HomeMy WebLinkAboutPC Minutes 2024-08-15 Town of Ithaca Planning Committee Thursday,August 15,2024 (3:00 PM Aurora Conference Room and on Zoom) Minutes Committee members present: Rich DePaolo, Chair; Rod Howe. Absent: Margaret Johnson Board/Staff members: Director of Planning C.J. Randall; Director of Codes Marty Moseley; Nick Quilty-Koval, Town Planner; Dave O'Shea, Senior Civil Engineer; Justin McNeal, Civil Engineer. Guests. Maplewood 11 project team on Zoom and in person including but not limited to: Michele Palmer, Jacob von Mechow and intern Niel, Whitham Planning Design Landscape Architecture; Henry Weinberg, CBT Architects. Conifer-West Hill TND Team Including but not limited to: Scott Whitham & Mary Martin, Whitham Planning Design Landscape Architecture; Kevin Day, Conifer; Bear Smith, Holt Architects; David Herrick, TG Miller. Laura Schneider, environmental guest. 1. Persons to be heard: None. 2. Committee announcements and concerns: None 3.Approval of July meeting minutes: Rich moved, Rod seconded. The July 18, 2024, minutes were approved with one minor correction. 2 Ayes. 4. Proposed amendments to add Town-owned sewer infrastructure exemption to the Town Zoning Code.Dave O'Shea submitted a memo noting the existing (2017)provision for Town- owned water infrastructure to be exempted from certain requirements of the Town's Zoning Code. The proposal is to amend 270-230.2 to include Town-owned sewer infrastructure as well as to allow Zoning Code provisions to not be applicable to Town-owned water and sewer infrastructure. Rich proposed to recommend this change, Rod agreed. C.J. stated she will prepare the local law draft and send it to the Attorney for the Town for review and refer it to County Planning for proposed Town Board action. 5. Continue review of Maplewood II development Planned Development Zone (PDZ) rezoning proposal. Michele Palmer of Whitham Planning Design presented a memo with another revised redlined draft PDZ language proposal to show the changes from the previous committee meeting along with an explanatory memo regarding the Level of Service measurement of driver experience relative to traffic analysis. Level D was confirmed by a traffic engineer as an acceptable level of service and most of the intersections were at an A-B level. Discussion with TCAT is ongoing and no formal commitments have been made. Bike Share and Car Share are also interested in a possible commitment. The existing carpooling program available at Cornell was noted and Greystar will notify residents of the program. The NACTO bike safety and urban bikeway design, and it had led to the exploration of a bicycle boulevard 1 with set standards for the connection between Maplewood 1 and Maple Ave. Michele will forward that document electronically. 271-18.3 B. 1 Clarify this language. The half-acre area removed was an imaginary lot line or site envelope calculation around each building. Proposed to now have square footage assigned within the civic building for community center use. The "community open space calculation does not include the following list" on page 4 should be clear that the building footprint is excluded from the calculations. The language related to"site envelope"that was carried over from the first phase was removed and more conventional descriptions for setbacks, coverage and separation between buildings is suggested. A column was added to the building"type"table for the bicycle storage sheds/accessory buildings which are currently under design. 271-185.A Performance standards. The site envelope elimination and addition of Performance standards was explained in detail. How the height is measured was discussed in detail. The tallest proposed building was shown on a slide. Marty asked if slab on grade was the proposal? (yes). He noted height is from the lowest point of measurement and up, not an average. The mechanicals on the top will need to be addressed, measuring to the top of the elevator shaft was also mentioned. Marty suggested not to exceed height from the lowest point to the highest point including the elevator shaft. Each building could have height not to exceed number spelled out independently, due to the different stories/height proposed. Parapets are proposed to obscure the view of the mechanicals (not included in the height calculation); however, will need to be visualized from different vantage points. The right of way was explained (in this case the property line is the centerline of Maple Avenue) and the front, rear, and side yards. Ground coverage will need to be defined or changed to Building Area which already has a definition. Change NYS Fire Code Reference to NYS Uniform Code. The facade will be broken up, an indent will articulate the 2' offset on the street facing wall and a more dimensional illustration was shown for clarity that was not rendered as clearly at the past presentation. Further articulation and how it would affect the floor plan and budget was briefly noted. The length of the street-facing wall without the required offset can be reduced from <175' to <100'. 