Loading...
HomeMy WebLinkAboutPB packet- SWX Woods FSP-FSUB-11-17-26mtg 1 To: Planning Board Members From: Christine Balestra, Senior Planner Date: November 9, 2026 RE: The Woods at SouthWorks – Final Site Plan, Final Subdivision Review Please find attached materials related to the proposed The Woods at SouthWorks project, located on NYS Route 96B/Danby Road, in Town of Ithaca Planned Development Zone No. 16. The project is scheduled for the November 17, 2026, Planning Board meeting for consideration of Final Site Plan and Final Subdivision approval. The Planning Board issued a negative determination of environmental significance and granted Preliminary Site Plan/Subdivision approval for this project on September 15, 2026. The board approved the modifications to cladding materials for the project on October 6, 2026. The applicant has satisfied all conditions required to be met prior to Final Site Plan review that were indicated in the Preliminary Site Plan resolution (Resolution No. 2026-011). The attached application materials include a narrative that lists the changes to the project that comply with the conditions listed in the resolution. The attached Final Site Plan materials include: 1. Applicant narrative, dated October 14, 2026 2. Draft final resolution for the board to consider 3. Items to comply with Resolution No. 2026-011: a. Correspondence from Marty Moseley, Director of Code Enforcement b. A copy of Town Board Resolution No. 2026-063 c. Correspondence from utility companies d. Correspondence from TCAT and Center for Community Transportation 4. Copy of architectural drawings that comply with cladding materials approved 10/6/2026 5. Revised civil drawings, based on Town Code and fire access/apparatus requirements Please call me at (607) 273-1721 ext. 121 or email me at cbalestra@townithacany.gov if you have any questions. Att. Cc: Daniel Bellgraph, Beacon Communities Development LLC James Gensel, Fagan Engineers & Land Surveyors PC Rob Lewis, Shift Chainworks Owner I LLC 113 East Chemung Place | Elmira, New York 14904 | 607.734.2165 | FaganEngineers.com October 14, 2026 Christine Balestra, Senior Planner Town of Ithaca Planning Department 215 North Tioga Street Ithaca, NY 14850 RE: SouthWorks Woods – Final Site Plan & Subdivision Project Narrative SWBR Project No. 22232.00 FE Project 2011.104-008 Dear Chris, On behalf of Beacon Communities, LLC and Shift Chainworks Owner 1 LLC, Fagan Engineers & Land Surveyors, P.C. respectfully submits the Final Site Plan and Final Subdivision Plat materials for The Woods at SouthWorks residential development in the Town of Ithaca. The Town of Ithaca Planning Board granted Preliminary Site Plan and Preliminary Subdivision Plat Approval for the project on September 15, 2026, subject to conditions addressing zoning variances, fire apparatus access and fire-flow calculations, public infrastructure, utility coordination, and transportation service commitments. Since preliminary approval, the Applicant and Project Team have continued coordinating with Town Staff and applicable agencies to address the conditions established under Planning Board Resolution PB 2026-011 and finalize the engineering and architectural documents. The Applicant has obtained the required Zoning Board of Appeals and Town Board approvals, completed the required utility coordination submissions, and provided the transportation service commitment letters. The fire-flow calculations and fire apparatus access documentation have also been submitted to the Town Director of Code Enforcement, with final written approval pending. Project Description The Woods at SouthWorks is a proposed mixed-income residential development located within Planned Development Zone No. 16 on approximately 6.09 acres of the larger SouthWorks redevelopment property. The project consists of eight residential apartment buildings containing approximately 130 mixed-income dwelling units, together with a community room, lounge, fitness center, offices, maintenance and storage areas, internal roadways, parking facilities, sidewalks, pedestrian and bicycle connections, playground, landscaping, outdoor lighting, utilities, and stormwater management improvements. The proposed development remains substantially consistent with the overall layout, land use, and development program presented during preliminary review. Project Modifications Since Preliminary Approval Following preliminary approval, the Project Team has continued to advance the engineering and architectural plans. The principal modifications and refinements are summarized below. 1. Fire Apparatus Access and Fire Flow The Project Team has continued coordinating with Marty Moseley, Town Director of Code Enforcement, regarding the fire apparatus access requirements identified in his July 21, 2026 memorandum. Updated plans and supporting documentation have been submitted addressing fire apparatus circulation, roadway Page 2 Final Site Plan & Subdivision Plat October 14, 2026 113 East Chemung Place | Elmira, New York 14904 | 607.734.2165 | FaganEngineers.com grades, turning movements, aerial apparatus access, fire hydrant locations, and fire department connections. Fagan Engineers also completed a hydraulic evaluation of the proposed private 8-inch ductile iron water distribution system using EPA EPANET Version 2.2 and the September 10, 2026 Bolton Point hydrant flow test. The required exterior fire flow was evaluated in accordance with Appendix B of the 2025 Fire Code of New York State. The analysis establishes a preliminary minimum exterior fire-flow requirement of 1,000 gallons per minute (GPM) for each building. The hydraulic model demonstrates that the proposed system can provide 1,500 GPM at the most hydraulically remote proposed fire hydrant while maintaining a calculated residual pressure of 48.47 PSI. The Applicant has submitted the requested information and is awaiting final written acceptance from the Town Director of Code Enforcement. 2. Architectural Materials and Building Façades Following the September 15, 2026 Planning Board meeting, SWBR prepared revised architectural elevations and renderings for Buildings C1, C2, and C3 to provide additional façade articulation and human-scaled architectural details. At its October 6, 2026 meeting, the Planning Board adopted Resolution PB 2026-012, approving the revised architectural designs for Buildings C1, C2, and C3 and determining that the modifications satisfied the Board's previously requested design strategy. The approved architectural revisions have been incorporated into the final project documents. 3. Site Grading, Stormwater Management, and Stream Mitigation The Project Team has continued refining the site grading, drainage infrastructure, erosion and sediment control measures, and project-specific Stormwater Pollution Prevention Plan (SWPPP). Revised stormwater documentation has been prepared in response to comments from the Town Engineering Department and Barton & Loguidice. The project also incorporates stream setback mitigation measures, including stabilization, native riparian plantings, and restoration of disturbed areas, consistent with the project plans and applicable approvals. 4. Public Infrastructure and Utilities The final plans incorporate continued coordination regarding the proposed water and sanitary sewer infrastructure, internal roads, sidewalks, streetlighting, and associated easements. The Town Board approved the concept and location of the proposed public infrastructure and associated easements at its October 5, 2026 meeting. Electrical and telecommunications service coordination has also advanced through submissions to NYSEG and Spectrum. 5. Transportation and Site Amenities The project continues to incorporate pedestrian and bicycle facilities, transportation demand management measures, and transportation service commitments. The required commitment letters from local bikeshare and carshare providers and Tompkins Consolidated Area Transit, Inc. (TCAT) have been obtained and submitted. Compliance with Conditions of Preliminary Approval The following summarizes compliance with Conditions A through E of the Preliminary Site Plan and Preliminary Subdivision Plat Approval. Page 3 Final Site Plan & Subdivision Plat October 14, 2026 113 East Chemung Place | Elmira, New York 14904 | 607.734.2165 | FaganEngineers.com Condition A – Zoning Board of Appeals Variances The preliminary approval required receipt of any necessary variances from the Town of Ithaca Zoning Board of Appeals. The Applicant has received the required Zoning Board of Appeals approval. The applicable variance and associated mitigation measures have been incorporated into the final project documents. Status: Satisfied. Condition B – Fire Flow and Fire Apparatus Access The preliminary approval required confirmation from the Town Director of Code Enforcement that the fire-flow calculations comply with the New York State Fire Code and that the fire apparatus access issues identified in the July 21, 2026 memorandum have been satisfied. The Applicant has submitted revised site plans, fire apparatus access analyses, supporting exhibits, and the Water Distribution System Fire Flow Report addressing these requirements. The fire-flow analysis utilizes Appendix B of the 2025 Fire Code of New York State and demonstrates adequate modeled hydraulic capacity to provide the calculated exterior fire-flow requirement. All requested supporting documentation has been submitted for review. The Applicant is awaiting final written acceptance from the Town Director of Code Enforcement. Status: Required documentation submitted; final written acceptance pending. Condition C – Town Board Approval of Public Infrastructure The preliminary approval required Town Board approval of the concept and location of proposed dedicated public utilities, infrastructure, and associated easements. The Town of Ithaca Town Board approved the proposed public infrastructure arrangements at its October 5, 2026 meeting. Status: Satisfied – Town Board approval received October 5, 2026. Condition D – Utility Company Coordination The preliminary approval required coordination with applicable utility companies regarding electrical service, underground utility installations, and other project infrastructure. The Applicant has submitted the proposed utility plans and service requirements to NYSEG and Spectrum. Supporting utility coordination documentation, including the NYSEG service layout and Spectrum service agreement, is included with the project submission. Status: Utility coordination documentation submitted. Condition E – Transportation Service Commitment Letters The preliminary approval required commitment letters from local bikeshare and carshare providers confirming their intent to locate bicycles and vehicles at the project site, and from TCAT confirming its intent to serve the development. The Applicant has obtained and submitted the required transportation service commitment letters. Status: Satisfied. Page 4 Final Site Plan & Subdivision Plat October 14, 2026 113 East Chemung Place | Elmira, New York 14904 | 607.734.2165 | FaganEngineers.com Conditions Applicable to Subsequent Project Approvals The Applicant acknowledges that the preliminary approval also establishes conditions to be satisfied prior to issuance of building permits and certificates of occupancy. These include final stormwater review and documentation, execution and filing of applicable stormwater operation and maintenance agreements, NYSDOT Highway Work Permits, final subdivision plat filing requirements, public infrastructure dedication and acceptance, environmental documentation, and other applicable approvals and agreements. The Applicant will continue coordinating with Town Staff and the appropriate agencies to satisfy these requirements in accordance with the timing established by the Planning Board's preliminary approval resolution. Conclusion The Final Site Plan and Final Subdivision Plat submission incorporates the engineering, architectural, environmental, and infrastructure refinements completed since Preliminary Site Plan and Preliminary Subdivision Plat Approval. The Applicant has obtained the required Zoning Board of Appeals approval, received Town Board approval of the proposed public infrastructure, completed the architectural modifications approved by Planning Board Resolution PB 2026-012, coordinated with the applicable utility providers, and submitted the required transportation service commitment letters. The Applicant has also submitted the fire-flow calculations and fire apparatus access documentation requested by the Town Director of Code Enforcement and is awaiting his final written acceptance. Accordingly, the Applicant respectfully requests that the Town of Ithaca Planning Board consider granting Final Site Plan and Final Subdivision Plat Approval, subject to receipt of the outstanding written approval from the Town Director of Code Enforcement confirming compliance with Condition B of Planning Board Resolution PB 2026-011. We appreciate the continued assistance and cooperation of the Planning Board, Town Staff, and consulting reviewers throughout the approval process. Sincerely, FAGAN ENGINEERS & LAND SURVEYORS, P.C. James B. Gensel, P.E., CPESC President PROPOSED RESOLUTION: Final Site Plan, Subdivision Approval The Woods at SouthWorks Residential Development NYS Route 96B/Danby Road Tax Parcel No. 40.