlet-valley. The proposed Local 81 Union project will require a special permit and site plan approval from the Town of Ithaca Planning Board and may require area variances from the Zoning Board of Appeals, pending further review by the Town Code Enforcement Department. The proposed project is a Type I Action under the State Environmental Quality Review Act and is subject to environmental review. As such, the project requires the completion of a Full Environmental Assessment Form and a coordinated review amongst the agencies that have discretionary decision authority to approve certain aspects of the project. IVOD Design Standard Requirements The applicant is proposing to construct a +/- 23,700 square foot facility, along with outdoor training areas, a public walking trail, solar panels, and other site plan elements. This project will be required to comply with the building and design standards, lighting standards, parking standards, and other design standards associated with the IVOD provisions. Additionally, the project will be required to comply with other Town Code sections related to solar energy systems. The preliminary site plan submission must contain significant architectural, building, and site details, drawings, and plans. This site is located prominently on NYS Route 13/Elmira Road, so this project’s architectural design should promote the character and design characteristics of the IVOD while complementing the existing community. The submission should include a narrative statement from the applicant (along with the associated drawings), listing the specific details on how the project complies with the IVOD standards. With respect to vegetation, the project should prioritize preservation of existing vegetation and native trees where feasible, especially along property boundaries, areas located adjacent to Tompkins County Unique Natural Areas, and areas located adjacent to New York State parkland. The preliminary site plan application submission will require a landscaping plan that complies with the IVOD requirements; and the plan should contain native, non-invasive tree and plant species. This is a highly disturbed site, and is a highly visible site located at the gateway of the southeastern portion of the Town, so the proposed landscaping plan should include abundant plantings. Lastly, the project will require a highway work permit and approval from the NYS DOT to install a curb cut off NYS-13/Elmira Road. Please call me at (607) 273-1747 ext. 127 or email me at nquiltykoval@townithacany.gov if you have any questions, comments, or concerns. Att. Brian S Manthey Ed Keplinger Tommy Hayward Memorandum To: Town of Ithaca Planning Board From: The Town of Ithaca Conservation Board - Environmental Review Committee Date: 08/17/2026 RE: Office and training center sketch plan review The Environmental Review Committee members review the sketch plan and visit the on the east side of Elmira Rd between Sunny Gables and Eddydale Farm Stand for the new construction of a Local 81 Plumbers and Steamfitters union office and training center. We appreciate the applicants’ plans to leave the space in the back of the parcels and provide public parking to allow access to fishing and trails. We were uncertain how storm water would be directed off the service area behind the building. We would encourage a previous surface in that bottleneck area given the sloping nature of the terrain. Recognizing that the project area has many invasive species growing and even more banked in the soil, steps to reduce invasive plants presence in work areas and minimize their further spread need to be a part of construction preparation and implementation. This includes having all vehicles leaving the site cleaned, especially those running among several job sites. Seeds or other plant parts stuck in soil in tire treads, and other vehicle parts will easily spread invasive plants on site and to other areas. Respectfully submitted Lori Brewer Frank Cantone Eva Hoffmann James Hamilton Pete Loucks Richard Martinez PROPOSED RESOLUTION: SEQR Lead Agency – Declaration of Intent Plumbers and Steamfitters Joint Apprentice Training Center Elmira Road 35.-1-10.2 & 35.-1-9.21 Town of Ithaca Planning Board September 1, 2026 WHEREAS: 1. The Town of Ithaca Planning Board, at its meeting on September 1, 2026, considered a Sketch Plan for the proposed Plumbers and Steamfitters (Local 81 Union) new Joint Apprentice Training Center building project, located on Elmira Road, between Enfield Falls Road and Park Lane, in the Low Density Residential Zone and the Inlet Valley Overlay District (IVOD). The projec t involves constructing a +/- 23,700 square foot building on +/- 9 acres of land, along with parking facilities, outdoor training areas, a public walking trail, and other site plan elements. 2. The proposed project, which requires Site Plan approval and Special Permit by the Planning Board, is a Type I action pursuant to the State Environmental Quality Review Act, 6 NYCRR Part 617, and Chapter 148 of the Town of Ithaca Code regarding Environmental Quality Review, because the proposal involves “any Unlisted action, that exceeds 25 percent of any threshold in this section, occurring wholly or partially within or substantially contiguous to any publicly owned or operated parkland, recreation area or designated open space, including any site on the Register of National Natural Landmarks pursuant to 36 CFR part 62 (which is incorporated by reference pursuant to section 617.17 of this Part),” as noted in 617.4(b)(10). 3. A Full Environmental Assessment Form, Part 1, has been submitted by the applicant, along with a report containing a narrative and studies titled “Plumbers and Steamfitters Local 81 Joint Apprenticeship Training Center Sketch Plan Review Application Project Summary,” dated July 20, 2026, prepared by Brian Manthey Architect, drawings titled “PLUMBERS & STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center,” dated July 20, 2026, prepared by Keplinger Freeman Associates, and other materials; NOW, THEREFORE, BE IT RESOLVED: That the Town of Ithaca Planning Board hereby proposes to establish itself as Lead Agency to coordinate the environmental review of the proposed actions, as described above, and BE IT FURTHER RESOLVED: That the Town of Ithaca Planning Board hereby requests the concurrence of all involved agencies on this proposed Lead Agency designation, said concurrence to be received by the Town of Ithaca Planning Department by October 1, 2026. Moved: Seconded: Vote: Plumbers &Steamfitters (Local 81),Elmira Road Legend 35.-1-10.2 &35.-1-9.21 ||Town of Ithaca Parcels Elmira Road (Tax Map IDs 35.-1-10.2 &35.-1-9.21), Ithaca,New York This map was created for informational purposes. 