271-18.5 E. Parking. Rich wants assurance that there are enough EV charging stations available to all onsite residents and not based on the residents who have paid extra(via a paid permit unbundled from rental charges) for priced parking at a particular space with a charger. The language indicates> 5% of off-street parking spaces will be provided with EV charging stations at project opening with another 20%having the provisions to have future stations added as needed. On-street parking and off-street parking differences were discussed, designated trail access parking was mentioned as being requested by the town. Interior spaces being for rent/assigned or available to all residents was discussed as something further for Greystar to weigh in on. The intent was initially that they are for rent and assigned/not for anyone to use, other than a couple visitor spaces and the Town requested spaces designated for trail access parking. 2 During the Sketch presentation, the Planning Board asked for the new buildings proposed in Phase 2 to be put into context with the existing Phase 1 for visualization, that rendering will be provided to the Planning Committee as well. Staff was comfortable with the progress so far with the proposed PDZ language and C.J. noted the site visit scheduled for Wednesday,August 21st from 1:30-3:00. 6. West Hill (Conifer) Traditional Neighborhood Development Early concept review proposal presentation and introduction of New Neighborhood Code rezoning request. Kevin Day of Conifer began with an introduction to the Conifer company and their existing developments in the town and goals to provide a mixed-use village/full traditional neighborhood development of up to 400 housing units on an approximately 50 acres site on West Hill off Mecklenburg Road. The project proposed a compact mixed-us neighborhood that is pedestrian friendly, and human-scale designed while offering mixed income housing options with transportation connection networks, green space and access to adjacent town parkland. Mary Martin of Whitham Planning, lead project designer, presented an overview and memo regarding the proposed Conifer West Hill TND early concept review. The submission included a project narrative, charrette structure, public outreach letter, Charette Boards including concept plans, draft municipal approvals schedule, and public outreach mailing list. The proposal includes twenty-five (25) one-to two-story single-family homes; thirty-five (35) two-to three-story townhomes, fifteen (15) three-story small apartment buildings, and two(2) large (four-story) buildings would make up the neighborhood and the small-scale commercial space(s)would be the street level of the two large apartment buildings. Essential services like caf6, deli, hair salon, etc. for the commercial space. The first design charrette is scheduled for Wednesday, August 28th from 5-7 pm with the stakeholders to inform and get feedback on the concepts. The second design charrette is tentatively scheduled for September 26th to confirm the feedback previously received and get additional feedback to inform design development for the formal Regulating plan application. The project timeline is conceptual review this month,Nov 2024 for the Regulating plan, January 2025 for re-zoning, June 2025 for subdivision and Spring 2026 construction kick off. Project completion is anticipated in the Fall of 2028. The team indicated that the funding is anticipated through tax credits and the single-family homes would likely be the first phase with the variable funding sources. Town Engineering initial comments were that the water system can support the additional development, the sewer is the initial concern. The road network and dedication of the infrastructure will need to be looked at closely. Road access was discussed, secondary ingress/egress via Oakwood Lane in addition to Mecklenburg Rd. is a possibility of using an 3 existing fire access road. Rich asked for the building heights to be accurately projected and noted the timeline for rezoning seems to be ambitious. The charette materials did not need formal approval or acceptance by the Planning Committee, staff will review for compliance with the New Neighborhood Code. The information for the first design charrette will be on the Town website for information and town staff and board members who attend will not be there for formal active involvement, participation or presentations, only viewing as guests. Follow-up with the Planning Committee after each respective charrette is anticipated. 7. Staff updates and reports. C.J. updated on the following: The Town is working closely with Tompkins County Planning & Sustainability to better understand NYSDEC's work with Cornell Institute for Resource Information Sciences in the transition from the current regulatory maps to the new informational maps relative to the major NYSDEC Wetlands updates mentioned at the previous meeting which will reduce the threshold size from 12.4 to 7.4 and being in new wetlands under State jurisdiction. Wetlands of Local Importance is a new classification. Dave noted that it won't have to be mapped, the current DEC regulations indicate it is only a State jurisdictional wetland if it is mapped. It will create more work for town staff to determine when they are referred to DEC under the new regulations. January 2025 will begin the implementation of the new regulations. Conifer West Hill TND Design Charrette date noted, shared townwide in newsletter, and also Ithaca Voice article which will get the information out to the public. Possibly there is a local listsery that could be used for the West Hill neighborhood also. South Hill TND continues to be in conversation, no changes or progress has been made. 8. Next meeting date and upcoming agenda items: Monday September 16, 2024, 3:00 p.m. The Town of Ithaca Planning Committee meeting concluded at 4:20 p.m. 4