-3-3 Town of Ithaca Planning Board November 17, 2026 WHEREAS: 1. This action involves consideration of Final Site Plan and Final Subdivision Approval for the SouthWorks Woods project located off NYS Route 96B/Danby Road, in Town of Ithaca Planned Development Zone No.16. The SouthWorks Woods mixed-income residential project comprises a 6.09-acre portion of the overall SouthWorks (formerly Chain Works District) Redevelopment Project and involves the construction of eight residential buildings with a total of 130 mixed-income apartments, including a community room, lounge, fitness center, offices, maintenance areas, and storage. The Woods project also involves the development of internal roads and infrastructure, a playground, sidewalks and path connections, stormwater facilities, landscaping, outdoor lighting, parking, and other site improvements. Shift Chainworks Owner 1 LLC, Owner; Beacon Communities, LLC, Applicant; James Gensel, Fagan Engineers & Land Surveyors, PC, Agent, 2. The overall SouthWorks (formerly Chain Works District) Redevelopment Project is located on a 95-acre parcel traversing the City and Town of Ithaca’s municipal boundary. It is a proposed mixed-use development consisting of residential, office, commercial, retail, restaurant/café, warehousing/distribution, manufacturing, and open space. The City of Ithaca, as the Lead Agency in the environmental review of the SouthWorks (formerly Chain Works District) Redevelopment Project, issued a Findings Statement for the GEIS on March 26, 2019, 3. The Town of Ithaca, as an Involved Agency in the environmental review of the SouthWorks (formerly Chain Works District) Redevelopment Project, issued a Findings Statement for the GEIS on May 21, 2019. The Findings Statement included a threshold condition chart and checklist for future site-specific projects associated with the overall development, 4. The Town of Ithaca Planning Board, as the Lead Agency in the environmental review of The Woods at SouthWorks project, at their meeting on August 18, 2026, determined that The Woods at SouthWorks project did not exceed the threshold conditions outlined in the SouthWorks (formerly Chain Works District) Redevelopment Project GEIS Findings Statement, and that the Woods at SouthWorks project did not require additional environmental review, 5. Project plans, and related information, were duly delivered to the Tompkins County Planning and Sustainability Department per New York State General Municipal Law §§239- l et seq., and such Department responded in an August 14, 2026, letter from Katherine Borgella, Tompkins County Commissioner of Planning, pursuant to §§239-l, -m, and -n of the New York State General Municipal Law, determining that the proposed action will not have significant county-wide or inter-community impact, Page 2 of 3 6. The Planning Board granted Preliminary Site Plan Approval for this project, after a public hearing held on August 18, 2026, and an additional meetings on September 15, 2026, and October 6, 2026, and 7. The Planning Board, after a public hearing held on November 17, 2026, has reviewed and accepted as adequate a revised applicant narrative, re-submitted architectural and elevation drawings that were approved by the Planning Board on October 6, 2026, prepared by SWBR, (most recently date-stamped October 15, 2026), a revised drawing set titled “Beacon Communities, The Woods at SouthWorks, Town of Ithaca, Tompkins [Co], New York,” including Sheets C000, C100, C200, C300-C305, C400-C407, C500-C505, C600, C601, C700, C701, C800-C802, C900, C901, and CP, prepared by Fagan Engineers, most recently revised 10/14/2026 (Sheet C300 revised 11/03/2026); and other application materials. NOW, THEREFORE BE IT RESOLVED: 1. That the Town of Ithaca Planning Board hereby makes an exception for the proposed Driveway V/Road B, relative to the Town of Ithaca Complete Streets Policy, Section 4(d) Exceptions, which states “the existing and planned population, employment densities, traffic volumes, or level of transit service around a particular roadway, as documented, is so low that future expected users of the roadway will include very few pedestrians, users of public transportation, or bicycles,” as: a. The topography of Driveway V/Road B prevents the safe installation of bicycle and pedestrian facilities, b. The design of the remaining SouthWorks Woods project contains bicycle and pedestrian facilities and connections that are more convenient for users, safe, and aligned with the Complete Streets Policy, c. The Town of Ithaca Town Board approved the concept and location of Driveway V/Road B at their meeting on October 5, 2026 (TB Resolution No. 2026-063), and d. All future phases, and cumulative impacts associated with the overall SouthWorks project, will be evaluated by the Town for compliance with the Complete Streets Policy. 2. That the Town of Ithaca Planning Board hereby grants Final Site Plan and Final Subdivision Approval for the proposed The Woods at SouthWorks, as described in the materials listed in Whereas number 7 above, subject to the following conditions, to be met: Before issuance of a Building Permit: a. Satisfaction of all comments identified in the memorandum prepared by Barton and Loguidice to Justin McNeal, Town Director of Engineering, dated August 10, 2026 (memo attached), b. Submission, review, execution, and filing of an Operation, Maintenance and Reporting agreement for the proposed stormwater management facilities, with the Town of Ithaca, specifying the ownership and maintenance responsibilities for the Page 3 of 3 stormwater system, including: (i) Submission of an access easement, or other mechanism, to assure Town of Ithaca access to the stormwater facilities, (ii) Review and approval of the access easement and the Operation, Maintenance, and Reporting Agreement by the Attorney for the Town and the Town Engineer, and (iii)Town Board authorization to allow the Town Supervisor to sign any necessary easements and the Stormwater Operation, Maintenance, and Reporting Agreement associated with the project, c. Submission of an approved Highway Work Permit (Commercial Driveway Access Permit and/or Utility Permits, as applicable) from the New York State Department of Transportation (NYSDOT) for improvements within the NYS Route 96B/Danby Road right-of-way. Town of Ithaca Planning Board approval will be required for any alteration of traffic flows and access, or a significant (in the judgment of the Director of Planning) increase in the volume of traffic as a result of any NYSDOT-required changes to the approved final site plan, d. Submission for signing by the Chairperson of the Planning Board of an original and three dark lined prints of the final subdivision plat, prior to filing with the Tompkins County Clerk Office; and submission of a copy of the receipt of filing to the Planning Department, e. Dedication to and acceptance by the Town Board, of any proposed public utilities (water, sewer), and infrastructure (roads, streetlights, sidewalks, etc.), and proposed easements associated with such utilities and infrastructure, f. Per the NYS Department of Environmental Conservation’s (DEC) Record of Decision Declaration of Covenants and Restrictions, submission of proof that the former NCR and Ithaca College sewer lines have been evaluated for potential soil vapor intrusion, Before issuance of any Certificate of Occupancy: g. If required, mitigation of any potential soil vapor intrusion of the former NCR and Ithaca College sewer lines, and submission of proof from the NYS DEC and/or NYS Department of Health (DOH) that said mitigation was in accordance with DEC and DOH requirements, h. Completion of all requirements of the NYS DOT, including construction of the sidewalk along the west side of Danby Road/NYS Route 96B to the City of Ithaca line, and including any temporary measures at the intersection of Coddington Road and Danby Road/NYS Route 96B, and i. Submission of any required executed easements, licenses, or other legal agreements involving Town or City property, for review and approval by the Attorney for the Town. 443 Electronics Parkway, Liverpool, NY 13088·Office: 315-457-5200·Fax: 315-451-0052·BartonandLoguidice.com August 10, 2026 Justin McNeal, Director of Engineering 114 Seven Mile Drive Ithaca, New York 14850 Re: Southworks – The Woods Subj: Engineering Review of Site Plan Submission File: 2071.015.001 Dear Members of the Planning Board: Barton & Loguidice, D.P.C. (B&L) has completed a review of the Site Plan Drawings and Stormwater Pollution Prevention Plan (SWPPP) provided on July 7, 2026 prepared by Fagan Engineers & Land Surveyors, P.C. on behalf of Beacon Communities, LLC (Applicant) for the above-referenced project. B&L’s engineering review focused on grading, drainage, and the submitted SWPPP. Based on our stormwater review, in conjunction with the Town of Ithaca Engineering Department, we offer the following comment suggestions for the Board’s consideration: General 1.A Stormwater operation maintenance and reporting agreement (SOMRA) will need to be filed before a building permit is issued. 2.MS4 Approval will not be issued until a SWPPP Application is submitted to Open Gov and the associated permit fees are paid. Site Plan Drawings 1.All water connections must branch off the private water main line after the meter. 2.Town will provide our standard details for water and sewer infrastructure. These must be used for items that are proposed for dedication. 3.The erosion and sediment control plan should be reviewed for Blue book compliance. The steep slopes on site limit the length of contributing flow for silt fence and silt socks. 4.The site grading appears incomplete. Several contours terminate in spots that are illogical with no tie-in to existing grade. Some contours appear to overlap or branch in multiple directions with multiple tie-ins to existing. Justin McNeal, Director of Engineering August 10, 2026 Page 2 2071015 Southworks SWPPP Review 081026 (ID 3667934).docx 5.Significant portions of the proposed new impervious area are not captured and treated despite appearing to be feasible to capture based on the proposed grading plan. This including portions of “Drive D”, “Road B”, the proposed roundabout, as well as “Road A” and “Drive C” near the tie-in to Morse Place. Roadway edge treatments (curb, gutter, ditch, etc.) are recommended to capture roadway runoff rather than allowing it flow towards proposed infrastructure or off-site untreated. 6.DM-3 and associated 24” HDPE storm pipe is proposed in close proximity to an existing structure. DM-3 appears to be situated with less than 3ft of clearance from outer wall of the manhole to the existing structure and is approximately 8ft deep. Please justify how this infrastructure will be installed without risk of undermining the existing building foundation. 7.Please justify the embankment in close proximity to the structures at 908 Danby Road and how site runoff onto this property will be addressed. 8.The inlet & outlet pipes as well as the proposed underdrain for the underground storage should be depicted on the utility plan. 9.Several sanitary and storm pipes have excessive slope. Sanitary pipe full flow velocities are recommended to be less than 10 ft/s (approx. 8% slope for 8in pipe), and sewers on over a 20% slope require anchoring in accordance with the 10 States Standards. The Applicant should consider reducing sanitary pipe slopes through the use of drop structures or other means to reduce flow velocities. Storm pipe slopes should be reduced by utilizing drop across structures where applicable. 10.Allowing the 21” RCP storm pipe running under Danby Road (State Route 96B) to daylight and attempting to pick up the surface discharge in a grated structure is not a recommended practice. This 21" storm appears to have a significant drainage area along State Rte 96B. Debris accumulation or inadequate grate capacity has potential to cause significant bypass that could result in localized flooding. It should be evaluated if the pipe may be connected directly to a structure and conveyed around the project site. 11.The Stormtech Outlet Structure Detail provides elevations that are not consistent with the submitted ADS drawings. 12.Please justify the placement of CB-22, CB-24 and CB-25. These locations do not appear logical based on the grading provided. 