20 July 2026 Plumbers and Steamfitters Local 81 Joint Apprenticeship Training Center Sketch Plan Review Application Project Summary This project represents new construction of a +/-23,700sf Local 81 Plumbers and Steamfitters union office and training center on what is now two tax parcels totaling just over 9 acres. The site is on the east side of Elmira Rd between Sunny Gables and Eddydale Farm Stand, in the Inlet Valley Overlay District (IVOD) transition zone (IV-T). This project includes a subdivision application to combine the two tax parcels into one. The site is directly adjacent to State land which is part of a planned expansion of the Black Diamond Trail System, connecting Taughannock Falls State Park to Robert H Treman State Park. Use and Occupancy Zoning use as defined by the IVOD guidelines classify this as a mixed-use Place of Assembly and Private Club/ Lounge. As a labor union, this use is specifically allowed with special permit approval under the IVOD-VT zoning code. New York State building code classifies this use as a business occupancy. Site programming for the project includes: • Parking for 82 vehicles • Loading dock, including required maneuvering space • Waste enclosure • Additional parking and walking trail for public use to gain access to the planned expansion of the Black Diamond Trail, which is directly adjacent to this site. Building programming for the project includes: • Union offices • Union meeting room • Six training classrooms and labs • Welding training and support space • Loading dock • Outdoor: o rigging training o underslab plumbing training “sandbox” o freestanding solar panel array Hours of operation: This training center will enable a shift from evening classes to daytime (M-F 7am-5pm) training for approximately 60 students. In addition, approximately six labor union staff will occupy the office space during business hours. There will be minimal transient visitors to the office space for paying labor union dues and conducting other union Professional Corporation 1919 Patterson Road Marietta,New York 13110 hone:315.636.8436 business. Monthly evening meetings in the large meeting room could surge the need for parking to approximately 100 cars. During these events, the truck maneuvering apron will serve as overflow parking. There will be approximately 6 trucks/month to the loading dock and outdoor cylinder storage area. Outdoor training areas: • Rigging training will occasionally involve setup of a truck mounted crane on the paved area in vicinity of the rigging yard. This activity will generally occur during business hours. • Underslab plumbing systems training will involve hand excavation through compacted gravel in the “sandbox”. The sandbox is covered with a steel frame and small scale (<2,000sf) solar panel array to provide some weather protection. Site Design Intent: The driveway into the site is located at the northernmost corner to enhance sight distance to the Highway 13/34/96 northbound merge lane. A sweeping drive, with single loaded parking, provides access to a larger double loaded parking lot in closer proximity to the building and to the rear loading and public parking areas. Additional paved areas provide access to the rigging and sandbox areas while providing emergency vehicle access to the rear and south sides of the building. The rear of the property (approximately five acres) is set aside for public use paths and Black Diamond Trail access as well as approximately solar array. Stormwater will be managed on site for both quality and quantity as required by DEC SWPPP regulations. Site disturbance will be less than 5 acres. Utilities • Water-The building will be served by an existing 8” water service valve currently on the site. This will feed the domestic water and fire protection needs of the building. • A sanitary manhole is available at the road for tie-in. A water and sewer availability determination application to the Town’s Engineering Department has been made. • Electric- There is existing electric service across the street along Elmira Rd. A new utility pole will be set on this property, with underground electric serving an 800-amp 480-volt, three-phase service main with 1200 amp bus bar to accommodate future solar additional integration. A medium scale ground mounted solar array (2-7,000sf) is included as well as a small-scale roof mounted array over the sandbox. • Heating- a geothermal heating system is planned to serve a heat pump HVAC system. The geothermal field is expected to utilize an array of vertical wells under paved areas. Natural gas fired boilers will supplement the geothermal loop and snowmelt at building entrance sidewalks. • The building will be sprinklered in accordance with building and zoning code. Building Design Intent: The building is arranged with larger mass spaces towards the rear of the property while a smaller scale elevation faces Elmira Road. The angled building plan enables site development to utilize a portion of the site bottlenecked by the lot configuration. The building interior design is conceived of as a living laboratory, where the building systems are exposed to view and serve as exhibits to enhance student training. Because fossil fuel fired equipment is a large part of the world these students are being trained to provide service, a natural gas service and equipment will be part of the building systems. This is in addition to solar and geothermal renewable energy components included to provide compliance with Zero Code 2.0 provisions. This project complies with zoning code setbacks and height restrictions. Next Steps: • Preliminary Review application. o Address board comments. o Provide dark sky and Town lighting law compliant site lighting. o Address findings of water and sewer availability report. o Incorporate input from Bolton Point and the Tompkins County Business Energy Advisory Committee. Regards Brian S Manthey FEAF 2026Page 1 of 15 Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Project Location (describe and attach a general location map): Brief Description of Proposed Action (include purpose or need): Name of Applicant/Sponsor: Telephone: E-Ma ress: City/PO: State: Zip Code: Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephon : Address: City/PO: State: Zip Code: FEAF 2026Page 2 of 15 B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Required Application Date (Actual or projected) a. City Council, Town Board, Yes No or Village Board of Trustees b. City, Town or Village Yes No Planning Board or Commission c. City, Town or Yes No Village Zoning Board of Appeals d. Other local agencies Yes No e. County agencies Yes No f. Regional agencies Yes No g. State agencies Yes No h. Federal agencies Yes No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? Yes No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? Yes No iii. Is the project site within a Coastal Erosion Hazard Area? Yes No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 Yes No C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action would be located? Yes Yes No No b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other)? If Yes, identify the plan(s): Yes No c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan or an adopted municipal farmland protection plan? If Yes, identify the plan(s): Yes No o FEAF 2026Page 3 of 15 d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate change? If Yes , identify the elements of the plan that are relevant to the action: Yes No C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? If Yes, what is the zoning classification(s) including any applicable overlay district? Yes No b. Is the use permitted or allowed by a special or conditional use permit? Yes No c. Is a zoning change requested as part of the proposed action? If Yes, what is the proposed new zoning for the site? Yes No C.4. Existing community services. a. In what school district is the project site located? b. What police or other public protection forces serve the project site? c. Which fire protection and emergency medical services serve the project site? d. What parks serve the project site? D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? Yes If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: No d. Is the proposed action a subdivision, or does it include a subdivision? Yes If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum No No FEAF 2026Page 4 of 15 e. Will the proposed action be constructed in multiple phases? Yes No i.If No, anticipated period of construction: months ii.If Yes: Total number of phases anticipated Anticipated commencement date of phase 1 (including demolition) month year Anticipated completion date of final phase month year Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: f. Does the project include new residential uses?Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase At completion of all phases g. Does the proposed action include new non-residential construction (including expansions)?Yes No If Yes, i.Total number of structures ii.Dimensions (in feet) of largest proposed structure:height; width; and length iii.Approximate extent of building space to be heated or cooled: square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i.Purpose of the impoundment: ii.If a water impoundment, the principal source of the water:Ground water Surface water streams Other specify: iii.If other than water, identify the type of impounded/contained liquids and their source. iv.Approximate size of the proposed impoundment.Volume: million gallons; surface area: acres v.Dimensions of the proposed dam or impounding structure: height; length vi.Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii.How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? Volume (specify tons or cubic yards): Over what duration of time? iii.Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv.Will there be onsite dewatering or processing of excavated materials?Yes No If yes, describe. v.What is the total area to be dredged or excavated?acres vi.What is the maximum area to be worked at any one time?acres vii.What would be the maximum depth of excavation or dredging?feet viii.Will the excavation require blasting? Yes No ix.Summarize site reclamation goals and plan: FEAF 2026Page 5 of 15 b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. FEAF 2026Page 6 of 15 d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district:  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)?  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No FEAF 2026Page 7 of 15 f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i.Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii.Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii.Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i.Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii.As calculated in the air permit application, the proposed action has the potential to emit: Tons/year (short tons) of carbon monoxide (CO) Tons/year (short tons) of oxides of nitrogen (NOx) Tons/year (short tons) of particulate matter (PM-10, PM-2.5) Tons/year (short tons) of volatile organic compounds (VOC) Tons/year (short tons) of sulfur dioxide (SO2) iii.Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h.Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i.Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i.When is the peak traffic expected (Check all that apply):Morning Evening Weekend Randomly between hours of to . ii.For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii.Parking spaces: Existing Proposed Net increase/decrease iv.Does the proposed action include any shared use parking?Yes No v.If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi.Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? FEAF 2026Page 8 of 15 k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i.Estimate annual electricity demand during operation of the proposed action: ii.Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii.Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i.During Construction:ii.During Operations: Monday - Friday:Monday - Friday: Saturday:Saturday: Sunday:Sunday: Holidays:Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i.Provide details including sources, time of day and duration: ii.Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i.Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii.Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o.Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i.Product(s) to be stored ii.Volume(s) per unit time (e.g., month, year) iii.Generally, describe the proposed storage facilities: q.Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i.Describe proposed treatment(s): ii.Will the proposed action use Integrated Pest Management Practices? Yes No n- cT n- FEAF 2026Page 9 of 15 r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i.Describe any solid waste(s) to be generated during construction or operation of the facility: Construction:tons per (unit of time) Operation : tons per (unit of time) ii.Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: Construction: Operation: iii.Proposed disposal methods/facilities for solid waste generated on-site: Construction: Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i.Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): ii.Anticipated rate of disposal/processing: Tons/month, if transfer or other non-combustion/thermal treatment, or Tons/hour, if combustion or thermal treatment iii.If landfill, anticipated site life: years t.Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: i.Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii.Generally describe processes or activities involving hazardous wastes or constituents: iii.Specify amount to be handled or generated tons/month iv.Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: Page 10 of 15 E.Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i.Check all uses that occur on, adjoining and near the project site. Urban Industrial Commercial Residential (suburban) Rural (non-farm) Forest Agriculture Aquatic Other (specify): ii.If mix of uses, generally describe: b. Land uses and cover types on the project site. Land use or Cover type Current Acreage Acreage After Project Completion Change (Acres +/-) Roads, buildings, and other paved or impervious surfaces (total) • Industrial or manufacturing •Commercial •Residential Forested Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural) Agricultural (includes active orchards, field, greenhouse, etc.) Surface water features (lakes, ponds, streams, rivers, etc.) Wetlands (freshwater or tidal) Non-vegetated (bare rock, earth, or fill) Other, Describe: FEAF 2026 — FEAF 2026Page 11 of 15 c. Is the project site presently used by members of the community for public recreation? i.If Yes: explain: Yes No d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed day care centers, or group homes) within 1500 feet of the project site? If Yes, i.Identify facilities: Yes No e. Does the project site contain an existing dam? If Yes: i.Dimensions of the dam and impoundment: Dam height: feet Dam length: feet Surface area: acres Volume impounded: gallons OR acre-feet ii.Dam’s existing hazard classification: iii.Provide date and summarize results of last inspection: Yes No f.Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i.Has the facility been formally closed? If Yes, cite sources/documentation: ii.Describe the location of the project site relative to the boundaries of the solid waste management facility: iii.Describe any development constraints due to the prior solid waste activities: Yes Yes No No g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i.Describe waste(s) handled and waste management activities, including approximate time when activities occurred: Yes No h.Potential contamination history. Has there been a reported spill at the proposed project site, or have any remedial actions been conducted at or adjacent to the proposed site? If Yes: i.Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site Remediation database? Check all that apply: Yes – Spills Incidents database Provide DEC ID number(s): Yes – Environmental Site Remediation database Provide DEC ID number(s): Neither database ii.If site has been subject of RCRA corrective activities, describe control measures: iii.Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? If Yes, provide DEC ID number(s): iv.If Yes to (i), (ii) or (iii) above, describe current status of site(s): Yes Yes Yes No No No FEAF 2026Page 12 of 15 v. Is the project site subject to an institutional control limiting property uses?  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place?  Explain: Yes Yes No No E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? If Yes, what proportion of the site is comprised of bedrock outcroppings? % Yes No c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: Well Drained: % of site Moderately Well Drained: % of site Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 0-10%: % of site 10-15%: % of site 15% or greater: % of site g. Are there any unique geologic features on the project site? If Yes, describe: Yes No h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information: Streams: Name Classification• Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: Yes Yes Yes Yes No No No No i. Is the project site in a designated Floodway? Yes No j. Is the project site in the 100-year Floodplain? Yes No k. Is the project site in the 500-year Floodplain? Yes No l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? If Yes: i. Name of aquifer: Yes No FEAF 2026Page 13 of 15 m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres Yes No o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): Yes No p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of special concern? If Yes: i. Species and listing: Yes No q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? If Yes, give a brief description of how the proposed action may affect that use: Yes No E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: Yes No b. Are agricultural lands consisting of highly productive soils present? i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): Yes No c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National Natural Landmark? If Yes: i. Nature of the natural landmark: Biological Community Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: Yes No d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Yes No FEAF 2026Page 14 of 15 e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i.Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii.Name: iii.Brief description of attributes on which listing is based: f.Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i.Describe possible resource(s): ii.Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i.Identify resource: ii.Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii.Distance between project and resource: miles. i.Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i.Identify the name of the river and its designation: ii.Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a.Is the project located within, or within ½ mile of, a disadvantaged community?Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b.Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below?Yes No i.new noise sources or expansions/modification of existing noise sources; - noise from operational sources -noise from construction activities ii.emissions of air pollutants including, mobile emissions; iii.wastewater discharges; iv.generation of odors; v.ligh pot llution; vi.new or modified radiation sources; vii.new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c.Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No FEAF 2026Page 15 of 15 E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought?Yes No ii. temperature extremes (hot or cold)?Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G.Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Date Signature Title EAF Mapper Summary Report Monday, July 13, 2026 12:27 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources to confirm data provided by the Mapper or to obtain data not provided by the Mapper. B.i.i [Coastal or Waterfront Area]No B.i.ii [Local Waterfront Revitalization Area]No C.2.b. [Special Planning District]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site - Potential Contamination History] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Listed] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.i [DEC Spills or Remediation Site - Environmental Site Remediation Database] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h.iii [Within 2,000' of DEC Remediation Site] No E.2.g [Unique Geologic Features]No E.2.h.i [Surface Water Features]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.h.ii [Surface Water Features]Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.iii [Surface Water Features]Yes - Digital mapping information on local, New York State, and federal wetlands and waterbodies is known to be incomplete. Refer to the EAF Workbook. E.2.h.v [Impaired Water Bodies]No E.2.i. [Floodway]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.j. [100 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.k. [500 Year Floodplain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. 1Full Environmental Assessment Form - EAF Mapper Summary Report Klnonton Toronto Hamillon on Buffalo Albany Roc*l«tBr /MnWYo'rk-- Monlps0 W Gmtoni SlXiiKl Baiiie f Sources Esr,HERE Garmin,USGS Irtermao.INCRE'.^x.RL3n Es'i Japd1 MET Esti Chiru ij-ony Esh Eu ?=ir.-.NGCC r "prrST-vrj ip ;.-.'h r.J l -irr.I GIS Lsei i^r^PiV/E;d HERE GjrTir,^PS DLl-Hhiir/ih E.2.l. [Aquifers]No E.2.n. [Natural Communities]Yes E.2.n.i [Natural Communities - Name]Rich Sloping Fen, Hemlock-Northern Hardwood Forest E.2.n.i [Natural Communities - Acres]25.0, 430.0 E.2.o. [Endangered or Threatened Species]No E.2.p. [Rare Plants or Animals]No E.3.a. [Agricultural District]No E.3.c. [National Natural Landmark]No E.3.d [Critical Environmental Area]No E.3.e. [National or State Register of Historic Places or State Eligible Sites] Yes - Digital mapping data for archaeological site boundaries are not available. Refer to EAF Workbook. E.3.e.ii [National or State Register of Historic Places or State Eligible Sites - Name] Eligible property:Sunny Gables E.3.f. [Archeological Sites]Yes E.3.i. [Designated River Corridor]No E.4.a [Disadvantaged Community]Yes 2Full Environmental Assessment Form - EAF Mapper Summary Report NY S R T E S 1 3 , 3 4 , 9 4 EN F I E L D F A L L S R O A D PA R K R O A D NY S R T E S 1 3 NY S R T E S 3 4 NY S R T E S 3 4 NY S R T E S 1 3 EDDYDALE FARM STAND PROJECT SITE ROBERT H. TREMAN STATE PARK 47 3 462.85 462.98 462.19 462.13 461.61 462.53 462.28 465.08 464.04 463.97 464.31 463.77 463.89 463.78 463.70 464.80 464.79 464.80 469.02 466.37 461.09 459.92 459.88 463.33 464.50 461.50 462.63 462.07 453.92 462.90 457.29 457.11 458.14 462.39 462.60 459.79 459.09 462.63 460.41 457.33 457.67 457.63 457.11 456.70 460.60 OH W OH W OH W OH W OH W OH W OH W W W ST ST SS 466 465 464 463 463 464 465 466 467 468 464 465 466 465 464 463 462 463 464 465 466 467 468 469 470 467 466 466 467 468 469 470 471 472 473 474 469 468 467 466 465 464 463 462 461 460 459 458 457 456 455 454 453 452 451 45 0 450 449 448 465 460 455 450 456 457 458 459 460 461 462 463 464 465 466 467 468 469 465 460 455 450 445 440 465 458 459 460 461 462 463 464 465 466 467 469 468 465 462 463 461 462 463 464 465 460 455 448 449 450 451 452 453 450 451 449 448 447 446 445 444 443 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463464 465 466 467 468 469 470 465 460 470 468 467 466 459 457 458 465 472 47 1 471 471 479 475 475 472 473 474 472 471 475 476 477 478 47 0 475 474 473 47 2 471 470 471 471 470469 465 460 461 462 463 464 466 467 468 460 461 462 463 464 465 46 4 463 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 479 475 470 480 475 470 478 477 476 475 474 473 472 471 470 469 466 467 451 452 453 454 455 456 457 458 459 460 461 462 463 464 470 469 468 463462 461 460 459 458 457 456 455 455 454 459 459 458 460 465 455 476 475 474 W W W SS SS UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT W W W W W W W W W W G G G G G G G G G G PROPOSED BUILDING FFE - 476.00 SERVICE AREA EL M I R A R O A D NY S R T E S 1 3 - 3 4 - 9 6 G G UE UE T SANDBOX RIGGING AREA FISHING ACCESS PARKING - 8 SPACES SOLAR PANELS 3 ROWS APPROXIMATELY 100 FT. X 20 FT., SPACED 20 FEET APART RECREATION TRAIL TO ACCESS BLACK DIAMOND TRAIL AND ENFIELD PARK EVERGREEN SCREENING EVERGREEN SCREENING STORM WATER FACILITY A STORM WATER FACILITY B EDDYDALE FARM STAND WASTE ENCLOSURE SITE ENTRANCE SAN SAN W PROPOSED BUILDING NYS PARKLAND NYS PARKLAND SUNNY GABLES EV CHARGING STATION MONUMENT SIGN (TBD) 74 PARKING SPACES WALK TO EDDYDALE CO P Y R I G H T 2 0 2 6 20 JULY 2026 LANDSCAPE ARCHITECTURE & LAND PLANNING PHONE: (315) 445-7980 FAX: (315) 445-7981 6320 FLY ROAD, SUITE 109 EAST SYRACUSE, NEW YORK 13057 K E P L I N G E R F R E E M A N ASSOCIATES AS SHOWN JPR SKE T C H P L A N SUB M I S S I O N NOT F O R C O N S T R U C T I O N 7.20 . 2 0 2 6 PLUMBERS & STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center between 827 & 919 Elmira Rd ITHACA, NY 14850 Tax Map No. 035.-1-9.21 & 10.2 80400 150 SCALE IN FEET SF GENERAL NOTES PLAN L100 OVERALL ZONE DATA CHART - TOWN OF ITHACA LOCATION MAP SCALE: 1" = 500' ALL NON-PAVED AREAS ARE 'O BE LAHN UNLESS OTHERWISE NOTED LEGEND EXSTNS ’O’AL LOT S'ZE;363315 SF <9.03 ACRES?<COMBINED PARCELS;CCfCCCK &O’ELEVATICN ’OF.SOTTOM Cf CUiB UkiU /LOW PON’ UTLITY PO-E WATER LINE PRE HYDRANT 5TC»f PIPE SANITARY PIPEMAXIMUMBUILDINGHEIGHT JNOEWiRCUND ELECTRIC 2 SPACES PER CLASSROOM XX SPACES 14 SPACES ASPHALT PAtEI-ENT-OtER-AT CONCRETE PAvtf-BN’ TRAFFC SON LIG“T POLE -SEE ELECTRICAL =LANS FOR WIRING- C-RB FLUSH fl'REVEAL XLE55 OTHERWISE NOTES- VEGETATION REVSIONS: DATE SCALE DRAWN BY TITLE1919PcHe^n Rwd Ikrtetto.New Vert 15*3 PROPOSED 353315 SF VARIES 23.’OO SF CONTRACTOR SHALL BLEND NEW WORK SMOOTHLY AND EVENLY WITH EXISTING LINES AND GRADES. REQU 'RED 30.000 SF 100 FT 39331 SF SITE BOUNDARY,TOPOGRA°H'C AND UTILITY SURVEY PREPARED Bv CT MALE ASSOCIATES.SYRACUSE.NY,DATED 24 APRIL 2026,FILE NUMBER 26.0233. ALL FILL/BACKHLL OF EXCAVATIONS AND VOIDS RESU-TING FROM REMOVALS AND RELATED WR<UNDER °RO°OSED OR REP-ACEMENT PAVING AREAS SHALL CN_Y EE COARSE AGGREGATE FILL OR SUBBASE COURSE MATERIAL THOROUGHLY COMPACTED. 30 FT SOFT 40 FT ADJUST RMS OF UTILITY S’RLCTURES TO REMAIN WITHIN AREAS OF GRADE CHANGES ~O MEET PROPOSED LNES AND GRADES. 35 FT 50 FT 40 FT Minimum lot size MINIMUM LOT WIDTH MAXIMUM BUILDING AREA OJNER AND ARCHITECT DO NO’CONFIRM THE COMPLETENESS OR ACCURACY OF SUCH INFORMATION.CONTRACTOR IS RESPONSIBLE FOR ’HOROUGH EXAMINATION AND VERIFICATION OF ALL EXISTING SURFACE AND SUBSURFACE CONDITIONS AFFECTNG THE NATURE,SCOPE,COMPLEXITY AND COST OF THE CONTRACT WORK ADDITIONAL INFORMATION ON EXISTING CONDITIONS HAS BEEN ADDED TO THE DRAWINGS BASED ON THE LANDSCAPE ARCHITECTS OBSERVATIONS BUT IS NOT INTENDED TO AND DOES NOT ALTER TLE SURVEY INFORMATION.REFER TO SURVEY NOTES FOR ADDITIONAL IFORMATION. 5AW CUT FOR PAVING REMOVALS.EXTEND REMOVAL LNES TO NCLUDE ANY ADJOINING BROKEN OR DETERIORATING PAVING.CAREFULLY REMOVE. STOCKPILE AND PROTECT ANY ITEMS NOTED FOR SALVAGE.ALL DEMOLITION RUBBLE,DEBRS AND EXCESS SOILS TO BE PROMPTLY REMOVED FROM SITE. STRIP AND STOCKPILE SUFFICIENT EXISTING ORGANIC TOPSOILS FOR RESPREADING AS REQUIRED ON DISTURBED AND REGRADED AREAS TO BE ESTABLISHED AS LAHN AND FOR REPAIR OF DIS’URBED EXISTING LAWNS TO REMAIN.STOCKPILE ALL MATERIALS IN APPROVED LOCATIONS WITHOUT INTERFERING WITH OTHER CONTRACTOR LOR<SCHOOL "RAFF'C OR DRAINAGE. CONIAGLMGlTOMMYHAYWARD 4.PROTECT ALL FACILITIES AND IMPROVEMEN’S ON AND ADJOINING THE PROPERTY WHICH ARE NOT SPECIFICALLY IDENTIFIED FOR REMOVAL.VERIFY LOCATIONS AND DEPTHS O=ALL SUBSURFACE UTILITIES TO REMAN PRIOR TO ANY ADJACENT REMOVAL AND EXCAVATION WORK. MINIMUM YARD SETBACKS** FRONT REAR SIDE YARD (ONE SIDE? ALL EXISTNG FEATURES SHALL REMAN UNLESS OTHERWISE NOTED.IF THE CONTRACTOR DAMAGES ANY OF THE EXISTING ON-SITE FACILITIES TO REMAN !TREES.PAVEMENTS.UNDERGROUND UTILITIES.STRUCTURES,ETC-?WHETHER SHOWN ON THE P-ANS OR NOT,THE CONTRACTOR SHALL REPAIR AND/OR REPLACE SUCH ITEMS AT HIS OWN EXPENSE AND ASSUME ALL RESPONSIBILITY FOR SUCH DAMAGE WITHOUT ANY ADDITIONAL COST TO THE OWNER REPLACEMENT MATERIAL SHALL BE SAME QUALITY AND QUANTITY AS OR'GNAL. NOTES; I.REQUIRES SPECIAL PERMIT =OR 2T0-55,PRINCIPAL USE AS PLACE O= ASSEMB-Y AND PRIVATE CLUB-LOUNGER (LABOR UNION? IT IS *MO.ATXM O'YtfW STATE EOUCATOH 14«FOR ANY FfRSCN.UMfSS ACTRG LHC€R THEPWCTSUP^VTSOY tf A UCtNStOARCHITECT.TO ALTER AH iltM 0*THS DOCIMNT IN ANY Ml.PAST 69.5 (6) CYOE TC'BC 0.CONTRACTOR SHALL BE RESPONS'B-E =0R LAUN MAINTENANCE WITHIN THE CONTRACT LIMIT LINE.EXISTING LAWNS SHALL BE MOWED AS MUCH AS PRACTICAL TO KEEP AREA FROM LOOKNG UNSIGHTLY.ALL TRA5H AND DEBRIS SHALL BE PICKED UP AND DISPOSED OF PROPER.Y. ZONNG;LDR -LOW DENSITY RESIDENTIAL WITH IV0D OVERLAY 6.THE CONTRACTOR SHALL CONFIRM EXISTNG GRADES AND LOCATIONS OF ALL EXISTING FEATURES WITHN TK CONTRACT LIMIT LINE.THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY SHOU-D ANY DISCREPANCIES BE =OLND AT (3152 445--9B0. ARCHITECT1 Professional Corporation Wo DECK FFE LBAGHOUSE IMAGES REPRESENTING SIDING at ROADSIDE ENTRANCE IMAGE REPRESENTING LOADING DOCK WEST ELEVATION Wo DECK FFE FFE IMAGE REPRESENTING METAL PANEL SIDING at OFFICE AREA WEST ELEVATION Wo DECK FFE FFE 94'-9' IMAGE REPRESENTING MASONRY WELD SHOP PORTION of BLDG WEST ELEVATION SANDBOX IMAGE REPRESENTING SOLAR PANEL COVER OVER SANDBOX 5TONE BASE DATE 20 JULY 2026 1919 Pottmon Rood Monetta New York DUO SECTION THRU WELD 5H0P ROOF AREA ZONE DIAGRAM A200North WATER TABLE TRIM IN ACCORDANCE mV IVOD Wo DECK CLASSRM SOLAR PANELS Wo DECK at MTG RM ENTRANCE ACCENT WINDOW HEAD NlCHIHA CEMENT BOARD SIDING PANELS SPLIT FACE.INTEGRALLY COLORED CMU at WELD SHOP BEYOND Wo DECK at MTG RM LCANOPY OVER CYLINDER STORAGE CEMENT BOARD CLAPBOARD SIDING CEMENT- BOARD FASCIA CAP TRIM SCALE AS NOTED '-RECESSED ENTRANCE +/-93-2' L VERTICAL METAL PANEL SIDING WEST ELEVATION ARCHITECT Professional Corporation IT IS A (ICLATOI CP HEW YCRK STATE EDUCATE LAW ANYPE»$O*.UXlESS ACUNO UNDER '<OREC’SLPERYSCN 0«*LICENSEDARCHITECT.TO AllER AN ITEM CN THIS DOCUMENT IN AST WAY.TTU Ml.PART 605 (B) DRAWN BY B5M Wo DECK at CLASSRM 5 CONTACT iNEOTOMMYHAYWARD 607.227.2444 TITLE PRELIMINARYSECTIONS5 WINDOW'« CORNER TRIM IN ACCORDANCE WITH IVOD SECTION I I . PLUMBERS &STEAMFITTERS LOCAL 81 JATC Joint Apprentice Training Center between 827 &919 Elmira Rd ITHACA,NY 14850 Tax Map No.035.