13.Silt fence should be installed parallel to contours in accordance with the New York State Standards and Specifications for Erosion and Sediment Control (Blue Book). 14.The Erosion & Sediment Control Plan should provide locations for concrete washouts, soil stockpiling, and material staging. Justin McNeal, Director of Engineering August 10, 2026 Page 3 2071015 Southworks SWPPP Review 081026 (ID 3667934).docx SWPPP 1.Please provide a table showing the Developed Drainage Peak Runoff Rates that takes the stormwater practices into account (true pre vs post development flows showing actual flow leaving site). 2.Provide a drawing showing an extreme flood conveyance route for the stormwater entering the site through the Route 96B pipe. A flood conveyance route may be needed for other areas of the site depending on the provided pipe capacities. 3.A rain garden detail is provided on the plans but not noted in the narrative or called out on any of the site plans. Please remove or provide clarification on where this will be located. 4.Please include the Town of Ithaca's inspection requirements noted in Chapter 228 of the Town of Ithaca Code. 5.All storage chambers not designed to meet minimum clearance to groundwater or bedrock (2’-0” min. separation) shall include an impermeable liner in accordance with the Stormwater Design Manual. The impermeable liner shall be designed and installed by a qualified professional in accordance with Note 11 on Page 1 of the ADS Drawing Set. 6.Calculating full-flow capacity of individual storm sewer pipes using Manning's equation is an overestimate of the hydraulic capacity of the overall conveyance system. A hydraulic analysis of the storm sewer network that accounts for energy losses at structures, inlet and outlet control, tailwater effects, and other hydraulic constraints must be submitted to adequately assess system performance under the design storms. 7.The Applicant should submit justification for the value of 13,336 CF of RRv provided as stated in the Water Quality Treatment section of the SWPPP body, preferably through use of the GI Worksheets. The GI Worksheets currently submitted do not support this claim. 8.Please clarify the total area of new impervious. Different values are provided in the Water Quality Treatment Section of the SWPPP body, Question 22 of the eNOI, and the modeling. 9.Please explain how total disturbed area will remain under 5 acres for the duration of construction as indicated by the response to Question 23 of the eNOI. Given the site area is approximately 8.3 acres, the provided construction sequence does not indicate disturbance phasing that would support this claim. 10.Please revise the drainage maps to conform to the requirements of Appendix E of the Stormwater Management Design Manual. Most critically, please provide existing contours on Sheets D1 & D2 as well as proposed contours and all storm infrastructure on Sheet D2. As currently shown, the drainage areas and Tc Paths cannot be evaluated. 11.Drainage Areas PDA-1 and PDA-3 contain significant portions of new impervious area that is not captured or treated by any SMP. For new development, WQv must be addressed for all proposed new impervious. Justin McNeal, Director of Engineering August 10, 2026 Page 4 2071015 Southworks SWPPP Review 081026 (ID 3667934).docx 12.The proposed model routing should be refined to more accurately represent the proposed storm conveyance. At a minimum, Drainage Areas 2-A and 2-B should be combined such that the flow at this outfall may be evaluated. 13.Please review the inverts provided for Pond 4P as they do not appear to match the ADS drawings. 14.All GI worksheets must be updated to reflect the current state of the Site Plans. a.The swale depicted on the Site Plans does not meet the requirements of a Dry Swale. This worksheet should be removed and no treatment credit should be taken. b.Minimum RRv is calculated based off new impervious area. Please update the Step 4 worksheet to provide only the acreage of new impervious. c.The Site Plans do not indicate the location or drainage patterns to the 109 tree plantings proposed for an area reduction. A tree planting detail that conforms with the Stormwater Design Manual must be included. The area that is directly tributary to the tree plantings must be delineated; this is the only area eligible for reduction. The 5.33 acres currently shown to be tributary to the tree plantings appears unlikely based on the Site Plans. d.The Flow Based Alternative Practices (ADS Arcadia Hydrodynamic Separators) shown on the Site Plans are not on the NYSDEC list for Verified Proprietary Practices for New Development and are thus ineligible to provide WQv treatment for this project. Please reference the NYSDEC Stormwater Toolbox for the list of proprietary practices approved for new development. At this time, we recommend that the Applicant address the engineering review comments presented herein, and submit revised documents/additional information to the Town for further review. Please contact me if you have any questions or comments regarding our engineering review of this project. Sincerely, BARTON & LOGUIDICE, D.P.C. Charles A. White, P.E., LEED AP Vice President MJK/jjb cc: C.J. Randall, Director of Planning, Town of Ithaca (email only) 10/26/26,11:30AM Sent Items -Marty Moseley -Outlook ar Outlook Re:Beacon The Woods Review From Marty Moseley <MMoseley@townithacany.gov> Date Mon 10/26/2026 10:18 AM To Steve Peet <speet@swbr.com>;James Gensel <james.gensel@faganengineers.com> Cc Brett Gawronski <bgawronski@swbr.com>;CJ Randall <cjrandall@townithacany.gov>;Chris Balestra <CBalestra@townithacany.gov> Q]2 attachments (3 MB) 2026-10-26_Architect Confirmation.pdf;Woods Fire Flow Report 10-13-2026.pdf; Good Morning, The fire flow documentation submitted by SWBR and Fagan Engineers has been reviewed,and the proposed fire flow appears to comply with the requirements of Appendix B of the 2025 Fire Code of New York State.Copies of the approved documents,bearing the approval stamp,are attached to this email. Thank you, Marty Moseley Director of Code Enforcement Town of Ithaca 215 N Tioga Street Ithaca,New York 14850 P:607-273-1783 F:607-273-1704 www.townithacany.gov The information contained in this e-mail message is confidential and intended onlyfor the individual or entity to whom or which it is addressed.If the reader of this message is not the intended recipient,you are hereby notified that any dissemination,distribution,alteration,or copying of this e-mail message is strictly prohibited.If you have received this e-mail in error,please immediately notify the sender by telephone (607-273-1783),or by return e- mail,and delete this e-mail message. From:Steve Peet <speet@swbr.com> Sent:Monday,October 26,2026 7:44 AM To:Marty Moseley <MMoseley@townithacany.gov>;James Gensel <james.gensel@faganengineers.com> Cc:Brett Gawronski <bgawronski@swbr.com>;CJ Randall <cjrandall@townithacany.gov> Subject:RE:Beacon The Woods Review Good morning,Marty, Please see the attached letter and let us know if you need anything else. https://outlook.office.com/mail/sentitems/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AmTpWEYvrsE26uMR%2BCWxJpgAIZmQkbwAA7n...1/7 10/26/26,11:27AM Sent Items -Marty Moseley -Outlook ar Outlook Re:Beacon The Woods Review From Marty Moseley <MMoseley@townithacany.gov> Date Mon 10/26/2026 10:19 AM To James Gensel <james.gensel@faganengineers.com> Cc CJ Randall <cjrandall@townithacany.gov>;Brett Gawronski <bgawronski@swbr.com>;Steve Peet <speet@swbr.com> Q]2 attachments (1 MB) 11104-008 CODE FP100 10-26-2026.pdf;The Woods -Mountable Curb.pdf; Jamie, The fire apparatus access road documentation submitted by SWBR and Fagan Engineers has been reviewed,and the proposed fire apparatus access plan appears to comply with the requirements of the 2025 Fire Code of New York State.Copies of the approved documents,bearing the approval stamp,are attached to this email. Thank you, Marty Moseley Director of Code Enforcement Town of Ithaca 215 N Tioga Street Ithaca,New York 14850 P:607-273-1783 F:607-273-1704 www.townithacany.gov The information contained in this e-mail message is confidential and intended onlyfor the individual or entity to whom or which it is addressed.If the reader of this message is not the intended recipient,you are hereby notified that any dissemination,distribution,alteration,or copying of this e-mail message is strictly prohibited.If you have received this e-mail in error,please immediately notify the sender by telephone (607-273-1783),or by return e- mail,and delete this e-mail message. From:James Gensel <james.gensel@faganengineers.com> Sent:Monday,October 26,2026 10:01AM To:Marty Moseley <MMoseley@townithacany.gov> Cc:CJ Randall <cjrandall@townithacany.gov>;Brett Gawronski <bgawronski@swbr.com>;Steve Peet <speet@swbr.com> Subject:RE:Beacon The Woods Review I meant to include the revised Raised Crosswalk Section. https://outlook.office.com/mail/sentitems/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AmTpWEYvrsE26uMR%2BCWxJpgAIZmRFtgAA7na...1/5 MEETING OF THE ITHACA TOWN BOARD October 5, 2026 TB Resolution 2026 -_063: Acceptance of the Concept and Locations of Public Utilities (Water & Sewer) and Infrastructure (Roads & Streetlights) to be Dedicated to the Town in Conjunction with the SouthWorks Woods Project Whereas, the Town of Ithaca Planning Board has granted Preliminary Site Plan and Preliminary Subdivision Approval for the SouthWorks Woods project located off NYS Route 96B/Danby Road, in Town of Ithaca Planned Development Zone No.16. The SouthWorks Woods mixed- income residential project comprises a 6.09-acre portion of the overall SouthWorks (formerly Chain Works District) Redevelopment Project and involves the construction of eight residential buildings with a total of 130 mixed-income apartments, including a community room, lounge, fitness center, offices, maintenance areas, and storage. The Woods project also involves the development of internal roads and infrastructure, a playground, sidewalks and path connections, stormwater facilities, landscaping, outdoor lighting, parking, and other site improvements; and Whereas, the project Owner, Shift Chainworks LLC, and Applicant, Beacon Communities, LLC will extend existing potable water and sewer to the project; and will construct a road from the project to Danby Road (Drive V) that will include streetlights to be designed and installed in accordance with the Town’s Streetlight Policy; and Whereas, the Owner/Applicants have requested and proposed dedication to the Town of Ithaca the water and sewer extensions, which will require easements, along with Drive V and its associated infrastructure; and Whereas, all proposed dedications are shown on the drawing titled “Town Dedication Exhibit” (Sheet C900), dated 07/27/2026, prepared by SWBR; and Whereas, the Public Works Committee at their meetings on July 21, 2026 and September 15, 2026, respectively, reviewed the plans for the above improvements that are proposed to be dedicated to the Town, and have found them generally acceptable, and recommended acceptance by the Town Board; now, therefore be it Resolved, that the Town Board hereby accepts the concept and location of the above-described improvements, subject to the following conditions: 1. That the Final Subdivision Approval be granted by the Town of Ithaca Planning Board, prior to the Town Board accepting the conveyance of said improvements and easements; and 2. That the specific surveyed locations, deeds, and abstracts showing good and marketable title for the proposed improvements and easements be submitted in a form acceptable to the Attorney for the Town, the Director of Public Works, the Director of Engineering, and the Director of Planning, prior to dedication and acceptance of the improvements by the Town Board; and 2 3. The proposed improvements to be dedicated to the Town are completed to the satisfaction of the Director of Engineering, prior to the acceptance of the improvements by the Town Board, which acceptance is in the Town Board’s discretion. Moved: Susie Gutenberger Seconded: Rich DePaolo Vote: ayes – Gutenberger, DePaolo, Sinton, Levine, and Wright NYSEG NEW YORK STATE ELECTRIC & GAS CORP. Charter Communications Confidential © 2024 Charter Communications Inc. All rights reserved. 