-1-9.21 &10.2 REVISIONS: Outlook InLet Valley From Lainey Papageorge <papageorge@icloud.com> Date Tue 9/1/2026 5:58 PM To Town Of Ithaca Planning <planning@townithacany.gov> You don't often get email from papageorge@icloud.com. Learn why this is important InLet Valley August 31, 2026 Submitted by Elaine Irene Papageorge 152 Inlet Valley Way Ithaca, NY 14850 30 year Resident Inlet Valley Homeowners Association Ithaca, NY InLet means just that=to let in. To some, Inlet Valley appears only as a corridor for commerce, the land along Rt 13 appearing useless, yet is anything but. Its intrinsic value is life-giving, lung-like, inletting mud, sand, rocks, meandering streams and massive cottonwoods that in turn support a litany of life-giving entities. It is our wetland. In addition to what lives in its breathing mud, it is also home to creature s of air and water such as migrating birds, insects, fish and reptiles that sustain us in a myriad of ways-spiritually and physically. Inlet Valley is vital not only to creatures who live upon it but to all that lies north of us: The City of Ithaca, Cayuga Lake, FLX basin, and St Lawrence River. Nutrient rich waters must be let into the circulatory system that flows in from somewhere, and that somewhere begins here, with us. Moisture, minerals from glacial till, mud, oxygen, the alchemy of life. Our InLet receives, admits and introduces nourishment into the very air we breathe, the water we drink, the soil for our crops. The future of Inlet Valley, our home, the land that foremothers and forefathers invested their life blood into, now rests upon us. As part of this fluid life-offering system, we must stop this massive building project. Let us collaborate to protect InLet Valley’s innate usefulness as a wetland, exactly as it is now, not smothered beneath piles of gravel, concrete mixing machines, massive buildings, trucks and infrastructure that will surely pollute all future nourishment for organic and inorganic life forms alike. Such an endeavor will surely strangle our very life-blood. By Lainey Papageorge 8-31-26 Lainey Papageorge 9/2/26, 8:00 AM https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmItNDBhYi04YTk2LWVlMjhiYzViYTc0MQAQAPI8SUFW56dEmcE4ewGIeAg%3D…1/2 152 Inlet Valley Way Ithaca, NY 14850 678-662-6156 cell Www.elainadesigns.com Lp@elainadesigns.com "Be Kind whenever possible Kindness is always possible". "My religion is now Kindness." 14th Dalai Lama 9/2/26, 8:00 AM https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmItNDBhYi04YTk2LWVlMjhiYzViYTc0MQAQAPI8SUFW56dEmcE4ewGIeAg%3D…2/2 Outlook Strong Opposition to Development of said 24,000-26,000square foot building on wetland located between Eddydale Market and the new Sunny Gables Venue(old Tubacks)on Rt 13 South From Lainey Papageorge <papageorge@icloud.com> Date Tue 9/1/2026 6:14 PM To Town Of Ithaca Planning <planning@townithacany.gov> Cc Lainey Papageorge <papageorge@icloud.com> You don't often get email from papageorge@icloud.com. Learn why this is important Dear Board Members for Town of Ithaca, Respectfully Submitted by Elaine Irene Papageorge 152 Inlet Valley Way Ithaca, NY 14850 30 year Resident Inlet Valley Homeowners Association Ithaca, NY InLet means just that=to let in.  To some, Inlet Valley appears only as a corridor for commerce, the land along Rt 13 appearing useless, yet is anything but. Its intrinsic value is life-giving, lung-like, inletting mud, sand, rocks, meandering streams and massive cottonwoods that in turn support a litany of life-giving entities. It is our wetland. In addition to what lives in its breathing mud, it is also home to creature s of air and water such as migrating birds, insects, fish and reptiles, and furry animals that sustain us in a myriad of ways- spiritually and physically. Inlet Valley is vital not only to creatures who live upon it but to all that lies north of us: The City of Ithaca, Cayuga Lake, FLX basin, and St Lawrence River. Nutrient rich waters must be let into the circulatory system that flows in from somewhere, and that somewhere begins here, with us. Moisture, minerals from glacial till, mud, oxygen, the alchemy of life. Our InLet receives, admits and introduces nourishment into the very air we breathe, the water we drink, the soil for our crops. The future of Inlet Valley, our home, the land that  foremothers and forefathers invested their life blood into, now rests upon us. As part of this fluid life-offering system, we must stop this massive building project. Let us collaborate to protect InLet Valley’s innate usefulness as a wetland, exactly as it is now, not smothered beneath piles of gravel, concrete mixing machines, massive buildings, concrete parking lots, trucks and infrastructure that will surely pollute all future nourishment for organic and inorganic life forms alike, upstream. Such an endeavor will surely strangle our very life-blood. Written and submitted 9-1-26 by Elaine Irene Papageorge  8-31-26 Elaine (Lainey) Papageorge 9/2/26, 8:02 AM https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmItNDBhYi04YTk2LWVlMjhiYzViYTc0MQAQABYuzN19QFdGmNCHxdrCwws%3…1/2 152 Inlet Valley Way Ithaca, NY 14850 678-662-6156 papageorge@icloud.com 9/2/26, 8:02 AM Inbox - Abby Homer - Outlook https://outlook.office.com/mail/none/id/AAQkADgzM2Y5ZDBhLTQxYmItNDBhYi04YTk2LWVlMjhiYzViYTc0MQAQABYuzN19QFdGmNCHxdrCwws%3…2/2 PB 2026-08-04 (Filed 8/11) Pg. 1 TOWN OF ITHACA PLANNING BOARD August 4, 2026 DRAFT MINUTES The full video recording of this meeting is available on YouTube @TownofIthacaVideo (Written comments submitted at the meeting or after posting of the official mailout packet and 24 hours after the meeting can be found in the updated packet online and will be filed permanently with the project folder along with any other comments received after the post meeting deadline.) Present: Caitlin Cameron, Chair, Bill Arms, Sara Reynolds, Vincent Ferrara, Kelda McGurk, and Jenni Minner Absent: Liz Bageant CJ Randall, Director of Planning; Christine Balestra, Senior Planner; Nate VanWhy, Attorney for the Town; Dana Magnuson, Senior Code Officer; Ashley Colbert, Deputy Town Clerk Ms. Cameron called the meeting to order. 1. Persons to be heard – None 2. Public Hearing: Consideration of Modification of Planning Board Condition at East Hill Plaza, located in a Community Commercial Zone. This project includes removing existing overgrown plant materials and topsoil from two existing storefront planter beds and replacing them with new topsoil and low-profile ornamental plantings. This is a Type II Action under New York State Department of Environmental Conservation and is not subject to an environmental review. Maria Maynard, Applicant; Cornell University, Owner. Ms. Randall gave a brief overview of the request on behalf of the applicant saying that the Planning Board at the time of approval of the East Hill Plaza project in 1995 and 1999 had a very specific planting condition for East Hill Plaza. The modification is a request to remove the condition requiring "like-kind" replacement of vegetation, as the current plantings are overgrown and blocked retail signage. The project involves removing overgrown topsoil and plant materials—specifically Chanticleer Pear trees that block signage—and replacing them with low-profile ornamental plantings. Discussion Ms. Cameron had concerns that if they strike the “like-kind” condition what is to stop the applicant from tearing out the new vegetation in two years? Ms. Balestra noted that monitoring of such minor modifications typically occurs at the staff level under Town Code section 270-191. Removing the condition would just allow the applicant to put in plantings of their choice and be monitored by Staff moving forward. PB 2026-08-04 (Filed 8/11) Pg. 2 Public Hearing Ms. Cameron opened the public hearing; there was no one wishing to speak and the hearing was closed. Determination PB Resolution 2026-005: Modification of Planning Board Condition East Hill Plaza Landscaping Modifications 0 Pine Tree Road Tax Parcel No. 62.-2-1.121 Whereas: 1. This action is consideration of Modification of Planning Board Condition at East Hill Plaza (as required by Town Code § 270-191B(8)), which is in a Community Commercial Zone. This project includes removing existing overgrown plant materials and topsoil from two existing storefront planter beds and replacing them with new topsoil and low- profile ornamental plantings. Maria Maynard, Applicant; Cornell University, Owner; and 2. This is a Type II Action, as stated in 6 NYCRR 617.5(c)(1) of the regulations of the New York State Department of Environmental Conservation, promulgated pursuant to the State Environmental Quality Review Act, because the Action constitutes “maintenance or repair involving no substantial changes in an existing structure or facility” and the modification to site plans is not subject to review under SEQR; and 3. Per the Inter-governmental Agreement between the Town of Ithaca and the Tompkin County Planning and Sustainability Department, dated August 3, 2004, this action is not subject to referral to the Tompkins County Planning and Sustainability Department under New York State General Municipal Law, Article 12-B, §§239-l, -m, and -n; and 4. The Planning Board, at the August 4, 2026, Planning Board meeting, reviewed and accepted as adequate a project narrative and a site plan entitled “East Hill Plaza Shopping Center,” prepared by Bellisario Companies, dated May 7, 2026, and other application materials; now, therefore be it Resolved: 1. That the Town of Ithaca Planning Board hereby waives certain requirements for Preliminary and Final Site Plan Approval, as shown on the Preliminary and Final Site Plan Checklists, having determined from the materials presented that such waiver will result in a significant alteration of neither the purpose of site plan control nor the policies enunciated or implied by the Town Board, and 2. That the Town of Ithaca Planning Board removes the following condition 2(b) from their East Hill Plaza Modification of Site Plan Resolution dated October 5, 1999: PB 2026-08-04 (Filed 8/11) Pg. 3 All landscaping elements to be maintained in a good and workmanlike manner and any of such element that may die be replaced promptly with like kind vegetation. 3. That the Town of Ithaca Planning Board hereby grants Modification of Site Plan Approval for the proposed East Hill Plaza Landscaping Renovation, located on 0 Pine Tree Road, as described in the materials listed in Whereas 4 above. Moved: Bill Arms Second: Vinnie Ferrara Vote: Ayes - Cameron, Arms, Reynolds, Ferrara, McGurk and Minner 3. Evaluation of the Generic Environmental Impact Statement (GEIS) that was prepared for the SouthWorks (formerly Chain Works District) Redevelopment Project site off NYS Route 96B/Danby Road, located in Town of Ithaca Planned Development Zone No. 16. The SouthWorks District is located on a 95-acre parcel traversing the City and Town of Ithaca’s municipal boundary. It is a mixed-use development consisting of residential, office, commercial, retail, restaurant/café, warehousing/distribution, manufacturing, and open space. The Town of Ithaca, as an Involved Agency in the environmental review, issued a Findings Statement for the GEIS on May 21, 2019, that included threshold conditions for future site-specific projects associated with the overall development. The Town of Ithaca Planning Board is the Lead Agency in the environmental review with respect to the proposed site-specific SouthWorks Woods mixed-income residential project, which comprises a portion of the overall SouthWorks redevelopment, and involves the construction of eight residential buildings with a total of 130 mixed-income apartments, including a community room, lounge, fitness center, offices, maintenance areas, and storage. The Woods project also involves the development of internal roads and infrastructure, a playground, sidewalks and path connections, stormwater facilities, landscaping, outdoor lighting, parking, and other site improvements. The Town of Ithaca Planning Board will determine if the project exceeds the threshold conditions that were outlined in the GEIS Findings Statement, therefore requiring additional or supplemental environmental review. Shift Chainworks Owner 1 LLC, Owner; Beacon Communities, LLC, Applicant; James Gensel, Fagan Engineers & Land Surveyors, PC, Agent. Mr. Gensel presented an overview of the project. The current focus is “The Woods,” an affordable housing project in the Town’s portion of the project. Discussion Ms. Cameron asked for clarification on what Staff and the Applicant needed the Board to discuss and determine today. Ms. Balestra explained that Staff has provided the SouthWorks GEIS checklist of questions and answers, along with the recommendation that no further environmental analysis is required. The PB 2026-08-04 (Filed 8/11) Pg. 4 Board needs to consider whether the project exceeds the thresholds in the accepted EIS. Discussion centered on whether the existing traffic study (2018/2019) needs updating to include the "Gateway" project impacts. Staff has recommended requiring a DOT letter and an updated traffic study as conditions for site plan approval. The applicant noted that the “Gateway” section has their own ingress and egress that will not impact the project discussed here. Also, the current phase is smaller than originally envisioned in the GEIS and the intersection will eventually have a traffic signal. Stormwater and erosion control for the project will utilize underground treatment chambers and Staff confirmed that the Engineering Department finds the current plan adequate for the SEQR review, with minor details to be finalized during site plan review. The Board decided that the GEIS Checklist and Part 3 EAF will be discussed at the next meeting along with the preliminary site plan review. Concerns were raised regarding the amount of corrugated metal siding proposed for the "C buildings" and requested verification that these materials do not exceed the secondary cladding percentages allowed by the Planned Development Zone (PDZ). There was also discussion regarding the "institutional" feel of the sidewalk connections and the need for more contextual pedestrian paths. The board wanted to see more bike racks dispersed throughout the site and individual sidewalks from each mansion apartment to the proposed sidewalk along NYS Route 96B. The board also wanted more information related to stream setback mitigations. The applicant will submit revised plans and information for the next meeting. 