1 OMMUNICATIONS NETWORK AND SERVICE AGREEMENT (Bulk) The pages that precede the signature blocks below are referred to as the “Property-Specific Terms”. The Property-Specific Terms together with the Attachments listed below constitute the Communications Network and Service Agreement (“Agreement”), which is entered into by the following customer (“Owner”) and service provider (“Operator”) on the “Effective Date” set forth under Operator’s signature below. Each of Owner and Operator may be referred to in the Agreement as a “party”, and, together, as the “parties”. Capitalized terms used in these Property-Specific Terms without definition will have the meanings assigned to them in the applicable Attachment. Owner Name and Billing/Legal Notice Addresses: Operator Name and Legal Notice Addresses: Southworks Affordable LLC Spectrum Northeast, LLC Billing Office and Notice Address: Two Center Plaza, Ste 700 Boston, MA 02108 Attn: Daniel Bellgraph Telephone: 716-704-3699 Email: dbellgraph@beaconcommunitiesllc.com All Notices Also Sent to (if applicable): Two Center Plaza, Ste 700, Boston, MA 02108 Attn: Nicole R. Clement, General Counsel Telephone: (617) 574-1100 Email: nclement@beaconcommunitiesllc.com All Notices Sent to Office at: 12405 Powerscourt Drive St. Louis, MO 63131 Attn: Legal Department – Operations All Notices Also Sent to Office at: 6399 South Fiddler’s Green Circle, Sixth Floor Greenwood Village, CO 80111 Attn: Legal Department – MDU All Notices Also Sent to: DL-SCS-Legal@charter.com Property Information: Owner’s Property Management Company Information (if applicable): Property Address: Southworks - The Woods & Gateway 620 S Aurora St Ithaca, NY 14850 Corporate Office Address: Property Type: Apartment Number of Units: 230 On-Site Contact Name: Contact Name: On-Site Telephone: Contact Telephone: On-Site Email: Contact Email: Owner owns (or is building), or, in the case of an owner’s association, is the authorized representative for the multi-unit property referred to above (including the underlying land and all improvements thereon, the “Property”). Owner and Operator desire that Operator install (as necessary) and operate the System to make the Services available to Users in accordance with the terms of the Agreement. Owner and Operator agree as follows: 1. Term. The Agreement commences on the Effective Date and may be terminated by either party at any time after the end of the Service Commitment Period by providing a Termination Notice (defined hereafter) (the “Term”). 2. Service Commitment Period. The “Service Commitment Period” is 60 months and commences on the later of the following two dates: (a) the date that System installation or upgrading is complete (or the Effective Date if Operator currently serves the Property and no System modifications are required); or (b) if Owner is purchasing any Bulk Service under the Agreement, the date that Operator first begins billing Owner the full (undiscounted) Bulk Service Fee to all Units . 3. Termination Notice. In addition to any early termination rights contained elsewhere in the Agreement, either party may terminate the Agreement after the end of the Service Commitment Period by providing the other with a termination notice (the “Termination Notice”). The Termination Notice must provide at least 90 days advance notice of termination. 4. Service Activation Date and Commencement of Billing. Operator will begin providing and billing for Services (to Users for individually-billed Services and/or to Owner for Services provided on a bulk-billed basis) on the Service Activation Date. The “Service Activation Date” is: Docusign Envelope ID: 23E987CD-1C35-82F1-83C5-93CA12B4F7D3 2 ● upon (a) Operator installation of the Spectrum Ready equipment within 180 days after the Effective Date and (b) User activation of the Spectrum Ready Service to such Unit. 5. Special Terms. The following special terms supplement and/or supersede, as the case may be and as the context requires, any contrary terms in the Attachments. 5.1 Bulk Service Fee. The “Bulk Service Fee” is $20.00 per Unit x 230 Units = $4,600.00 per month (plus applicable taxes and fees) for the Services provided on a bulk-billed basis as described below. Operator may increase the Bulk Service Fee by 3% each year beginning the later of the (a) January following the start of the Service Commitment Period, unless the Service Commitment Period starts on the Effective Date and the Effective Date occurs in October, November, or December, in which case Operator shall not increase the Bulk Service Fee until January of the following calendar year or (b) January, 2028 as further specified in the applicable Bulk Service Attachment(s). 5.2 Bulk Service Ramp-Up Period. Notwithstanding any contrary provision in these Property-Specific Terms or any Attachment, the Bulk Service Fee will become payable with respect to each Unit, on the date that (i) a User activates and (ii) Operator begins providing the Bulk Service to such Unit, provided that, Operator shall begin billing Owner the full Bulk Service Fee as described in the Bulk Service Fee section above on the date that is the earlier of (a) the date that Users have activated and Operator begins providing the Bulk Service to all Units at the Property or (b) twelve (12) months after the date Operator begins providing the Bulk Service to the first Unit at the Property. 5.3 Bulk Internet Service. Owner is purchasing from Operator on a bulk-billed basis (a) the Service currently known as Spectrum Ready Fiber Advantage (100 Mbps x 100 Mbps) (“Spectrum Ready” for the purposes of the Bulk Internet Services Attachment) including the following common common areas: Woods Community Room; Woods Business Center; Woods Fitness Center; Woods Laundry; Woods Maintenance Shop; Woods Lobby C1; Woods Lobby C2; Woods Lobby C3; Gateway Community Room; Gateway Fitness Center; Gateway Lobby; Gateway Laundry at the following 100 Mbps x 100 Mbps and (b) the CPE listed in the Section below, if any (collectively, the “Bulk Internet Service”). The Bulk Internet Service will be provided to the appropriately installed CPE provided by Operator. Upgrades to the Bulk Internet Service, if available, will be provided per Operator’s then-current terms and conditions. Concurrently with signing the Agreement, Owner shall provide Operator with a complete list of addresses of all Units to receive the Bulk Internet Service. Owner acknowledges receipt of the Spectrum Ready Equipment Placement Wiring Guidelines that need to be implemented by Owner and/or Owner’s contractor so that Operator can deliver Services. 5.4 Bulk Internet Service CPE. The Bulk Service Fee includes Owner Responsible (Spectrum Ready) • Operator will install one always on optical network unit (“ONU”) and one wireless router per Unit located in either a media panel or wall mounted in the Unit. The CPE shall remain in the Unit until the end of the Term. Each User is required to activate and deactivate this CPE upon move in or move out and to maintain an active account with Operator while a User at the Property. Operator provides WiFi connectivity only through Operator- provided CPE, specifically the ONU and wireless router provided to the Unit in this Section. Connection of third-party CPE is not supported and risks compromise both network and device security and interference with other network-enabled functionality, for which Operator shall not be responsible. Owner is responsible for returning the CPE to Operator. Operator, at its sole cost and expense, shall be responsible for repairing or replacing lost, stolen or damaged CPE, except for lost, stolen or damaged CPE resulting from Owner’s negligence or intentional misconduct. Upgrades to the CPE, if available, will be provided per Operator’s then-current terms and conditions. 5.5 Capital Investment by Operator. Operator is making the following capital investment at the Property, which is subject to the Capital Investment Return Attachment: $355,804.09 6. Attachments. The following Attachments are incorporated into and made a part of the Agreement by this reference. (Operator) System Installation and Services Attachment Greenfield(CCG) Non-Exclusive Marketing Rights Attachment Bulk Internet Attachment Spectrum Ready Non-Exclusive Marketing Rights Attachment (CCG) Bulk Internet Attachment (CCG) Capital Investment Return Attachment (CCG) 7. Signatures; Authority. The individuals signing below represent to Owner and Operator that they are duly authorized to execute and deliver the Agreement on behalf of the entity for which they have signed. Electronic signatures or exact copies (such as facsimiles) of original signatures will have the same force and effect as original signatures. Docusign Envelope ID: 23E987CD-1C35-82F1-83C5-93CA12B4F7D3 3 OWNER OPERATOR Southworks Affordable LLC Spectrum Northeast, LLC By: Southworks Affordable MM LLC, its Managing Member By: Beacon Communities Corp., its Managing Member By: Charter Communications, Inc., its Manager Signature Signature Dara Kovel Ben Topor Printed Name Printed Name Chief Executive Officer VP, Spectrum Community Solutions Title Title Effective Date: Docusign Envelope ID: 23E987CD-1C35-82F1-83C5-93CA12B4F7D3 9/29/2026 P.O. Box 418, Ithaca, New York 14851 607.793.9578 The Center for Community Transportation - Ithaca Carshare, Bike Walk Tompkins & Ithaca Bikeshare October 12th, 2026 Daniel Bellgraph Senior Development Director Beacon Communities LLC 2 Center Plaza, Suite 700 Boston, MA 02108 RE: CCT Bikeshare and Carshare Services Dear Mr. Bellgraph: The Center for Community Transportation (CCT) is pleased to provide this letter confirming our commitment to support transportation access for residents of the proposed Southworks affordable housing community in Ithaca, New York. This letter is intended to demonstrate CCT’s commitment to partnering with Beacon Communities LLC (Beacon) to provide one-site bikeshare and carshare access at your community. Beacon has expressed a commitment to provide capital investment to initiate the project for the purpose of purchasing 1 EV for Carshare and 20 e-bikes for Bikeshare. As the local provider of shared mobility services, CCT is committed to partnering to expand transportation options available to residents of the community. CCT believes that access to shared mobility services can reduce transportation costs, decrease dependence on private vehicle ownership, and improve access to employment, education, healthcare, and community resources. We are enthusiastic about the opportunity to partner with your team to provide these transportation services. If you have any questions or require additional information, please do not hesitate to contact us. Sincerely, Laura Vineyard Executive Director of CCT Tompkins ConsolidatedArea Transit, Inc.737 Willow AvenueIthaca, NY 14850-3214Phone: 607 277-9388TDD/TTY: 607 277-9766Fax: 607 277-9551E-mail: tcat@tcatmail.comWeb: www.tcatbus.com Memo: Letter of support for Southworks “The Woods” development Prepared by: Trevor Jensen; Planning & Scheduling Manager; TCAT, Inc. I am writing on behalf of Tompkins Consolidated Area Transit, Inc. to express support for the low-income housing development, “The Woods”, proposed to be developed on the Southworks site. At present, we are committed to serving “The Woods” in some capacity from NY-96B (Aurora Street) initially using our existing route network. These service adjustments would likely see the addition of at least one pair of bus stops on the state road to better site route 65 boarding and alighting points with “The Woods”. Looking forward, TCAT and “The Woods” representatives will continue discussing the possibility and specifics of bus circulation, bus stop placement, stop amenities, and bus-friendly site planning. While nothing concrete has been mutually agreed upon, these good-faith discussions are regular and both parties have expressed interest in finding a way to introduce service into the complex in a safe and productive manner. These sorts of developments are where public transit service does well. Low-income housing and a lower parking-space-to-housing ratio are recognized industry-wide as prompting higher rates of transit ridership. Examples of this trend in practice can be found across TCAT’s transit network, including the housing-dense but parking-sparse Collegetown neighborhood and numerous low-income apartment complexes located along TCAT’s route 14. Feedback from riders in these aforementioned communities repeatedly cite how the existence of bus service improves their quality of life and access to core life functions and recreation. I have no reason to believe these trends won’t be reflected by future prospective residents of “The Woods” as well. We are hopeful to see this project, and others like around the developers’ site and the broader town, proceed. Thank you for your consideration, Trevor Jensen Site Plan Drawings ForBeacon CommunitiesThe Woods At SouthWorks Town of Ithaca, Tompkins (Co), New York EXISTING CONDITIONSC200 PROJECT LOCATION August 14, 2024 LOCATION MAP Beacon Communities 505 Ellicott Street, Suite 44 Buffalo, NY 14203 (716) 704-3699 PREPARED FOR: NO.TITLE INDEX OF DRAWINGS C100 SITE PLANC300 C400 C500 GRADING PLAN UTILITY PLANGENERAL NOTES SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG TITLE SHEET JBG RSN C000 BEACON COMMUNITIES -THE WOODS Beacon SouthWorks The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLANC301 SITE PLANC302 SITE PLANC303 SITE PLANC304 SITE PLANC305 GRADING PLANC401 GRADING PLANC402 GRADING PLANC403 GRADING PLANC404 GRADING PLANC405 NO.TITLE C600 E & S PLAN C601 E & S DETAILS CIVIL DETAILSC700 ROADWAY PROFILES C701 C900 SEWER PROFILES C901 CIVIL DETAILS C702 STORM CHAMBER DETAILSC800 STORM CHAMBER DETAILSC801 CIVIL DETAILS UTILITY PLANC501 UTILITY PLANC502 UTILITY PLANC503 UTILITY PLANC504 UTILITY PLANC505 Last Revised: October 14, 2026 SEGMENTAL WALL DETAILSC406 WALL LOCATIONSC4071 1 ADDENDUM #1 ( 6/29/2026 ) STORM CHAMBER DETAILSC802 2 ADDENDUM #2 ( 7/27/2026 ) 2 NOTE FROM PLANNING DEPT STAFF: This PDF contains two sets of plans: the civil drawings (first set- with final subdivision plat at the end), and the architectural/landscape drawings, with cladding changes that were approved by the board on October 6, 2026). Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) LEGEND SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GENERAL NOTES C100 I.GENERAL 1.BASE MAPPING PREPARED BY FAGAN ENGINEERS & LAND SURVEYORS, PC. 2. THE PROJECT SITE DOES NOT CONTAIN FEMA DELINEATED FLOODWAYS OR FLOODPLAINS. 3. THE PROJECT SITE DOES NOT CONTAIN FEDERALLY REGULATED WETLANDS ON-SITE, NOR ANY NWIMAPPED WETLANDS. 4. MUNICIPAL WATER SERVICE PROVIDED BY CITY OF ITHACA. 5. PUBLIC SEWER SERVICE PROVIDED BY CITY OF ITHACA. 6. PRIOR TO COMMENCEMENT OF ANY GROUND-INTRUSIVE WORK, THE CONTRACTOR SHALL OBTAIN ANDREVIEW THE CURRENT NYSDEC-APPROVED INTERIM SITE MANAGEMENT PLAN (OCTOBER 2022) AND ALLSUBSEQUENT AMENDMENTS. COMPLIANCE WITH THE ISMP IS MANDATORY AND SHALL BE CONSIDEREDINCIDENTAL TO THE WORK UNLESS OTHERWISE NOTED. 7. THE CONTRACTOR'S SURVEYOR SHALL CHECK ALL HORIZONTAL AND VERTICAL CONTROL PRIOR TOCONSTRUCTION. ANY DISCREPANCIES SHALL PROMPTLY BE BROUGHT TO THE ATTENTION OF THEENGINEER. 8. THE CONTRACTOR SHALL KEEP HIS OPERATIONS WITHIN THE PROJECT LIMITS OF DISTURBANCE. 9. ALL DAMAGE TO PRIVATE PROPERTY OR UTILITIES (UNDER OR ABOVE GROUND) SHALL BE REPORTED TOTHE OWNER OF RECORD AT ONCE. 10. CONSTRUCTION ALONG CITY, TOWN, AND STATE ROADS SHALL CONFORM TO SPECIFICATIONS LISTED ONPERMITS ISSUED BY THE APPROPRIATE AGENCIES. 11. SAFE AND CONTINUOUS THROUGH TRAFFIC, INGRESS AND EGRESS FOR ADJACENT OWNER DRIVEWAYS,SERVICE ROADS, PUBLIC STREETS, AND SIDEWALKS SHALL BE MAINTAINED THROUGHOUT THE PERIOD OFCONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE THE LOCAL MUNICIPALITY AND NEWYORK STATE D.O.T. AN ACCEPTABLE MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR CONSTRUCTION IN/ALONG/NEAR TOWN AND STATE ROADWAYS. 12.HIGHWAY DRAINAGE, SIDE STREET DRAINAGE, SWALES, DITCHES, AND OTHER EXISTING DRAINAGEFACILITIES SHALL BE PROTECTED AND MAINTAINED IN ADEQUATE WORKING CONDITION DURINGCONSTRUCTION. THE CONTRACTOR SHALL RESTORE ANY OF SUCH FACILITIES THAT ARE DAMAGED DURINGCONSTRUCTION TO THE SATISFACTION OF THE OWNER OF THE INFRASTRUCTURE. 13. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS. 14. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS NOT TO DISTURB AND/OR DAMAGEPROPERTY CORNERS (IRON PINS, HUBS, ECT.). ANY DISTURBED OR DAMAGED PROPERTY CORNERS SHALLBE REPLACED BY THE CONTRACTOR'S LICENSED LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. 15. ALL EXISTING UTILITIES SUCH AS ELECTRIC, GAS MAINS, AND TELEPHONE SHALL BE STAKED OUT BY THEUTILITY COMPANY PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CALL NEW YORK STATE DIG SAFELY(1-800-962-7962) PRIOR TO CONSTRUCTION AND NOTIFY UTILITY COMPANIES FOR STAKEOUT. 16. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES. IF UTILITIES ARE DAMAGED DURINGCONSTRUCTION, THE CONTRACTOR SHALL REPAIR THESE TO THE SATISFACTION OF THE OWNER'SREPRESENTATIVE. 17.EXISTING WATERMAIN LOCATIONS AND DEPTHS SHOWN ARE APPROXIMATE. EXISTING INDIVIDUALWATER SERVICES ARE NOT SHOWN ON DRAWINGS. 18. THE CONTRACTOR SHALL NOTIFY OWNER OF ALL IMPACTED MUNICIPAL WATER SYSTEMS, THE RESIDENTENGINEER AND THE FIRE DEPARTMENT 48 HOURS IN ADVANCE PRIOR TO CONSTRUCTION ON ANDINTERRUPTION OF SERVICE OF ANY WATERMAINS. THE CONTRACTOR SHALL PROTECT ALL WATER SERVICELINES AND PRIVATE WELLS. THE CONTRACTOR SHALL HAVE AMPLE SUPPLY OF REPAIR CLAMPS,COUPLINGS, AND PIPING FOR EMERGENCY REPAIRS. 19.IN AREAS WHERE THE CONTRACTOR IS EXCAVATING NEAR ANY UTILITY POLES, THE CONTRACTOR SHALLBRACE AND/OR HOLD IN PLACE UNTIL EXCAVATED AREA IS BACKFILLED AND COMPACTED. 20. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF ALL REMOVED VEGETATION, SOIL ANDOTHER DISTURBED DEBRIS. 21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING APPROPRIATEEROSION CONTROL MEASURES TO PREVENT SEDIMENT FROM MIGRATING OFF SITE, TO STORM SEWERS,OR ADJACENT ROADWAYS IN ACCORDANCE WITH THE APPROVED SWPPP. 22. ALL EXCAVATIONS SHALL PROVIDE PROTECTION TO THE WORK FORCE AS PER THE CURRENT O.S.H.A.REQUIREMENTS, AS WELL AS ANY STATE AGENCY REQUIREMENTS. 23. THE CONTRACTOR SHALL OBSERVE O.S.H.A. AND OTHER APPLICABLE SAFETY REQUIREMENTS. THECONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CONSTRUCTION SAFETY AT ALL TIMES. 24. CONTRACTOR SHALL REVIEW SOIL BORING AND TESTING REPORTS TO DETERMINE SPECIAL CONDITIONSREQUIRED FOR CONSTRUCTION AND SUITABILITY OF ON-SITE SOILS FOR FILL MATERIAL AND FORINFORMATION ON GROUNDWATER DEPTHS. 25. ALL DISTURBED AREAS SHALL BE SEEDED ACCORDING TO THE REQUIREMENTS SPECIFIED ON SHEET C4.7AND THE EROSION AND SEDIMENTATION CONTROL PLANS. 26. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE EROSION AND SEDIMENT CONTROLFEATURES PRIOR TO BULK EARTHMOVING ACTIVITIES. 27. ALL LIGHT POLES, LIGHT FIXTURES AND ASSOCIATED CONDUIT SHALL BE PROVIDED AND INSTALLED UNDERA SEPARATE CONTRACT. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THECONTRACTOR RESPONSIBLE FOR THIS WORK AND PROVIDE THE NECESSARY EXCAVATION AND BACKFILLFOR INSTALLATION OF THE TRENCHING. THE SITE CONTRACTOR SHALL ALSO BE RESPONSIBLE FORSUPPLYING AND INSTALLING THE POLE BASES FOR ALL EXTERIOR LIGHTING FIXTURES. II.SANITARY SEWERS 1. SANITARY SEWERS, MANHOLES, CLEANOUTS, AND OTHER APPURTENANCES SHALL BE CONSTRUCTED, ANDTESTED IN ACCORDANCE WITH LOCAL MUNICIPAL SPECIFICATIONS. 2. SANITARY SEWERS SHALL BE SDR-35 PVC PIPE CONFORMING TO ASTM D-3034, WITH RUBBER GASKETEDJOINTS CONFORMING TO ASTM D-3212 AND ASTM F-477. 3. TESTED SANITARY SEWERS SHALL HAVE AN INFILTRATION RATE OF LESS THAN 100 GALLONS PER MILE PERINCH DIAMETER OF PIPE PER DAY. 4. SANITARY SEWERS SHALL BE LAID WITH A STRAIGHT ALIGNMENT BETWEEN MANHOLES. AS PER THERECOMMENDED STANDARDS FOR WASTEWATER FACILITIES, 2014 EDITION, SECTION 33.85 DEFLECTIONTEST. THE TEST SHALL BE CONDUCTED AFTER THE FINAL BACKFILL HAS BEEN IN PLACE 30 DAYS. A RIGIDBALL OR MANDREL USED FOR THE DEFLECTION TEST SHALL HAVE A DIAMETER NOT LESS THAN 95% OF THEBASE INSIDE DIAMETER OR AVERAGE INSIDE DIAMETER OF THE PIPE DEPENDING ON WHICH IS SPECIFIEDIN THE ASTM SPECIFICATION, INCLUDING THE APPENDIX, TO WHICH THE PIPE IS MANUFACTURED. 5. THE CONTRACTOR SHALL CONCRETE ENCASE THE SANITARY SEWER LINE OR FORCEMAIN AT ALL POINTSWHERE VERTICAL SEPARATION IS LESS THAN 18' AT CROSSINGS WITH STORM SEWER LINES. 6. ANY POLYETHYLENE FORCEMAIN SHALL BE TYPE DR-11 WITH A PRESSURE RATING OF 128 PSI. III.STORM SEWERS 1. STORM SEWERS, MANHOLES, INLETS, DITCHES, AND OTHER SYSTEM COMPONENTS SHALL BECONSTRUCTED IN ACCORDANCE WITH MUNICIPAL SPECIFICATIONS. 2. STORM SEWERS SHALL BE ADVANCED DRAINAGE SYSTEM'S ADS N-12 CORRUGATED, SMOOTH INTERIOR, HIGH DENSITY POLYETHYLENE (HDPE) PIPE. ADS N-12 STORM SEWER SHALL BE INSTALLED IN STRICTACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND ASTM D 2321. 3. ALL FLARED-END SECTIONS SHALL BE GALVANIZED METAL END SECTIONS UNLESS OTHERWISE SPECIFIED. 4. RIPRAP PADS AT STORM SEWER DISCHARGES SHALL CONSIST OF NYSDOT LIGHT STONE FILLING UNLESSOTHERWISE NOTED ON THE CONTRACT DRAWINGS. 5. CROWN OF MULTIPLE PROPOSED STORM SEWER PIPES IS AT OR NEAR THE TOP OF THE SUBGRADE.CONTRACTOR SHALL PROTECT INTEGRITY OF ALL INSTALLED STORM SEWERS UNTIL SUFFICIENT COVER ISPLACED ON SAID PIPING. IV.ACCESS ROADS AND PARKING AREA 1. LIMING, FERTILIZING, SEEDING, AND MULCHING OF DISTURBED AREAS SHALL BE CONSISTENT WITH THEAPPROVED SWPPP. 2. SIGNAGE, PAVEMENT MARKINGS AND OTHER TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE TOTHE NYSDOT'S MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 3. ROADWAY EMBANKMENT: OBTAIN SUBGRADE ELEVATION BY COMPACTING ON-SITE SOILS IN MAXIMUM8 INCH HORIZONTAL LIFTS. USE ON-SITE SOILS AS EMBANKMENT FILL THAT DO NOT CONTAIN ORGANIC ORDELETERIOUS MATERIALS, ARE NOT EXCESSIVELY WET OR FROZEN, OR THAT HAS COBBLES IN EXCESS OF 6INCHES ALONG THE LONGEST DIMENSION. IF SUITABLE ON-SITE SOILS ARE NOT AVAILABLE, A WELLGRADED BANK-RUN APPROVED BY THE ENGINEER SHALL BE IMPORTED. THE BANK-RUN GRAVEL SHALL BESOUND, DURABLE, FREE OF ORGANIC OR OTHER DELETERIOUS MATERIAL, WITH NO MORE THAN 10PERCENT BY WEIGHT FINER THAN NO. 200 SIEVE. ADJUST THE MOISTURE CONTENT OF THE EMBANKMENTFILL (WHETHER ON-SITE OR OTHERWISE) TO WITHIN 2% OF OPTIMUM BY EITHER AIR DRYING ORTHROUGH THE ADDITION OF WATER PRIOR TO COMPACTION. SPREAD WET FILL IN AN 8 INCH LOOSE LIFTAND DISC TO EXPEDITE AIR DRYING. 4. ROADWAY EXCAVATION: EXCAVATE SUBSOIL TO THE DEPTH REQUIRED TO PROVIDE A UNIFORM SURFACEOF SOLID UNDISTURBED GROUND FOR THE PLACEMENT OF AGGREGATE SUBBASE COURSE. 5. FILL, SUBGRADE, AND SUBBASE SHALL BE COMPACTED TO OR ABOVE 95 PERCENT 'MODIFIED PROCTOR'DENSITY WITH A SMOOTH DRUM ROLLER, OR OTHER SUFFICIENT COMPACTION EQUIPMENT, WEIGHINGAT LEAST 7 TONS. OPERATE COMPACTOR IN THE STATIC MODE FOR COMPACTION OF SILTY SOILS AND INTHE VIBRATORY MODE FOR ALL OTHER MATERIALS. 6. SUBBASE MATERIAL SHALL BE PLACED IN MAXIMUM 6 INCH AND MINIMUM 3 INCH HORIZONTAL LIFTS.MAINTAIN OPTIMUM MOISTURE CONTENT FOR COMPACTION. 7. WHEREVER GROUNDWATER SEEPAGE IS ENCOUNTERED, INSTALL UNDERDRAINS BELOW THE SUBBASE.LAP UNDERDRAIN FABRIC WITH SUBBASE FABRIC. 8. BELOW THE SUBBASE, PROVIDE A SOIL STABILIZATION GEOTEXTILE FABRIC, SUBJECT TO THE ACCEPTANCEOF THE HIGHWAY SUPERINTENDENT, WITH THE FOLLOWING CERTIFIABLE PROPERTY VALUES: MINIMUMPUNCTURE STRENGTH OF 125 LBS., MINIMUM MULLEN BURST STRENGTH OF 430 PSI, MINIMUM GRABTENSILE STRENGTH OF 220 LBS., AND MAXIMUM APPARENT OPENING SIZE OF 40-80 SIEVE. V.PUBLIC WATER 1. WATERMAINS, WATER SERVICES, FIRE HYDRANTS, AND OTHER APPURTENANCES SHALL BE CONSTRUCTED,TESTED, AND DISINFECTED IN ACCORDANCE WITH THE OWNER'S SPECIFICATIONS FOR WATERMAINEXTENSIONS. WATERMAIN AND APPURTENANCE MATERIALS AND INSTALLATION SHALL COMPLY WITHNYSDOH STANDARDS AND AWWA STANDARD C600-93. 2. DUCTILE IRON PIPE SHALL BE CLASS 52, AND SHALL CONFORM IN ALL ASPECTS TO AWWA C-151. FITTINGSHALL CONFORM IN ALL ASPECTS TO AWWA C-11- OR TO COMPACT FITTINGS AWWA C-153. ALL SHALL BEFURNISHED WITH CEMENT MORTAR LINING IN CONFORMANCE WITH AWWA C-104. PIPES SHALL HAVEGASKETED, PUSH-ON, JOINTS CONFORMING TO AWWA C-111 3. THE MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN WATER AND ANY TYPE OF SEWER UTILITIES (SANITARY OR STORM) SHALL BE 10 FEET, MEASURED FROM OUTSIDE WALL TO OUTSIDE WALL OF THEMAINS. THE MINIMUM VERTICAL SEPARATION DISTANCE AT THE POINT OF CROSSING SHALL BE 18 INCHES,ALSO MEASURED FROM OUTSIDE WALL TO OUTSIDE WALL. 4. WATERMAIN SHALL BE INSTALLED AT A CONTINUOUS UPWARD GRADE TO A POINT OF AIR RELEASE.POINTS OF AIR RELEASE INCLUDE WATER INCLUDE WATER SERVICES, FIRE HYDRANTS, AND BLOW-OFFVALVES. 5. SAMPLING REQUIREMENTS FOR THE DISINFECTION OF WATERMAINS SHALL BE CONSISTENT WITH AWWASTANDARD C651-92, SECTION 5.2 CONTINUOUS FEED METHOD, DISINFECTING WATERMAINS. AFTER FINALFLUSHING AND BEFORE THE NEW WATERMAIN IS IN OPERATION, TWO CONSECUTIVE SAMPLES TAKEN 24HOURS APART, SHALL BE COLLECTED FROM THE NEW WATERMAIN. AT LEAST ONE SET OF SAMPLES SHALLBE COLLECTED FROM EVERY 1200 LINEAR FEET OF WATERMAIN, PLUS ONE SET FROM THE END OF LINESAND EACH BRANCH. 6. FITTINGS SHALL BE DUCTILE IRON WITH MECHANICAL JOINTS. 7. HYDRANTS SHALL CONFORM TO WATER SYSTEMS SPECIFICATIONS WITH A 5' BURY, OPEN LEFT, TRAFFIC TYPE GROUND FLANGE, 6” INLET, (1) 4-1/2” NST STEAMER NOZZLE, (2) 2-1/2” NST HOSE NOZZLESMECHANICAL JOINT CONNECTION, 5” HYDRANT VALVE SEAT, AND A PENTAGON OPERATING NUT. THEHYDRANTS SHALL CONFORM TO AWWA C-502. 8. MAIN VALVES SHALL BE MECHANICAL JOINTS, RESILIENT SEAT, GATE, 2” OPERATING NUT, OPEN LEFT,WITH STAINLESS STEEL BONNET AND PACKING BOLTS AND NUTS. THE VALVES SHALL CONFORM TO AWWAC-509. 9. MAIN VALVE BOXES SHALL BE 5-1/4”, SCREW TYPE, WITH CAST IRON LIDS MARKED “WATER.” 10. ALL NEW AND ALTERED EXISTING WATERMAINS SHALL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH THE LATEST REVISION OF AWWA STANDARD C-600-93 (LATEST REVISION). 11. THE FOLLOWING MINIMUM SEPARATION DISTANCES BETWEEN GAS LINES AND WATER LINES ARERECOMMENDED. OTHER MORE STRINGENT SEPARATION DISTANCES MAY APPLY. HORIZONTAL- 5 FEET VERTICAL- 2 FEET VI.ENVIRONMENTAL SITE MANAGEMENT REQUIREMENTS THIS PROJECT IS LOCATED WITHIN THE FORMER EMERSON POWER TRANSMISSION FACILITY (NYSDEC SITE NO. 755010) AND IS SUBJECT TO THE NYSDEC-APPROVED INTERIM SITE MANAGEMENT PLAN (ISMP), DATED OCTOBER 2022, INCLUDING ALL ASSOCIATED INSTITUTIONAL CONTROLS (ICS), ENGINEERING CONTROLS (ECS), EXCAVATION WORK PLAN (APPENDIX F), HEALTH AND SAFETY PLAN (APPENDIX G), ENVIRONMENTAL EASEMENT REQUIREMENTS, AND SUBSEQUENT NYSDEC-APPROVED AMENDMENTS. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF THE ISMP DURING CONSTRUCTION. ANY EXCAVATION, GRADING, UTILITY INSTALLATION, DRILLING, DEWATERING, DEMOLITION, SOIL DISTURBANCE, OR OTHER GROUND-INTRUSIVE ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED ISMPAND EXCAVATION WORK PLAN. MANAGEMENT, HANDLING, STOCKPILING, CHARACTERIZATION, TRANSPORTATION, DISPOSAL, AND/OR REUSE OF SOIL, FILL, GROUNDWATER, AND OTHER SITE MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH THE ISMP AND APPLICABLE NYSDEC REQUIREMENTS. THE CONTRACTOR SHALL COORDINATE ALL INTRUSIVE ACTIVITIES WITH THE OWNER'S ENVIRONMENTAL PROFESSIONAL AND SHALL IMMEDIATELY NOTIFY THE OWNER AND ENGINEER IF CONTAMINATED SOIL,GROUNDWATER, PETROLEUM IMPACTS, BURIED STRUCTURES, UNKNOWN UTILITIES, DRUMS, TANKS, STAINED SOILS, ODORS, OR OTHER ENVIRONMENTAL CONDITIONS ARE ENCOUNTERED. WORK IN THE AFFECTED AREA SHALL CEASE UNTIL APPROPRIATE DIRECTION IS PROVIDED BY THE OWNER'S ENVIRONMENTAL PROFESSIONALAND, IF REQUIRED, NYSDEC. 1. THE PROPERTY LOCATED AT 690 SOUTH AURORA STREET, ITHACA NY IS A NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) INACTIVE HAZARDOUS WASTE SITE (#755010). RESIDUAL CONTAMINATION REMAINS ON-SITE. AN INTERIM SITE MANAGEMENT PLAN (ISMP) IS IN PLACE AND THECONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH THE SMP. 2. A PRE-CONSTRUCTION MEETING WILL BE CONDUCTED WITH THE CONTRACTOR AND ENVIRONMENTALCONSULTANT TO REIVEW THE SMP AND PLANNED EXACAVATION AND GRADING ACTIVITIES. 3. ALL INTRUSIVE EARTHWORK (I.E., EXCAVATION, GRADING), DISTRUBANCE TO SOIL, AND LOAD-OUT OF ALLEXCAVATED MATERIAL WILL BE OVERSEEN BY A QUALIFIED ENVIRONMENTAL PROFESSIONAL (QEP) ORPERSON UNDER THEIR SUPERVISION / THAT WILL BE RETAINED BY THE OWNER. 4. THE CONTRACTOR SHALL NOTIFY THE QEP AT LEAST 48-HRS IN ADVANCE OF ANY SOIL DISTURBANCES SOTHAT AN ENVIRONMENTAL MONITOR CAN BE MOBILIZED TO THE SITE TO IMPLEMNET THE REQUIREDENVIRONMENTAL MONITORING. 5. THE QEP/ENVIRONMENTAL MONITOR, RETAINED BY THE OWNER, SHALL BE RESPONSIBLE FOR THEFOLLOWING: a. COMMUNITY AIR MONITORING TO BE COMPLETED DURING ALL SOIL DISTURBANCES. b. SCREENING OF ALL SOILS THAT ARE DISTURBED USING VISUAL, OLFACTORY, AND INSTRUMENTS BYA QUALIFIED ENVIRONMENTAL PROFESSIONAL OR PERSON UNDER THEIR SUPERVISION. c. SOIL/FILL REUSE TESTING AS NEEDED. d. ALL CORRESPONDENCE AND DISCUSSIONS WITH NYSDEC OR OTHERS IN RELATION TOENVIRONMENTAL MATTERS. 6. THE CONTRACTOR SHALL, PRIOR TO MOBILIZING TO THE SITE, PROVIDE A HEALTH AND SAFETY PLAN (HASP) TO THE ENGINEER FOR THEIR RECORDS. THE HASP SHALL INCLUDE PROPER PROCEDURE ANDPROTOCOLS FOR THE WORK BASED ON THE ENVIRONMENTAL INFORMATION IN THE SMP AND OTHERPRIOR REPORTS. 7. ALL EXCAVATED SOILS / FILL WILL BE SEGREGATED BY THE CONTRACTOR, BASED ON DIRECTION FROM THE QEP/ENVIRONMENTAL MONITOR, AND THE SEGREGATED MATERIALS WILL EITHER BE STOCKPILED FOR OFF-SITE DISPOSAL, ON-SITE REUSE, OR OFF-SITE RE-USE. SOIL/FILL PROPOSED FOR ON-SITE OR OFF-SITEREUSE MAY REQUIRE ANALYTICAL TESTING AS DETERMINED BY NYSDEC. ANY ANALYTICAL TESTING FOR REUSE SHALL BE CONDUCTED BY THE QEP/ENVIRONMETNAL MONITOR AND THE TESTING RESULTS WILLDETERMINE IF THE MATERIAL IS ACCEPTABLE FOR REUSE. THE TIME FOR TESTING AND CONFIRMINGREUSE MAY VARY AND THE CONTRACTOR SHALL MAINTAIN STOCKPILES UNTIL THE TESTING RESULTS AREAVAILABLE AND A DETERMINATION IS MADE BY THE QEP TO CONFIRM REUSE OF SOIL/FILL. 8. ALL SOIL/FILL PROPOSED FOR OFF-SITE DISPOSAL (OR SOIL/FILL INITIALLY PROPOSED FOR REUSE BUTTHROUGH TESTING DETERMINED TO REQUIRE OFF-SITE DISPOSAL) SHALL BE CHARACTERIZED FOR WASTEDISPOSAL BY THE CONTRACTOR. 9. ALL OFF-SITE DISPOSAL SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE (INCLUDING 6NYCRR PART 360),AND FEDERAL REGULATIONS. THE CONTRACTOR SHALL ONLY UTILIZE DISPOSAL FACILITIES THAT AREPERMITTED FOR DISPOSAL OF THE WASTE AND CONTRACTOR SHALL PROVIDE A LIST OF PROPOSEDFACILITIES PRIOR TO ANY SOIL OR FILL MATERIAL BEING SENT OFF-SITE. THE CONTRACTOR SHALL PROVIDE THE QEP/ENVIRONMENTAL MONITOR ALL WASTE DISPOSAL DOCUMENTATION WITHIN 48-HRS OF RECEIPT. WASTE DISPOSAL DOCUMENTATION SHALL INCLUDE APPROVED WASTE PROFILE(S), FULLYEXECUTED WASTE MANIFESTS AND WASTE DISPOSAL WEIGH TICKETS. THE CONTRACTOR SHALL NOTRECEIVE PAYMENT FOR ANY WASTE DISPOSAL UNTIL ALL DISPOSAL DOCUMENTATION IS PROVIDED TO THE QEP/ENVIRONMENTAL MONITOR. 10. ALL EXCAVATED SOIL/FILL STOCKPILED WILL BE PLACED BY THE CONTRACTOR ON MINUMUM 6-MILPOLYETHYLENE (POLY) SHEETING WITH PERIMETER BERMS AND COVERED WITH WEIGHTED DOWN POLYAT THE END OF EACH DAY. 11. ALL SOIL/FILL GENERATED FROM THE SITE SHALL NOT LEAVE THE SITE BOUNDARY WITHOUT AUTHORIZATION FROM THE QEP/ENVIRONMENTAL MONITOR. 12. ANY WATER (GROUNDWATER OR PRECIPITATION) ENCOUNTERED IN THE EXCAVATION AREAS SHALL BECONTAINERIZED AND SAMPLED FOR WASTE CHARACTERIZATION BY THE CONTRACTOR PRIOR TO OFF-SITEDISPOSAL. 13. ANY FREE PRODUCT (OIL/PETROLEUM OR OTHER CHEMICALS) SHALL BE CONTAINERIZED AND SAMPLEDFOR WASTE CHARACTERIZATION BY THE CONTRACTOR PRIOR TO OFF-SITE DISPOSAL. 14. ALL WATER AND FREE PRODUCT SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE REGULATIONSBY THE CONTRACTOR. THE CONTRACTOR SHALL PROCURE ANY REQURIED PERMITS FOR DISPOSAL OFLIQUIDS (E.G., TEMPORARY SEWER USE PERMIT FROM LOCAL PUBLIC OWNED TREATMENT WORKS). 15. DUST AND ODOR SHALL BE MANAGED BY THE CONTRACTOR PER SMP AND AS REQUESTED BY THEQEP/ENVIRONMENTAL MONITOR (E.G., WETTING EXCAVATION SURFACES, MODIFYING WORK PROCEDURES, UTILIZING ODOR SUPRESSANTS, ETC.). 16. THE CONTRACTOR SHALL SECURE THE SITE FROM ACCESS BY THE PUBLIC AND SECURE AREAS OF EXCAVATION WITH CONSTRUCTION FENCING, AS NEEDED, BASED ON FIELD FINDINGS/OBSERVATIONS AND AS REQUESTED BY THE QEP/ENVIRONMENTAL MONITOR. P A R K I N G L O T # 6 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width DENSE VEGETATION City of Ithaca Aerial City of Ithaca Aerial Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) LEGEND SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 00 30'60' FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com EXISTING CONDITIONS C200 STREAM SETBACK ZONE 2 LIMITS OF APPALACHIAN OAK - HICKORY FOREST STREAM SETBACK ZONE 1 LEGEND 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width 18 16 21 5 25 PROJECT BOUNDARY PROJEC T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTM E N T BUILDING A2 FFE BASEMENT: 7 7 6 . 0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT . SHED LOADING AREA PROPOSED 9 UNIT APARTM E N T BUILDING A1 FFE BASEMENT: 7 7 5 . 5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 EV FEVEVFEV FEV FEV FEVFEV FEVFEV FEV EV EV EV FEV FEV FEV FEV EV FEV FEV FEV FEVFEVFEVFEVFEVFEV FEV FEV DANBY ROA D DRIVE V D D D D D NO PARKING - FIRE LANE NO PARKING - FIRE LANE NO PARKING - FIRE LANE 34459.89 Sf. 0.79 Acres 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements, designs and plans indicated thereon or presented thereby are owned by and remain the property of SWBR and no part thereof shall be utilized by any person, firm, or corporation for any purpose whatsoever except with the specific written permission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 10/15/2026 ASI 002 11/03/2026 Town Final Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44 Buffalo, NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig! 1-800-962-7962 Dig Safely New York (non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung Place Elmira N.Y. 14904 Phone (607) 734-2165 Fax (607) 734-2169 www.FaganEngineers.com OVERALL SITE PLAN C300 N. Y. S. R O U T E 9 6 B N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width 18 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 9 UNIT APARTMENT FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 EV DRIVE IV 8856.25 Sf. 0.20 Acres NO PARKING - FIRE LANE SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLAN C301 00 15'30' N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width 18 16 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 EV FEVEV FEV FEV FEV FEV FEV DANBY ROAD NO PARKING - FIRE LANE NO PARKING - FIRE LANE SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLAN C3020015'30' 2 0 ' S A N I T A R Y S E W E R R - O - W PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 FEVFEV DRIVE V 118687.50 Sf.2.72 Acres D D SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLAN C303 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W 16 21 28 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 LOADING AREA EV EV FEV FEV FEV FEV FEV 97870.66 Sf. 2.25 Acres NO PARKING - FIRE LANE NO PARKING - FIRE LANE SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLAN C304 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W 16 21 5 28 PROJECT BOUNDARY PR O J E C T B O U N D A R Y PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 MAINT.SHED LOADING AREA FEVFEV FEV EV EV EV FEV FEV FEV FEV EV FEV FEV FEV FEVFEVFEVFEVFEVFEV FEV FEV 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres D D D D NO PARKING - FIRE LANE NO PARKING - FIRE LANE SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SITE PLAN C305 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width M O R S E P L A C E ROAD A RO A D B DRIVE C DR I V E D PROJECT BOUNDARY PROJECT B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y D D D PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT.SHED LOADING AREA PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.50 F F E : 1 S T F L O O R : 7 8 5 . 8 3 DANBY ROAD DRIVE V 8856.25 Sf.0.20 Acres 97870.66 Sf.2.25 Acres 118687.50 Sf. 2.72 Acres Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com OVERALL GRADING PLAN C400 STREAM SETBACK ZONE 2 LIMITS OF APPALACHIAN OAK - HICKORY FOREST STREAM SETBACK ZONE 1 LEGEND STREAM A CROSSING No. 1 STREAM A CROSSING No. 2 N. Y. S. R O U T E 9 6 B N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width PROJECT B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 9 UNIT APARTMENT FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 DRIVE IV 8856.25 Sf. 0.20 Acres Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) 00 15'30' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GRADING PLAN C401STREAM SETBACK ZONE 2 LIMITS OF APPALACHIAN OAK - HICKORY FOREST STREAM SETBACK ZONE 1 LEGEND N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 DANBY ROAD Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GRADING PLAN C402 00 15'30' 2 0 ' S A N I T A R Y S E W E R R - O - W RO A D B DR I V E D PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT.SHED DRIVE V 118687.50 Sf.2.72 Acres Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GRADING PLAN C403 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W MORSE P L A C E ROAD A DRIVE C PROJECT B O U N D A R Y PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 LOADING AREA 97870.66 Sf. 2.25 Acres Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) 00 15'30' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GRADING PLAN C404STREAM SETBACK ZONE 2 LIMITS OF APPALACHIAN OAK - HICKORY FOREST STREAM SETBACK ZONE 1 LEGEND 2 0' S A N I T A R Y S E W E R R - O - W PROJECT BOUNDARY PR O J E C T B O U N D A R Y PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 MAINT.SHED LOADING AREA 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify theowner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) 00 15'30' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com GRADING PLAN C405STREAM SETBACK ZONE 2 LIMITS OF APPALACHIAN OAK - HICKORY FOREST STREAM SETBACK ZONE 1 LEGEND SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SEGMENTAL WALL DETAILS C406 < 4' TALL RETAINING WALLS · · · · · · · > 4' TALL RETAINING WALLS GEOSYNTHETIC REINFORCEMENT TABLE WALL ABUTMENT DETAIL PAVEMENT AT BASE OF WALL STEPPING BASE DETAIL PINNING DETAIL DRAIN DETAIL CAPPING DETAIL - PROFILE CURVE CAPPING DETAIL - PLAN GEOSYNTHETIC AT STRUCTURES BEHIND WALL NOTE:ALL RETAINING WALL SHOP DRAWINGS, DESIGN CALCULATIONS, AND SUPPORTING DOCUMENTATION, INCLUDING THOSE FOR THE BASIS-OF-DESIGN SYSTEM (VERSA-LOK), SHALL BE PREPARED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK. 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT.SHED LOADING AREA PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.50 F F E : 1 S T F L O O R : 7 8 5 . 8 3 DANBY ROAD DRIVE V 8856.25 Sf.0.20 Acres 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres City of Ithaca Aerial City of Ithaca Aerial 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com WALL LOCATIONS C407 CONCRETE RETAINING WALL LOCATIONS SEGMENTAL RETAINING WALL LOCATIONS 1 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width SA N SA N W W W W W W W W W PROJECT BOUNDARY PROJECT B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y ST ST ST ST SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SAN SAN SAN SAN SAN SAN SAN SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST UG / E UG/ E ST ST ST ST ST ST ST ST W W W W W W W W W W W W W W W W W W W W W W W UG / E UG / E UG/ E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/ E UG/ E UG/ E PROPOSED STORM W A T E R TREATMENT CHAMBER S (UPPER) PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) D D PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT.SHED LOADING AREA ST ST ST PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.50 F F E : 1 S T F L O O R : 7 8 5 . 