4. Approval of Minutes - None 5. Other Business – Brief review of upcoming projects. Three Board Members will attend the NY Planning Federation training in Canandaigua. Gideon Casper has resigned because he is no longer a town resident. Applications are being sought for his replacement. The meeting was adjourned upon a motion and a second; unanimous. Submitted by Monica Moll, Deputy Town Clerk PROPOSED RESOLUTION: Recommendation to the Town Board Proposed Revisions to Town Code, Chapter 234 Subdivision of Land Town of Ithaca Planning Board September 1, 2026 WHEREAS: The Town of Ithaca Codes and Ordinances Committee has drafted revisions to the Town of Ithaca Code, Chapter 234, Subdivision of Land; and WHEREAS: The Town of Ithaca Town Board has referred the proposed revisions to the Town of Ithaca Planning Board for review and recommendations; and WHEREAS: The Town of Ithaca Planning Board has discussed the proposed revisions at its meetings on July 7, 2026, July 21, 2026, and September 1, 2026; NOW, THEREFORE BE IT RESOLVED: That the Town of Ithaca Planning Board hereby recommends that the Town of Ithaca Town Board adopt the proposed revisions to Town Code, Chapter 234, Subdivision of Land, with the following suggested modifications: [Planning staff/attorney will add language for any suggested mods at meeting] a. b. c. Moved: Seconded: Vote: Prepared by Planning staff 9/1/2026 1 Town of Ithaca Planning Board Compiled comments on dra revised regulaons: Town Code Chapter 234 Subdivision of Land Arcles I through V: No comments for Town Board (only minor clarifying quesons, typos, etc.) Arcle VI: Major Subdivisions §234-21. Planning Board findings and decision: Please revise leer C so the criteria/standards are objecve so that the Planning Board can apply and make adequate findings. Arcle VII: Subdivision Design Standards §234-24. Cluster subdivisions-D. Resource Analysis: Consider reducing the classificaon to two Classes (combining Classes 2 and 3) of conservaon assets (ecological, cultural, or historical features as defined in the Town’s Open Space Index), with Class 1 being unbuildable and Class 2 being buildable with conservaon assets listed. §234-24. Cluster subdivisions-E. Calculaon methodology to determine required open space assets in cluster subdivisions, based on Resource Analysis. Overall, the board believes that these requirements are too restricve and arbitrary. The board is concerned that this methodology will create significant barriers to affordable housing development. Consider:  Reducing the 40% required preserved open space of the parent parcel.  Combining the Classes (per above), then reducing the preserved percentage of new Class 2 assets to something less than 80%. [note: Planning staff will recalculate and provide new, updated analysis to provide the board will depicons of possible housing unit yield / subdivision examples based on this approach.] §234-26. Convenonal subdivision design standards and procedures. Line 785 states “Convenonal subdivisions do not require a resource analysis, conservaon easement, or plat notaon.” The Planning Board recommends striking this sentence. They believe that a subdivider will have to go through the resource analysis process to make a compelling case for a convenonal subdivision (required in §234-24.C.1(c)). [note: Planning staff notes that the resource analysis process is specifically designed to determine conservaon/open space requirements relave only to cluster subdivisions and based on the Town’s foundaonal 1992 Open Space Index. Planning staff guides all applicants through the approval process and does not believe a subdivider advocang for a convenonal plat will need to go through such an extensive analysis to make the compelling case for a convenonal subdivision. Also, staff suggests that the law be clear that conservaon easements/plat notaons are not required in convenonal subdivisions. The Planning Board can consider such things on a case by case basis, as it always has.] Arcles VIII through XI: No comments for Town Board (only minor clarifying quesons, typos, etc.) 1 Chris Balestra From:Nick Quilty-Koval Sent:Tuesday, August 11, 2026 9:27 AM To:Chris Balestra Cc:CJ Randall; Mike Smith Subject:RECAP: Subdivision Regulations Presentation to the Conservation Board Hi Chris, I'm sharing a few notes from our subdivision regulations presentation to the Conservation Board last Thursday (8/6). We broadly discussed development throughout the Town, inclusive C.J.'s wonderful explanation of the role of the Comprehensive Plan, Future Land Use Map, and zoning. By elaborating on the Town's approach to development and maintaining a strong "growth boundary," further describing how rarely major subdivisions occur, board members seemed to understand how the subdivision regulations would and would not impact land development, including areas in the Agricultural Zone. Shout out to Mike for addressing cluster developments in the Ag Zone. With support from Eva, we also discussed our methods used to develop the subdivision regulations. Specifically, explaining how the 1992 Open Space Index served as a framework for the Resource Analysis section of the code, signaling that this code update was carefully crafted to align with Town goals. I also think this discussion helped frame our presentations for the Resource Mapper and my typical cluster subdivision example presentation. While we did not review the subdivision code line by line, the Conservation Board provided valuable insight about things that we should consider:  Add a Conservation Board (Chapter 23) cross-reference to the regulations. I do not believe existing Chapter 234 regulations cross-references Chapter 23, so I'm just sharing this suggestion for our notes.  Invite real estate agents to future public outreach events to discuss market appeal and popularity of cluster subdivisions.  Consider how, and if, cluster subdivisions impact property taxes.  Maintaining ecological corridors should be a priority. The Board emphasized that the regulations should ensure that the Planning Board has the ability to require projects to create meaningful, connected conservation areas. C.J. And I answered this question by referencing sections 234-21I. and 234-24B.4 in the cluster subdivision regulations. I believe we adequately answered the question and reassured the Board that connected corridors are a priority, but it was worth noting here in case it comes up again in future discussions. Overall, it was a productive meeting. Let me know if you'd like to discuss any of my notes more in more detail. 2 Thank you, Nick Quilty-Koval Planner Town of Ithaca 215 North Tioga Street Ithaca, NY 14850 P: 607-273-1747 (ext. 127) E: nquiltykoval@townithacany.gov