8 3 ST ST ST ST ST ST UG / E UG / E UG / E UG / E UG/E UG/E UG/E UG/E UG/E UG/E UG / E UG/E UG/E UG/E UG/E UG/E PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) W W W W W W SAN SAN SAN DANBY ROAD DRIVE V SAN SAN ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST UG/E UG / E UG/ E UG / E UG / E UG / E UG / E UG/ E UG/E UG/E UG/E UG/E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STST 8856.25 Sf. 0.20 Acres 97870.66 Sf. 2.25 Acres 118687.50 Sf.2.72 Acres W W W W W W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W STRUCTURE TABLE STRUCTURE NAME:RIM ELEV.PIPES IN:PIPES OUT STRUCTURE TABLE STRUCTURE NAME:RIM ELEV.PIPES IN:PIPES OUT STRUCTURE TABLE STRUCTURE NAME:RIM ELEV.PIPES IN:PIPES OUT STRUCTURE TABLE STRUCTURE NAME:RIM ELEV.PIPES IN:PIPES OUT LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com FE Project Number 2011.104-008 OVERALL UTILITY PLAN C500 1 2 2 SA N SA N SA N SA N MORSE P L A C E ROAD A W W W W W W W W W W W W W W W W W W W PROJECT B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y ST ST ST ST SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W W W W W W W W W W UG/E UG/E UG/E UG/E UG/ E UG/ E UG/ E PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 9 UNIT APARTMENT FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 ST ST ST ST UG / E UG / E UG / E UG / E UG / E UG / E UG / E UG / E DRIVE IV 8856.25 Sf. 0.20 Acres W W W LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com UTILITY PLAN C501 00 15'30' ROAD A W W W W W W W W W W W W W W W W W W W DR I V E D PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SA N SA N SA N SA N SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W W W W W W W W W W W W W W W W W W W W W W W W W W UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/ E UG/ E UG/ E PROPOSED STORM W A T E R TREATMENT CHAMBE R S (UPPER) PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 ST ST ST ST ST ST ST ST ST ST ST ST UG / E UG / E UG / E UG / E UG / E UG / E UG / E UG / E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG / E UG / E DANBY ROAD ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W W W W W W W W W W W LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com UTILITY PLAN C502 00 15'30' 1 2 0 ' S A N I T A R Y S E W E R R - O - W RO A D B DR I V E D PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y UG / E PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 UG / E UG / E W W W W W SAN SAN SAN DRIVE V ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST UG/E UG/E UG / E UG / E UG / E UG / E UG / E UG/ E UG / E UG / E UG / E UG / E UG / E UG/ E UG / E UG/ E UG/ E UG/E UG/E UG/E UG/E 118687.50 Sf.2.72 Acres ST ST ST LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com UTILITY PLAN C503 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W SA N SA N SA N SA N SA N MORSE P L A C E ROAD A DRIVE C W W W W W W W W PROJECT B O U N D A R Y ST ST ST ST ST ST ST ST SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SA N SA N SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/ E UG/ E UG/ E UG / E PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 LOADING AREA ST ST ST ST ST ST ST ST ST ST ST ST ST PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN ST ST 97870.66 Sf. 2.25 Acres ST ST ST ST ST ST ST ST ST ST ST LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com UTILITY PLAN C504 00 15'30' 2 0' S A N I T A R Y S E W E R R - O - W PROJECT BOUNDARY PR O J E C T B O U N D A R Y SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST UG/ E UG / E UG / E UG/ E UG/E ST ST ST ST W W W W W W W W W W W W W W W W W W W W W W W W W UG / E UG/ E UG / E UG/ E UG/ E UG / E UG/ E UG/ E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG / E UG/ E UG / E UG / E UG / E PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 MAINT.SHED LOADING AREA ST ST ST ST ST ST UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E PROPOSED STORM WATER TREATMENT CHAMBERS (LOWER) ST ST W W W W W W W W W W W W W SAN SAN SAN SAN SAN SAN SAN SA N SAN SAN SA N ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST UG/ E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN ST ST ST ST 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W W W W W W W W LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com UTILITY PLAN C505 00 15'30' -0+50 0+00 74 8 . 1 9 1+00 75 1 . 6 1 74 9 . 0 6 2 2+00 75 1 . 8 3 75 0 . 1 4 8 3+00 75 1 . 7 2 75 0 . 6 5 9 4+00 75 1 . 2 0 75 1 . 1 5 9 5+00 75 2 . 2 7 75 1 . 6 5 9 6+00 75 1 . 1 1 75 2 . 1 5 9 7+00 75 2 . 3 1 75 2 . 8 8 0 8+00 75 2 . 3 3 75 8 . 4 3 6 9+00 9+25 -0+50 0+00 72 4 . 6 6 72 4 . 6 5 7 1+00 72 6 . 9 2 72 6 . 9 2 4 2+00 72 7 . 7 2 72 7 . 7 1 5 3+00 72 7 . 6 0 72 7 . 6 0 0 4+00 73 2 . 1 9 73 2 . 1 9 4 5+00 74 1 . 9 5 74 1 . 9 5 1 6+00 75 3 . 1 9 75 3 . 1 9 1 6+50 SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY ROAD A PROFILE ROAD B PROFILE DRIVE C PROFILE DRIVE D PROFILE 00 30'60' 00 10'20' FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com ROADWAY PROFILES C600 SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY CB-6 THRU CB-14 00 30'60'00 10'20' DMH-5 THRU CB-11 CB-3 THRU CB-8 ES-1 THRU CB-2 EXIST. SMH THRU SMH-9 SMH-4 THRU SMH-6 FE Project Number 2011.104-008 SMH-19 RELOCATION 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SEWER PROFILES C601 CB-11 THRU CB-22 ES-7 THRU CB-24 CB-10 THRU CB-18CB-8 THRU CB-16 CONDITION SCHEMATIC REQUIREMENTS WATERMAIN / SEWER CROSSING DETAIL Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determiningexact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY R7-8 PARKING AREA LIGHTING DETAIL TYPICAL STOP SIGNTYPICAL HC PARKING SIGN TYPICAL SIGN INSTALLATION HEAVY DUTY REGULAR DUTY N.Y. PARKING AREA PAVEMENT SECTIONS CONCRETE SIDEWALK NOTES CONCRETE SIDEWALK SECTION FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com CIVIL DETAILS C700 PAVED AREAS LAWN AREAS 12" MIN.REBATE 6" MIN. PIP E D I A . 12" MIN. 12" MIN.12" MIN. WASHED D-W-1 OR D-W-2 CRUSHED STONE TO12" ABOVE PIPE CROWN, FURNISH IN 6" LIFTS 2FT MIN. DEPTH ABOVE PIPE CROWNREQUIRED BEFORE COMPACTING DIRECTLYOVER PIPE. PLACE DETECTABLE MARKINGTAPE ON COMPACTED MATERIAL. SPRINGLINE OF PIPE SCREENED GRAVEL SUBBASE TYPE B-4WELL GRADED AND COMPACTED SURFACE RESTORATION PER APPROVEDPLANS AND SPECIFICATIONS PIPE DIA. COMPACTED NATIVE OR SUITABLE MATERIAL 12 " RUN OF CRUSHER D-R-2 WELL GRADED ANDCOMPACTED, FURNISH IN 6" LIFTS MAX. SURFACE RESTORATION PER APPROVEDPLANS AND SPECIFICATIONS 4'-6" MIN. EXISTING PAVEMENT SAWCUT TOP COURSE CRACK SEAL TOWN OF ITHACASTANDARD DETAILSTYPICAL TRENCHING BREAK FLANGE MAXHEIGHT 2" ABOVE GROUND 1'-0" MIN. PUMPER NOZZLE TO BE PLACEDPERPENDICULAR TO ROADWAY CULVERT DIAMETER VARIES,INSTALL UP AND DOWNSTREAMRIPRAP END SECTIONS PER DETAIL C-XX SURFACE RESTORATION PERAPPROVED PLANS AND SPECIFICATIONS EXISTING DITCH MARKINGTAPE GATE VALVE, SEEDETAIL W-06 6" DIP CL 52 POLYWRAP PIPE,FITTINGS, ETC.,SEE DETAIL W-02 CONCRETE THRUSTBLOCK ABOVE WEEPHOLE, SEE DETAILSW-07 AND W-08 HOLE CUT INPOLYWRAP TOEXPOSE WEEP FORDRAINAGE POLYWRAP BARRIERBETWEEN THRUSTBLOCK ANDDRAINAGE STONE D-W-R-1 OR D-W-R-2 STONE CONCRETE THRUST BLOCK,SEE DETAILS W-07 AND W-08 TYPE B-4 ASTM C90 CONCRETEBLOCK - 4x8x16 2'-6" MIN. 5' - 0 " M I N . MAINTAIN PROPERSEPARATION,SEE DETAIL W-05 TOWN OF ITHACASTANDARD DETAILSWATER TYPICAL HYDRANT INSTALLATION BUFFALO STYLE TYPE CURB BOX WITHOPERATING ROD AND GUIDE RINGS.CURB BOX LIDS MARKED "WATER" CORPORATION STOP TAPPEDDIRECTLY INTO PIPE BARREL 1" MIN. CURB STOP REDUCER SHALL BE PLACED ON HOUSESIDE OF CURB STOP, AS REQUIRED 6" BELOW AND 12" ABOVED-W-R-1 OR D-W-R-2 STONE 1" MIN. TYPE K COPPER TUBING TRACER WIRE MONUMENT BOX HARDSCAPE AREAS LANDSCAPED AREAS CAST IRON COVER INSTALL COVER 1/2" BELOWGRADE IN HARDSCAPE 4" REVEAL INLANDSCAPED AREAS SURFACE RESTORATION PERAPPROVED PLANS ANDSPECIFICATIONS (TYP.) SERVICE BOX WITH STATIONARYROD INSTALLED PLUMB WATER MAIN GOOSENECK 4' - 6 " M I N . 5' - 0 " M I N . SERVICE CONNECTION TOWN OF ITHACASTANDARD DETAILS WATER VALVE BOX THREADS MUST BE ENGAGEDBY A MINIMUM OF 2 THREADS GATE VALVE RETAINER GLAND POLYETHYLENEENCASEMENT POLYETHYLENE TAPE MARKING TAPE VALVE CENTERING DEVICE D-W-R-1 OR D-W-R-2 STONE CONCRETE THRUST BLOCK,SEE DETAILS W-07 AND W-08 OPERATING NUTEXTENSION REQUIRED FORVALVES 7FT OR GREATER INSTALL COVER 1/2" BELOWGRADE IN HARDSCAPE 4" REVEAL INLANDSCAPED AREAS SURFACE RESTORATION PER APPROVEDPLANS AND SPECIFICATIONS (TYP.) HARDSCAPE AREASLANDSCAPED AREAS VALVE BOX COVER MARKED "WATER" WATER MAIN 5'- 0 " M I N . GATE VALVE TOWN OF ITHACASTANDARD DETAILSWATER THRUST BLOCK,(TYP.) PIPE CAP THRUST BLOCKS TOWN OF ITHACA STANDARD DETAILSWATER 6" MOUNTABLE CONCRETE CURB RAISED CROSSWALK SECTIONS Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 4' DIA. CATCH BASIN DETAIL 2'x2' CATCH BASIN DETAIL FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com CIVIL DETAILS C701 TRENCH PLUG INSTALLATION DETAIL MAINTAIN 1/2" BELOW INHARDSCAPE, MATCH CROSS SLOPE CAST IRON FRAME AND COVER AS SPECIFIED FRAME SET IN A BED OF MASTICCASTING FLANGE TO BE COVERED IN MORTAR 4" MIN. - 12" MAX. PRECAST CONCRETE GRADE RING ASNECESSARY FOR FINAL GRADE ADJUSTMENT JOINTS TO HAVE MASTIC GASKET MANHOLE STEPS CAST IN PLACE AT 12" O.C. 9" RUN OF CRUSHER D-R-1WELL GRADED AND COMPACTED TRACER WIRESECURE TO MANHOLE WITH TAPE PRIOR TO BACKFILLINSTALL BETWEEN FRAME AND COVER SLABMIN OF 24" REQUIRED IN MANHOLE NEW MANHOLES:CAST FLEXIBLE MANHOLE CONNECTORS INTOMANHOLE. INSTALL AND SEAL PIPE CONNECTIONS PERMANUFACTURER INSTRUCTIONS EXISTING MANHOLES:CORE DRILL THROUGH WALL, USE MODULAR LINK SEAL,SEE DETAIL S-04 FOR BENCH PRECAST CONCRETE MONOLITHIC BASE SECTION PRECAST CONCRETE RISER SECTION BACKFILL IN ACCORDANCE WITH TRENCH DETAIL,SEE DETAIL S-09 PRECAST CONCRETE ECCENTRIC CONE SECTION. FORMANHOLE DEPTHS LESS THAN 7'-6" USE STANDARD RISERSECTION AND PRECAST CONCRETE FLAT SLAB TOP 4'-0" DIA. MIN. DIA. +4" CONCRETE BENCH EPDM JOINT WRAPINFI-SHIELD GATOR WRAP, OR EQUIVALENT PARGE CORE WITH NON-SHRINK GROUTWHEN DETERMINED BY TOWN ENGINEER SURFACE RESTORATION PER APPROVED PLANS ANDSPECIFICATIONS, MIN. 4" REVEAL IN LANDSCAPED AREAS INTERIOR TO BE COATED WITH EPOXY COATINGSYSTEM WHEN DETERMINED BY TOWN ENGINEER MORTAR PIPE/BENCH TRANSITION CHANNELWIDTH TOWN OF ITHACASTANDARD DETAILSSANITARY SEWERPRECAST CONCRETE SANITARY MANHOLE FLOW FLOW VARIES 2" X 3/8" STAINLESS STEEL MASONRYSCREWS OR LAG BOLTS WITH ANCHORS. DROP BOWL BY DURAN INC., LYME CT.,OR APPROVED EQUAL PRECAST CONCRETE SANITARYMANHOLE, SEE DETAIL S-01 PIPE BRACKET, SEEENLARGEMENT THIS SHEET 45° ELBOW INTO FLOWCHANNEL TURNED IN THEDIRECTION OF FLOW TOWN ENGINEER MAY REQUIRE BENCHMODIFICATION PER DETAIL S-04PINCH BOLT, MIN. 3/8"DIA. STAINLESS STEEL PIPE BRACKETS MINIMUM1 1/2" x 0.1196" THICKSTAINLESS STEEL STOCK TOWN OF ITHACASTANDARD DETAILS SANITARY SEWER PROVIDE LATERAL TO EASEMENT ORHIGHWAY RIGHT OF WAY BOUNDARY TRENCHWIDTH BACKFILL IN ACCORDANCEWITH TRENCH DETAIL,SEE DETAIL S-09 4" DIA. SDR35 PVC @ 2% MIN. SLOPEUNLESS OTHERWISE SPECIFIED CLEANOUT SEWER MAIN SURFACE RESTORATION PER APPROVEDPLANS AND SPECIFICATIONS WATER TIGHT CAPFOR FUTURECONNECTION WYE 45° BEND CLEANOUT MONUMENT BOX HARDSCAPE AREAS LANDSCAPED AREAS FLOW TRACER WIRE CAST IRON COVER SEE ENLARGEMENTTHIS SHEET 6" MIN. D-W-1 OR D-W-2 CRUSHED STONEBEDDING ABOVE AND BELOW (TYP.) TRACER WIRE 1'- 0 " REDUCER FOR FM SERVICE TO GRAVITY 2"x4" PT LUMBER MARKER WATER TIGHTPUSH ON CAP MAIN CONNECTION,SEE DETAIL S-08 INSTALL COVER 1/2" BELOWGRADE IN HARDSCAPE 4" REVEAL INLANDSCAPED AREAS PVC RISER SLOPE UP TOCONNECTION TOWN OF ITHACASTANDARD DETAILSSANITARY SEWER LATERAL AND CLEANOUT INSIDE DROP MANHOLE REMOVE BELL END ON EXISTING PIPE IFENCOUNTERED AT POINT OF CONNECTION FLOW SAWCUT EXISTING PIPE (2 TYP.),SEE NOTE 2 EXISTING GRAVITY SEWER MAIN,SEE NOTE 2 NEW PVC LATERAL PIPE,SEE NOTE 1 SDR35 PVC 45° BEND SDR35 PVC WYE WITH PUSH-ON JOINTS SDR35 PVC PIPE CONNECTION TO EXISTING MAIN WITH COUPLING,SEE NOTES 3 AND 4 RE M O V E E X I S T I N G P I P E , MI N . 6 ' - 0 " L E N G T H C E N T E R E D O N N E W W Y E BACKFILL IN ACCORDANCE WITHTRENCH DETAIL, SEE DETAIL S-09 GRAVITY MAIN CONNECTION TOWN OF ITHACASTANDARD DETAILSSANITARY SEWER Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY FE Project Number 2011.104-008 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com STORM CHAMBER DETAILS C800 2 SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com STORM CHAMBER DETAILS C801 2 Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. Ifuncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system priorto digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig!1-800-962-7962 Dig Safely New York(non-members must be contacted separately) SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com STORM CHAMBER DETAILS C802 STORMTECH OUTLET STRUCTURE DETAIL AQUA BOX OUTLET STRUCTURE DETAIL 2 0' S A N I T A R Y S E W E R R - O - W 2 0 ' S A N I T A R Y S E W E R R - O - W N. Y. S. R O U T E 9 6 B - D A N B Y R O A D variable width M O R S E P L A C E ROAD A RO A D B DRIVE C DR I V E D PROJECT BOUNDARY PROJECT B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y PR O J E C T B O U N D A R Y D PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTMENT BUILDING A2 FFE BASEMENT: 776.0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT.SHED LOADING AREA PROPOSED 9 UNIT APARTMENT BUILDING A1 FFE BASEMENT: 775.50 F F E : 1 S T F L O O R : 7 8 5 . 8 3 DANBY ROAD DRIVE V SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSF 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres LEGEND E&S PLAN NOTES: 1. ONLY LIMITED DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS TO THE SITE FOR GRADING AND ACQUIRING BORROW TO CONSTRUCT THOSE BMPS. 2. EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS. 3. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTBMPS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY. 4. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. 5. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR,REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 6. SITE CONTRACTOR TO BECOME CO-PERMITTEE PRIOR TO EARTHWORK ACTIVITIES COMMENCING. SITE CONTRACTOR IS RESPONSIBLE FOR ALL CONDITIONS OF THE E&S PERMITS. CONSTRUCTION SEQUENCE 1. ALL PAGE NUMBERS (P. 5*.**) REFER TO THE NEW YORK STATE GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL. 2. INSTALL STABILIZED CONSTRUCTION ENTRANCE (P. 5A.75). WIDTH: - TWELVE (12) FT. MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. IF ONLY ONE ENTRANCE IS USED THE MINIMUM WIDTH SHALL BETWENTY-FOUR (24) FEET. 3. STANDARD SILT FENCE (P. 5A.19) SHALL THEN BEPLACED AROUND ALL DISTURBED AREAS. 4. CLEAR AND GRUB THE SITE. STRIP TOPSOIL AND STOCKPILE ON-SITE WITH PERIMETER SILT FENCE AND VEGETATIVE COVER. 5. CONSTRUCT BUILDING FOUNDATION AND ENCLOSE BUILDING. 6. CONSTRUCT STORM WATER BASINS AND PERFORMLAND GRADING IN ACCORDANCE WITH MANUAL (P. 5B.49). INSURE ALL RUNOFF IS DIVERTED TO THE SEDIMENT BASIN UNTIL THE SITE IS STABILIZED(80% COVERAGE). 7. CONSTRUCT PROPOSED STORM SEWER AND INSTALL TEMPORARY SEDIMENT TRAPS (P. 5A.41) AT EACH INLET. 8. INLET PROTECTION (P. 5A.27) SHALL BE PLACED AROUND ALL STORM DRAIN INLETS. UTILIZE TYPE IIIN AREAS OF EXCAVATION AND TYPE III IN PAVEMENT AREAS. CONVERT ALL FABRIC DROP INLET PROTECTION TO TYPE III IN-PAVEMENT PROTECTION UPON PAVING WITHIN PROJECT AREA. 9. INSTALL ROCK OUTLET PROTECTION (P. 5B.21) AT ALL STORM SEWER OUTLETS. 10. FINALIZE CONSTRUCTION OF MAIN PROJECTELEMENTS INCLUDING INFRASTRUCTURE AND NEW PAVEMENT. 11.SPREAD TOPSOIL, FINE GRADE, SEED, MULCH AND ESTABLISH VEGETATIVE COVER. 12..REMOVE SEDIMENT FROM ANY SEDIMENT TRAPS OR BASINS. 13.REMOVE TEMPORARY EROSION CONTROLMETHODS WHEN CONTRIBUTING DRAINAGE AREAS ARE STABILIZED. 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com E & S PLAN C900 STANDARD AND SPECIFICATIONS FOR LAWN AREA IMPROVEMENT · · · · · · · · · · · · PROFILE PLAN VIEW CONSTRUCTION SPECIFICATIONS STABILIZED CONSTRUCTION ENTRANCE FILTER FABRIC STORM DRAIN PROTECTION SPECIFICATIONS FOR SILT FENCE PROTECTION BURIED FABRICDROP INLET WITH GRATE 2"X4" WOOD FRAME GATHER EXCESS AT CORNERS FRAME FABRIC STAKE RIP-RAP OUTLET APRON DETAIL OUTLET No. PIPE DIA. (in) Q (cfs) V (fps) STONE DIA. (in) W1 (ft) W2 (ft) L (ft) D (in) PERSPECTIVE VIEW SILT FENCING SECTION CONSTRUCTION SPECIFICATIONS FOR FABRICATED SILT FENCE SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements,designs and plans indicated thereon or presentedthereby are owned by and remain the property ofSWBR and no part thereof shall be utilized by anyperson, firm, or corporation for any purposewhatsoever except with the specific writtenpermission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 25189.00 JBG JBG RSN BEACON COMMUNITIES -THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44Buffalo,NY 14203 Ithaca, NY 113 East Chemung PlaceElmira N.Y. 14904Phone (607) 734-2165Fax (607) 734-2169 www.FaganEngineers.com SOIL STOCKPILING NOTES: SOIL STOCKPILE DETAIL SLOPEINSTALLATIONDETAIL Drawing Not To Scale 1. Prepare soil before installing rollederosion control products (RECPs),including any necessaryapplication of lime, fertilizer, andseed.2. Begin at the top of the slope byanchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyondthe up-slope portion of the trench.Anchor the RECPs with a row ofstaples/stakes approximately 12"(30cm) apart in the bottom of thetrench. Backfill and compact thetrench after stapling. Apply seed tothe compacted soil and fold theremaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spacedapproximately 12"(30cm) apartacross the width of the RECPs.3. Roll the RECPs (A) down or (B)horizontally across the slope.RECPs will unroll with appropriateside against the soil surface. AllRECPs must be securely fastenedto soil surface by placingstaples/stakes in appropriatelocations as shown in the staplepattern guide.4. The edges of parallel RECPs mustbe stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type.5. Consecutive RECPs spliced downthe slope must be end over end(Shingle style) with an approximate3"(7.5cm) overlap. Staple throughoverlapped area, approximately12"(30cm) apart across entireRECPs width. Drawn on: 3-16-11 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5"(5-12.5cm) 3B 4 2 5 1 3A 12"(30cm) 6"(15cm) 6"(15cm) *NOTE:In loose soil conditions, the use ofstaple or stake lengths greater than6"(15cm) may be necessary toproperly secure the RECP's. 3"(7.5cm) 5401 St. Wendel - Cynthiana Rd.Poseyville, IN 47633 PH: 800-772-2040www.tensarnagreen.com E & S DETAILS C901 M O R S E P L A C E ROAD A RO A D B DRIVE C DR I V E D 18 16 21 5 28 PROPOSED 12 UNIT TOWNHOUSE BUILDING B3 FFE BASEMENT: 753.61 FFE: 1ST FLOOR: 765.11 PROPOSED 6 UNIT TOWNHOUSE BUILDING B1 FFE BASEMENT: 751.85 FFE: 1ST FLOOR: 763.35 PROPOSED 9 UNIT TOWNHOUSE BUILDING B2 FFE BASEMENT: 752.61 FFE: 1ST FLOOR: 764.11 PROPOSED 27 UNIT APARTMENT BUILDING C1 FFE BASEMENT: 739.40 FFE: 1ST FLOOR: 750.90 PROPOSED 26 UNIT APARTMENT BUILDING C2 FFE BASEMENT: 740.40 FFE: 1ST FLOOR: 751.90 PROPOSED 30 UNIT APARTMENT BUILDING C3 FFE BASEMENT: 741.40 FFE: 1ST FLOOR: 752.90 PROPOSED 9 UNIT APARTM E N T BUILDING A2 FFE BASEMENT: 77 6 . 0 F F E : 1 S T F L O O R : 7 8 6 . 3 3 MAINT . SHED LOADING AREA PROPOSED 9 UNIT APARTM E N T BUILDING A1 FFE BASEMENT: 77 5 . 5 0 F F E : 1 S T F L O O R : 7 8 5 . 8 3 EV FEVEVFEV FEV FEVFEVFEV FEVFEV FEV EV EV EV FEV FEV FEV FEV EV FEV FEV FEV FEVFEVFEVFEVFEVFEV FEV FEV DRIVE IV DANBY ROA D DRIVE V 8856.25 Sf. 0.20 Acres 97870.66 Sf. 2.25 Acres 118687.50 Sf. 2.72 Acres = = == = = = = = = = = = = = = = == = NO PARKING - FIRE LANE NO PARKING - FIRE LANE NO PARKING - FIRE LANE 00 30'60' SWBR NYS Certificate of Authorization #: 235221 260 East Main Street Rochester NY 14604 585 232 8300 | rochester@swbr.com These documents and all the ideas, arrangements, designs and plans indicated thereon or presented thereby are owned by and remain the property of SWBR and no part thereof shall be utilized by any person, firm, or corporation for any purpose whatsoever except with the specific written permission of SWBR. All rights reserved. © FI L E P A T H : Checked By: Project Manager: Drawn By: Revisions SWBR Project Number 4/16/2026 Town Sketch Plan Comments 100% CONSTRUCTION DOCUMENTS 07/27/2026 6/29/2026 Addendum #1 7/07/2026 Town Preliminary Plan Submission 7/27/2026 Addendum #2 8/10/2026 Town Preliminary Plan Resubmission 10/1/2026 City Final Plan Submission 10/14/2026 Final Site Plan Submission 12 / 9 / 2 0 2 5 1 2 : 4 5 : 4 6 P M Au t o d e s k D o c s : / / 2 5 1 8 9 . 0 0 B e a c o n T h e W o o d s / 2 5 1 8 9 _ B e a c o n T h e W o o d s _ A r c h R 2 5 _ C e n t r a l . r v t 25189.00 JBG PROPERTY PLAT JBG RSN CP BEACON COMMUNITIES - THE WOODS Beacon Southworks - The Woods 505 Ellicott St. Suite 44 Buffalo, NY 14203 Ithaca, NY LEGEND Note : Utility information has been plotted from available sources and their locations and size should be considered approximate only. The contractor is responsible for determining exact utility locations, sizes, and elevations prior to commencing construction. If uncharted or misplotted utilities are encountered, the contractor is required to notify the owner immediately. New York State law requires excavators to contact the one-call notification system prior to digging to prevent damage to buried facilities. IT'S THE LAW! Call three days before you dig! 1-800-962-7962 Dig Safely New York (non-members must be contacted separately) 113 East Chemung Place Elmira N.Y. 14904 Phone (607) 734-2165 Fax (607) 734-2169 www.FaganEngineers.com 1 FE Project Number 2011.104-008 PROJECT PARCEL 6.09 Acres PUBLIC RIGHT-OF-WAY 0.70 Acres Site Plan - The Woods BR BUILDING A1 BUILDING A2 BUILDING B1 BUILDING B2 BUILDING B3 BUILDING C1 BUILDING C2 BUILDING C3 PLAYGROUND DANBY ROAD MORS E P L A C E RIDE SHARE • • • TEN BIKE RACKS THAT FIT FIVE OR SEVEN BIKES EACH = 66 BIKES ONE CONTROLLED ACCESS BIKE CAGE WITH SEVEN E-BIKE CHARGING SPOTS AND SEVEN REGULAR PARKING SPOTS = 14 BIKES TOTAL = 80 BIKES CAN BE PARKED OUTSIDE ON SITE BIKE PARKING NOTE: NSCALE: 1" = 30' 0 30'60'120' Imagery - The Woods VIEW 1 VIEW 2 DANBY RD MORSE PLACE N 1 3 2 Imagery - The Woods VIEW 3 LINK TOC2 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C1 1 - FACING ROAD A2 - FACING COURTYARD 3 - FACING DRIVE C 3 1 2 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR) FINEX PANEL JAMES HARDIE - SMOOTH PANELLIGHT MIST TRESPA PURA NFC 7" PLANKWESTERN RED CEDAR OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) Exterior Elevations - C1 (43%) BEFORE LINK TOC2 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C1 1 - FACING ROAD A2 - FACING COURTYARD 3 - FACING DRIVE C 3 1 2 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR) FINEX PANEL JAMES HARDIE - SMOOTH PANELLIGHT MIST TRESPA PURA NFC 7" PLANKWESTERN RED CEDAR OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) Exterior Elevations - C1 (43%) Dropped parapet height Dropped parapet height Vertically connected windows with contrasting light grey panels Trim surround Awning at 1st level windows Vertical trim Contrasting dark green window head trim Wood reveal cuts through copper band Awning at ground level windows facing sidewalk Vertically connected windows with contrasting light grey panels AFTER LINK TOC3 LINK TOC1 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C2 1 - FACING ROAD A2 - FACING C3 3 - FACING DRIVE C4 - FACING COURTYARD 3 1 24 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR)FINEX PANEL JAMES HARDIE - SMOOTH PANELLIGHT MIST TRESPA PURA NFC 7" PLANKWESTERN RED CEDAR OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) Exterior Elevations - C2 (43%) BEFORE LINK TOC3 LINK TOC1 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C2 1 - FACING ROAD A2 - FACING C3 3 - FACING DRIVE C4 - FACING COURTYARD 3 1 24 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR)FINEX PANEL JAMES HARDIE - SMOOTH PANELLIGHT MIST TRESPA PURA NFC 7" PLANKWESTERN RED CEDAR OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) Exterior Elevations - C2 (43%) Dropped parapet height Dropped parapet height Vertically connected windows with contrasting light grey panels Trim surround Vertical trim Contrasting dark green window head trim Awning at 1st level windows Wood reveal cuts through copper band Awning at ground level windows facing sidewalk Vertically connected windows with contrasting light grey panels AFTER LINK TOC2 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C3 1 - FACING ROAD A2 - SIDE FACING ROUNDABOUT 3 - FACING DRIVE C4 - FACING C2 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR) FINEX PANEL JAMES HARDIE - SMOOTH PANEL LIGHT MIST OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) 1 23 4 Exterior Elevations - C3 (43%) BEFORE LINK TOC2 A1 A2 B1 B2 B3 C1 C2 C3 EXTERIOR ELEVATIONS - C3 1 - FACING ROAD A2 - SIDE FACING ROUNDABOUT 3 - FACING DRIVE C4 - FACING C2 PAC-CLAD 7/8" CORRUGATED PANELHEMLOCK GREEN JAMES HARDIE BOARD AND BATTENIMPERIAL GREEN (OR SIMILAR) FINEX PANEL JAMES HARDIE - SMOOTH PANEL LIGHT MIST OMEGA-LITE ACM PANELCOPPERTONE (METALLIC) 1 23 4 Exterior Elevations - C3 (43%) Dropped parapet height Dropped parapet height Vertically connected windows with contrasting light grey panels Trim surround Vertical trim Contrasting dark green window head trim Awning at 1st level windows Wood reveal cuts through copper band Awning at ground level windows facing sidewalk Vertically connected windows with contrasting light grey panels AFTER